CN101906974A - Supporting structure of extra-large cross-section loess tunnel and construction method thereof - Google Patents

Supporting structure of extra-large cross-section loess tunnel and construction method thereof Download PDF

Info

Publication number
CN101906974A
CN101906974A CN 201010248504 CN201010248504A CN101906974A CN 101906974 A CN101906974 A CN 101906974A CN 201010248504 CN201010248504 CN 201010248504 CN 201010248504 A CN201010248504 A CN 201010248504A CN 101906974 A CN101906974 A CN 101906974A
Authority
CN
China
Prior art keywords
excavation
tunnel
construction
preliminary bracing
large cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010248504
Other languages
Chinese (zh)
Inventor
李雷
梁文灏
刘培硕
刘赪
李国良
杨国柱
赵秋林
杨木高
谢君泰
李凌志
刘小刚
王新东
马洪程
李宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN 201010248504 priority Critical patent/CN101906974A/en
Publication of CN101906974A publication Critical patent/CN101906974A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention relates to a supporting structure of an extra-large cross-section loess tunnel and a construction method thereof. Larger deformation and even collapse accidents occur in the construction process of the loess tunnel easily. At present, aiming at the large cross-section loess tunnels, the construction of the large cross-section loess tunnel with the excavating area of 140 m<2> is realized by a reserved core soil short step method successfully; the construction of a new loess tunnel with the burial depth of 25 m and the excavating area of 120 m<2> under-passing the existing railway is realized by a CRD method; and the difficulty and the risk of the construction increase gradually along with further increment of the excavated cross-section of the loess tunnel. The supporting structure comprises an initial support, an archwall secondary lining and an inverted arch, wherein a small conduit leading support is arranged along the contour line of the tunnel arch part; and a waterproof layer is arranged between the initial support and the archwall secondary lining. The supporting structure and the construction method thereof have the advantages of effective guarantee of construction safety of the extra-large cross-section loess tunnel, simple construction process, large excavating space, convenient operation for a large-size machine and fast tunnel construction progress.

Description

A kind of supporting and protection structure of extra-large cross-section loess tunnel and job practices thereof
Technical field
The present invention relates to tunnel-like, be specifically related to a kind of supporting and protection structure and job practices thereof of extra-large cross-section loess tunnel.
Background technology
Moderate finite deformation even landslide accident easily take place in the loess tunnel construction process, and current, at large-section loess tunnel, successful Application is reserved the short benching tunnelling method of core soil and is solved excavation area 140m 2The construction of large-section loess tunnel, and adopt the CRD method to solve buried depth 25m, excavation area 120m 2New loess tunnel under wear existing railway construction.Along with the further increasing of loess tunnel excavated section, it is big that its difficulty of construction and risk also progressively become.Though side heading method can be controlled sedimentation effectively, but construction step preface is various, construction space is narrow and small, construction speed is slow, construction costs is higher, especially at long distance, extra-large cross-section loess tunnel group's construction, safe, quick, economic construction be realized, suitable supporting and protection structure measure and reasonable excavation method must be adopted.
Summary of the invention
Technical problem solved by the invention provide a kind of simple in structure, working procedure is simple, the excavation space greatly, effectively guarantees the supporting and protection structure and the job practices thereof of extra-large cross-section loess tunnel construction safety.
For solving above-mentioned technical problem, the technical scheme that the present invention takes:
The present invention includes preliminary bracing, arch wall secondary lining, inverted arch, its special character is: the outline line along the arch, tunnel is provided with the ductule advance support, is provided with waterproofing course between preliminary bracing and the arch wall secondary lining.
Above-mentioned preliminary bracing by the upright profile steel frame of sprayed mortar, frame, set anchor pole and hang steel mesh reinforcement and constitute.
The inverted arch of above-mentioned preliminary bracing partly comprises sprayed mortar and the upright profile steel frame of frame.
Above-mentioned waterproofing course is made of nonwoven and splash guard.
A kind of job practices of supporting and protection structure of extra-large cross-section loess tunnel, its special character is: described job practices realizes by following steps:
(1), along arch, tunnel excavation outline line, perform the ductule advance support;
(2), the excavation of under ductule advance support protection, topping bar and stay core soil, excavate drilling depth is a Pin steelframe distance at every turn, performs the part of topping bar of preliminary bracing then;
(3), excavation central core soil;
(4), get out of a predicament or an embarrassing situation in step and right side in the staggered excavation left side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step left side of preliminary bracing and the right side part of getting out of a predicament or an embarrassing situation then;
(5), get out of a predicament or an embarrassing situation in step and left side in the staggered excavation right side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step right side of preliminary bracing and the left part of getting out of a predicament or an embarrassing situation then;
(6), carry out the excavation of the inverted arch part soil body, excavate Pin steelframe distance at every turn, perform the inverted arch part of preliminary bracing then, immediately following performing inverted arch;
(7), perform the waterproofing course between preliminary bracing and arch wall secondary lining, carry out the lining cutting reinforcing bar binding then;
(8), cast arch wall secondary lining.
Compared with prior art, beneficial effect of the present invention:
The present invention is when effectively guaranteeing the extra-large cross-section loess tunnel construction safety, and its working procedure is simple, and the excavation space is big, is convenient to the big machinery operation, and Tunnel Construction Schedule is fast.
Description of drawings
Fig. 1 is a structure cross-sectional drawing of the present invention;
Fig. 2 is a working procedure cross-sectional drawing of the present invention;
Fig. 3 is a working procedure longitudinal plan of the present invention.
The specific embodiment
The present invention is described in detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, the present invention includes preliminary bracing 2, arch wall secondary lining 3, inverted arch 4, be provided with ductule advance support 1 along the outline line of arch, tunnel, be provided with waterproofing course between preliminary bracing 2 and the arch wall secondary lining 3.
Preliminary bracing 2 by the upright profile steel frame of sprayed mortar, frame, set anchor pole and hang steel mesh reinforcement and constitute.
The inverted arch of preliminary bracing 2 partly comprises sprayed mortar and the upright profile steel frame of frame.
Waterproofing course is made of nonwoven and splash guard.
Referring to Fig. 2,3, the step of implementing job practices of the present invention is:
(1), along arch, tunnel excavation outline line, perform ductule advance support 1;
(2), 5 the excavation and stay core soil of under ductule advance support 1 protection, topping bar, excavate drilling depth is a Pin steelframe distance at every turn, performs the part of topping bar of preliminary bracing 2 then;
(3), excavation central core soil 6;
(4), step 7 and right side get out of a predicament or an embarrassing situation 10 in the staggered excavation left side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step left side of preliminary bracing 2 and the right side part of getting out of a predicament or an embarrassing situation then;
(5), step 8 and left side get out of a predicament or an embarrassing situation 9 in the staggered excavation right side, each excavation is controlled at 1~2 Pin profile steel frame distance, performs the middle step right side of preliminary bracing 2 and the left part of getting out of a predicament or an embarrassing situation then;
(6), carry out the excavation of the inverted arch part soil body 11, excavate 5 Pin steelframe distances at every turn, perform the inverted arch part of preliminary bracing 2 then, immediately following performing inverted arch 4;
(7), perform the waterproofing course of 3 of preliminary bracing 2 and arch wall secondary linings, carry out the lining cutting reinforcing bar binding then;
(8), cast arch wall secondary lining 3.

Claims (5)

1. the supporting and protection structure of an extra-large cross-section loess tunnel, comprise preliminary bracing (2), arch wall secondary lining (3), inverted arch (4), it is characterized in that: the outline line along the arch, tunnel is provided with ductule advance support (1), is provided with waterproofing course between preliminary bracing (2) and the arch wall secondary lining (3).
2. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 1 is characterized in that: described preliminary bracing (2) by sprayed mortar, the upright profile steel frame of frame, set anchor pole and hang steel mesh reinforcement and constitute.
3. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 1 and 2 is characterized in that: the inverted arch of described preliminary bracing (2) partly comprises sprayed mortar and the upright profile steel frame of frame.
4. the supporting and protection structure of a kind of extra-large cross-section loess tunnel according to claim 3, it is characterized in that: described waterproofing course is made of nonwoven and splash guard.
5. the job practices of the supporting and protection structure of an extra-large cross-section loess tunnel, it is characterized in that: described job practices realizes by following steps:
(1), along arch, tunnel excavation outline line, perform ductule advance support (1);
(2), the excavation of under ductule advance support (1) protection, top bar (5) and stay core soil, excavate drilling depth is a Pin steelframe distance at every turn, performs the part of topping bar of preliminary bracing (2) then;
(3), excavation central core soil (6);
(4), get out of a predicament or an embarrassing situation (10) in step (7) and right side in the staggered excavation left side, each excavation is controlled at 1~2 Pin profile steel frame distance, the middle step left side that performs preliminary bracing (2) then with get out of a predicament or an embarrassing situation the right side part;
(5), get out of a predicament or an embarrassing situation (9) in step (8) and left side in the staggered excavation right side, each excavation is controlled at 1~2 Pin profile steel frame distance, the middle step right side that performs preliminary bracing (2) then with get out of a predicament or an embarrassing situation left part;
(6), carry out the excavation of the inverted arch part soil body (11), each excavation (5) Pin steelframe distance performs the inverted arch part of preliminary bracing (2), then immediately following performing inverted arch (4);
(7), perform the waterproofing course between preliminary bracing (2) and arch wall secondary lining (3), carry out the lining cutting reinforcing bar binding then;
(8), cast arch wall secondary lining (3).
CN 201010248504 2010-08-09 2010-08-09 Supporting structure of extra-large cross-section loess tunnel and construction method thereof Pending CN101906974A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010248504 CN101906974A (en) 2010-08-09 2010-08-09 Supporting structure of extra-large cross-section loess tunnel and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010248504 CN101906974A (en) 2010-08-09 2010-08-09 Supporting structure of extra-large cross-section loess tunnel and construction method thereof

Publications (1)

Publication Number Publication Date
CN101906974A true CN101906974A (en) 2010-12-08

Family

ID=43262541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010248504 Pending CN101906974A (en) 2010-08-09 2010-08-09 Supporting structure of extra-large cross-section loess tunnel and construction method thereof

Country Status (1)

Country Link
CN (1) CN101906974A (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345463A (en) * 2011-10-19 2012-02-08 中交第一公路工程局有限公司 Support structure for large-span shallow-buried underground tunnel in urban sensitive area
CN102392651A (en) * 2011-11-30 2012-03-28 中铁五局(集团)有限公司 Completely weathered granite tunnel excavation construction method
CN102562099A (en) * 2012-03-15 2012-07-11 中铁二十三局集团第四工程有限公司 Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN102606169A (en) * 2012-03-16 2012-07-25 铁道部工程管理中心 Tunnel support method, tunnel support structure and tunnel
CN102758638A (en) * 2012-07-19 2012-10-31 中铁十六局集团有限公司 Construction method for CRD (center cross diaphragm) inverted arch
CN103774992A (en) * 2012-10-18 2014-05-07 中国石油化工股份有限公司 Driving device of downhole expansion tool for sleeve
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN105114098A (en) * 2015-06-08 2015-12-02 中国电建集团贵阳勘测设计研究院有限公司 Method for treating unfavorable geology segment of diversion tunnel and major-diameter diversion tunnel structure
CN105350973A (en) * 2015-10-08 2016-02-24 同济大学 Construction method for large-span section loess tunnel under-crossing highway
CN106121661A (en) * 2016-08-08 2016-11-16 中铁二局集团有限公司 A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN106761810A (en) * 2016-11-23 2017-05-31 长安大学 A kind of large-deformation tunnel in soft rock supporting structure system and its construction method
CN107013222A (en) * 2017-05-28 2017-08-04 中铁五局集团有限公司 A kind of the middle regions of the Yunnan Province red beds tunnel milling digging construction method close to existing railway
CN107035383A (en) * 2017-04-26 2017-08-11 中铁第勘察设计院集团有限公司 The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN107560510A (en) * 2017-08-25 2018-01-09 中铁十二局集团有限公司 A kind of tunnel big cross section section constructing method and its face blast arrangement
CN108005673A (en) * 2017-12-05 2018-05-08 中国铁路设计集团有限公司 A kind of buried Central drain excavation method in tunnel of reserved foundation back-pressure soil
CN108412501A (en) * 2018-02-11 2018-08-17 中铁十二局集团有限公司 Under wear oil pipeline shallow depth loess tunnels construction method
CN109594995A (en) * 2019-01-31 2019-04-09 长安大学 A kind of Support System in Soft Rock Tunnels micro-disturbance machinery branch driving engineering method
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN110410110A (en) * 2019-08-23 2019-11-05 中铁第四勘察设计院集团有限公司 A kind of large cross-section tunnel composite lining and its construction method
CN111734425A (en) * 2020-07-30 2020-10-02 中铁隆工程集团有限公司 Construction method of underground excavation tunnel for downwards passing through airport terminal building
CN113464145A (en) * 2021-07-06 2021-10-01 北京交通大学 Excavation construction method for weak surrounding rock large-section tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5396749A (en) * 1992-09-16 1995-03-14 Asahi Denki Kogyo K.K. Method of cutting off water flow by grouting
JP2002013395A (en) * 2000-06-30 2002-01-18 Iwate Haneda Concrete Kk Concrete arch type structure
CN101196118A (en) * 2008-01-07 2008-06-11 北京市政建设集团有限责任公司 Advanced double rows slip casting ductule construction technique
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method
CN101324072A (en) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 Construction method of pervious rib type arch beam tunnel
CN201738932U (en) * 2010-08-09 2011-02-09 中铁第一勘察设计院集团有限公司 Support structure of loess tunnel with extra-large cross-section

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5396749A (en) * 1992-09-16 1995-03-14 Asahi Denki Kogyo K.K. Method of cutting off water flow by grouting
JP2002013395A (en) * 2000-06-30 2002-01-18 Iwate Haneda Concrete Kk Concrete arch type structure
CN101196118A (en) * 2008-01-07 2008-06-11 北京市政建设集团有限责任公司 Advanced double rows slip casting ductule construction technique
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method
CN101324072A (en) * 2008-07-30 2008-12-17 中国科学院武汉岩土力学研究所 Construction method of pervious rib type arch beam tunnel
CN201738932U (en) * 2010-08-09 2011-02-09 中铁第一勘察设计院集团有限公司 Support structure of loess tunnel with extra-large cross-section

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20070731 李秋忠 秦东大断面黄土隧道施工控制 第33卷, 第19期 2 *
《铁道工程学报》 20071231 王晓州等 大断面湿陷性黄土隧道施工技术 , 第增刊期 2 *
《铁道建筑》 20100531 史赵鹏 偏压超浅埋大断面黄土隧道施工技术 , 第5期 2 *
《铁道标准设计》 20071231 贺廷西等 石太铁路客运专线大断面黄土隧道施工技术 , 第4期 2 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102345463A (en) * 2011-10-19 2012-02-08 中交第一公路工程局有限公司 Support structure for large-span shallow-buried underground tunnel in urban sensitive area
CN102392651A (en) * 2011-11-30 2012-03-28 中铁五局(集团)有限公司 Completely weathered granite tunnel excavation construction method
CN102392651B (en) * 2011-11-30 2014-10-22 中铁五局(集团)有限公司 Completely weathered granite tunnel excavation construction method
CN102562099A (en) * 2012-03-15 2012-07-11 中铁二十三局集团第四工程有限公司 Method for carrying out rapid face excavation construction of loess tunnel by double rows of small conduits
CN102606169B (en) * 2012-03-16 2014-06-11 铁道部工程管理中心 Tunnel support method, tunnel support structure and tunnel
CN102606169A (en) * 2012-03-16 2012-07-25 铁道部工程管理中心 Tunnel support method, tunnel support structure and tunnel
CN102758638A (en) * 2012-07-19 2012-10-31 中铁十六局集团有限公司 Construction method for CRD (center cross diaphragm) inverted arch
CN102758638B (en) * 2012-07-19 2014-12-10 中铁十六局集团地铁工程有限公司 Construction method for CRD (center cross diaphragm) inverted arch
CN103774992A (en) * 2012-10-18 2014-05-07 中国石油化工股份有限公司 Driving device of downhole expansion tool for sleeve
CN103774992B (en) * 2012-10-18 2016-01-06 中国石油化工股份有限公司 The drive unit of bloat tool under cased well
US9347297B2 (en) 2012-10-18 2016-05-24 China Petroleum & Chemical Corporation Downhole casing expansion tool and method of expanding casings using the same
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN105114098A (en) * 2015-06-08 2015-12-02 中国电建集团贵阳勘测设计研究院有限公司 Method for treating unfavorable geology segment of diversion tunnel and major-diameter diversion tunnel structure
CN105350973A (en) * 2015-10-08 2016-02-24 同济大学 Construction method for large-span section loess tunnel under-crossing highway
CN106121661A (en) * 2016-08-08 2016-11-16 中铁二局集团有限公司 A kind of tunnel trunk is by loess separating surface water rich strata construction method
CN106761810B (en) * 2016-11-23 2019-06-11 长安大学 A kind of large-deformation tunnel in soft rock supporting structure system and its construction method
CN106761810A (en) * 2016-11-23 2017-05-31 长安大学 A kind of large-deformation tunnel in soft rock supporting structure system and its construction method
CN107035383A (en) * 2017-04-26 2017-08-11 中铁第勘察设计院集团有限公司 The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN107013222A (en) * 2017-05-28 2017-08-04 中铁五局集团有限公司 A kind of the middle regions of the Yunnan Province red beds tunnel milling digging construction method close to existing railway
CN107560510A (en) * 2017-08-25 2018-01-09 中铁十二局集团有限公司 A kind of tunnel big cross section section constructing method and its face blast arrangement
CN108005673A (en) * 2017-12-05 2018-05-08 中国铁路设计集团有限公司 A kind of buried Central drain excavation method in tunnel of reserved foundation back-pressure soil
CN108412501A (en) * 2018-02-11 2018-08-17 中铁十二局集团有限公司 Under wear oil pipeline shallow depth loess tunnels construction method
CN109594995A (en) * 2019-01-31 2019-04-09 长安大学 A kind of Support System in Soft Rock Tunnels micro-disturbance machinery branch driving engineering method
CN109763838A (en) * 2019-03-13 2019-05-17 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure and its assembling method suitable for drill+blast tunnel
CN109763838B (en) * 2019-03-13 2023-09-15 中铁第一勘察设计院集团有限公司 Assembled inverted arch structure suitable for tunnel by drilling and blasting method and assembling method thereof
CN110410110A (en) * 2019-08-23 2019-11-05 中铁第四勘察设计院集团有限公司 A kind of large cross-section tunnel composite lining and its construction method
CN111734425A (en) * 2020-07-30 2020-10-02 中铁隆工程集团有限公司 Construction method of underground excavation tunnel for downwards passing through airport terminal building
CN113464145A (en) * 2021-07-06 2021-10-01 北京交通大学 Excavation construction method for weak surrounding rock large-section tunnel

Similar Documents

Publication Publication Date Title
CN101906974A (en) Supporting structure of extra-large cross-section loess tunnel and construction method thereof
CN201738932U (en) Support structure of loess tunnel with extra-large cross-section
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN201786361U (en) Supporting structure for railway crossing under loess tunnel with extra-large section
CN101906975A (en) Supporting structure for extra-large cross-section loess tunnel underpass railway and construction method thereof
CN102606167B (en) Settlement control construction method for transverse grouting guide pipe of shallow underground excavation tunnel
CN106761778B (en) A kind of underground digging in subway station construction technology suitable for upper-soft lower-hard ground
CN202560245U (en) Multifunctional trolley with freely retractable arms
CN106223967B (en) A kind of great burying rectangle or class rectangle tunneling shield constructing device and method
CN102953737B (en) Construction method for inverted arch of VI-level water-enriched surrounding rock tunnel
CN101886390B (en) All casing static pressure pile pulling technology in narrow space
CN101539021B (en) Road tunnel excavation method
CN101781991B (en) Double-well type reinforcement method of shield arrival or starting end and double-well type shield arrival method
CN108868778A (en) A kind of Large Underground Structure no-dig technique construction method
CN106979021B (en) Large-section loess tunnel excavates and preliminary bracing quick closure cyclization method
CN102606168B (en) Construction method for preventing settlement and deformation of shallow-buried-excavation tunnel in excavation
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN104452809A (en) Ultra-shallow buried tunnel cover-excavation construction method
CN107035383A (en) The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN107905814B (en) Large span loess tunnel top bar CD construction method
CN106246192A (en) Large-scale karst cave treatment under a kind of tunnel basis and base plate and tunnel excavation method
CN107965325B (en) A kind of small interval shallow tunnel just branch arch replacement construction method
CN106968691A (en) Improve CD method construction methods in a kind of extremely frigid zones silty clay tunnel
CN106894350A (en) A kind of steel basil is buried jacking box culvert device and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20101208