CN1019325B - Hydraulic energy storage petroleum workover rig or well drilling machine - Google Patents

Hydraulic energy storage petroleum workover rig or well drilling machine

Info

Publication number
CN1019325B
CN1019325B CN 91106336 CN91106336A CN1019325B CN 1019325 B CN1019325 B CN 1019325B CN 91106336 CN91106336 CN 91106336 CN 91106336 A CN91106336 A CN 91106336A CN 1019325 B CN1019325 B CN 1019325B
Authority
CN
China
Prior art keywords
hydraulic
workover rig
fuselage
trepan
energy accumulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
CN 91106336
Other languages
Chinese (zh)
Other versions
CN1057088A (en
Inventor
顾心怿
王运安
潘伟
栾桂花
孙东昌
刘志安
邴如吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Drilling Technology Research Institute Of Shengli Petroleum Administration
Original Assignee
Drilling Technology Research Institute Of Shengli Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute Of Shengli Petroleum Administration filed Critical Drilling Technology Research Institute Of Shengli Petroleum Administration
Priority to CN 91106336 priority Critical patent/CN1019325B/en
Publication of CN1057088A publication Critical patent/CN1057088A/en
Publication of CN1019325B publication Critical patent/CN1019325B/en
Expired legal-status Critical Current

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a hydraulic energy storage petroleum workover rig or drilling rig. The machine is composed of hydraulic station, hydraulic energy storage device, detection control device, lifting cylinder group and rope suspension system, when the drill is being pulled out, the small-power machine can continuously do work, and the energy storage device can store energy to lift the pipe column, so that the installation power of the invention is only 1/4 of conventional machine under the condition of no reduction of load and speed, when the drill is being pulled out, the energy storage device can absorb the potential energy of the pipe column, and the operation without starting up can be realized, so that the energy can be greatly saved.
The invention adopts the lifting hydraulic oil cylinder group to lift and lower the pipe column without a derrick, a winch, a traveling block and the like.

Description

Hydraulic oil well repairing machine with energy storage
The invention belongs to a kind of petroleum well servicing rig or trepan.
At present countries in the world workover rig, trepan are all similar, the Hoisting System of being made up of derrick, overhead traveling crane, travelling block, hook, winch mostly, the transmission system of dynamic machine, gearbox, transmission device composition
To trip out and be lowered to be the process that repeats again and again for oil pipe and drilling rod in the process that makes a trip of well workover, drilling well.Aboveground in a bite, number is tripped out and is lowered in the oil pipe or the drilling rod (tens of tons that often weigh, hundreds of ton) of km.See almost there is not work done on the macroscopic view.Yet in fact consume fuel is a lot, because trip out in the process of a pipe when pulling out of hole, though the time of pure lifting tubing string only accounts for about 1/4 of whole process, all the other times are auxiliary operations, but when hoisting tubing string, require in the short time, to make very big merit, require installed power very big, and in overhead time, also to consume a part of fuel though powerful engine is no-load running.Even during following brill, engine can not stall, causes a large amount of wastes of fuel (energy).
The objective of the invention is to provide a kind of energy-conservation workover rig or trepan.
The present invention includes Hydraulic Station, the fuselage (1) formed by engine (11), hydraulic oil pump (12), fuel tank (13), drain valve (26), top petrol tank (14), also comprise hydraulic accumulating device, by content gauge (21), pressure gauge (22), manually the detection maneuver control device formed of pilot valve group (23), hydraulic valve bank (24), choke valve group (25), be installed in lifting hydraulic jack group (2) and corresponding connecting line on the fuselage (1).
One end of the piston rod (3) of described lifting hydraulic jack group (2) is fixed on the frame that moves about (4), and an end of wire rope (6) is connected on the frame that moves about (4), and the other end directly links to each other with suspension ring.Perhaps an end of wire rope (6) be fixed on that the frame that moves about (4) is gone up or fuselage (1) on, the other end is walked around and is installed in the frame that moves about (4) and links to each other with suspension ring with the square assembly pulley (5) that increases on the fuselage (1).
When the present invention pulls out of hole, engine (11)-hydraulic oil pump (12) is organized continuously to hydraulic accumulating device pump oil, use when storing hydraulic oil (energy) supply and demand and will promote tubing string (7) by hydraulic accumulating device, so the installed power of this machine is under load and the nondecreasing condition of speed, only be about 1/4th of uniform machines, its engine (11) can be diesel engine, motor or other prime mover.Under do not drive engine (11) when boring, select " the power shelves " of lifting force less than tubing string (7) gravity, hydraulic oil in lifting hydraulic jack group (2) high pressure chest is pushed back in the hydraulic accumulating device by descending tubing string (7) store (that is to say that hydraulic accumulating device has absorbed the potential energy that discharges when tubing string (7) is descending), wait drill down operator usefulness for making up a joint.
So energy conservation significantly just.
The minimizing of installed power makes that again the engine (11) of workover rig can be a motor, directly utilizes the well site power supply, makes operation convenient.
The present invention is with lifting hydraulic jack group (2) lifting or transfer tubing string (7) directly or behind increment, thereby no longer needs derrick, winch, travelling block etc.
The present invention not only can make trepan or other machine that workover rig can also be made hydraulic energy-accumulating.
Other purposes of the present invention and advantage can be cheer and bright by reading the embodiment that describes in detail below in conjunction with accompanying drawing, wherein:
Fig. 1: hydraulic energy accumulation petroleum workover rig lateral view of the present invention.
Fig. 2: hydraulic energy accumulation petroleum workover rig vertical view of the present invention.
Fig. 3: the hydraulic system principle figure of hydraulic energy accumulation petroleum workover rig of the present invention or trepan.
With reference to accompanying drawing 1-3, one cover lifting hydraulic jack group (2) is housed on its middle machine body (1), piston rod (3) top of lifting hydraulic jack group (2) is bound up on the frame that moves about (4), behind stroke process increment assembly pulley (5) increment of lifting hydraulic jack group (2), promote or transfer tubing string (7) by wire rope (6), wire rope (6) is adjusted degree of tightness with adjusting screw(rod) (8).For setting upright moving up and down of piston rod (3), lead (9) is housed on the fuselage (1), be equipped with on the frame that moves about (4) and guide roller (10) that lead (9) matches.
The present invention has a Hydraulic Station, is made up of engine (11), hydraulic oil pump (12), fuel tank (13), top petrol tank (14) and oil pipeline (15).The oil pipeline of movable part need be used high-pressure hose (16).Top petrol tank (14) can be provided with separately, also can utilize space in the lead (9) as top petrol tank (14).The hydraulic oil of all oil sump tanks (13) must flow to top petrol tank (14) earlier, has only after top petrol tank (14) is full of, and its overflow just can be flowed back to fuel tank (13), and is empty to guarantee that each chamber of lifting hydraulic jack group (2) can be full of unlikely suction all the time.
Hydraulic accumulating device of the present invention is by holding fluid cylinder (17) and being formed and be provided with aerating device (20) by the coupled pressure gas bag (19) of tracheae line (18).
Lifting hydraulic jack group of the present invention (2) also can be made up of two, three or more hydraulic jack.
The present invention also has a cover detection, maneuver control device, is made up of content gauge (21), pressure gauge (22), manual pilot valve group (23), hydraulic valve bank (24), choke valve group (brake valve group) (25) and drain valve (26) etc.
Above-mentioned Hydraulic Station, fuselage (1), hydraulic accumulating device detect maneuver control device and all are installed on the vehicle (27), and fuselage (1) is controlled it by amplitude oil cylinder (28) and hoisted or put upside down.For make on the fuselage (1) lifting hydraulic jack group (2) all the time and oil pipeline (15) be communicated with, be equiped with high-pressure hose (16).Fuselage (1) top has drawn guy wire (29) to stablize guaranteeing, fuselage (1) bottom is provided with very heavy (30) and larger area pressing plate (31) with straightening fuselage (1) and enough substrate support areas are provided.
Hydraulic oil pump (12) is got to the hydraulic oil of high pressure to hold in the fluid cylinder (17) by the stop valve of opening (32) and is gone, and by holding fluid cylinder (17), tracheae line (18) and this cover energy storage equipment of high pressure gas bag (19) high-pressure and hydraulic oil is stored.When content gauge (21) indication is held liquid level in the fluid cylinder (17) when too high, can fuel cut-off or open drain valve (26) and discharge a part.
Diverse location by manual pilot valve group (23) handgrip, the switching situation of each valve in the decision hydraulic valve bank (24), thereby each epicoele of each cylinder in the lifting hydraulic jack group (2) and the path of each cavity of resorption have been determined, become high pressure chest with the chamber of holding the hydraulic oil connection that stores in the fluid cylinder (17) this moment, and the chamber that all the other and top petrol tank (14) (being the normal pressure part) are communicated with becomes low pressure chamber.
If having only epicoele is being directed downwards of high pressure chest then pressure, lifting force is negative shelves, and upwarding pressure if all cavity of resorptions all become high pressure chest is maximum, becomes the positive shelves of lifting force maximum.If becoming high pressure chest simultaneously, the cavity of resorption that the epicoele that has has makes a concerted effort because of different combinations can form different liftings.So under the substantially constant situation of system pressure, as long as design different epicoele sectional areas and cavity of resorption sectional area dexterously and use the various connection combination of the upper and lower chamber of each cylinder and just can form a series of " power shelves ", comprise negative lifting " power shelves ", " zero span " and several positive liftings " power shelves ", satisfy the workover rig requirement of the various lifting force of needs at any time.Under when boring, select suitable " the power shelves " of lifting force less than tubing string (7) gravity, descending tubing string (7) just can be pressed into the interior hydraulic oil of each high pressure chest in each lifting hydraulic jack group (2) at that time to hold in the fluid cylinder (17) and go this moment, make and hold the increase of fluid cylinder (17) mesohigh oil reserve, reach the accumulation of energy purpose.When needs are mentioned single pipe or tubing string (7), as long as it is just much of that to spend a part of holding newly-increased high pressure oil storage in the fluid cylinder (17).So do not need out engine (11) during tripping operation, needn't use hydraulic oil pump (12) fuel feeding.Be exactly under the situation of this not fuel feeding, along with tubing string (7) is following more dark more, the high pressure oil storage meeting of holding in the fluid cylinder (17) gets more and more.After certain depth, tubing string (7) is pressed into the hydraulic oil that holds fluid cylinder (17) will be above the capacity that holds fluid cylinder (17) under the tubing string (7).Can also utilize this part unnecessary energy this moment.
Each lifting force of " power shelves " has level, can't guarantee to hoist or the stepless variation in ground of adjusting to changed conditions of the speed transferred and acceleration, and institute thinks the various needs that satisfy operating personnel, installs choke valve group (brake valve group) (25) in oil pipeline (15).Choke valve group (25) can infinitely be regulated, and has remedied the shortcoming that " power shelves " have level.Choke valve group (25) also can be checked car on urgent situation incision oil-break road, guarantees safety.
When pulling out of hole beginning, the tubing string (7) in the well is very long, and weight is big, and the high pressure oil storage that every one endowel (7) consumes is many, and along with the carrying out of trip-out operation, tubing string (7) is shorter and shorter, and weight is more and more lighter, and the oil storage of consumption high pressure is also fewer and feweri.For rationally utilizing the power of hydraulic oil pump (12), engine (11), one or more hydraulic oil pump (12), engine (11) can be set, so that according to circumstances level is made into the output discharge capacity of several different high-pressure and hydraulic oil.
Another advantage of the present invention is: when tubing string (7) is hampered and workover rig lifting force when not enough, can close stop valve (32), the hydraulic oil that hydraulic oil pump (12) is got directly enters each lifting hydraulic jack group (2) by hydraulic valve bank (24), turn the discharge capacity of hydraulic oil pump (12) simultaneously down, the pressure of raising system (as hydraulic oil pump (12) is constant output pump, and then pressure improves the back discharge capacity and can descend automatically and needn't regulate).The associating lifting force of each lifting hydraulic jack group (2) can increase exponentially this moment, and may make the releasing that is hampered.Certainly the hoisting velocity of this moment is extremely low.Just just require when being hampered " pulling out firmly " fortunately to carry on the low speed to guarantee safety.

Claims (7)

1, a kind of hydraulic energy accumulation petroleum workover rig or trepan comprise by engine (11), hydraulic oil pump (12), fuel tank (13), drain valve (26), the Hydraulic Station that top petrol tank (14) is formed, fuselage (1), it is characterized in that also comprising hydraulic accumulating device, by content gauge (21), pressure gauge (22), manual pilot valve group (23), hydraulic valve bank (24), the detection maneuver control device that choke valve group (25) is formed, be installed in lifting hydraulic jack group (2) and corresponding connecting line on the fuselage (1), one end of the piston rod (3) of described lifting hydraulic jack group (2) is fixed on the frame that moves about (4), one end of wire rope (6) is connected on the frame that moves about (4), and the other end directly links to each other with suspension ring.
2, hydraulic energy accumulation petroleum workover rig according to claim 1 or trepan, an end that it is characterized in that wire rope (6) be fixed on that the frame that moves about (4) is gone up or fuselage (1) on, the other end is walked around and is installed in the frame that moves about (4) and links to each other with suspension ring with increment assembly pulley (5) on the fuselage (1).
3, hydraulic energy accumulation petroleum workover rig according to claim 1 and 2 or boring machine is characterized in that hydraulic accumulating device is by holding fluid cylinder (17) and being formed by the coupled high pressure gas bag (19) of tracheae line (18).
4, hydraulic energy accumulation petroleum workover rig according to claim 1 and 2 or trepan is characterized in that lifting hydraulic jack group (2) is made up of two above hydraulic jacks.
5, hydraulic energy accumulation petroleum workover rig according to claim 3 or trepan is characterized in that lifting hydraulic jack group (2) is made up of plural hydraulic jack.
6, hydraulic energy accumulation petroleum workover rig according to claim 1 and 2 or trepan is characterized in that lead (9) is housed on the fuselage (1), are equipped with on the frame that moves about (4) and guide roller (10) that lead (9) matches.
7, hydraulic energy accumulation petroleum workover rig according to claim 1 and 2 or trepan, it is characterized in that described Hydraulic Station, fuselage (1), hydraulic accumulating device, detection maneuver control device all are installed on the vehicle (27), fuselage (1) is controlled it by amplitude oil cylinder (28) and is hoisted or put upside down.
CN 91106336 1991-02-11 1991-02-11 Hydraulic energy storage petroleum workover rig or well drilling machine Expired CN1019325B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 91106336 CN1019325B (en) 1991-02-11 1991-02-11 Hydraulic energy storage petroleum workover rig or well drilling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 91106336 CN1019325B (en) 1991-02-11 1991-02-11 Hydraulic energy storage petroleum workover rig or well drilling machine

Publications (2)

Publication Number Publication Date
CN1057088A CN1057088A (en) 1991-12-18
CN1019325B true CN1019325B (en) 1992-12-02

Family

ID=4907763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 91106336 Expired CN1019325B (en) 1991-02-11 1991-02-11 Hydraulic energy storage petroleum workover rig or well drilling machine

Country Status (1)

Country Link
CN (1) CN1019325B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101382046B (en) * 2008-10-23 2011-04-13 烟台大学 Inertia variable fly wheel energy storage type well repairing machine

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101429762B (en) * 2007-11-08 2011-11-02 中国石化集团胜利石油管理局钻井工艺研究院 Energy-saving safeguard device for lifting platform
CN101725326A (en) * 2009-07-24 2010-06-09 胜利油田山友石油技术有限公司 Modular assembly type offshore platform hydraulic energy-storing workover rig
CN102140896A (en) * 2011-01-20 2011-08-03 中国石油集团渤海石油装备制造有限公司 Multi-hydraulic cylinder electric energy-accumulation well repairing machine with energy accumulator
JP5834132B2 (en) 2011-03-21 2015-12-16 楊双来 Jib lifting system and lifting method for work machine, and work machine
CN202391827U (en) * 2011-12-12 2012-08-22 杨双来 Lifting system for erector arm of working machine and working machine
CN102852464A (en) * 2012-09-28 2013-01-02 胜利油田胜兴石油机械制造有限公司 Hydraulic energy-storage petroleum drilling and repairing machine capable of tripping double joints or three-joint unit
CN102900381A (en) * 2012-10-27 2013-01-30 盐城市大冈石油工具厂有限责任公司 Full hydraulic energy-saving snubbing aggregate unit
CN103485736B (en) * 2013-09-16 2015-05-20 宝鸡石油机械有限责任公司 Manipulator device for seafloor drilling machine sampling pipe
CN103821464B (en) * 2013-11-12 2017-02-01 山东科瑞石油装备有限公司 Tubing string vertical vehicular full-automatic smart hydraulic workover rig
CN103912224B (en) * 2014-04-23 2016-01-13 烟台大学 Constant displacement pump or the energy-conservation workover rig of motor tandem
CN107445073B (en) * 2017-07-18 2019-04-02 中煤科工集团西安研究院有限公司 Truck-mounted drilling rig combined type lifting device and application method
CN108571293A (en) * 2018-05-28 2018-09-25 盐城市金巨石油机械制造有限公司 A kind of gravitation energy recycles formula well repairing device and its application method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101382046B (en) * 2008-10-23 2011-04-13 烟台大学 Inertia variable fly wheel energy storage type well repairing machine

Also Published As

Publication number Publication date
CN1057088A (en) 1991-12-18

Similar Documents

Publication Publication Date Title
CN1019325B (en) Hydraulic energy storage petroleum workover rig or well drilling machine
US5390747A (en) Well rig lift system and a hydraulic energy-storing well rig lift system
CN206985563U (en) A kind of manhole cover hoisting device
CN200943444Y (en) Spiral digging machine
CN210340211U (en) Scissor-fork type lifting device with rotation and building hoisting device thereof
CN102041980A (en) Non-impact hydraulic oil pumping device capable of realizing full energy recovery
CN103321612B (en) Water salvaging type drainage and gas production machine
CN201458608U (en) Hydraulic cylinder of leg automatic-turning device
CN113073949A (en) Centralized-driving full-driving automatic workover rig
CN205654312U (en) Hydraulic drive system of ocean well drilling compensation winch
CN202970633U (en) Full-automatic hydraulic pumping unit
CN2881158Y (en) Vertical beam-pumping unit
CN201013262Y (en) Novel hydraulic energy-accumulation workover rig
CN202441281U (en) Energy-saving hydraulic mechanism for workover rigs
CN210768647U (en) Hydraulic workover rig
CN211767977U (en) Buried energy-saving automatic lifting garbage storage equipment
CN205100905U (en) Weight controlled hydraulic drive workover rig
CN201250608Y (en) Electric well workover machine
CN2856218Y (en) Mud clearing car for sewage pipe network
CN212201948U (en) Automatic pipe rod taking and delivering mechanism and workover rig
CN2250938Y (en) Energy saving lifter for drilling machine or production rig
CN215093344U (en) Dryer drive gear installation device in papermaking equipment
CN205100904U (en) Controllable type hydraulic drive workover rig of speed
CN2455915Y (en) Drilling rigs with wheels for drawing wholly
CN2737769Y (en) Automatic balancing hydraulic lifting device

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C13 Decision
GR02 Examined patent application
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 19930922

Termination date: 20100211