CN101941024A - Method for eliminating peeling of IF steel edge in hot continuous rolling process - Google Patents

Method for eliminating peeling of IF steel edge in hot continuous rolling process Download PDF

Info

Publication number
CN101941024A
CN101941024A CN 201010237117 CN201010237117A CN101941024A CN 101941024 A CN101941024 A CN 101941024A CN 201010237117 CN201010237117 CN 201010237117 CN 201010237117 A CN201010237117 A CN 201010237117A CN 101941024 A CN101941024 A CN 101941024A
Authority
CN
China
Prior art keywords
temperature
steel
rolling
sample
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010237117
Other languages
Chinese (zh)
Other versions
CN101941024B (en
Inventor
魏建全
李明
武军宽
李彬
王伦
胡志远
关建东
刘风刚
刘兰霄
徐海卫
余威
安冬洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QIAN'AN IRON AND STEEL COMPANY OF SHOUGANG Corp.
Original Assignee
Shougang Corp
Hebei Shougang Qianan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shougang Corp, Hebei Shougang Qianan Iron and Steel Co Ltd filed Critical Shougang Corp
Priority to CN2010102371173A priority Critical patent/CN101941024B/en
Publication of CN101941024A publication Critical patent/CN101941024A/en
Application granted granted Critical
Publication of CN101941024B publication Critical patent/CN101941024B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The invention provides a method for eliminating peeling of IF steel edge in a hot continuous rolling process, belonging to the technical field of steel rolling. The technical process comprises the following steps: detecting the phase change temperature of IF steel in the hot rolling process by adopting a physical simulation method; properly increasing the temperature of a tapping side of the furnace by a heating furnace by adopting micro positive pressure control to ensure that the transverse temperature difference of a plate blank is controlled to be not higher than 20 DEG C; regulating time sequence of rolling and descaling to avoid temperature of the strip edge from falling into a coexistence region; using an upstream spray pattern to replace side jet for cleaning descaling water of rough rolling and fine rolling to prevent the strip edge from water washing; and taking the temperature of the fine rolling inlet as a control target, which is controlled to be between 1,030 and 1,060 DEG C. The invention has the advantages of simple method and high efficiency. By using the method, the defect of edge peeling of the IF steel can be easily solved under a condition of not influencing the production situation and the performance of the IF steel.

Description

A kind ofly eliminate the method that skin is stuck up in IF steel limit portion in the hot continuous rolling process
Technical field
The invention belongs to technical field of steel rolling, particularly relate to a kind of method that skin is stuck up in IF steel limit portion in the hot continuous rolling process of eliminating, be applicable to that eliminating the hot rolling IF steel wire that strip edge portion cracking produces in the operation of rolling sticks up skin.
Background technology
The IF steel is as a kind of deep-draw steel of excellence, and the user generally is applied in automobile with it, and household electrical appliances etc. need high mouldability field, and the user is also more and more higher to its surface requirements.It is a kind of very common and influence a kind of very serious defective of its surface quality that the wire that strip edge portion occurs after the hot rolling is stuck up skin, this defective has very strong heredity, if will have the strip of this defective continues cold rolling, then can cause the cold rolled sheet surface spot to occur, broken belt also can take place in serious, and these stick up the wiping scuffing that Pi Haihui causes cold rolling touch roll.The measure of generally taking at present is skin excision back to be stuck up in hot-strip limit portion use, and adopts this method can cause great waste, has influence on band steel lumber recovery, but also can have influence on production efficiency.
Application (patent) number: thus in 200720067413.7 by making the slab corner angle be fillet the mold shape transformation, avoided the too fast cooling of corner part to eliminate and stuck up skin.This method is stuck up the skin improvement for limit portion and is truly had benefit, but need carry out big scrap build, and the most at present crystallizer of China Steel enterprise does not adopt this transformation.By to the microscopic appearance of this defective and researching and analysing of formation mechanism, find that it is to fall into the coexistence region because this place's temperature is low that the skin defective is stuck up in IF steel limit portion, due in distortion, ftractureing.This patent is intended to by adopting some little changes of some technology adjustment and control and equipment to solve this defective cost-effectively in the hot rolling stage, and this method also can not have influence on the performance of IF steel others.
Some enterprise also attempts guaranteeing that by the tapping temperature and the rolling temperature of integral body raising IF steel limit portion does not go out to stick up skin, but this method can have influence on strip surface quality, and temperature improved how much to spend the also notion of the concrete amount of neither one, the present invention accurately measures IF steel phase transition temperature in the operation of rolling by physical analogy in conjunction with production reality, and, be difficult for taking place thereby make limit portion stick up skin with the control parameter of this temperature as band steel minimum temperature in distortion.
Setting at the finish rolling inlet temperature, most literature and producer only with the roughing outlet temperature as a technology controlling and process point, but think that the finish rolling inlet temperature can not influence limit portion and stick up skin, analyze after deliberation and experimental verification, the high-pressure water descaling that the band steel goes out to advance after the roughing before the finish rolling is very big to the influence of finish rolling inlet temperature, if this temperature is not controlled, limit portion also can take place and stick up the skin defective in the band steel in the finish rolling interval.
Summary of the invention
The object of the present invention is to provide a kind of method that skin is stuck up in IF steel limit portion in the hot continuous rolling process of eliminating, adjustment by technology in course of hot rolling and equipment is simple to be transformed and eliminates IF steel limit portion and stick up this method of skin with physical analogy and actual the combining of production, method is simple, applicability is strong, and effect is remarkable.
Produced on-site flow process of the present invention comprises that continuous casting steel billet heating → thick de-scaling → Fixed width forcing press → roughing → coiled sheet case → flying shear crop end → smart de-scaling → finish rolling (6 frames or 7 frame four-high mills) → laminar flow cools off → coil into coil of strip, the following parameter of control in the technology:
(1) slab adopts pressure-fired 15~30Pa when heating furnace heats, and prevents the burner air draught, improves the tapping side temperature in bringing-up section, and tapping temperature is controlled at 1250~1300 ℃, and the slab transverse temperature difference is controlled within 20 ℃;
(2) adopt contrary spray to sweep water after each passage de-scaling of roughing and replace the side spray to sweep water, prevent that strip edge portion is subjected to washing away of water, contrary water spray pressure is controlled at 0.1~0.5MPa;
(3) roughing outlet temperature is controlled at 1040~1080 ℃, and the finish rolling inlet temperature is controlled at 1030~1070 ℃.
(4) to adopt the coiled sheet case for the band steel of finished product thickness below 3.5mm,, avoid being with steel afterbody temperature to drop into the coexistence region with homogeneous band steel toe tail temperature.
It is described that to avoid dropping into the coexistence region with steel afterbody temperature be that the step of utilizing Gleeble-1500 thermal simulation machine to measure the phase transition temperature of IF steel is:
(1) take a sample on strand, be processed into sample as shown in Figure 1, the thermocouple of burn-oning on sample puts behind the quartz ampoule fixingly in the operating room, vacuumizes, and carries out argon shield (argon stream amount 1L/min);
(2) on the thermal simulation machine sample is being heated to a certain temperature between 1250~1350 ℃ with 5~20 ℃/s, insulation 3~5min, with a certain cooling rate between 1~10 ℃/s sample is chilled to 1000~1100 ℃ of a certain temperature then, carries out 20~60% distortion, rate of deformation is 0.5~10s -1After the distortion sample is cooled to a certain temperature between 850~950 ℃ with a certain cooling rate between 1~10 ℃/s, distortion once more, engineering strain is 20~50%, rate of deformation is 1~10s -1Respectively with cooling velocity cool to room temperature different between 0.5~80 ℃/s, finish physical simulation experiment at last.
(3) will test after the compression sample along perpendicular to flatten cylinder axis to mid-sectional, through grind away, polishing, adopt 4% nital etch, under light microscope, carry out structure observation.
(4) temperature-strain that the thermal simulation machine is noted, and temperature-time curve also calculates the phase transition temperature of this steel grade under different temperatures in conjunction with (3) observed situation of organizing.
(5) with the phase transition temperature peak under different cooling speed of this steel grade control point as band steel minimum temperature in distortion.
Description of drawings
Fig. 1 is a thermal simulation experiment sample manuscript.
The process route of Fig. 2 thermal simulation experiment.
Concrete embodiment
Utilize involved in the present invention to method and control device move on the steel 2250mm hot continuous rolling production line at Shoudu Iron and Steel Co and carried out M3A33, M3A20, these three kinds of IF steel of M3A22 rolling, rolling specs is 3.0 * 1375mm and 4.0 * 1375mm.Wherein thickness is that 3.0mm uses the coiled sheet case, and thickness is that 4.0mm does not use the coiled sheet case.
This three class IF steel has representative preferably, because M3A33 is the Ti-IF steel, M3A20 is the Nb-IF steel, and M3A22 is the Ti+Nb-IF steel.
Through physical analogy, the highest phase transition temperature of M3A33 is 885 ℃; The highest phase transition temperature of M3A20 is 900 ℃, and the highest phase transition temperature of M3A25 is 892 ℃, so be set as follows process system.
Table 1 main points of processes control, ℃
Figure BSA00000207117400031
1. heating furnace adopts the 1.05MPa pressure-fired, when heating furnace is come out of the stove, utilizes temperature-measuring gun to measure slab both sides temperature all within above-mentioned scope, and temperature difference be controlled at ± 15 ℃ within;
2. the 1+5 pattern is adopted in roughing, and R1 rolls 1 passage, and R2 is reversible to roll 5 passages, and the de-scaling of R1 employing inlet, and R2 adopts 1,3,5 passage de-scalings, all adopts the contrary cleaning of spraying for de-scaling water;
3. the whole participation process controls of roughing outlet temperature and finish rolling inlet temperature, and all within target zone.
All under parsytec, observe surface topography for the every volume of these test volumes, find no limit portion and stick up the skin existence, check after the uncoiling that the coiled sheet quality is good.

Claims (2)

1. eliminate the method that skin is stuck up in IF steel limit portion in the hot continuous rolling process for one kind, production procedure is: continuous casting steel billet heating → thick de-scaling → Fixed width forcing press → roughing → flying shear crop end → coiled sheet case → smart de-scaling → finish rolling → laminar flow cools off → coils into coil of strip; It is characterized in that the following parameter of control in the technology:
(1) slab adopts pressure-fired 15~30Pa when heating furnace heats, and prevents the burner air draught, improves the tapping side temperature in bringing-up section, and tapping temperature is controlled at 1250~1300 ℃, and the slab transverse temperature difference is controlled within 20 ℃;
(2) adopt contrary spray to sweep water after each passage de-scaling of roughing and replace the side spray to sweep water, prevent that strip edge portion is subjected to washing away of water, contrary water spray pressure is controlled at 0.1~0.5MPa;
(3) roughing outlet temperature is controlled at 1040~1080 ℃, and the finish rolling inlet temperature is controlled at 1030~1070 ℃.
(4) to adopt the coiled sheet case for the band steel of finished product thickness below 3.5mm,, avoid being with steel afterbody temperature to drop into the coexistence region with homogeneous band steel toe tail temperature.
2. method according to claim 1 is characterized in that, described to avoid dropping into the coexistence region with steel afterbody temperature be that the phase transition temperature step of utilizing Gleeble-1500 thermal simulation machine to measure the IF steel is:
(1) take a sample on strand, be processed into sample, the thermocouple of burn-oning on sample puts behind the quartz ampoule fixingly in the operating room, vacuumizes, and carries out argon shield, argon stream amount 1L/min;
(2) on the thermal simulation machine sample is being heated to a certain temperature between 1250~1350 ℃ with 5~20 ℃/s, insulation 3~5min, with a certain cooling rate between 1~10 ℃/s sample is chilled to 1000~1100 ℃ of a certain temperature then, carries out 20~60% distortion, rate of deformation is 0.5~10s -1After the distortion sample is cooled to a certain temperature between 850~950 ℃ with a certain cooling rate between 1~10 ℃/s, distortion once more, engineering strain is 20~50%, rate of deformation is 1~10s -1Respectively with cooling velocity cool to room temperature different between 0.5~80 ℃/s, finish physical simulation experiment at last;
(3) will test after the compression sample along perpendicular to flatten cylinder axis to mid-sectional, through grind away, polishing, adopt 4% nital etch, under light microscope, carry out structure observation;
(4) temperature one strain of the thermal simulation machine being noted, and the metallographic situation that temperature-time curve integrating step (3) is observed calculates the phase transition temperature of this steel grade under different temperatures;
(5) with the phase transition temperature peak under different cooling speed of this steel grade control point as band steel minimum temperature in distortion.
CN2010102371173A 2010-07-22 2010-07-22 Method for eliminating peeling of IF steel edge in hot continuous rolling process Active CN101941024B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102371173A CN101941024B (en) 2010-07-22 2010-07-22 Method for eliminating peeling of IF steel edge in hot continuous rolling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102371173A CN101941024B (en) 2010-07-22 2010-07-22 Method for eliminating peeling of IF steel edge in hot continuous rolling process

Publications (2)

Publication Number Publication Date
CN101941024A true CN101941024A (en) 2011-01-12
CN101941024B CN101941024B (en) 2012-06-27

Family

ID=43433338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102371173A Active CN101941024B (en) 2010-07-22 2010-07-22 Method for eliminating peeling of IF steel edge in hot continuous rolling process

Country Status (1)

Country Link
CN (1) CN101941024B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699028A (en) * 2012-02-24 2012-10-03 宝山钢铁股份有限公司 Method for eliminating linear edge defects of hot-rolled low-carbon steel
CN102773267A (en) * 2012-08-03 2012-11-14 河北省首钢迁安钢铁有限责任公司 Control method of tilting in finish rolling of pipe line steel
CN103480656A (en) * 2013-09-17 2014-01-01 首钢总公司 SPHC cold-rolled edge cracking eliminating method
CN104307911A (en) * 2014-08-28 2015-01-28 首钢总公司 Method for improving elongation rate of high-surface-grade IF steel (Interstitial-Free Steel)
CN107552566A (en) * 2017-07-11 2018-01-09 首钢京唐钢铁联合有限责任公司 A kind of production method for controlling ultra-low-carbon steel edge upwarping defect
CN109382493A (en) * 2018-11-28 2019-02-26 攀钢集团攀枝花钢铁研究院有限公司 A method of improving hot rolling acid-cleaning plate peeling defect
CN109772883A (en) * 2019-01-30 2019-05-21 北京首钢股份有限公司 A kind of production method of IF steel
CN110449465A (en) * 2019-07-04 2019-11-15 邯郸钢铁集团有限责任公司 A method of reducing high-hardenability cold rolling high-strength steel cold rolling side brisement band
CN110883090A (en) * 2019-10-31 2020-03-17 邯郸钢铁集团有限责任公司 Method for overcoming acid rolling edge crack defect of cold-rolled high-strength steel above 780MPa level
CN110961467A (en) * 2019-12-24 2020-04-07 攀钢集团西昌钢钒有限公司 Control method for reducing warping defect of double-heat-accumulation type heating furnace
CN111633026A (en) * 2020-05-21 2020-09-08 武汉钢铁有限公司 Control method for reducing linear defects at edge of hot-rolled medium-high carbon alloy steel
CN112453055A (en) * 2020-10-26 2021-03-09 北京首钢股份有限公司 Method for controlling edge quality of interstitial-free IF steel and IF steel
CN112782208A (en) * 2019-11-07 2021-05-11 上海梅山钢铁股份有限公司 Test method for simulating surface oxidation of hot rolled steel plate

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974824A (en) * 2006-12-18 2007-06-06 马鞍山钢铁股份有限公司 Continuous casting and rolling process for producing thin IF billet
EP1870172A1 (en) * 2005-03-28 2007-12-26 Angang Steel Company Limited A continuous casting and rolling method for medium plate
WO2008093396A1 (en) * 2007-01-30 2008-08-07 Toshiba Mitsubishi-Electric Industrial Systems Corporation Temperature control unit of hot rolling machine
JP2008238241A (en) * 2007-03-28 2008-10-09 Kobe Steel Ltd Manufacturing method of aluminum metal sheet
CN101693253A (en) * 2009-11-05 2010-04-14 北京科技大学 Method for rolling high-strength IF steel in ferrite area

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1870172A1 (en) * 2005-03-28 2007-12-26 Angang Steel Company Limited A continuous casting and rolling method for medium plate
CN1974824A (en) * 2006-12-18 2007-06-06 马鞍山钢铁股份有限公司 Continuous casting and rolling process for producing thin IF billet
WO2008093396A1 (en) * 2007-01-30 2008-08-07 Toshiba Mitsubishi-Electric Industrial Systems Corporation Temperature control unit of hot rolling machine
JP2008238241A (en) * 2007-03-28 2008-10-09 Kobe Steel Ltd Manufacturing method of aluminum metal sheet
CN101693253A (en) * 2009-11-05 2010-04-14 北京科技大学 Method for rolling high-strength IF steel in ferrite area

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102699028B (en) * 2012-02-24 2015-03-04 宝山钢铁股份有限公司 Method for eliminating linear edge defects of hot-rolled low-carbon steel
CN102699028A (en) * 2012-02-24 2012-10-03 宝山钢铁股份有限公司 Method for eliminating linear edge defects of hot-rolled low-carbon steel
CN102773267A (en) * 2012-08-03 2012-11-14 河北省首钢迁安钢铁有限责任公司 Control method of tilting in finish rolling of pipe line steel
CN102773267B (en) * 2012-08-03 2014-07-16 北京首钢股份有限公司 Control method of tilting in finish rolling of pipe line steel
CN103480656A (en) * 2013-09-17 2014-01-01 首钢总公司 SPHC cold-rolled edge cracking eliminating method
CN103480656B (en) * 2013-09-17 2016-06-01 首钢总公司 The removing method that SPHC splits on cold rolling limit
CN104307911A (en) * 2014-08-28 2015-01-28 首钢总公司 Method for improving elongation rate of high-surface-grade IF steel (Interstitial-Free Steel)
CN107552566A (en) * 2017-07-11 2018-01-09 首钢京唐钢铁联合有限责任公司 A kind of production method for controlling ultra-low-carbon steel edge upwarping defect
CN107552566B (en) * 2017-07-11 2019-12-03 首钢京唐钢铁联合有限责任公司 A kind of production method controlling ultra-low-carbon steel edge upwarping defect
CN109382493B (en) * 2018-11-28 2021-03-16 攀钢集团攀枝花钢铁研究院有限公司 Method for improving peeling defect of hot-rolled pickled plate
CN109382493A (en) * 2018-11-28 2019-02-26 攀钢集团攀枝花钢铁研究院有限公司 A method of improving hot rolling acid-cleaning plate peeling defect
CN109772883A (en) * 2019-01-30 2019-05-21 北京首钢股份有限公司 A kind of production method of IF steel
CN110449465A (en) * 2019-07-04 2019-11-15 邯郸钢铁集团有限责任公司 A method of reducing high-hardenability cold rolling high-strength steel cold rolling side brisement band
CN110449465B (en) * 2019-07-04 2021-03-09 邯郸钢铁集团有限责任公司 Method for reducing cold-rolled edge fracture zone of high-hardenability cold-rolled high-strength steel
CN110883090A (en) * 2019-10-31 2020-03-17 邯郸钢铁集团有限责任公司 Method for overcoming acid rolling edge crack defect of cold-rolled high-strength steel above 780MPa level
CN110883090B (en) * 2019-10-31 2021-11-05 邯郸钢铁集团有限责任公司 Method for overcoming acid rolling edge crack defect of cold-rolled high-strength steel above 780MPa level
CN112782208A (en) * 2019-11-07 2021-05-11 上海梅山钢铁股份有限公司 Test method for simulating surface oxidation of hot rolled steel plate
CN112782208B (en) * 2019-11-07 2022-06-14 上海梅山钢铁股份有限公司 Test method for simulating surface oxidation of hot rolled steel plate
CN110961467A (en) * 2019-12-24 2020-04-07 攀钢集团西昌钢钒有限公司 Control method for reducing warping defect of double-heat-accumulation type heating furnace
CN111633026A (en) * 2020-05-21 2020-09-08 武汉钢铁有限公司 Control method for reducing linear defects at edge of hot-rolled medium-high carbon alloy steel
CN112453055A (en) * 2020-10-26 2021-03-09 北京首钢股份有限公司 Method for controlling edge quality of interstitial-free IF steel and IF steel

Also Published As

Publication number Publication date
CN101941024B (en) 2012-06-27

Similar Documents

Publication Publication Date Title
CN101941024B (en) Method for eliminating peeling of IF steel edge in hot continuous rolling process
CN102699028B (en) Method for eliminating linear edge defects of hot-rolled low-carbon steel
CN109465295B (en) Method for preventing edge cracking and strip breakage of hot continuous rolled steel plate in cold rolling
CN102387874B (en) Method and device for preparing hot-rolling stock
CN103484643B (en) Method for preventing hot rolling edge fractures in oriented silicon steel
CN103752610B (en) A kind of 2250 hot continuous rolling process improving automobile exterior panel steel surface quality
CN103547689B (en) For preparing the method and apparatus of steel rolled piece before hot rolling
CA2623984A1 (en) Method and device for producing a metal strip by continuous casting and rolling
CN102319734B (en) Method for effectively controlling small pockmark defects on surface of medium plate
WO2009076890A1 (en) Methode for producing wide flat steel by thin slab continuous casting and rolling and the system thereof
CN102601129B (en) Controlling method for scales on surface of low-carbon cold heading steel hot-rolled wire rods
TWI381894B (en) Method and casting-rolling plant for the manufacture of hot-rolled metal strip-more preferably steel material strip with high surface quality
CN101107085B (en) Method for continuous casting and rolling with an increased casting rate and subsequent hot-rolling of relatively thin metal strands, especially steel strands, and continuous casting and rolling devic
CN104911321A (en) Extra-thick steel plate production process of plastic dies steel
RU2015151581A (en) METHOD FOR PRODUCING A METAL STRIP
CN103817155B (en) Thickness is greater than 50mm steel plate board-shape control method
JP2018520876A (en) Continuous casting and rolling apparatus and continuous casting and rolling method
CN201157843Y (en) System for producing wide strip by thin slab casting and rolling
CN104233136A (en) Production process for obtaining copper alloy strip with uniform and small grains
CN107354377B (en) A kind of high magnetic strength hot-rolled orientation silicon steel steel plate and its production technology
CN207386158U (en) A set of thin roll bending production equipment of magnesium alloy wide-width
CN104190722B (en) A kind of control method of SPHC hot-strip head scale defect
CN103111822B (en) Moderate thickness plate production process
CN104998917A (en) Method for removing streak defects on hot rolled steel plate surface
CN108495723B (en) The manufacturing method of the manufacturing equipment column and hot rolled strip of hot rolled strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING SHOUGANG CO., LTD.

Free format text: FORMER OWNER: HEBEI SHOUGANG QIAN'AN STEEL CO., LTD.

Effective date: 20140404

Free format text: FORMER OWNER: CAPITAL IRON + STEEL GENERAL CO.

Effective date: 20140404

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 064404 TANGSHAN, HEBEI PROVINCE TO: 100041 SHIJINGSHAN, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20140404

Address after: 100041 Shijingshan Road, Beijing, No. 68, No.

Patentee after: Beijing Shougang Co., Ltd.

Address before: Yangzidian Town, Qian'an City, Hebei province 064404

Patentee before: Hebei Shougang Qian'an Steel Co., Ltd.

Patentee before: Capital Iron & Steel General Company

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210518

Address after: 025 Zhao'an street, Qian'an Economic Development Zone, Tangshan City, Hebei Province 064400

Patentee after: QIAN'AN IRON AND STEEL COMPANY OF SHOUGANG Corp.

Address before: 100041 Shijingshan Road, Beijing, Shijingshan District