CN101858058B - Turn-around method for bridge girder erection machine - Google Patents

Turn-around method for bridge girder erection machine Download PDF

Info

Publication number
CN101858058B
CN101858058B CN2010102139580A CN201010213958A CN101858058B CN 101858058 B CN101858058 B CN 101858058B CN 2010102139580 A CN2010102139580 A CN 2010102139580A CN 201010213958 A CN201010213958 A CN 201010213958A CN 101858058 B CN101858058 B CN 101858058B
Authority
CN
China
Prior art keywords
bridge formation
formation machine
rotating turret
horn
vehicle frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010102139580A
Other languages
Chinese (zh)
Other versions
CN101858058A (en
Inventor
***
何功玲
张建慈
古辉荣
姚晓虹
张胜
叶鹏云
欧剑
王李洪
刘义新
赖景良
莫劲
唐湘华
葛斌
蔡文胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 25th Bureau Group Co Ltd
Original Assignee
China Railway 25th Bureau Group Co Ltd
Guangzhou Railway Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 25th Bureau Group Co Ltd, Guangzhou Railway Engineering Co Ltd of China Railway 25th Bureau Group Co Ltd filed Critical China Railway 25th Bureau Group Co Ltd
Priority to CN2010102139580A priority Critical patent/CN101858058B/en
Publication of CN101858058A publication Critical patent/CN101858058A/en
Application granted granted Critical
Publication of CN101858058B publication Critical patent/CN101858058B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a turn-around device for a bridge girder erection machine and a method for turning around a machine to be turned around by using the device. The turn-around device comprises a frame and driving mechanisms which are arranged at the two ends of the frame for driving the frame to move along a track, wherein the middle part of the frame is provided with an annular track; a rotary frame is positioned above the frame; a plurality of bearing wheels are arranged in the annular track so as to move along the annular track; the centre of the bottom side of the rotary frame is provided with a worm wheel; and a worm arranged on the frame through a fixing frame is engaged with the worm wheel. The worm is turned so as to drive the worm wheel to rotate, so the bearing wheels can move along the annular track and the rotary frame can rotate gradually. When the bridge girder erection machine is turned around, the bridge girder erection machine can be broken down into a main machine and an arm, the main machine and the arm are arranged on the rotary frame, the rotary frame is controlled to rotate the main machine and the arm for 180 degrees by driving the worm and then the main machine and the arm are reassembled so as to turn around the bridge girder erection machine. The invention has the advantages of safe operation process, simple and convenient use and high efficiency.

Description

A kind of turning method of the machine of building bridge
Technical field
The present invention relates to the bridge formation machine of use in the construction of highway and bridge construction, particularly a kind of device of tune of the machine of building bridge; And the method for using this upender that the bridge formation machine is reversed end for end.
Background technology
The bridge formation machine is the current main construction machinery that sets up the bridge erection of railway T type, setting a roof beam in place in the variation route construction, or setting a roof beam in place in the existing route transformation, and the bridge formation machine often all can need to reverse end for end operation, to satisfy the requirement of site operation.
At present, the bridge formation machine can not be realized pivot turn, mainly adopts the mode of seeking triangle line on the existing railway route nearby to realize tune in the construction, as Fig. 1.During tune, earlier the bridge formation unit disintegrated, fix by the requirement of long-distance transport, and after vehicle sections carried out the rail coherence check and handled the formality of more complicated, the bridge formation machine is transported to the triangle line place along existing line, after the triangle line place finishes the tune operation, get back to initial position along the existing line transportation again, realize the tune of bridge formation machine.
In its tune operation process, need take the transportation of existing railway route, safe pressure is big.Especially, at the triangle track under bridge formation machine situation far away, transport very constant, the safe pressure Judas.In addition, this kind mode, the bridge formation machine need disintegrate and transport for less part, after turning around, it needs again recombinate to the bridge formation machine, not only trouble, length consuming time, and also labour intensity is big.
Summary of the invention
The present invention is intended to provide a kind of efficient, safety, the upender of the bridge formation machine that labor degree intensity is relatively low, and use this device that the tune machine is reversed end for end the method for operation.
The upender of bridge formation machine of the present invention, comprise that vehicle frame and vehicle frame two ends drive the driving mechanism that vehicle frame moves along track, the middle part of vehicle frame is provided with the track of annular, rotating turret is positioned at the vehicle frame top, place in the circular orbit and can move by a plurality of bearing wheels along circular orbit, the central authorities of rotating turret bottom side are equipped with turbine, and the scroll bar that is installed on the vehicle frame by fixed mount is meshed with turbine.
The turning method of bridge formation machine of the present invention comprises following step:
The horn of bridge formation machine is separated with main frame, horn is unloaded from the bridge formation machine;
Bridge formation machine upender is moved to bridge formation machine below, location;
Rotating turret with bridge formation machine upender supports the bridge formation machine host, drives scroll bar and rotates, and makes scroll bar drive the turbine rotation that is engaged with, and bearing wheels is moved along circular orbit, realizes the rotation of rotating turret, thereby drives the bridge formation machine host rotation that places on the rotating turret; The driving scroll bar rotates, and stops after rotating turret rotates 180 degree;
Horn is placed on the bridge formation machine upender, drives scroll bar and rotate, the scroll bar rotation drives the turbine rotation that is engaged with, and the driving rotating turret carries the horn rotation on it, stops after rotating turret rotates 180 degree;
Again horn is installed on the bridge formation machine host.
Above-mentioned bridge formation machine upender can directly be realized the tune of bridge formation machine in the original place, its tune mustn't take the existing railway route, and is fool proof.Simultaneously, in its tune process, the bridge formation machine does not need to disintegrate, and only needs horn to separate with main frame and gets final product, and installs simple, quick and easy once more.Saved greatly because of disintegrating and reset required time and work, greatly improved the efficient of tune, reduced the workload of tune.Reversing end for end the required time can shorten to about 3 days by original 10-15 days.
Description of drawings
Fig. 1 is the schematic diagram of existing bridge formation machine tune;
Fig. 2 is a kind of front view of the machine upender of building bridge;
Fig. 3 is a kind of vertical view of the machine upender of building bridge;
Fig. 4 is a kind of lateral view of the machine upender of building bridge.
The specific embodiment
A kind of upender of the machine of building bridge as Fig. 2, Fig. 3, Fig. 4, comprises that the two ends of vehicle frame 1 and vehicle frame 1 are equipped with the driving mechanism 2 that the driving vehicle frame moves along track.Described driving mechanism can be for by motor 20 wheel driven, and the wheel 21 of similar and train rotates by motor rotating band motor-car wheel, thereby walks along rail.The middle part of vehicle frame is provided with the track 3 of annular, as Fig. 3, rotating turret 4 is positioned at vehicle frame 1 top, place in the circular orbit 3 and can move by a plurality of bearing wheels 5 along circular orbit, described bearing wheels can be four, five, even more, is arranged in the bottom of rotating turret uniformly, the central authorities of rotating turret 4 bottom sides install turbine 6 also are installed, and the scroll bar 8 that is installed on the vehicle frame 1 by fixed mount 7 is meshed with turbine 6.
By rotating scroll bar 8, scroll bar can drive turbine 6 and rotate, thereby the bearing wheels of rotating turret is moved along the circular orbit on the vehicle frame, and rotating turret is rotated gradually.By the number of turns and the angle that the control scroll bar rotates, make rotating turret rotate 180 degree.
When the bridge formation machine being reversed end for end to operate with it, the horn of bridge formation machine is unloaded,, allow the main frame of bridge formation machine be placed on the rotating turret upender dislocation bridge formation motor spindle, rotate by driving scroll bar, drive turbine rotation, the bearing wheels of rotating turret is moved in circular orbit, realize the rotation of rotating turret, the bridge formation machine host that can drive the rotating turret top together rotates, drive scroll bar and make rotating turret rotate 180 degree, can make main frame follow rotation 180 degree, thereby realize the tune of bridge formation machine host.Same method can be reversed end for end to the horn that unloads.Main frame and horn after the tune re-assembly again, have both finished the tune operation of bridge formation machine.The whole operation process, simple, convenient, efficient is high, and safety.

Claims (1)

1. the turning method of the machine of building bridge is characterized in that,
The upender of bridge formation machine comprises that vehicle frame and vehicle frame two ends drive the driving mechanism that vehicle frame moves along track, the middle part of vehicle frame is provided with the track of annular, rotating turret is positioned at the vehicle frame top, place in the circular orbit and can move by a plurality of bearing wheels along circular orbit, the central authorities of rotating turret bottom side are equipped with turbine, and the scroll bar that is installed on the vehicle frame by fixed mount is meshed with turbine;
Turning method comprises following step:
(1) horn with the bridge formation machine separates with main frame, and horn is unloaded from the bridge formation machine;
(2) bridge formation machine host tune: bridge formation machine upender is moved to bridge formation machine below, location; Rotating turret with bridge formation machine upender supports the bridge formation machine host, drives scroll bar and rotates, and makes scroll bar drive the turbine rotation that is engaged with, and bearing wheels is moved along circular orbit, realizes the rotation of rotating turret, thereby drives the bridge formation machine host rotation that places on the rotating turret; The driving scroll bar rotates, and stops after rotating turret rotates 180 degree;
(3) bridge formation machine horn is reversed end for end: horn is placed on the bridge formation machine upender, drives scroll bar and rotate, the scroll bar rotation drives the turbine rotation that is engaged with, and the driving rotating turret carries the horn rotation on it, stops after rotating turret rotates 180 degree;
(4) again horn is installed on the bridge formation machine host.
CN2010102139580A 2010-06-30 2010-06-30 Turn-around method for bridge girder erection machine Expired - Fee Related CN101858058B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102139580A CN101858058B (en) 2010-06-30 2010-06-30 Turn-around method for bridge girder erection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102139580A CN101858058B (en) 2010-06-30 2010-06-30 Turn-around method for bridge girder erection machine

Publications (2)

Publication Number Publication Date
CN101858058A CN101858058A (en) 2010-10-13
CN101858058B true CN101858058B (en) 2011-09-07

Family

ID=42944196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102139580A Expired - Fee Related CN101858058B (en) 2010-06-30 2010-06-30 Turn-around method for bridge girder erection machine

Country Status (1)

Country Link
CN (1) CN101858058B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102817321B (en) * 2012-08-07 2014-10-29 中铁十二局集团有限公司 Bridge girder erection machine set turn-around trolley
CN103046471A (en) * 2012-12-31 2013-04-17 中铁十七局集团第三工程有限公司 Turn-around method implemented in bridging airport
CN104264545B (en) * 2014-11-04 2016-02-03 中铁十五局集团有限公司 A kind of paving sets up standby method of carrying out reversing end for end in paving frame base
CN105297629B (en) * 2015-04-07 2017-06-30 蓝清 For the rotating disk that Bridge Erector is integrally turned to
CN108842622B (en) * 2018-05-28 2019-11-22 中铁十二局集团有限公司 U-turn construction method is rotated integrally on a kind of Bridge Erector bridge
CN108755440B (en) * 2018-07-24 2023-05-23 中铁十二局集团有限公司 Small contact surface shearing-free turning equipment for large-scale equipment
CN113044076A (en) * 2019-12-27 2021-06-29 沙小如 Rail arrangement for turning around of high-speed train
CN113186834A (en) * 2021-05-17 2021-07-30 中铁十二局集团有限公司 Rotary turning device and turning method of girder transporting vehicle of bridge girder erection machine
CN115849179A (en) * 2023-02-28 2023-03-28 山西潞安集团余吾煤业有限责任公司 Temporary direction-adjusting track and direction-adjusting method for monorail crane

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303657A (en) * 2007-06-08 2008-12-18 Meiwa Kogyo Kk Girder installation apparatus and girder installation carriage

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303657A (en) * 2007-06-08 2008-12-18 Meiwa Kogyo Kk Girder installation apparatus and girder installation carriage

Also Published As

Publication number Publication date
CN101858058A (en) 2010-10-13

Similar Documents

Publication Publication Date Title
CN101858058B (en) Turn-around method for bridge girder erection machine
CN107059634B (en) A kind of dedicated gib equipment of tunnel bridge
CN104500107B (en) A kind of existing railway Curing of Tunnel Diseases lining cutting steel arch-shelf mounting groove groover
CN102941390B (en) Multidimensional intersecting line tapping and cutting system for pipeline
CN111232827A (en) Gantry crane with high stability for bridge construction
CN205394855U (en) Tunnel secondary lining cutting device
CN101476407B (en) Vehicle carrier
CN202944362U (en) Track switching device
CN104631882A (en) Avoidance-free dual-layer parking device
CN107630417B (en) Road cone transmission device
CN105799737B (en) Single-track turnout beam drive device
CN106743798A (en) A kind of steel pipe loading apparatus and steel pipe transmission car
CN201722622U (en) Turning-round device of bridge erector
CN105947316B (en) Annular packing cartoning sealing machine
CN203844765U (en) Mining downhole working face turning platform
CN101173569A (en) Ring arch type split cab multi-storied garage
CN108327026A (en) A kind of wood-based planet scoring apparatus
CN204457812U (en) A kind of existing railway Curing of Tunnel Diseases lining cutting steel arch-shelf mounting groove groover
CN105836548B (en) A kind of Intelligent Cable conveying equipment
CN207387019U (en) A kind of brake disc disintegrating machine
CN205239269U (en) Beam carrying vehicle
CN202951950U (en) Multi-dimensional intersecting line tapping and cutting system for pipeline
CN105270239A (en) Beam transporting vehicle
CN201901417U (en) Universal track rotary table structure of track platform vehicle
CN211593999U (en) Ground rotary ferry vehicle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY 25TH BUREAU GROUP CO., LTD.

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Jianping

Inventor after: Liu Yixin

Inventor after: Lai Jingliang

Inventor after: Mo Jin

Inventor after: Tang Xianghua

Inventor after: Ge Bin

Inventor after: Cai Wensheng

Inventor after: He Gongling

Inventor after: Zhang Jianci

Inventor after: Gu Huirong

Inventor after: Yao Xiaohong

Inventor after: Zhang Sheng

Inventor after: Ye Pengyun

Inventor after: Ou Jian

Inventor after: Wang Lihong

Inventor before: Zhang Jianping

Inventor before: Liu Yixin

Inventor before: Lai Jingliang

Inventor before: Mo Jin

Inventor before: Tang Xianghua

Inventor before: He Gongling

Inventor before: Zhang Jianci

Inventor before: Gu Huirong

Inventor before: Yao Xiaohong

Inventor before: Zhang Sheng

Inventor before: Ye Pengyun

Inventor before: Ou Jian

Inventor before: Wang Lihong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG JIANPING HE GONGLING ZHANG JIANCI GU HUIRONG YAO XIAOHONG ZHANG SHENG YE PENGYUN OU JIAN WANG LIHONG LIU YIXIN LAI JINGLIANG MO JIN TANG XIANGHUA TO: ZHANG JIANPING HE GONGLING ZHANG JIANCI GU HUIRONG YAO XIAOHONG ZHANG SHENG YE PENGYUN OU JIAN WANG LIHONG LIU YIXIN LAI JINGLIANG MO JIN TANG XIANGHUA GE BIN CAI WENSHENG

TA01 Transfer of patent application right

Effective date of registration: 20110421

Address after: 510405 No. 2, Guihua East, Guangzhou, Guangdong

Applicant after: Guangzhou Railway Engineering Co., Ltd. of China Railway 25th Bureau Group Co., Ltd.

Co-applicant after: China Railway 25th Bureau Group Co., Ltd.

Address before: 510405 No. 2, Guihua East, Guangzhou, Guangdong

Applicant before: Guangzhou Railway Engineering Co., Ltd. of China Railway 25th Bureau Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110907

Termination date: 20210630

CF01 Termination of patent right due to non-payment of annual fee