CN101871352A - Water-proof method for seepagetunnel with super burial depth - Google Patents

Water-proof method for seepagetunnel with super burial depth Download PDF

Info

Publication number
CN101871352A
CN101871352A CN 201010201217 CN201010201217A CN101871352A CN 101871352 A CN101871352 A CN 101871352A CN 201010201217 CN201010201217 CN 201010201217 CN 201010201217 A CN201010201217 A CN 201010201217A CN 101871352 A CN101871352 A CN 101871352A
Authority
CN
China
Prior art keywords
jurisdiction
section
super
seepagetunnel
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010201217
Other languages
Chinese (zh)
Inventor
吴惠明
顾赟
宋兴宝
张轶
范杰
梁真
徐征杰
梁敬东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI QINGCAOSHA INVESTMENT CONSTRUCTION DEVELOPMENT Co Ltd
Shanghai Tunnel Engineering Co Ltd
Original Assignee
SHANGHAI QINGCAOSHA INVESTMENT CONSTRUCTION DEVELOPMENT Co Ltd
Shanghai Tunnel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI QINGCAOSHA INVESTMENT CONSTRUCTION DEVELOPMENT Co Ltd, Shanghai Tunnel Engineering Co Ltd filed Critical SHANGHAI QINGCAOSHA INVESTMENT CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN 201010201217 priority Critical patent/CN101871352A/en
Publication of CN101871352A publication Critical patent/CN101871352A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a water-proof method for a seepagetunnel with super burial depth. The method comprises the following steps: before the construction, carrying out the step of increasing the thickness of duct pieces and the step of enhancing the connection between contact surfaces and end faces of the duct pieces, wherein the step of enhancing the connection between the contact surfaces and the end faces of the duct pieces comprises the following steps: increasing the quantity of annular bolts and adding a rebate groove on the annular surfaces of the duct pieces; and increasing positioning rods and double-channel waterstop bands on the end faces of the duct pieces; during the construction, sealing the top of a tube piece lining with a top block of small size when assembling the wedged tube pieces; and selecting rational grouting points on the assembled duct pieces to synchronous grout the duct pieces; and after the construction, filling and blocking handholes and caulked joints of the duct pieces. By using the technical scheme, improving the original duct piece design and constituting a rational construction process, the method ensures the forming quality of the tunnel and controls the synchronous grouting and ensures the stability of the tunnel and the caulked joints of the tunnel and the like so as to meet the water-proof requirement of the seepagetunnel with super burial depth.

Description

A kind of water-proof method for seepagetunnel with super burial depth
Technical field
Waterproof method when the present invention relates to a kind of constructing tunnel relates in particular to a kind of waterproof method of seepagetunnel with super burial depth.
Background technology
Develop rapidly along with the urban underground engineering construction, construction of tunnel is also gradually towards burying deeplyer, developing apart from longer, functional diversities direction, general tunnel water proofing technology can not satisfy existing construction speed requirement, and the waterproof index that especially how effectively guarantees the drinking water tunnel becomes design and unit in charge of construction's emphasis considers a problem.
The suffered limitation of present tunnel water proofing is bigger, and the restraining factors of conventional waterproof technology comprise: the buried depth degree of depth that the tunnel is bigger, and the effect of external and internal pressure after the seepage tunnel water flowing, whether drinking water quality can be guaranteed etc.Any one factor all might determine the success or failure of diversion works.
Surpass in 20 meters the constructing tunnel at average buried depth, also do not have special effective method to guarantee waterproof effect, under such condition, certainly will will reform the method for tunnel water proofing, to reach the waterproof technique requirement of seepagetunnel with super burial depth.
Summary of the invention
The object of the invention is to provide a kind of method, by improving the design of original section of jurisdiction, formulating reasonable construction technology and guarantee that tunnel forming quality, control synchronous grouting guarantee that steps such as tunnel stability and tunnel filleting satisfy the waterproof requirement of seepagetunnel with super burial depth.
To achieve the above object, the invention provides a kind of water-proof method for seepagetunnel with super burial depth, comprise step:
Before construction, increase the step of section of jurisdiction thickness; And strengthen the section of jurisdiction and touch step of connecting between face and end face indirectly; Described reinforcement section of jurisdiction touches indirectly that step of connecting comprises between face and end face, in increasing hoop bolt quantity on the anchor ring of section of jurisdiction and set up concavo-convex tongue-and-groove on the anchor ring of section of jurisdiction, sets up locating bar and two pass waterstop on the end face of section of jurisdiction.The rainwater expanded rubber is pasted in the outside of described two pass waterstop.
In construction, the step of using undersized jacking block that pipe-plate lining is bound when assembly unit is carried out in the wedge shape section of jurisdiction; On spliced section of jurisdiction, choose rational slip casting point carries out synchronous grouting to the section of jurisdiction step.In described slip casting step, on the section of jurisdiction, choose 4 slip casting points and synchronous grouting is carried out in the section of jurisdiction with single liquid slurry; After described slip casting step finishes, connecting bolt is tightened up.When segment assembly, control ovality and magnitude of misalignment, and the ring height of section of jurisdiction is controlled in the 4mm.When slip casting, select corresponding grouting pressure and grouting amount according to the soil layer situation.
After construction, hand hole and section of jurisdiction filleting are filled the step of shutoff.Described hand hole comprises the big hand hole of hoop and vertical little hand hole, carrying out adopting interfacial agents to handle basal plane when hand hole is filled, adopts super early strength micro expansion cement to carry out hand hole then and fills, and sets up zinc-plated dowel in big hand hole; Described section of jurisdiction filleting comprises circumferential weld, longitudinal joint and the deformation joint of general section of jurisdiction, is carrying out filling up polyethylene bar, pointing high modulus polyurethane fluid sealant then when filleting is filled in the tunnel lining piece.
Pass through technique scheme, water-proof method for seepagetunnel with super burial depth of the present invention is by improving the compactness that has guaranteed between section of jurisdiction contact surface and end face to the design of original section of jurisdiction, and formulation reasonable construction technology assurance tunnel forming quality, control synchronous grouting are guaranteed tunnel stability, steps such as tunnel filleting filling are satisfied the waterproof requirement of seepagetunnel with super burial depth after construction.
Description of drawings
Fig. 1 is the flow chart of water-proof method for seepagetunnel with super burial depth of the present invention.
Fig. 2 is the connection diagram of end face four bolts in section of jurisdiction in the water-proof method for seepagetunnel with super burial depth of the present invention;
Fig. 3 is the schematic diagram of the rebate design of anchor ring in the water-proof method for seepagetunnel with super burial depth of the present invention;
Fig. 4 is the schematic diagram of end face locating bar design in the water-proof method for seepagetunnel with super burial depth of the present invention;
Fig. 5 is section of jurisdiction outer course in the water-proof method for seepagetunnel with super burial depth of the present invention, interior elastic caoutchouc and water-absorbing sponge figure schematic diagram;
Fig. 6 is bind for a short time schematic diagram of piece figure of pipe-plate lining in the water-proof method for seepagetunnel with super burial depth of the present invention;
Fig. 7 is the schematic diagram of synchronous grouting point position and grouting amount control in the water-proof method for seepagetunnel with super burial depth of the present invention; And
Fig. 8 is the schematic diagram of section of jurisdiction infiltration behind the employing water-proof method for seepagetunnel with super burial depth of the present invention, the situation of breaking.
The specific embodiment
Illustrate in greater detail technical scheme of the present invention and technique effect below in conjunction with drawings and Examples.
As shown in Figure 1, water-proof method for seepagetunnel with super burial depth of the present invention improves the design of original section of jurisdiction before mainly being included in construction; Formulation reasonable construction technology guarantees the tunnel forming quality and controls synchronous grouting and guarantee tunnel stability in construction; And after construction, carry out the waterproof requirement that steps such as tunnel filleting satisfy seepagetunnel with super burial depth.
Fig. 2 to Fig. 5 has shown the improvement that water-proof method for seepagetunnel with super burial depth of the present invention carries out the design of original section of jurisdiction before construction.
As shown in Figure 2, the thickness of water-proof method for seepagetunnel with super burial depth of the present invention by increasing the section of jurisdiction to be resisting the external pressure that big buried depth brings, and the number by increasing anchor ring bolt 10 is to have increased the compactness that end face connects.In one embodiment, the liner structure internal diameter is 5840mm, external diameter is 6800mm, thickness is 480mm, ring width is 1.5m, the tunnel maximum gradient is 4.5%, minimum radius of horizontal curve is R992.5m, earthing bosom, top, tunnel is 33.8m, the most shallow place of earthing is 16.08m, the end face of every section of jurisdiction is improved to four M36 bolts 10 from two bolts connections and connects, and therefore the bolt 10 of an endless tube sheet (every endless tube sheet is made up of 6 tubule sheets 60, will illustrate with reference to figure 6 in following cooperation) is improved to 24 bolts connections.
As shown in Figures 3 and 4, water-proof method for seepagetunnel with super burial depth of the present invention is more closely knit by anchor ring contact after the concavo-convex tongue-and-groove 20 of increase is finished assembly unit between the anchor ring of section of jurisdiction, and makes the assembly unit location more accurate by increase locating bar 30 settings at the section of jurisdiction end face.Specifically,
As shown in Figure 5, water-proof method for seepagetunnel with super burial depth of the present invention is by being improved to single track waterstop waterproof of the prior art inside and outside two pass EPDM elastic caoutchouc waterstop 40.Preferably, on the elastic caoutchouc basis, can directly paste the waterproof effect of hydro-expansive rubber 50 with further reinforcement tunnel.
Shown that as Fig. 6 and Fig. 7 water-proof method for seepagetunnel with super burial depth of the present invention formulates reasonable construction technology to guarantee the tunnel forming quality and to control synchronous grouting to guarantee tunnel stability in construction.
As shown in Figure 6, the every ring of every endless tube sheet built is made up of six tubule sheets 60 in the water-proof method for seepagetunnel with super burial depth of the present invention, is designated as B1, B2, B3, L1, L2, F totally six models and take the staggered joint erection mode to splice.The F piece is as binding piece, size is about 1/3rd of calibrated bolck, guaranteeing that adjacent two ring straight joints are no more than under 3 the requirement, with respect to the medium size piece that binds, the piece of selecting to bind for a short time makes the position of F piece select to have bigger leeway, the whole piece tunnel axis is kept smoothly having played important function, waterproof effect is guaranteed.
Below further specifically describe the control of water-proof method for seepagetunnel with super burial depth of the present invention to construction technology.Before assembly unit, the type selecting of section of jurisdiction directly determines the formulation of assembling process.In the assembly unit process, need observant technology be: need the special messenger before the assembly unit section of jurisdiction is checked, the scope of examination comprises the section of jurisdiction model, places in proper order, placement direction, section of jurisdiction outward appearance situation, sealing rod stickup situation etc.When being advanced into jack and stretching out 1700mm, measure 4 gaps of shield tail, manually carry out the selection of key position.Key selects to require: adjacent ring straight joint number does not allow above 3.
Whether must someone command in shield structure the place ahead during assembly unit, it is long to prevent that the weight lifting arm from stretching out, and causes that the section of jurisdiction extrados is cracked, observe the section of jurisdiction simultaneously and turn up in.When first of assembly unit, accurate location, the strict control anglec of rotation and in turn up.Hoop, longitudinal bolt must be tightened in section of jurisdiction of every assembly unit, and place waterproof washer on every bolt, and for longitudinal bolt, the bolt length that the two ends, section of jurisdiction spill must be consistent, and nut must all be screwed to the position.Must be noted that opening during two adjacent block of assembly unit L1, L2, especially during the L2 assembly unit, must measure the aperture position between two adjacent block, regulate L2 piece position and be in (this size must be guaranteed) more than the 840mm until opening.If find in the assembly unit L2 process, be difficult to perforate is controlled in the prescribed limit by adjusting to L2, after then L2 locatees to greatest extent, before the piece assembly unit of binding, again L1 is positioned, suitable until opening.
Below further specifically describe water-proof method for seepagetunnel with super burial depth of the present invention stability controlled.The index that characterizes tunnel stability is more, relevant with waterproof quality tunnel come-up, tunnel oval-shaped degree is arranged, encircles the discrepancy in elevation etc.And in practice, tunnel stability and synchronous grouting are closely bound up.This engineering adopts single liquid slurry, by grouting pump slip casting is filled in shield tail space, and the propelling of shield structure, pipe sheet assembling, synchronous grouting are organically combined, and reaches the Dynamic Construction balance, thereby improves the construction quality of tunnel integral body.
As shown in Figure 7,1 stroke is roughly equal to 0.012m 3By practice, advance since the 28th ring, four points of synchronous grouting carry out pressure injection simultaneously, and one to encircle total mud jacking amount constant, is 6-7m 3A1, A4 top each pressure injection 2m of two pipelines 3A2, A3 bottom each pressure injection 1m of two pipelines 3Follow the synchronism of mud jacking in the progradation, the number of stroke according to mud jacking decides the shield driving speed in principle, stops to carry out the ftercompction slurry in case of necessity.After one ring advance to finish, pressed once every one hour, must not blanking time oversize or unmanned mud jacking.In normal progradation, synchronous grouting is based on the control grouting pressure, and grouting pressure reaches 7.0bar and stops slip casting when above, and grouting amount is about about 6~7m3.
In progradation, when moving on to the limit behind the weight lifting arm, require all the section of jurisdiction bolts in preceding 3 rings are tightened up.
Under above assembly unit and grouting process control, its ovality is controlled in 4 ‰ D (D=6800mm) scope behind the pipe sheet assembling; Its ring discrepancy in elevation is controlled in the 4mm, and the dislocation of two pass elastic caoutchouc waterstop can guarantee that within 6mm, the waterproof action of waterstop is unaffected.
Below further specify water-proof method for seepagetunnel with super burial depth of the present invention and after construction, carry out steps such as tunnel filleting.After the tunnel advanced end, hand hole on the section of jurisdiction and circumferential weld longitudinal joint needed to handle, and this engineering adopts the mode of shutoff hand hole and filleting.Wherein the section of jurisdiction hand hole blocking comprises the big hand hole of hoop (cast iron hand hole) and vertical little hand hole, all adopts interfacial agents to handle basal plane, adopts super early strong (microdilatancy) cement of aluminium sulfate to carry out hand hole then and fills, and need set up in addition in the big hand hole Zinc-plated dowel, every Kong Yigen is processed into
Figure BSA00000164750300052
Shape, heat dip zinc treating, coating layer thickness 70 μ m.Interface treating agent adopts acrylic acid fat liquor interface treating agent, and should meet certain index: with wire brush the cast iron basal plane is cleaned out earlier before hand hole is filled, removed the mud in the hand hole, the foreign material such as loosening cement block on cast iron limit.In hand hole cast iron basal plane (comprising bolt, packing ring, nut) brushing three degree interfacial agents, acrylate emulsion consumption is 1.2kg/m then 2, compound is 3kg/m 2In concrete surface brushing once interfacial agents, acrylate emulsion consumption is 0.4kg/m 2, compound is 1kg/m 2
Should keep its density in super early strong (microdilatancy) cement placement process of aluminium sulfate, its surface should guarantee with the section of jurisdiction intrados equal planeness is arranged after filling finished.The cement that shutoff is used should stir as required, and the cement block that has hardened before the filling must not be inserted hand hole, to guarantee the density of inserts.Two waists following hand hole in tunnel is filled and is finished and should wipe one's face immediately, carries out after the initial set wiping one's face the second time, guarantees planeness.
In addition, the section of jurisdiction filleting comprises ring (indulging) seam and the deformation joint of general section of jurisdiction, all adopts with a kind of filleting mode.Promptly in the tunnel lining piece, fill up polyethylene bar, pointing high modulus polyurethane fluid sealant then.
Below cooperate Fig. 8 that the effect of water-proof method for seepagetunnel with super burial depth of the present invention is described.Super large buried depth long distance water diversion tunnel is relatively more rare at home, and its waterproof problem need be taken all factors into consideration.No matter be in design, still in construction technology and stability and later stage aided process management, higher requirement arranged all.The present invention will need the combined factors considered, work out the standards such as section of jurisdiction design, synchronous grouting technology, assembling process and stability control that satisfy the high standard waterproof requirement.
As shown in Figure 8, the statistical form exposed conduit sheet of infiltration and presentation quality such as cracked does not have obvious seepage, weeping, and the small size mark that wets is only arranged.On inspection, the whole leakage rate in tunnel has obtained consistent favorable comment between one of percentage is to two, the detail statistics of section of jurisdiction waterproof effect such as the infiltration of figure section of jurisdiction, the situation of breaking.

Claims (8)

1. a water-proof method for seepagetunnel with super burial depth is characterized in that, comprises step:
A. before construction, increase the step of section of jurisdiction thickness; And strengthen the section of jurisdiction and touch step of connecting between face and end face indirectly;
B. in construction, the step of using undersized jacking block that pipe-plate lining is bound when assembly unit is carried out in the wedge shape section of jurisdiction; On spliced section of jurisdiction, choose rational slip casting point carries out synchronous grouting to the section of jurisdiction step.
2. water-proof method for seepagetunnel with super burial depth as claimed in claim 1, it is characterized in that, described reinforcement section of jurisdiction touches indirectly that step of connecting comprises between face and end face: in increasing hoop bolt quantity on the anchor ring of section of jurisdiction and set up concavo-convex tongue-and-groove on the anchor ring of section of jurisdiction, set up locating bar and two pass waterstop on the end face of section of jurisdiction.
3. water-proof method for seepagetunnel with super burial depth as claimed in claim 2 is characterized in that, in described slip casting step, chooses 4 slip casting points and with single liquid slurry synchronous grouting is carried out in the section of jurisdiction on the section of jurisdiction; After described slip casting step finishes, connecting bolt is tightened up.
4. water-proof method for seepagetunnel with super burial depth as claimed in claim 3 is characterized in that, also be included in construction after, hand hole and section of jurisdiction filleting are filled the step of shutoff.
5. water-proof method for seepagetunnel with super burial depth as claimed in claim 4 is characterized in that, the rainwater expanded rubber is pasted in the outside of described two pass waterstop.
6. water-proof method for seepagetunnel with super burial depth as claimed in claim 5 is characterized in that, controls ovality and magnitude of misalignment when segment assembly, and the ring height of section of jurisdiction is controlled in the 4mm.
7. water-proof method for seepagetunnel with super burial depth as claimed in claim 6 is characterized in that, selects corresponding grouting pressure and grouting amount according to the soil layer situation when slip casting.
8. water-proof method for seepagetunnel with super burial depth as claimed in claim 7, it is characterized in that, described hand hole comprises the big hand hole of hoop and vertical little hand hole, carrying out adopting interfacial agents to handle basal plane when hand hole is filled, adopt super early strength micro expansion cement to carry out hand hole then and fill, in big hand hole, set up zinc-plated dowel; Described section of jurisdiction filleting comprises circumferential weld, longitudinal joint and the deformation joint of general section of jurisdiction, is carrying out filling up polyethylene bar, pointing high modulus polyurethane fluid sealant then when filleting is filled in the tunnel lining piece.
CN 201010201217 2010-06-13 2010-06-13 Water-proof method for seepagetunnel with super burial depth Pending CN101871352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010201217 CN101871352A (en) 2010-06-13 2010-06-13 Water-proof method for seepagetunnel with super burial depth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010201217 CN101871352A (en) 2010-06-13 2010-06-13 Water-proof method for seepagetunnel with super burial depth

Publications (1)

Publication Number Publication Date
CN101871352A true CN101871352A (en) 2010-10-27

Family

ID=42996419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010201217 Pending CN101871352A (en) 2010-06-13 2010-06-13 Water-proof method for seepagetunnel with super burial depth

Country Status (1)

Country Link
CN (1) CN101871352A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071946A (en) * 2010-12-31 2011-05-25 上海市隧道工程轨道交通设计研究院 Plugging device for large-aperture hand hole in shield tunnel
CN102080547A (en) * 2010-12-31 2011-06-01 上海市隧道工程轨道交通设计研究院 Method for plugging big aperture hand hole in shield tunnel
CN103061780A (en) * 2012-12-25 2013-04-24 上海隧道工程股份有限公司 Operating tunnel structure reinforcement construction method through steel ring
CN103742167A (en) * 2013-12-30 2014-04-23 中铁第四勘察设计院集团有限公司 Tunnel segment structure with difference waterproof capability
CN103758531A (en) * 2013-09-29 2014-04-30 深圳中海建筑有限公司 General method for laying out and assembling wedge-shaped duct pieces
CN108425691A (en) * 2018-03-24 2018-08-21 徐州迈斯特机械科技有限公司 A kind of tunnel waterproofing method
CN108487917A (en) * 2018-04-25 2018-09-04 中铁隧道局集团有限公司 A kind of tunnel duct piece hand hole blocking device and method
CN109519194A (en) * 2018-12-13 2019-03-26 西南交通大学 The hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum and construction method
CN111253117A (en) * 2018-12-03 2020-06-09 沈阳市政地铁管片有限公司 Anti-erosion and anti-corrosion concrete shield segment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101338681A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Shield tunneling segment pretightening device
CN201407054Y (en) * 2009-05-26 2010-02-17 中铁第四勘察设计院集团有限公司 Segment connecting structure of subway shield tunnel
CN101705829A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101338681A (en) * 2008-08-08 2009-01-07 上海市隧道工程轨道交通设计研究院 Shield tunneling segment pretightening device
CN201407054Y (en) * 2009-05-26 2010-02-17 中铁第四勘察设计院集团有限公司 Segment connecting structure of subway shield tunnel
CN101705829A (en) * 2009-10-21 2010-05-12 上海隧道工程股份有限公司 Method for controlling quality of tunnel pipe sheet built by using shield method and pipe sheet structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071946A (en) * 2010-12-31 2011-05-25 上海市隧道工程轨道交通设计研究院 Plugging device for large-aperture hand hole in shield tunnel
CN102080547A (en) * 2010-12-31 2011-06-01 上海市隧道工程轨道交通设计研究院 Method for plugging big aperture hand hole in shield tunnel
CN103061780A (en) * 2012-12-25 2013-04-24 上海隧道工程股份有限公司 Operating tunnel structure reinforcement construction method through steel ring
CN103061780B (en) * 2012-12-25 2015-09-09 上海隧道工程股份有限公司 Operation tunnel structure steel loop reinforced construction method
CN103758531A (en) * 2013-09-29 2014-04-30 深圳中海建筑有限公司 General method for laying out and assembling wedge-shaped duct pieces
CN103742167A (en) * 2013-12-30 2014-04-23 中铁第四勘察设计院集团有限公司 Tunnel segment structure with difference waterproof capability
CN103742167B (en) * 2013-12-30 2016-06-22 中铁第四勘察设计院集团有限公司 Possesses the Structural Test of Tunnel Segments of difference waterproof ability
CN108425691A (en) * 2018-03-24 2018-08-21 徐州迈斯特机械科技有限公司 A kind of tunnel waterproofing method
CN108487917A (en) * 2018-04-25 2018-09-04 中铁隧道局集团有限公司 A kind of tunnel duct piece hand hole blocking device and method
CN111253117A (en) * 2018-12-03 2020-06-09 沈阳市政地铁管片有限公司 Anti-erosion and anti-corrosion concrete shield segment
CN109519194A (en) * 2018-12-13 2019-03-26 西南交通大学 The hexagon section of jurisdiction in the tunnel boring machine tunnel on swelled ground stratum and construction method
CN109519194B (en) * 2018-12-13 2023-10-20 西南交通大学 Hexagonal duct piece of tunnel boring machine for expanding soil layer and construction method

Similar Documents

Publication Publication Date Title
CN101871352A (en) Water-proof method for seepagetunnel with super burial depth
CN106988346A (en) Immersed tube tunnel final joint and method for prefabricating, installation method
CN102061710B (en) Diaphragm wall joint and manufacturing method of diaphragm wall
CN108825269A (en) Mechanical Method service channel T socket part position adaptive waterproof construction
CN208280185U (en) A kind of post-cast strip advanced water-stopping construction
CN109356201A (en) A kind of the interface waterproof construction and interface method for waterproofing of new-old concrete
CN103774663A (en) Waterproof structure and construction method of basement anti-floating anchor bar
CN202611012U (en) Assembly type concrete shear wall edge member connection structure
CN109024721B (en) Reinforced foundation and method for improving bending and shearing resistance of existing building rigid foundation
CN110258640A (en) A kind of construction method of the overlapping wall system of covered back-digging
CN206145290U (en) Steel cylinder concrete jack pipe
CN106498929B (en) Grouting Pipe and reinforcement of concrete defect method
CN206693265U (en) A kind of installation node of piping lane
CN206693271U (en) A kind of prefabricated pipe gallery steel plate concrete attachment structure
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN206220277U (en) Simple Deformation Joint Structure for Field Construction
CN208105923U (en) A kind of existing pond increases the connecting joint structure of water string
CN203834477U (en) Waterproof structure of anti-floating anchor bars of basement
CN207376488U (en) A kind of road and bridge crack bracing means
CN110258368A (en) Prefabricated box culvert connecting form adopting twisted steel and construction method
CN205714225U (en) A kind of railway culvert, tunnel defect wavy metal culvert pipe liner bracing means
CN206189456U (en) Three cabin piping lanes
CN205976235U (en) Grout sleeve and prefab
CN211037075U (en) Anti structure of floating of effluent water sump
CN103924694B (en) Leakage repairing treatment method for waterproof concrete expansion joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20101027