CN101929581A - Underwater pipe clamp mounting method - Google Patents

Underwater pipe clamp mounting method Download PDF

Info

Publication number
CN101929581A
CN101929581A CN2009100871995A CN200910087199A CN101929581A CN 101929581 A CN101929581 A CN 101929581A CN 2009100871995 A CN2009100871995 A CN 2009100871995A CN 200910087199 A CN200910087199 A CN 200910087199A CN 101929581 A CN101929581 A CN 101929581A
Authority
CN
China
Prior art keywords
pipe clamp
steel wire
tightener
flange
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2009100871995A
Other languages
Chinese (zh)
Other versions
CN101929581B (en
Inventor
刘永良
陶杰
张英
党志敏
包刚
张大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN2009100871995A priority Critical patent/CN101929581B/en
Publication of CN101929581A publication Critical patent/CN101929581A/en
Application granted granted Critical
Publication of CN101929581B publication Critical patent/CN101929581B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention relates to an underwater pipe clamp mounting method, including the following steps: (1) the mounting position of an underwater pipe clamp (1) and the positions of three platform winches are determined; (2) the mounting datum line of a plurality of pipe clamps is determined; (3) concentricity position of a plurality of pipe clamps is determined; (4) a plurality of pipe clamps are mounted, namely 1) the steel wires (9, 10 and 11) of the three platform winches are adjusted, so as to form a three-dimensional coordinate system; 2) one pipe clamp (1) is placed to the mounting position, a flange tightener steel wire (12) is taken as the mounting datum line of an outer clamp (6), the mounting position and angle of the pipe clamp (1) are determined, the pipe clamp (1) encircles a pipe frame construction member (2), and the pipe clamp (1) is fixed; and the rest pipe clamps (1) are mounted by repeating the steps 1) and 2). The invention can simultaneously respectively carry out pipe clamp mounting fixing and coaxial adjusting, and underwater pipe clamp mounting efficiency and the coaxial accuracy ratio of pipe clamps are improved.

Description

The installation method of underwater pipe clamp
Technical field
The present invention relates to the installation method of pipe clamp, relate in particular to a kind of installation method that is applicable to underwater pipe clamp.Belong to offshore oil engineering field.
Background technique
At sea in the petroleum development engineering, need be at submarine laying pipeline under the ocean and submarine cable.Pipeline under the ocean comprises: flat pipe, platform standpipe and expansible bend, platform standpipe are the chief components that is used for connecting flat pipe and Shunping County, pipeline termination platform member is drawn the water surface.
After at sea the oil field is constructed and put into operation, because the foundation of the further exploitation in oil field and new platform, need to set up newly-increased submerged pipeline and newly-increased cable, this just need install newly-increased standpipe and cable protecting tube on original platform, riser clip or cable protecting tube clamp are used for standpipe or cable protecting tube are fixed on the jacket member, because standpipe and cable protecting tube all are the steel pipes, when installing, pipe clamp must adjust concentricity accurately, just make the wild card center of circle of all pipe clamps accurately on same axis, just can carry out the installation of standpipe and cable protecting tube.
As Fig. 1-shown in Figure 2, existing underwater pipe clamp when mounted, generally be on platform, to use winch steel wire 3 to transfer the mounting point of pipe clamp 1 earlier to jacket member 2, then, by the diver use Lever Blocks 4 with pipe clamp 1 after jacket member 2 is in place, welding antislip plate 5 is guaranteed the stationarity of pipe clamp 1 below pipe clamp 1.Reach standard in order to ensure the welding procedure technological requirement, the selection of welding consumables requires very high, and is also high to the welding technique requirement of welding operator under water, therefore, it is bigger to implement the welding difficulty under water, and this has just increased diver's diving workload and unsafe factor greatly.And there is certain defective in WET WELDING under water, and it is very big that the member mother metal is injured coefficient, thereby reduces the working life of platform.
As Fig. 2-shown in Figure 4, after underwater pipe clamp 1 installed and fixed in advance, the concentricity of pipe clamp 1 had very large deviation, need carry out same axial adjustment to pipe clamp 1, with the center of circle of the wild card 6 of guaranteeing underwater pipe clamp 1 on same axis.All be to adopt a simulation standpipe 7 to try to install, when examination is installed, generally be to use winch steel wire 3 and winch steel wire 8 to transfer simulation standpipe 7 on platform in the past.Because all pipe clamps 1 are fixing, this process also will be loosened and fastening pipe clamp 1 screw, uses mechanical force more rambunctious on pipe clamp 1.Policer operation is left-right rotation pipe clamp 1 in position, and it can be alignd with the superincumbent pipe clamp 1 of installation, as adjusting simulation standpipe 7 length limited of concentricity, also need transpose step by step.This method has strengthened the error rate of pipe clamp 1 concentricity and the water surface more than 13 and the operating time under water, when the standpipe in later stage is installed, also need to adjust pipe clamp 1 sub-concentricity once more, therefore according to standpipe in kind, the installation steps of existing underwater pipe clamp are more loaded down with trivial details, can't disposablely put in place.
Summary of the invention
Main purpose of the present invention is to overcome the above-mentioned shortcoming that existing installation method exists, and provide a kind of installation method of improved underwater pipe clamp, it can install and fix pipe clamp and carry out synchronously with two work of axial adjustment mutual noninterference, make and install and settle at one go, improved the installation efficiency and the pipe clamp coaxial accuracy of underwater pipe clamp with axial adjustment; Reduce diver's underwater operation amount, avoided the simulative tube that hangs waterborne to carry out clamp with the loaded down with trivial details operation of axial adjustment and carry out weld job under water, improved the overall security of diver's underwater operation and construction.
The objective of the invention is to realize by following technological scheme:
1, a kind of installation method of underwater pipe clamp comprises:
1) several underwater pipe clamps (1) are fixed on respectively on the jacket member (2),
2) to several under water clamp (1) carry out same axial adjustment, the circle centre position that makes all wild cards (6) that are fixed on several underwater pipe clamps (1) on the jacket member (2) is on same axis; It is characterized in that:
Following installation steps are adopted in above-mentioned installation:
(1) determine the mounting point of submerged riser clamp (1) and the putting position of three platform winches:
1. according to the structure and the construction technical requirement of jacket, determine the mounting point of underwater pipe clamp (1);
2. the jacket member (2) of underwater pipe clamp (1) mounting points is carried out the marine growth cleaning, and according to the putting position of three platform winches of installation position selection of pipe clamp (1);
(2) confirm the installation reference line of several pipe clamps:
1. determine the mounting point of the pipe clamp (1 ') on the above jacket member of the water surface (13) (2) earlier, and be basic point with the mounting point of this jacket member (2), an end of flange tightener steel wire (12) is fixed on the mounting point of this jacket member (2) upper end;
2. the pipe clamp of diver's the other end of drawing flange tightener steel wire (12) to the nethermost jacket member (2) (1 ") mounting point; after determining pipe clamp mounting center line, (12 are fixed on the mounting point of pipe clamp on the bottom jacket member (2) (1 ") with flange tightener steel wire;
3. tighten up flange tightener steel wire (12), and be several pipe clamps (1) installation reference line with the flange tightener steel wire (12) that tightens up;
(3) determining of several pipe clamp concentricity positions:
1. steel wire (9), (10), (11) with three winches on the platform are connected respectively on three diverse locations of a pipe clamp, then, three-dimensional system of coordinate of formation are adjusted in steel wire (9), (10), (11) of three winches on the platform;
2. the steel wire of three winches (9), (10), (11) are lifted by crane simultaneously and are transferred nethermost pipe clamp (1 ") to the mounting point; with the flange tightener steel wire (12) that tightens up is riser clip (1 ") installation reference line, pipe clamp (1 ") is filled the span of a man's arms on jacket member (2), and pipe clamp (1 ") is fixed;
3. take off winch steel wire (9), (10), (11), and reclaim;
4. loosen flange tightener steel wire (12), the diver unties the immovable point of flange tightener steel wire (12) lower end, the lower end of flange tightener steel wire (12) is fixed on the wild card (6) of pipe clamp (1 "); Untie the upper end immovable point of flange tightener steel wire (12), the upper end of flange tightener steel wire (12) is fixed on the wild card (6) of pipe clamp (1 '), and upper and lower two immovable points of flange tightener steel wire (12) are identical with the relative position of upper and lower wild card (6);
5. tighten up flange tightener steel wire (12), the flange tightener steel wire (12) and the spacing of jacket member (2) are consistent up and down, determine the installation reference line of several pipe clamps (1);
(4) installation of other several pipe clamps:
1. steel wire (9), (10), (11) with three winches on the platform are connected respectively on three diverse locations of a pipe clamp, then, three-dimensional system of coordinate of formation are adjusted in steel wire (9), (10), (11) of three winches on the platform;
2. the steel wire of three winches (9), 10), (11) are lifted by crane simultaneously and are transferred one of them pipe clamp (1) to the mounting point, with flange tightener steel wire (12) is the installation reference line of wild card (6), determine the mounting point and the angle of pipe clamp (1), pipe clamp (1) is filled the span of a man's arms on jacket member (2), and pipe clamp (1) is fixed; 1. and 2. the installation of several pipe clamps of later other (1) repeats above-mentioned steps.
In definite step of described several pipe clamp concentricity positions: transfer nethermost pipe clamp (1 ") behind the mounting point; with the flange tightener steel wire 12 that tightens up) be pipe clamp (1 ") installation reference line, winch steel wire (9) is used for adjusting the height up and down of pipe clamp (1 "); winch steel wire (10) and winch steel wire (11) are used to adjust the position, the left and right sides of pipe clamp (1 "), and use Lever Blocks (4) that pipe clamp (1 ") is finely tuned, to determine the mounting point of pipe clamp (1 ").
In the installation steps of described other several pipe clamps, transfer one of them pipe clamp (1) behind the mounting point, winch steel wire 9) is used for adjusting the height up and down of riser clip (1), winch steel wire (10) and winch steel wire (11) are used to adjust the position, the left and right sides of pipe clamp (1), and use Lever Blocks (4) that pipe clamp (1) is finely tuned, to determine the mounting point and the angle of pipe clamp (1).
Beneficial effect of the present invention: the present invention can install and fix pipe clamp and carry out synchronously with two work of axial adjustment mutual noninterference, makes and installs and settle at one go with axial adjustment, has improved the installation efficiency and the pipe clamp coaxial accuracy of underwater pipe clamp; Reduce diver's underwater operation amount, avoided the simulative tube that hangs waterborne to carry out clamp with the loaded down with trivial details operation of axial adjustment and carry out weld job under water, improved the overall security of diver's underwater operation and construction.
Description of drawings:
Fig. 1 is existing pipe clamp scheme of installation.
Fig. 2 installs local enlarged diagram for existing pipe clamp.
Fig. 3 is for having pipe clamp now with the axial adjustment schematic representation.
Fig. 4 is for having pipe clamp now with the local enlarged diagram of axial adjustment.
Fig. 5 carries out schematic representation for pipe clamp of the present invention installs and fixes with pipe clamp synchronously with axial adjustment.
Fig. 6 carries out local enlarged diagram for pipe clamp of the present invention installs and fixes with pipe clamp synchronously with axial adjustment.
Major label description in figure:
1, pipe clamp, 2 jacket members, 3 winch steel wires, 4 Lever Blocks, 5 antislip plates, 6 wild cards, 7 simulation standpipes, 8 winch steel wires, 9 winch steel wires, 10 winch steel wires, 11 winch steel wires, 12 flange tightener steel wires, 1 ' pipe clamp, 1 " pipe clamp, 13 waters surface.
Embodiment
As Fig. 5-shown in Figure 6, the present invention includes:
1) several underwater pipe clamps 1 are fixed on respectively on the jacket member 2,
2) to several under water clamp 1 carry out same axial adjustment, the circle centre position that makes all wild cards 6 that are fixed on several underwater pipe clamps 1 on the jacket member 2 is on same axis;
As Fig. 5-shown in Figure 6, present embodiment is that example illustrates that above-mentioned installation adopts step as follows so that 9 submerged riser clamps 1 to be installed:
(1) determine the mounting point of submerged riser clamp 1 and the putting position of three platform winches:
1. according to the structure and the construction technical requirement of jacket, determine the mounting point of submerged riser clamp 1;
2. the jacket member 2 of submerged riser clamp 1 mounting points is carried out the marine growth cleaning, and according to the putting position of three platform winches of installation position selection of riser clip 1.
(2) installation reference line of 9 pipe clamps of affirmation:
1. determine the mounting point of the riser clip 1 ' on the water surface 13 above jacket members 2 earlier, and be basic point with the mounting point of this jacket member 2, the mode that adopts the nylon rope binding is fixed on an end of flange tightener steel wire 12 on the mounting point of these jacket member 2 upper ends;
2. the riser clip 1 of diver's the other end of drawing flange tightener steel wire 12 to the nethermost jacket member 2 " mounting point; after determining pipe clamp mounting center line, the mode that adopts the nylon rope binding is fixed on riser clip 1 on the bottom jacket member 2 with flange tightener steel wire 12 " the mounting point on;
3. tightening up flange tightener steel wire 12, at this moment, is 9 pipe clamp 1 installation reference lines with the flange tightener steel wire 12 that tightens up.
Determining of (3) 9 riser clip concentricity positions:
1. the steel wire 9,10,11 of three winches on the platform Joining clasp by separately is connected respectively on three diverse locations of a riser clip, then, the steel wire 9,10,11 of three winches on the platform is adjusted form a three-dimensional system of coordinate;
2. the steel wire 9,10,11 of three winches lifts by crane simultaneously and transfers nethermost riser clip 1 " to the mounting point; winch steel wire 9 is used for adjusting riser clip 1 " height up and down, winch steel wire 10 and winch steel wire 11 are used to adjust riser clip 1 " position, the left and right sides; and use 4 pairs of riser clips 1 of Lever Blocks " finely tune, with the flange tightener steel wire 12 that tightens up is riser clip 1 " installation reference line; with riser clip 1 " fill the span of a man's arms on jacket member 2, and with riser clip 1 " adopt bolt connecting mode to fix;
3. take off winch steel wire 9,10,11, and reclaim;
4. loosen flange tightener steel wire 12, the diver unties the immovable point of flange tightener steel wire 12 lower ends, and the mode that adopts the nylon rope binding is fixed on riser clip 1 with the lower end of flange tightener steel wire 12 " wild card 6 on; Untie the upper end immovable point of flange tightener steel wire 12, the mode of employing nylon rope binding is fixed on the upper end of flange tightener steel wire 12 on the wild card 6 of riser clip 1 ', upper and lower two immovable points of flange tightener steel wire 12 are identical with the relative position of upper and lower wild card 6, can use steel ruler to measure, determine;
5. tighten up flange tightener steel wire 12, the flange tightener steel wire 12 and the spacing of jacket member 2 are consistent up and down.The installation of 8 riser clips 1 of after this other is to be the installation reference line of the wild card 6 of riser clip 1 with flange tightener steel wire 12.
(4) installation of other 8 riser clips:
1. the steel wire 9,10,11 of three winches on the platform Joining clasp by separately is connected respectively on three diverse locations of a riser clip, then, the steel wire 9,10,11 of three winches on the platform is adjusted form a three-dimensional system of coordinate;
2. the steel wire 9 of three winches, 10,11 liftings are simultaneously transferred one of them pipe riser clip 1 to the mounting point, winch steel wire 9 is used for adjusting the height up and down of riser clip 1, winch steel wire 10 and winch steel wire 11 are used to adjust the position, the left and right sides of riser clip 1, and use 4 pairs of riser clips 1 of Lever Blocks to finely tune, with flange tightener steel wire 12 is the installation reference line of wild card 6, that is: use steel ruler to measure, guarantee the center of circle of wild card 6 of riser clip 1 and relative position and the riser clip 1 ' and the riser clip 1 of flange tightener steel wire 12 " the center of circle of wild card 6 and the relative position of flange tightener steel wire 12 identical; determine the mounting point and the angle of riser clip 1; riser clip 1 is filled the span of a man's arms on jacket member 2, and adopt bolt connecting mode to fix riser clip 1; The installation method of other 7 riser clip 1 is the same.
Working principle of the present invention: adopt three winch steel wires 9,10 and 11 form a three-dimensional system of coordinate, in order to adjust the angle of pipe clamp 1, the steel wire 9 of three winches, 10, one of them pipe clamp 1 is transferred in 11 liftings simultaneously, in prior measurement, after the concentricity immovable point is found in adjustment accurately, utilize flange tightener steel wire 12 to pull into a vertical line from top to bottom, installation reference line as all pipe clamps, the box that tightens up with the steel wire tightener tightens up steel wire 12 again, all pipe clamp 1 concentric shafts are just on this finer wire 12 like this, afterwards, just can adjust concentricity accurately in fixed tube clamp 1, two work mutual noninterferences are carried out synchronously.After pipe clamp 1 installation, the concentricity of 1 riser clip 1 on 8 riser clips and the water surface 13 under water, error is no more than 2mm.
Advantage of the present invention:
1) is suitable for the installation of submerged riser, cable protecting tube clamp;
2) avoid carrying out under water the WET WELDING operation;
3) avoided using the simulation standpipe to carry out the loaded down with trivial details work procedure of pipe clamp with axial adjustment;
4) improve operating efficiency 50%, the validity of pipe clamp concentricity improves 50%;
5) improved the safety coefficient of diver's underwater operation.
6) improved working life of platform.
Pipe clamp 1, jacket member 2, winch steel wire 9,10,11, Lever Blocks 4, antislip plate 5, wild card 6, flange tightener steel wire 12 are prior art or adopt prior art to make, and the technology of not specified (NS) is a prior art.
The above, it only is preferred embodiment of the present invention, be not that the present invention is done any pro forma restriction, every foundation technical spirit of the present invention all still belongs in the scope of technical solution of the present invention any simple modification, equivalent variations and modification that above embodiment did.

Claims (3)

1. the installation method of a underwater pipe clamp comprises:
1) several underwater pipe clamps (1) are fixed on respectively on the jacket member (2),
2) to several under water clamp (1) carry out same axial adjustment, the circle centre position that makes all wild cards (6) that are fixed on several underwater pipe clamps (1) on the jacket member (2) is on same axis; It is characterized in that:
Following installation steps are adopted in above-mentioned installation:
(1) determine the mounting point of submerged riser clamp (1) and the putting position of three platform winches:
1. according to the structure and the construction technical requirement of jacket, determine the mounting point of underwater pipe clamp (1);
2. the jacket member (2) of underwater pipe clamp (1) mounting points is carried out the marine growth cleaning, and according to the putting position of three platform winches of installation position selection of pipe clamp (1);
(2) confirm the installation reference line of several pipe clamps:
1. determine the mounting point of the pipe clamp (1 ') on the above jacket member of the water surface (13) (2) earlier, and be basic point with the mounting point of this jacket member (2), an end of flange tightener steel wire (12) is fixed on the mounting point of this jacket member (2) upper end;
2. the pipe clamp of diver's the other end of drawing flange tightener steel wire (12) to the nethermost jacket member (2) (1 ") mounting point; after determining pipe clamp mounting center line is fixed on flange tightener steel wire (12) on the mounting point of pipe clamp on the bottom jacket member (2) (1 ");
3. tighten up flange tightener steel wire (12), and be several pipe clamps (1) installation reference line with the flange tightener steel wire (12) that tightens up;
(3) determining of several pipe clamp concentricity positions:
1. steel wire (9), (10), (11) with three winches on the platform are connected respectively on three diverse locations of a pipe clamp, steel wire (9), (10), (11) of three winches on the platform are adjusted to form a three-dimensional system of coordinate then;
2. the steel wire of three winches (9), (10), (11) are lifted by crane simultaneously and are transferred nethermost pipe clamp (1 ") to the mounting point; with the flange tightener steel wire (12) that tightens up is riser clip (1 ") installation reference line, pipe clamp (1 ") is filled the span of a man's arms on jacket member (2), and pipe clamp (1 ") is fixed;
3. take off winch steel wire (9), (10), (11), and reclaim;
4. loosen flange tightener steel wire (12), the diver unties the immovable point of flange tightener steel wire (12) lower end, the lower end of flange tightener steel wire (12) is fixed on the wild card (6) of pipe clamp (1 "); Untie the upper end immovable point of flange tightener steel wire (12), the upper end of flange tightener steel wire (12) is fixed on the wild card (6) of pipe clamp (1 '), and upper and lower two immovable points of flange tightener steel wire (12) are identical with the relative position of upper and lower wild card (6);
5. tighten up flange tightener steel wire (12), the flange tightener steel wire (12) and the spacing of jacket member (2) are consistent up and down, determine the installation reference line of several pipe clamps (1);
(4) installation of other several pipe clamps:
1. steel wire (9), (10), (11) with three winches on the platform are connected respectively on three diverse locations of a pipe clamp, then, three-dimensional system of coordinate of formation are adjusted in steel wire (9), (10), (11) of three winches on the platform;
2. the steel wire of three winches (9), 10), (11) are lifted by crane simultaneously and are transferred one of them pipe clamp (1) to the mounting point, with flange tightener steel wire (12) is the installation reference line of wild card (6), determine the mounting point and the angle of pipe clamp (1), pipe clamp (1) is filled the span of a man's arms on jacket member (2), and pipe clamp (1) is fixed; 1. and 2. the installation of several pipe clamps of later other (1) repeats above-mentioned steps.
2. the installation method of underwater pipe clamp according to claim 1, it is characterized in that: in definite step of described several pipe clamp concentricity positions: transfer nethermost pipe clamp (1 ") behind the mounting point; with the flange tightener steel wire 12 that tightens up) be pipe clamp (1 ") installation reference line, winch steel wire (9) is used for adjusting the height up and down of pipe clamp (1 "); winch steel wire (10) and winch steel wire (11) are used to adjust the position, the left and right sides of pipe clamp (1 "), and use Lever Blocks (4) that pipe clamp (1 ") is finely tuned, to determine the mounting point of pipe clamp (1 ").
3. the installation method of underwater pipe clamp according to claim 1, it is characterized in that: in the installation steps of described other several pipe clamps, transfer one of them pipe clamp (1) behind the mounting point, winch steel wire 9) is used for adjusting the height up and down of riser clip (1), winch steel wire (10) and winch steel wire (11) are used to adjust the position, the left and right sides of pipe clamp (1), and use Lever Blocks (4) that pipe clamp (1) is finely tuned, to determine the mounting point and the angle of pipe clamp (1).
CN2009100871995A 2009-06-19 2009-06-19 Underwater pipe clamp mounting method Expired - Fee Related CN101929581B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100871995A CN101929581B (en) 2009-06-19 2009-06-19 Underwater pipe clamp mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100871995A CN101929581B (en) 2009-06-19 2009-06-19 Underwater pipe clamp mounting method

Publications (2)

Publication Number Publication Date
CN101929581A true CN101929581A (en) 2010-12-29
CN101929581B CN101929581B (en) 2012-11-28

Family

ID=43368918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100871995A Expired - Fee Related CN101929581B (en) 2009-06-19 2009-06-19 Underwater pipe clamp mounting method

Country Status (1)

Country Link
CN (1) CN101929581B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284828A (en) * 2011-04-28 2011-12-21 中国海洋石油总公司 Adjustment process for coaxiality of pipe clamp
CN102661444A (en) * 2012-04-25 2012-09-12 交通运输部上海打捞局 Installation method of deepwater double piping system of offshore platform
CN103466038A (en) * 2013-08-30 2013-12-25 中国海洋石油总公司 Method for changing connecting tubes in FPSO (floating production storage and offloading) single-point buoys
CN111735371A (en) * 2020-06-23 2020-10-02 中国海洋石油集团有限公司 Device for detecting coaxiality of marine riser clamp

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3699691A (en) * 1971-02-08 1972-10-24 Shell Oil Co Method for connecting flowlines to a platform
CN1456832A (en) * 2003-04-17 2003-11-19 冯毅 Underwater pipe jacking tunnelling process with balanced supply and discharge
CN101327895B (en) * 2007-06-22 2011-06-08 中国科学院沈阳自动化研究所 Underwater suspension type mooring winch

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284828A (en) * 2011-04-28 2011-12-21 中国海洋石油总公司 Adjustment process for coaxiality of pipe clamp
CN102284828B (en) * 2011-04-28 2013-06-19 中国海洋石油总公司 Adjustment process for coaxiality of pipe clamp
CN102661444A (en) * 2012-04-25 2012-09-12 交通运输部上海打捞局 Installation method of deepwater double piping system of offshore platform
CN102661444B (en) * 2012-04-25 2013-10-30 中国海洋石油总公司 Installation method of deepwater double piping system of offshore platform
CN103466038A (en) * 2013-08-30 2013-12-25 中国海洋石油总公司 Method for changing connecting tubes in FPSO (floating production storage and offloading) single-point buoys
CN103466038B (en) * 2013-08-30 2016-01-20 中国海洋石油总公司 A kind of FPSO single-point cone buoy inner connection tube replacing options
CN111735371A (en) * 2020-06-23 2020-10-02 中国海洋石油集团有限公司 Device for detecting coaxiality of marine riser clamp

Also Published As

Publication number Publication date
CN101929581B (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN101598246A (en) The method of pipeline under the ocean flange underwater mating
CN113148030B (en) Laying and installing method for deepwater submarine cable side launching
CN104631602B (en) Sewage deep sea emission engineering marine site pipeline construction method
CN101929581B (en) Underwater pipe clamp mounting method
MY154753A (en) Method of installing an underwater riser
CN109878649A (en) A kind of water surface photovoltaic raft anchor system and measurement method suitable for high water level luffing
CN102221128B (en) Seabed oil and gas transportation hose line fixed on the basis of anchor pier
CN202391394U (en) Ultra-deep water offshore oil/gas engineering development system
CN103883273A (en) Method for utilizing two cranes on saturation diving support vessel to mount vertical pipe
CN105398545B (en) A kind of tensioning method of mooring anchor leg
CN113803525B (en) Seabed brace rod fixing method for steel cylinder protection underwater production system manifold
CN100458362C (en) Quick distributing apparatus for underwater sensor chain
CN110185057B (en) Tool and construction method for lifting and erecting steel pipe piles of offshore wind power single pile foundation
CN108560595A (en) A kind of pre- tensioning system of immersed tube mooring installation anchor system and immersed tube sinking interconnection method
CN102213085A (en) Installation method of vertical pipe of guide pipe rack
CN107013743A (en) Deep water hydrocarbon platform steel catenary riser installation method
CN103373446A (en) Jacket removing ship and removing method
CN102586784A (en) Method for assembling direct current cathode protection system outside platform
CN2782547Y (en) Quick distributor for underwater sensor chain
CN100588779C (en) Method for installing vertical pipe clamp of jacket
CN102661444B (en) Installation method of deepwater double piping system of offshore platform
AU2019371809A1 (en) Installation of subsea pipelines
WO2007045850A1 (en) Tethered buoyant support and method for installation thereof
CN200995770Y (en) Sensor-chain distributor based on large buoy
CN113970013A (en) Method for fixing stay bar of underwater production manifold in steel cylinder under seabed mud surface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee after: CHINA NATIONAL OFFSHORE OIL Corp.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: OFFSHORE OIL ENGINEERING Co.,Ltd.

Patentee before: CHINA NATIONAL OFFSHORE OIL Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128