CN101881082B - 释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 - Google Patents
释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 Download PDFInfo
- Publication number
- CN101881082B CN101881082B CN2010101141418A CN201010114141A CN101881082B CN 101881082 B CN101881082 B CN 101881082B CN 2010101141418 A CN2010101141418 A CN 2010101141418A CN 201010114141 A CN201010114141 A CN 201010114141A CN 101881082 B CN101881082 B CN 101881082B
- Authority
- CN
- China
- Prior art keywords
- steel connecting
- layer
- connecting rod
- concrete
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明涉及一种建筑施工方法,公开了一种释放两座相对倾斜劲性混凝土结构上部钢连杆焊接连接强约束应力的施工方法。该施工方法由如下步骤组成:A、对其中一座建筑第n层的楼面和梁进行混凝土浇注施工;及在另一座建筑第n层需与钢连杆连接的位置对应设置暂不浇注混凝土的后浇段区域,并对其余楼面和梁进行混凝土浇注施工;B、在两座倾斜劲性混凝土结构的第n层之间进行钢连杆的安装施工;C、待钢连杆安装完毕并完全冷却、充分释放强约束应力之后,对另一座建筑倾斜劲性混凝土结构的第n层后浇段区域进行混凝土浇注施工。本发明通过合理留设后浇段区域的施工技术,使钢连杆焊接产生的强约束应力得以成功释放,使施工满足结构设计要求;同时加快了施工进度,取得了显著的经济效益和社会效益。
Description
技术领域
本发明涉及一种建筑施工方法,具体涉及一种释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法。
背景技术
劲性混凝土结构是一种采用型钢或用钢板焊接成型钢形式作为骨架的混凝土结构,由于该种混凝土结构具有承载能力大、抗震性能好和施工方便等优点,目前已越来越多地应用到高层建筑和大跨度建筑结构中。
目前,有一类建筑物是由两座采用倾斜式劲性混凝土结构的建筑物组成,两座建筑物的倾斜方向相对。由于倾斜式劲性混凝土结构的重心和刚度中心偏移,因此需在两座建筑物的上部安装钢连杆以支撑结构倾斜所带来的巨大推力,形成稳定的整体受力结构体系。
然而,由于钢连杆是采用焊接连接方式,因此在安装施工过程中会产生强约束应力。若在两座倾斜劲性混凝土结构完成了混凝土浇注施工后直接进行钢连杆焊接连接,则焊接过程因钢连杆高温热胀、冷却收缩而对钢连杆两端刚性结构产生强约束应力,导致混凝土结构下部的型钢混凝土柱产生结构性裂缝,不能满足结构的设计要求。若先对钢连杆其中一端所处的倾斜劲性混凝土结构层面进行结构施工,而另一端所述的倾斜劲性混凝土结构暂不施工,待钢连杆结构安装完成、应力完全释放之后再进行另一端结构的施工,则对工程结构整体施工进度的协调造成很大的影响。
发明内容
本发明的目的在于针对倾斜式劲性混凝土结构的特点,提供一种释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法,以防止或减小钢连杆焊接时产生的强约束应力对两端刚性的劲性混凝土结构的安全造成影响。
为达到上述目的,本发明采用如下技术方案:
释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法,是在两座倾斜劲 性混凝土结构的上部第n层之间设置钢连杆,由如下步骤组成:
A、对其中一座倾斜劲性混凝土结构第n层的楼面和梁进行混凝土浇注施工;及在另一座倾斜劲性混凝土结构第n层需与钢连杆连接的位置对应设置暂不浇注混凝土的后浇段区域,并对其余楼面和梁进行混凝土浇注施工;
B、在两座倾斜劲性混凝土结构的第n层之间进行钢连杆的安装施工;
C、待钢连杆安装完毕并完全冷却、充分释放强约束应力之后,对另一座倾斜劲性混凝土结构的第n层后浇段区域进行混凝土浇注施工。
进一步,上述后浇段区域包括:需与钢连杆一端连接的第n-1层柱;需与钢连杆连接的第n层边梁;自第n层边梁向内的三分之一跨度的楼面;处于该三分之一跨度楼面内并与第n层边梁连接的主梁和次梁。
作为优选,上述第n-1层柱的型钢设有临时加固构件。该临时加固构件为两条呈“八”字型布置的工字钢,该两条工字钢的一端与该n-1层柱的型钢露出于第n层楼面的部分连接,其另一端则分别与第n层已浇注混凝土中的预埋钢板连接。
本发明由于采用上述方法,通过合理留设后浇段区域的施工技术,使钢连杆焊接产生的强约束应力得以成功释放,使施工满足结构设计要求;同时加快了施工进度,取得了显著的经济效益和社会效益。
附图说明
图1是本发明所述留设后浇段区域的平面布置示意图。
图2是图1的C-C剖面图。
图中:
1-A楼;10-后浇段区域;11-A楼第n层楼面;12-A楼第n层边梁;13-A楼第n层主梁;14-A楼第n层次梁;15-A楼第n-1层劲性柱;16-劲性柱用型钢;17-A楼梁柱节点;2-B楼;21-B楼第n层楼面;22-B楼第n层边梁;23-B楼梁柱节点;24-B楼n-1层劲性柱;3-万向铰;4-钢箱梁。
现结合附图和实施例对本发明作进一步详细说明:
具体实施方式
如图1和图2所示,A楼1和B楼2是两座具有倾斜劲性混凝土结构的建筑物,需在两座倾斜劲性混凝土结构的上部第n层之间设置钢连杆。具体施工方法如下:
A、首先对B楼2第n层的楼面21和梁(包括主梁、次梁和边梁22)进行混凝土浇注施工。在A楼1第n层设置后浇段区域10暂不进行混凝土浇注施工,该后浇段区域10包括与钢连杆一端连接的第n-1层劲性柱15、第n层边梁12、自第n层边梁12向内的三分之一跨度的楼面11、处于该三分之一跨度楼面内并与第n层边梁12连接的主梁13和次梁14。对第n层的其余楼面和梁进行混凝土浇注施工。为防止钢连杆安装过程中对后浇段区域内的第n-1层劲性柱用型钢16的稳定性造成影响,需对该劲性柱设置临时加固构件。该临时加固构件为两条呈“八”字型布置的工字钢,该两条工字钢的一端与该n-1层柱的型钢16露出于第n层楼面的部分连接,其另一端则分别与已浇注第n层混凝土楼板11中的预埋钢板连接。
B、进行钢连杆吊装安装施工:先将连杆两端的万向铰3分别与连杆两端梁柱节点17焊接连接,再将连杆中间部分的钢箱梁4与万向铰3进行焊接连接。
C、待钢连杆结构安装完毕并完全冷却、充分释放强约束应力之后,对A楼第n层的后浇段区域10进行混凝土浇注施工。
如此,即可在顺利完成钢连杆安装施工的同时,成功释放出钢连杆焊接过程产生的强约束应力,避免对倾斜劲性混凝土结构下部的劲性混凝土柱造成影响,满足了结构设计的要求,并能保证施工进度。
Claims (4)
1.释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法,是在两座倾斜劲性混凝土结构的上部第n层之间设置钢连杆,其特征在于,由如下步骤组成:
A、对其中一座倾斜劲性混凝土结构第n层的楼面和梁进行混凝土浇注施工;及在另一座倾斜劲性混凝土结构第n层需与钢连杆连接的位置对应设置暂不浇注混凝土的后浇段区域,并对其余楼面和梁进行混凝土浇注施工;
B、在两座倾斜劲性混凝土结构的第n层之间进行钢连杆的安装施工;
C、待钢连杆安装完毕并完全冷却、充分释放强约束应力之后,对另一座倾斜劲性混凝土结构的第n层后浇段区域进行混凝土浇注施工。
2.根据权利要求1所述的施工方法,其特征在于,所述后浇段区域包括:
需与钢连杆一端连接的第n-1层柱;
需与钢连杆连接的第n层边梁;
自第n层边梁向内的三分之一跨度的楼面;
处于该三分之一跨度楼面内并与第n层边梁连接的主梁和次梁。
3.根据权利要求2所述的施工方法,其特征在于,所述第n-1层柱的型钢设有临时加固构件。
4.根据权利要求3所述的施工方法,其特征在于,所述临时加固构件为两条呈“八”字型布置的工字钢,该两条工字钢的一端与该n-1层柱的型钢露出于第n层楼面的部分连接,其另一端则分别与第n层已浇注混凝土中的预埋钢板连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101141418A CN101881082B (zh) | 2010-02-10 | 2010-02-10 | 释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101141418A CN101881082B (zh) | 2010-02-10 | 2010-02-10 | 释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101881082A CN101881082A (zh) | 2010-11-10 |
CN101881082B true CN101881082B (zh) | 2011-11-30 |
Family
ID=43053207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101141418A Active CN101881082B (zh) | 2010-02-10 | 2010-02-10 | 释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101881082B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107152078B (zh) * | 2017-06-29 | 2023-04-07 | 中国建筑第二工程局有限公司 | 铰接装置及利用其释放钢连廊焊接内应力的施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397844A (zh) * | 2008-09-25 | 2009-04-01 | 陕西省第三建筑工程公司 | 特殊型钢混凝土组合结构倾斜墙体模架工程施工方法 |
CN101457559A (zh) * | 2008-12-19 | 2009-06-17 | 北京工业大学 | 钢桁架-钢板-混凝土组合剪力墙及其制作方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0754361A (ja) * | 1993-08-19 | 1995-02-28 | Shinwa:Kk | 法面や建物等の壁面構築工法及びそれに用いる組立鉄筋 |
JPH11343609A (ja) * | 1998-06-01 | 1999-12-14 | Taisei Corp | バックステイ |
-
2010
- 2010-02-10 CN CN2010101141418A patent/CN101881082B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101397844A (zh) * | 2008-09-25 | 2009-04-01 | 陕西省第三建筑工程公司 | 特殊型钢混凝土组合结构倾斜墙体模架工程施工方法 |
CN101457559A (zh) * | 2008-12-19 | 2009-06-17 | 北京工业大学 | 钢桁架-钢板-混凝土组合剪力墙及其制作方法 |
Non-Patent Citations (5)
Title |
---|
JP特开平11-343609A 1999.12.14 |
JP特开平7-54361A 1995.02.28 |
汪大绥, 姜文伟, 包联进等.CCTV新台址主楼施工模拟分析及应用研究.《建筑结构学报》.2008,第29卷(第3期), * |
汪大绥, 姜文伟, 包联进等.CCTV新台址主楼结构设计与思考.《建筑结构学报》.2008,第29卷(第3期), * |
谢夫海.凯恒中心型钢混凝土施工技术.《建筑技术》.2010,第41卷(第1期), * |
Also Published As
Publication number | Publication date |
---|---|
CN101881082A (zh) | 2010-11-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544733A (zh) | 用于支撑建筑物的结构框架***和装配其的方法 | |
WO2012057510A3 (ko) | 철골/철근 콘크리트 구조를 갖는 고층 건축구조물 시공구조 | |
CN102182303B (zh) | 一种倾斜环形封闭结构模板支撑方法 | |
KR101766807B1 (ko) | 플레이트를 활용한 pc기둥-pc보 강접합 결합구조 및 pc거더-pc빔 강접합 결합구조, 이를 이용한 모듈러 시스템 | |
CN102021889A (zh) | 一种桥梁架设方法 | |
CN103046645A (zh) | 一种大跨度预制整浇结构及施工方法 | |
CN110388000A (zh) | 多层型钢-拉索立体支撑超大跨度现浇悬挑梁施工方法 | |
CN104594204A (zh) | 城市轻轨高架桥山型u梁施工支撑体系及施工方法 | |
KR102477955B1 (ko) | 콘크리트 존치거푸집을 이용한 교각 및 그 시공방법 | |
KR101750177B1 (ko) | 절단 브리지형 펀칭전단 보강재 및 이를 이용한 기초판의 시공방법 | |
CN113123516A (zh) | 梁板一体化的预制混凝土结构及施工方法 | |
CN101881082B (zh) | 释放倾斜劲性混凝土结构钢连杆强约束应力的施工方法 | |
JP2010261270A (ja) | 複合構造および複合構造建築物の施工方法 | |
CN109610707B (zh) | 一种预制钢梁与楼板平齐的装配结构及快速施工方法 | |
KR101856768B1 (ko) | 구조물 해체 방법 | |
CN112593632A (zh) | 适用于大跨度高净空建筑的装配式梁板结构及其施工方法 | |
JP2016094766A (ja) | 建築物躯体の構築方法 | |
KR20140137665A (ko) | 철골철근 콘크리트 구조(src)의 확장된 주두부 구조 | |
CN102828616A (zh) | 一种屋盖高支模体系 | |
KR101171061B1 (ko) | 기둥의 수직결합이 용이한 난방배관 일체형 경량합성바닥판이 구비된 모듈러 유닛 | |
KR102244658B1 (ko) | 기둥 상단부에 드롭판넬이 형성된 무량판 구조의 시공방법 | |
CN201024713Y (zh) | 新型建筑物隔震结构 | |
KR100578641B1 (ko) | 스틸 콘크리트 합성 기둥, 이를 이용한 복합 구조 시스템및, 이의 시공방법 | |
CN106869403B (zh) | 多层预制方钢管混凝土连梁 | |
CA2625897A1 (en) | Reinforced concrete forming system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 510075, Guangdong, Guangzhou Yuexiu District Ring East Road, No. 476, 10-17 layers Patentee after: Guangzhou Pearl River Construction Development Co., Ltd Address before: 11, No. 476, No. 510075 East Ring Road, Guangzhou, Guangdong Patentee before: GUANGZHOU RESIDENTIAL CONSTRUCTION DEVELOPMENT Co.,Ltd. |
|
CP03 | Change of name, title or address |