CN101936075A - Blasting method for dismantling frame structure building in situ - Google Patents

Blasting method for dismantling frame structure building in situ Download PDF

Info

Publication number
CN101936075A
CN101936075A CN2010102597589A CN201010259758A CN101936075A CN 101936075 A CN101936075 A CN 101936075A CN 2010102597589 A CN2010102597589 A CN 2010102597589A CN 201010259758 A CN201010259758 A CN 201010259758A CN 101936075 A CN101936075 A CN 101936075A
Authority
CN
China
Prior art keywords
building
blasting method
column
floor
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010102597589A
Other languages
Chinese (zh)
Inventor
孟祥栋
王俊如
黄钢其
杨永刚
陈代耘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Urban Construction Holdings Group Co Ltd
Original Assignee
Chongqing Urban Construction Holdings Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Urban Construction Holdings Group Co Ltd filed Critical Chongqing Urban Construction Holdings Group Co Ltd
Priority to CN2010102597589A priority Critical patent/CN101936075A/en
Publication of CN101936075A publication Critical patent/CN101936075A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention relates to a blasting method adopted in a process for demolishing a building, in particular to a blasting method for dismantling a frame structure building in situ. The method comprises the following steps of: 1, placing explosive on all upright posts of a to-be-blasted floor; and 2, detonating the explosive from top to bottom layer by layer to blow down the upright posts. The blasting method for dismantling the frame structure building in situ using the technical scheme of the invention has the advantages of safe and controllable disassembling process and small vibration and impact effect.

Description

The blasting method of original place disintegration frame construction building
Technical field
The present invention relates to a kind of blasting method, be specifically related to a kind of blasting method of original place disintegration building adopting in the building enforcement demolishing process.
Background technology
In recent years, along with the generally raising of fast development of national economy and living standards of the people, the upsurge that has all started reconstruction of the old city town in all parts of the country.Because demolition blasting is low than traditional artificial dismounting mode cost, efficient is high, old building is generally all adopted the mode of demolition blasting.
Many buildings are limited because of peripheral place, and common demolition blasting usually causes the destruction of surrounding buildings thing easily.Therefore for fear of building collapsing compression failure facility on every side, the blasting methods of adopting for the original place disintegration more, concrete technology is that whole load-bearing pillars is begun the enough height of explosion from the bottom, the binding site of column top and beam is cloth hole explosion simultaneously, building is under the self gravitation effect, impact ground and disintegrate in the original place, as shown in Figure 3, structure demolition point 33 in junction that column bottom and column top and beam are propped up in load-bearing:
Though adopt this kind blasting method can reach the purpose of disintegrating and build in the original place to a certain extent, still be faced with some following problems:
1, when the floor of brick structure building is integrated poured concrete, adopt this kind blasting method, be very easy to occur such situation, though the building bottom is gone up, to sit under the reinforced concrete structure integral body on it and do not cave in, some cracks appear, cause building to become the dangerous building of n-1 layer by the n layer, follow-up dismounting work will become abnormally dangerous and difficult.
2, this blasting method, mainly be by building under the self gravitation effect, impact ground and disintegrate.Upper building with the impact ground of integral body, produces bigger earth shock effect and bigger impact force after the bottom support post is destroyed, bigger vibrations and shock effect may endanger the safety of the peripheral construction of structures in quick-fried district.
3, as structures such as basements, adopt this blasting method, building may take place topple over.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of demolishing process safety, controlled, the blasting method of the original place disintegration frame construction building that vibrations and shock effect are little.
In order to solve the problems of the technologies described above, the invention provides a kind of blasting method of original place disintegration frame construction building, include following steps:
1) treating to settle explosive on all columns of explosion floor;
2) ignition charge successively from top to bottom, the demolition column.
As preferred version, consider that non bearing structures such as body of wall between the building column, stair may be clipped in after the column explosion between the floor of two floors, stress equalization when floor is stacked, avoid the brick slag to destroy flooring, and this destruction handed on, before settling explosive,, and clean out earlier with whole pre-demolitions of non bearing structure such as the body of wall between the building column, stair.
As preferred version, the floor of considering the blasting process upper strata can be to the roof and the column of one deck produce shock loading down, for avoiding the issuable shock loading stack of continuous demolition, when igniting the column of n-1 layer, it is also static to wait for that the above structure of n layer folded the top floor of falling the n-1 layer.
Adopt the blasting method of the original place disintegration frame construction building of the technical program to have following characteristics: 1, because the method for the top-down column of explosion is successively adopted in explosion, floor and beam be stack successively from top to down, floor constantly reduces and descends, until all floors ground bottom that is added to, the situation that building does not collapse can not appear in the process safety of explosion, controlled; 2, because the method for the top-down column of explosion is successively adopted in explosion, building single destructiveness is little, and the earth shock effect and the impact force of generation are less, can avoid the destruction to surrounding building preferably; 3, because the method for the top-down column of explosion is successively adopted in explosion, the building bottom support is not carried out direct explosion, for the isostructural building of basement is arranged, blasting process can avoid building to topple over.
Description of drawings
Fig. 1 is the blow-up point position view of the original place disintegration frame construction building blasting method of the embodiment of the invention;
Fig. 2 is the schematic diagram after the original place disintegration frame construction building blasting method explosion of the embodiment of the invention;
Fig. 3 is original original place disintegration frame construction blow-up point position view.
The specific embodiment
Below in conjunction with drawings and Examples technical solution of the present invention is further specified:
The invention provides a kind of blasting method of original place disintegration frame construction building, specifically comprise following step:
1), and cleans out with whole pre-demolitions of non bearing structure such as the body of wall between the building column, stair.
2) on all columns of building, settle explosive and detonator igniter.
3) successively ignite explosive on the column from top to bottom, with the demolition upright supports.Control the detonator time delay of each layer during this time, treat the upper strata floor stack lower floor's floor and static after explosion lower floor column again.
As depicted in figs. 1 and 2, treat demolition of buildings underground 2 floor of 6 floor on the ground, be reinforced concrete frame structure for one of Chongqing commercial centre.Because building surrounding enviroment complexity, and this building has the important structure thing for underground 2 layers, need be protected.Therefore can only take the mode of original place disintegration demolition blasting.
Be the stable of protection basement structure, determine that explosion highly on the ground 2~6 layers, keeps the support of 1 layer of structure as superstructure, and the impact force when cushioning the superstructure slump.Main operational sequence is as follows:
1) with 11 bodies of wall of 2~6 layers of all column, stair, the whole pre-demolitions of non bearing structure, and complete liquidation is clean.
2) on 2~6 layers of all column 11 of building, settle explosive and detonator igniter.
3) during explosion, the quick-fried column 11 that removes the 6th layer of elder generation, make the 6th layer floor 12 smooth-going overlaying on the 5th layer of top floor 11, its weight is by the 5th layer of top floor and column carrying, treat this stack the action finish static after, begin the explosion of one deck column 11 down, with top floor 12 of one deck under reducing and the shock loading that column 11 bears.Mode like this, the column 11 not explosions of 11,1 layers on the column of 6~2 layers of demolition blastings are successively born the quick-fried back weight on 5 layers on top with 1 layer top floor 12 and column 11, are not destroyed to guarantee underground 2 layers.
4) after the explosion, each floor plate and 1 layer of column adopt mechanical system to handle and get final product.
Above-described only is preferred implementation of the present invention; should be understood that; for a person skilled in the art; under the prerequisite that does not break away from blasting method of the present invention; can also make and somely not need to carry out creative work with regard to achievable improvement; these also should be considered as protection scope of the present invention, and these can not influence effect of the invention process and practical applicability.

Claims (3)

1. the blasting method of an original place disintegration frame construction building is characterized in that, includes following steps:
1) treating to settle explosive on all columns of explosion floor;
2) ignition charge successively from top to bottom, the demolition column.
2. the blasting method of disintegration frame construction building in original place according to claim 1 is characterized in that: before settling explosive, earlier with whole pre-demolitions of non bearing structure such as the body of wall between the building column, stair, and clean out.
3. the blasting method of disintegration frame construction building in original place according to claim 1 is characterized in that: go up following ignition charge successively certainly, when igniting the column of n-1 layer, it is also static to wait for that the above structure of n layer folded the top floor of falling the n-1 layer.
CN2010102597589A 2010-08-23 2010-08-23 Blasting method for dismantling frame structure building in situ Pending CN101936075A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102597589A CN101936075A (en) 2010-08-23 2010-08-23 Blasting method for dismantling frame structure building in situ

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102597589A CN101936075A (en) 2010-08-23 2010-08-23 Blasting method for dismantling frame structure building in situ

Publications (1)

Publication Number Publication Date
CN101936075A true CN101936075A (en) 2011-01-05

Family

ID=43389626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102597589A Pending CN101936075A (en) 2010-08-23 2010-08-23 Blasting method for dismantling frame structure building in situ

Country Status (1)

Country Link
CN (1) CN101936075A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153597A (en) * 2014-07-18 2014-11-19 张振堂 Low-rise building demolishing method
CN105973084A (en) * 2016-07-27 2016-09-28 宏大矿业有限公司 Blasting hole stemming method for thin-wall concrete structure
CN114754641A (en) * 2022-04-21 2022-07-15 武汉***有限公司 Directional dumping recoil control method for blasting demolition of large-span frame structure building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020013618A (en) * 2000-08-11 2002-02-21 윤영석 Method of Explosive Demolition on the Buildings by use of Explosives
CN101122179A (en) * 2006-08-09 2008-02-13 上海复旦***建设工程有限公司 Frame storied building blasting method
CN101314990A (en) * 2008-07-03 2008-12-03 武汉***公司 Method for dynamiting buildings
CN101660890A (en) * 2008-08-27 2010-03-03 鞍钢集团矿业公司 Method for demolishing surface mine underground reinforced concrete constructional work by blasting

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020013618A (en) * 2000-08-11 2002-02-21 윤영석 Method of Explosive Demolition on the Buildings by use of Explosives
CN101122179A (en) * 2006-08-09 2008-02-13 上海复旦***建设工程有限公司 Frame storied building blasting method
CN101314990A (en) * 2008-07-03 2008-12-03 武汉***公司 Method for dynamiting buildings
CN101660890A (en) * 2008-08-27 2010-03-03 鞍钢集团矿业公司 Method for demolishing surface mine underground reinforced concrete constructional work by blasting

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
《中国铁道科学》 20040229 张翠兵;邓志勇;张志毅;刘慧 《钢筋混凝土框架楼群定向***拆除》 110-114 , 第1期 2 *
《工程***》 20050930 朱铎 《高耸建筑物***实践与分析》 23-27 , 第3期 2 *
《工程***实用技术》 20050831 张应立 《高层楼房拆除***》 冶金工业出版社 211-212 , 1 *
《煤炭工程》 20100430 白云龙 《稳定框架结构楼房的控制***拆除》 34-36 , 第4期 2 *
《***》 20080630 赵红宇;王守祥;刘云剑;解增林 《高层框架剪力墙结构楼房的控制***拆除》 53-56 , 第2期 2 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153597A (en) * 2014-07-18 2014-11-19 张振堂 Low-rise building demolishing method
CN104153597B (en) * 2014-07-18 2016-08-24 张振堂 A kind of low floor building demolition method
CN105973084A (en) * 2016-07-27 2016-09-28 宏大矿业有限公司 Blasting hole stemming method for thin-wall concrete structure
CN105973084B (en) * 2016-07-27 2018-01-30 宏大矿业有限公司 A kind of thin wall concrete structure blasting hole obstruction method
CN114754641A (en) * 2022-04-21 2022-07-15 武汉***有限公司 Directional dumping recoil control method for blasting demolition of large-span frame structure building

Similar Documents

Publication Publication Date Title
JP4461434B2 (en) Demolition curing unit and demolition method of high-rise building using it
JP4201633B2 (en) Blasting and dismantling method of reinforced concrete structure
CN101314990A (en) Method for dynamiting buildings
CN102003921B (en) Balance blasting method
CN101936075A (en) Blasting method for dismantling frame structure building in situ
Melkumyan et al. Retrofitting by base isolation of existing buildings in Armenia and in Romania and comparative analysis of innovative vs. conventional retrofitting
Loizeaux et al. Progressive collapse—an implosion contractor’s stock in trade
Blondet et al. Earthquake resistant earthen buildings
CN105297954B (en) Steel framed building wall and its construction method with damping node
Chouw Low-damage design philosophy for future earthquake-resistant structures
CN104452775B (en) Pre-loaded support struts and construction method for foundation ditch
CN110685459A (en) Breaking hammer dismantling construction method for dismantling hoist bent from lower part
Nassir et al. Progressive Collapse Analysis of multi-story building under the scenario of multi-column removal
CN101956467B (en) Blasting method for disintegrating frame building in situ with low impact
KR100680032B1 (en) Method of Explosive Demolition on the Buildings by use of Explosives
Cutolo et al. Nonlinear FE analysis of a masonry spiral staircase in Nisida: a refined numerical case study
Lester et al. Christchurch cathedral of the blessed sacrament: Lessons learnt on the stabilisation of a significant Heritage Building
Melkumyan Base and roof isolation for earthquake retrofitting and protection of existing buildings in Armenia
CN204282371U (en) A kind of pre-loaded support struts for foundation ditch
CN113154978A (en) Frame cylinder high-rise building blasting demolition method
Sheng Design of a Five-story Brick-concrete Structure Building Demolition Scheme by Folding Blasting
Jayasinghe et al. Blast induced ground shock effects on pile foundations
CN103148749A (en) Symmetrical double-rotation blasting method
JP2006022557A (en) Base isolating technique for existing building
CN108613602A (en) A kind of blasting demolishing method of Structure in Complex Structure prestressed girder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110105