CN101858148A - Steel column splicing three-dimensional adjusting method - Google Patents

Steel column splicing three-dimensional adjusting method Download PDF

Info

Publication number
CN101858148A
CN101858148A CN200910029351A CN200910029351A CN101858148A CN 101858148 A CN101858148 A CN 101858148A CN 200910029351 A CN200910029351 A CN 200910029351A CN 200910029351 A CN200910029351 A CN 200910029351A CN 101858148 A CN101858148 A CN 101858148A
Authority
CN
China
Prior art keywords
steel column
otic placode
plumb bob
screw rod
adjusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910029351A
Other languages
Chinese (zh)
Other versions
CN101858148B (en
Inventor
佘小颉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shuntong Construction Company of Jiangsu
Suzhou Jiasheng Construction Engineering Co., Ltd.
ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.
Original Assignee
SHUNTONG CONSTRUCTION Co OF JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHUNTONG CONSTRUCTION Co OF JIANGSU filed Critical SHUNTONG CONSTRUCTION Co OF JIANGSU
Priority to CN2009100293514A priority Critical patent/CN101858148B/en
Publication of CN101858148A publication Critical patent/CN101858148A/en
Application granted granted Critical
Publication of CN101858148B publication Critical patent/CN101858148B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a simple, safe, economic and high-efficiency steel column splicing three-dimensional adjusting method, which adopts a steel column adjuster developed by the inventor to adjust the verticality, height and width of a seam. The method has reasonable process, high positioning precision and advanced technology during the adjusting construction of a steel column, and has remarkable social benefits and economic benefits. The method comprises the following steps of: welding ear plates on a steel column and snapping a center line; lifting the steel column in place, placing the steel column adjuster between the upper ear plate and the lower ear plate according to four directions and adjusting the directions by abutting against the ear plates; fixing an ear plate connecting plate with the upper ear plate and the lower ear plate by using bolts; placing a magnetic plumb bob, adjusting and rotating a middle screw rod till the steel column is perpendicular; determining whether the steel column is perpendicular or not by comparing the distance between the lower end line and the upper end line of the magnetic plumb bob; adjusting the height and the seam while adjusting the verticality; temporally fixing the steel column by using electric welding after the three dimensions of the steel column are corrected; and dismounting a lifting hook and the magnetic plumb bob to finish the mounting by performing final welding and mounting of the steel column.

Description

The steel column butt joint three-dimensional adjusting method
Technical field:
The present invention relates to a kind of steel column butt joint three-dimensional adjusting method, be mainly used in the building aspect, be used for regulating the verticality, absolute altitude of steel column, the width of also adjustable water saving downhand weld simultaneously, make it to satisfy design and code requirement.
Background technology:
Gradually adopted a large amount of steel work in recent years in the domestic construction, steel column application quantity in steel work is bigger, during traditional more piece steel column butt joint, the method of three-dimensional adjusting is to adopt iron wedge, backing plate, crowbar etc., and technology is relatively backward, and dangerous, work efficiency is low, and accuracy is not high yet.
Summary of the invention:
The invention provides a kind of simple, safety, economy, steel column butt joint three-dimensional adjusting method efficiently.This method adopts the steel column adjuster of development voluntarily to regulate the verticality of steel column and the width of weld seam.This method is in steel column adjustment construction, and technology is reasonable, the positioning accuracy height, and advanced technology has remarkable social benefit and economic benefit.
The objective of the invention is to realize by following measure:
A kind of steel column butt joint three-dimensional adjusting method, this method may further comprise the steps:
1), and plays center line to steel column welding otic placode;
2) lift by crane steel column in place, and divide four orientation to be placed between the upper and lower otic placode steel column adjuster, and push against otic placode adjustment orientation;
3) with bolt otic placode junction plate and upper and lower otic placode;
4) place the magnetic plumb bob, and suspension hook is loose, steel column drops on the steel column adjuster in four orientation, and adjustment and rotation middle screw rod are vertical to steel column;
5) by surveying line comparison upper end, magnetic plumb bob lower end linear distance, confirm whether steel column is vertical;
6) the verticality adjustment is regulated horizontal absolute altitude simultaneously, also is the width of regulating side seam, makes it to meet design and code requirement;
7) after the three-dimensional adjustment of steel column, steel column is temporary fixed with electric welding; Unload suspension hook, unload the magnetic plumb bob, carry out final welded and installed, finish installation.
The 7th) after the step, according to design and code requirement welding, unload the lower ear plate connector after finishing when steel column is installed, unload steel column three-dimensional regulation device, slice off otic placode, the steel column installation.
The 5th) after the step, adopt transit to check the steel column verticality, the transit frame on the extended line of ground steel column center line, is checked the accuracy of magnetic verticality that plumb bob is surveyed.
Steel column adjuster center is a screw rod, each suit one nut of screw rod upper/lower terminal, and the upper and lower part hand of spiral of screw rod is opposite, and a nut sleeve is fixed at the screw rod middle part.The outer end of the nut of upper/lower terminal is provided with the draw-in groove that is suitable for the steel column location.The steel column cross section is " O " type, " worker " font, " ten " font, " T " font or " " font.
The present invention has following advantage compared to existing technology:
The present invention's iron wedge, backing plate, crowbar adjusting process compared to existing technology, not only simple, safety, and also economical, efficient.This method is in steel column adjustment construction, and technology is reasonable, the positioning accuracy height, and advanced technology has remarkable social benefit and economic benefit.
The present invention adopts the steel column adjuster of development voluntarily, by the two-way backward leading screw that screws out or precession is middle, increase or reduce steel column adjuster two ends and be stuck in two joint steel columns distance between the nuts on the otic placodes is installed, heighten or reduce a certain angle of steel column, thereby reach the purpose of adjustment steel column verticality, absolute altitude, horizontal butt weld width.
Description of drawings:
Fig. 1 is the structural representation of invention steel column three-dimensional adjusting device.
Fig. 2 transfers three-dimensional school device scheme of installation for steel column of the present invention and steel column.
Fig. 3-Fig. 7 is for being the cross sectional shape schematic diagram of steel column.
Among the figure: the 1-screw rod; The 2-nut; The 3-nut sleeve; 4-steel column three-dimensional adjusting device; The last steel column of 5-; The 6-otic placode; 7-otic placode junction plate.
The specific embodiment:
The utility model will be further described below in conjunction with accompanying drawing:
The steel column adjuster that the present invention adopts is spontaneous development, its structure as shown in Figure 1, steel column adjuster center is a screw rod 1, each suit one nut 2 of screw rod 1 upper/lower terminal, the upper and lower part hand of spiral of screw rod 1 is opposite, a nut sleeve 3 is fixed at screw rod 1 middle part.The outer end of the nut 2 of upper/lower terminal is provided with the draw-in groove that is suitable for the steel column location.Be applicable to that steel column 5 cross sections are installed can be " O " type, " worker " font, " ten " font, " T " font or " " font structure, respectively as Fig. 3-shown in Figure 7.
Steel column butt joint three-dimensional adjusting method of the present invention, illustrate that as shown in Figure 2 concrete steps are as follows:
1, factory process welding otic placode 6, otic placode 6 adopts-14 steel plates to be processed into, and Ge Kai is two up and down
Figure B2009100293514D0000031
The hole.Eject center line with bloom.
2, steel column 5 liftings are in place, available tower crane or mobile crane lifting.
3, steel column three-dimensional regulation 4 devices are positioned between the lower ear plate 6, the screw rod 1 of regulating steel column three-dimensional regulation device 4 makes nut 2 push against otic placode 6.With bolt otic placode junction plate 7 and last lower ear plate 6, prevent from unstability.
4, place the magnetic plumb bob, and suspension hook is loose, steel column 5 is dropped on the steel column three-dimensional regulation device 4.Regulate steel column three-dimensional regulation device 4, make gap at joint satisfy code requirement.
Regulate steel column three-dimensional regulation device nut 2, when screw rod 1 screwed out, two end nuts 1 outwards overhanged, and this place's upper ear plate 6 rises, otherwise should descend by place's upper ear plate 6.
5, survey line comparison upper end, magnetic plumb bob lower end linear distance, measurement face becomes 90 ° with the adjusting direction, because of the last end line of magnetic plumb bob and the distance of steel column are certain, as long as measure down the distance of end line and steel column, when the distance of the distance of end line and steel column and last end line and steel column is identical instantly, can confirm that steel column is vertical.
The verticality adjustment is regulated horizontal absolute altitude simultaneously, and also be the width of regulating side seam this moment, makes it to meet design and code requirement.
6, check the steel column verticality with transit, the transit frame on the extended line of ground steel column center line, is checked the accuracy of magnetic verticality that plumb bob is surveyed, when adopting the magnetic plumb bob to survey the verticality quite stable, can not adopt transit to check, to improve work efficiency.
7, after the three-dimensional adjustment of steel column, steel column is temporary fixed with electric welding.Unload suspension hook, unload the magnetic plumb bob, carry out steel column and install.
8, steel column is according to design and code requirement welding.Unload the lower ear plate connector after finishing, unload steel column three-dimensional regulation device 4, slice off otic placode 6.The steel column installation.
9, steel column three-dimensional regulation device and otic placode junction plate can be processed some pairs according to the practice of construction progress.Otic placode 6 is reusable, can reprocess otic placode 6 in the time can not utilizing once more.

Claims (6)

1. steel column butt joint three-dimensional adjusting method, it is characterized in that: this method may further comprise the steps:
1), and plays center line to steel column welding otic placode;
2) lift by crane steel column in place, and divide four orientation to be placed between the upper and lower otic placode steel column adjuster, and push against otic placode adjustment orientation;
3) with bolt otic placode junction plate and upper and lower otic placode;
4) place the magnetic plumb bob, and suspension hook is loose, steel column drops on the steel column adjuster in four orientation, and adjustment and rotation middle screw rod are vertical to steel column;
5) by surveying line comparison upper end, magnetic plumb bob lower end linear distance, confirm whether steel column is vertical;
6) the verticality adjustment is regulated horizontal absolute altitude simultaneously, also is the width of regulating side seam, makes it to meet design and code requirement;
7) after the three-dimensional adjustment of steel column, steel column is temporary fixed with electric welding; Unload suspension hook, unload the magnetic plumb bob, carry out the final welded and installed of steel column, finish installation.
2. according to the described steel column butt joint three-dimensional adjusting method of claim 1, it is characterized in that: the 7th) after the step, according to design and code requirement welding, unload the lower ear plate connector after finishing when steel column is installed, unload steel column three-dimensional regulation device, slice off otic placode, the steel column installation.
3. according to claim 1 or 2 described steel column butt joint three-dimensional adjusting methods, it is characterized in that: the 5th) after the step, adopt transit to check the steel column verticality, the transit frame on the extended line of ground steel column center line, is checked the accuracy of magnetic verticality that plumb bob is surveyed.
4. according to the described steel column butt joint three-dimensional adjusting method of claim 1, it is characterized in that: described steel column adjuster center is a screw rod, screw rod top and each suit one nut of following two ends, and the upper and lower part hand of spiral of screw rod is opposite, and a nut sleeve is fixed at the screw rod middle part.
5. according to the described steel column butt joint three-dimensional adjusting method of claim 4, it is characterized in that: the outer end of the nut of described upper/lower terminal is provided with the draw-in groove that is suitable for the steel column location.
6. according to the described steel column butt joint three-dimensional adjusting method of claim 4, it is characterized in that: described steel column cross section is " O " type, " worker " font, " ten " font, " T " font or " " font.
CN2009100293514A 2009-04-10 2009-04-10 Steel column splicing three-dimensional adjusting method Expired - Fee Related CN101858148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100293514A CN101858148B (en) 2009-04-10 2009-04-10 Steel column splicing three-dimensional adjusting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100293514A CN101858148B (en) 2009-04-10 2009-04-10 Steel column splicing three-dimensional adjusting method

Publications (2)

Publication Number Publication Date
CN101858148A true CN101858148A (en) 2010-10-13
CN101858148B CN101858148B (en) 2012-08-22

Family

ID=42944287

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100293514A Expired - Fee Related CN101858148B (en) 2009-04-10 2009-04-10 Steel column splicing three-dimensional adjusting method

Country Status (1)

Country Link
CN (1) CN101858148B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102704696A (en) * 2012-06-21 2012-10-03 北京工业大学 Space locator for high, big and heavy steel upright column
CN102733545A (en) * 2012-06-28 2012-10-17 广东中城建设集团有限公司 Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN104100009A (en) * 2014-08-05 2014-10-15 山东莱钢建设有限公司 Connection device for steel column butt connection and steel column butt connecting method
CN104453255A (en) * 2014-10-24 2015-03-25 中国一冶集团有限公司 Heating furnace stand column perpendicularity alignment device and method
CN104895335A (en) * 2015-05-15 2015-09-09 中建钢构有限公司 Method for mounting hanging pillar
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device
CN105110182A (en) * 2015-09-01 2015-12-02 中国化学工程第六建设有限公司 Lifting process for large equipment
CN106149978A (en) * 2015-03-31 2016-11-23 天津市建工工程总承包有限公司 Steel framework post with joint type attachment means
CN107938858A (en) * 2017-12-19 2018-04-20 凉山州现代房屋建筑集成制造有限公司 The anti-misalignment scene splicing node of Special-Shaped Column
CN108343163A (en) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 Steel column butt joint adjusts fixing device and method
CN112709329A (en) * 2020-12-28 2021-04-27 浙江精工钢结构集团有限公司 Steel column butt joint installation three-axis adjusting device and construction method thereof
CN113463929A (en) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 Construction method for improving installation accuracy of steel column

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2438761Y (en) * 2000-06-23 2001-07-11 李得文 Vertical column and transverse beam butt-joint structure
CN2630360Y (en) * 2003-08-08 2004-08-04 北京城建二建设工程有限公司 Steel column butt-joint temporary hoop

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102434003B (en) * 2011-08-29 2014-04-23 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102434003A (en) * 2011-08-29 2012-05-02 山东寿光第一建筑有限公司 Heavy battened steel column construction process
CN102704696A (en) * 2012-06-21 2012-10-03 北京工业大学 Space locator for high, big and heavy steel upright column
CN102704696B (en) * 2012-06-21 2015-05-20 北京工业大学 Space locator for high, big and heavy steel upright column
CN102733545A (en) * 2012-06-28 2012-10-17 广东中城建设集团有限公司 Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN102733545B (en) * 2012-06-28 2014-07-30 广东中城建设集团有限公司 Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN104100009A (en) * 2014-08-05 2014-10-15 山东莱钢建设有限公司 Connection device for steel column butt connection and steel column butt connecting method
CN104453255B (en) * 2014-10-24 2016-09-21 中国一冶集团有限公司 The aligning method of heating furnace verticality of stand column alignment device
CN104453255A (en) * 2014-10-24 2015-03-25 中国一冶集团有限公司 Heating furnace stand column perpendicularity alignment device and method
CN106149978A (en) * 2015-03-31 2016-11-23 天津市建工工程总承包有限公司 Steel framework post with joint type attachment means
CN106149978B (en) * 2015-03-31 2018-06-01 天津市建工工程总承包有限公司 Steel framework column with joint type attachment device
CN104895335A (en) * 2015-05-15 2015-09-09 中建钢构有限公司 Method for mounting hanging pillar
CN104912342A (en) * 2015-06-16 2015-09-16 中国五冶集团有限公司 Steel column butt joint regulating device
CN105110182A (en) * 2015-09-01 2015-12-02 中国化学工程第六建设有限公司 Lifting process for large equipment
CN107938858A (en) * 2017-12-19 2018-04-20 凉山州现代房屋建筑集成制造有限公司 The anti-misalignment scene splicing node of Special-Shaped Column
CN107938858B (en) * 2017-12-19 2023-10-20 凉山州现代房屋建筑集成制造有限公司 On-spot concatenation node of dysmorphism post mistake proofing limit
CN108343163A (en) * 2018-05-08 2018-07-31 中国二十二冶集团有限公司 Steel column butt joint adjusts fixing device and method
CN112709329A (en) * 2020-12-28 2021-04-27 浙江精工钢结构集团有限公司 Steel column butt joint installation three-axis adjusting device and construction method thereof
CN113463929A (en) * 2021-07-29 2021-10-01 中冶建工集团重庆钢结构有限公司 Construction method for improving installation accuracy of steel column

Also Published As

Publication number Publication date
CN101858148B (en) 2012-08-22

Similar Documents

Publication Publication Date Title
CN101858148B (en) Steel column splicing three-dimensional adjusting method
CN103821376B (en) Single-layer latticed shell high-altitude oblique rail accumulation slippage construction
CN103174166B (en) A kind of recreation facility built-in fitting of complete integral installation and mounting method thereof
CN108343163A (en) Steel column butt joint adjusts fixing device and method
CN204552050U (en) A kind of anchor ear bearing frame and scaffolding platform assembly
CN102400559A (en) Steel column correction method in assembly of main body frame steel structure in benzene hydrogenation engineering
CN102864934A (en) Construction method of back-bolt type dry hanging stone curtain wall
CN201381650Y (en) Steel column adjusting device
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN103061249A (en) Quick positioning construction device and construction method for steel-pipe column of bridge
CN111794106B (en) Annular platform for bridge pier column construction and construction method
CN106703014B (en) The pre-buried steel column of diaphram wall is fixed and secondary deviation correcting device and method
CN201649668U (en) Lattice column lifting frame
CN202627214U (en) Beam-column connecting structure for steel reinforced concrete composite structure of high-rise building
CN206337668U (en) A kind of board-like adjustable damper embedded part of full assembled
CN205224561U (en) Rail mounted removes scaffold
CN203099228U (en) Anchor bolt leveling structure
CN202401775U (en) Safety protection platform for elevator shaft
CN102653943B (en) Underground embedded steel column straightening limiting device
CN205474644U (en) Multi -functional strutting arrangement of relevant track construction state adjustment
CN202482772U (en) Collapse-proof stop block mounting system for railway bridge
CN103291042B (en) A kind of can the curtain wall pendant of three-dimensional regulation
CN216551573U (en) Built-in steel tower column splicing construction assembly structure
CN203022409U (en) Iron tower support assembly
CN203594264U (en) Clamp special for angle steel iron tower rectification and tool for angle steel iron tower rectification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING C

Effective date: 20150514

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150514

Address after: 226400 No. 150, Tsing Yi Road South, digging Town, Rudong, Jiangsu

Patentee after: Shuntong Construction Company of Jiangsu

Patentee after: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.

Address before: 226400 No. 150, Tsing Yi Road South, digging Town, Rudong, Jiangsu

Patentee before: Shuntong Construction Company of Jiangsu

ASS Succession or assignment of patent right

Owner name: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING C

Free format text: FORMER OWNER: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.

Effective date: 20150608

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150608

Address after: 226400 No. 150, Tsing Yi Road South, digging Town, Rudong, Jiangsu

Patentee after: Shuntong Construction Company of Jiangsu

Patentee after: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.

Patentee after: Suzhou Jiasheng Construction Engineering Co., Ltd.

Address before: 226400 No. 150, Tsing Yi Road South, digging Town, Rudong, Jiangsu

Patentee before: Shuntong Construction Company of Jiangsu

Patentee before: ZHENHUA GROUP (KUNSHAN) CONSTRUCTION ENGINEERING CO., LTD.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120822

Termination date: 20160410

CF01 Termination of patent right due to non-payment of annual fee