CN101852845B - Integrated checking/counting device of intelligent electric energy meter - Google Patents

Integrated checking/counting device of intelligent electric energy meter Download PDF

Info

Publication number
CN101852845B
CN101852845B CN2010101922855A CN201010192285A CN101852845B CN 101852845 B CN101852845 B CN 101852845B CN 2010101922855 A CN2010101922855 A CN 2010101922855A CN 201010192285 A CN201010192285 A CN 201010192285A CN 101852845 B CN101852845 B CN 101852845B
Authority
CN
China
Prior art keywords
electric conductor
electric energy
energy meter
electron source
electrician
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010101922855A
Other languages
Chinese (zh)
Other versions
CN101852845A (en
Inventor
周克西
姜海岚
张国明
黄益峰
朱小弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Original Assignee
HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd filed Critical HAIYAN XINYUE ELECTRIC APPLIANCE CO Ltd
Priority to CN2010101922855A priority Critical patent/CN101852845B/en
Publication of CN101852845A publication Critical patent/CN101852845A/en
Application granted granted Critical
Publication of CN101852845B publication Critical patent/CN101852845B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tests Of Electronic Circuits (AREA)
  • Measurement Of Current Or Voltage (AREA)

Abstract

The invention relates to a checking/counting function switching device of an intelligent electric energy meter. The device comprises a vertical cabinet and two meter frames, wherein the two meter frames are provided with an electricity meter, a pair of an electrician source binding posts, a pair of electric energy meter loop binding posts, a pair of electron source binding posts and a switching device respectively; an electrician source and an electron source are arranged in the vertical cabinet; the switching device comprises an insulating bottom plate and a conductor; and the conductor comprises a left conductor, a middle conductor and a right conductor which are separated from one another. The device has the advantages of reasonable structural design, capability of switching different functions conveniently and low cost.

Description

A kind of detecting/reading integral device for intelligent electric energy meter
Technical field
The present invention relates to a kind of detecting/reading integral device for intelligent electric energy meter.
Background technology
Along with the development of electric power and metering, electric-power metering and relevant departments are more and more higher to demand and the cry of the electric energy meter calibrating apparatus of the electric energy meter calibration/function integration of having good luck, and its purpose mainly is to be convenient to equipment control, is convenient to data sharing.Electric energy meter calibration/the integrated device of having good luck is of electric energy meter calibrating apparatus, and it combines the have good luck all functions of device of electric energy meter calibrating apparatus and electric energy meter, be for Electro-metering center and metrological supervision check the most general a kind of equipment.And the electric energy meter calibration of routine in the prior art/have good luck integrated device as shown in Figure 1, be a kind of accurate integrative machine, be fixed with a pair of the first electrician source binding post 11A ', a pair of the first electric energy meter circuit connection post 13A ', a pair of the first electron source binding post 12A ' at the first dial framework.Be fixed with a pair of the second electrician source binding post 11B ', a pair of the second electric energy meter circuit connection post 13B ', a pair of the second electron source binding post 12B ' at the second dial framework.Electrician source C1 ' and electron source C2 ' are installed on the clothes closet.One of the first electrician source binding post 11A ' is connected with electrician source C1 ', and one of another root and the second electrician source binding post 11B ' is connected, and another root of the second electrician source binding post 11B ' is connected with electrician source C1 '.One of the first electron source binding post 12A ' is connected with electron source C2 ', and one of another root and the second electron source binding post 12B ' is connected, and another root of the second electron source binding post 12B ' is connected with electron source C2 '.Be connected with the interior ammeter loop of the first dial framework between two the first electric energy meter circuit connection post 13A '.Be connected with the interior ammeter loop of the second dial framework between two the second electric energy meter circuit connection post 13B '.
Electrician source C1 ' mainly is comprised of stepup transformer, current lifting device, pressure regulator, and the utility appliance of electrician source C1 ' is comprised of stepper motor, measurement mutual inductor and a small amount of electronic devices and components and electrical fuse.Electrician source C1 ' is used for output voltage, electric current.
Electron source C2 ' is by program-controlled derived digital signal, power amplifier and boost, current lifting device forms, and the utility appliance of electron source C2 ' comprises standard scale, center-control power supply, keyboard, error checking instrument, Communications Interface Unit, relay array, measuring equipment etc.Electron source C2 ' is used for output voltage, electric current, also can control frequency modulation rate, phase modulation position, output harmonic wave.
The output of electrician source C1 ' and electron source C2 ' electric weight is all according to accuracy requirement and the stability requirement of national regulation.
The two stage mechanisms of prior art 48 epi-positions, must do simultaneously certificate test or have good luck test, and can not realize that a dial framework is done certificate test, another dial framework is done this function of test of having good luck, that is to say the all-in-one that is not standard, if the user purchases a calibrating installation and although the device of having good luck can be finished above two functions calibrating,, this obvious cost of equipment gets obviously to be increased, the hold facility area also obviously increase, thereby inadvisable.So only have and realize two dial frameworks when electric energy meter calibrating apparatus and examine and determine respectively simultaneously/have good luck test, and can two functions switch smoothly, save a large amount of loading, unloading table times, can greatly increase work efficiency, but realize that such function must have two cover power sources, from saving cost, an optional cover electronic power source, for inspection purpose, the precision index requirement is arranged; One cover electrician source, the usefulness of having good luck, index request is low.Such cost uses producer to bear.It is as follows that each large manufacturer adopts conventional solution two function switching methods at present: use universal switch or relay, in view of device output current General Requirements reaches 100A.If adopt the universal switch method, generally need 4 pairs of contacts and connect, use as one pair of contact; And adopt the relay method, and be to consider device output stability and long term reliability, generally adopt single-contact magnetic latching relay, two and connect use.In principle, can reach the designing requirement of device.But still deposit the weak point of following several respects:
1, it is too many that current return increases the contact, just increased contact resistance simultaneously, to high-precision electric energy meter calibrating apparatus, will have a strong impact on precision and stability, also has carrying load ability.
2, additionally increased a large amount of connecting lines, and these connecting lines must be more than 20 squares, allow the large electric current line by 100A, increase material cost, increase time cost, also increase technologic manufacture difficulty, affect attractive in appearance.
3, use the universal switch method, each switch needs the contact chip number:
6 (paying the contact) * 4 (contact also connects)=24,
Its length is considerable, and switching universal switch is not that common people can pull, and the operating personnel of equipment are generally in the majority with the women, its result can to and know, so very impracticable.
4, use the relay method, magnetic latching relay is expensive, also needs control module and working power, and cost is a large problem, and wiring is more.In use also there is integrity problem etc., inadvisable.
Summary of the invention
Technical matters to be solved by this invention is to overcome existing above-mentioned deficiency in the prior art, and a kind of reasonable in design, difference in functionality easy switching, detecting/reading integral device for intelligent electric energy meter that cost is low are provided.
The present invention solves the problems of the technologies described above the technical scheme that adopts: a kind of detecting/reading integral device for intelligent electric energy meter comprises the first dial framework, the second dial framework and clothes closet; No. 1 ammeter, No. 2 ammeters are installed in the first dial framework ... the n ammeter, No. 1 ammeter, No. 2 ammeters ... the n ammeter is connected successively, and n is integer; N+1 ammeter, n+2 ammeter are installed in the second dial framework ... the m ammeter, n+1 ammeter, n+2 ammeter ... the m ammeter is connected successively, and m is integer; Electrician source and electron source are installed in the clothes closet; On the first dial framework, be fixed with successively a pair of the first electrician source binding post, a pair of the first electric energy meter circuit connection post, a pair of the first electron source binding post, on the second dial framework, be fixed with successively a pair of the second electrician source binding post, a pair of the second electric energy meter circuit connection post, a pair of the second electron source binding post; One of the first electrician source binding post is connected with the electrician source, and one of another root and the second electrician source binding post is connected, and another root of the second electrician source binding post is connected with the electrician source; One of the first electron source binding post is connected with electron source, and one of another root and the second electron source binding post is connected, and another root of the second electron source binding post is connected with electron source; One of the first electric energy meter circuit connection post is connected with No. 1 ammeter, and another root is connected with the n ammeter; One of the second electric energy meter circuit connection post is connected with the n+1 ammeter, and another root is connected with the m ammeter; It is characterized in that: also comprise switching device shifter, described switching device shifter comprises the first switching device shifter and the second switching device shifter;
The first switching device shifter comprises the first insulating base and the first electric conductor, and the first electric conductor is fixed on the first insulating base; Described the first electric conductor comprises the first left side electric conductor spaced apart from each other, the first middle electric conductor and the first right side electric conductor; Have the first electrician source contact hole, the first electric energy meter loop contact hole and the first electron source contact hole at described the first insulating base, the first electrician source contact hole respectively with the first left side electric conductor be connected in the middle of electric conductor be connected, the first electric energy meter loop contact hole with first in the middle of electric conductor is connected, the first electron source contact hole respectively with the first right side electric conductor be connected the centre electric conductor be connected; The first electrician source binding post is positioned at the first electrician source contact hole, and it cooperates with electric conductor in the middle of the first left side electric conductor and first; The first electric energy meter circuit connection post is positioned at the first electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of first; The first electron source binding post is positioned at the first electron source contact hole, and it cooperates with electric conductor in the middle of the first right side electric conductor and first;
The second switching device shifter comprises the second insulating base and the second electric conductor, and the second electric conductor is fixed on the second insulating base; Described the second electric conductor comprises the second left side electric conductor spaced apart from each other, the second middle electric conductor and the second right side electric conductor; Have the second electrician source contact hole, the second electric energy meter loop contact hole and the second electron source contact hole at described the second insulating base, the second electrician source contact hole respectively with the second left side electric conductor be connected in the middle of electric conductor be connected, the second electric energy meter loop contact hole with second in the middle of electric conductor is connected, the second electron source contact hole respectively with the second right side electric conductor be connected the centre electric conductor be connected; The second electrician source binding post is positioned at the second electrician source contact hole, and it cooperates with electric conductor in the middle of the second left side electric conductor and second; The second electric energy meter circuit connection post is positioned at the second electric energy meter loop contact hole, and it cooperates with electric conductor in the middle of second; The second electron source binding post is positioned at the second electron source contact hole, and it cooperates with electric conductor in the middle of the second right side electric conductor and second.
The first switching device shifter of the present invention can move along the orientation of the first electrician source binding post, the first electric energy meter circuit connection post, the first electron source binding post, and has two extreme positions; When the first switching device shifter moves to one of them extreme position, a pair of the first electrician source binding post contacts with the first left side electric conductor, a pair of the first electron source binding post contacts with electric conductor in the middle of first, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of first; When the first switching device shifter moves to another extreme position, a pair of the first electrician source binding post contacts with electric conductor in the middle of first, a pair of the first electron source binding post contacts with the first right side electric conductor, and a pair of the first electric energy meter circuit connection post contacts with electric conductor in the middle of first.
The second switching device shifter of the present invention can move along the orientation of the second electrician source binding post, the second electric energy meter circuit connection post, the second electron source binding post, and has two extreme positions; When the second switching device shifter moves to one of them extreme position, a pair of the second electrician source binding post contacts with the second left side electric conductor, a pair of the second electron source binding post contacts with electric conductor in the middle of second, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of second; When the first switching device shifter moves to another extreme position, a pair of the second electrician source binding post contacts with electric conductor in the middle of second, a pair of the second electron source binding post contacts with the second right side electric conductor, and a pair of the second electric energy meter circuit connection post contacts with electric conductor in the middle of first.
Electric conductor is divided into two that separate in the middle of of the present invention first, and the described second middle electric conductor is divided into two that separate.
The first electrician source contact hole of the present invention, the first electron source contact hole, the first electric energy meter loop contact hole, the second electrician source contact hole, the second electron source contact hole, the second electric energy meter loop contact hole are mounting hole.
The present invention has the groove that mates with the first electrician source contact hole one arc hole face at the first left side electric conductor, electric conductor has the groove that mates with another arc hole face of the first electrician source contact hole in the middle of first; Have the groove that mates with the first electron source contact hole one arc hole face at the first right side electric conductor, electric conductor has the groove that mates with another arc hole face of the first electron source contact hole in the middle of first; On electric conductor in the middle of first, also have the hole with the first electric energy meter loop contact hole coupling;
Have the groove that mates with the second electrician source contact hole one arc hole face at the second left side electric conductor, electric conductor has the groove that mates with another arc hole face of the second electrician source contact hole in the middle of second; Have the groove that mates with the second electron source contact hole one arc hole face at the second right side electric conductor, electric conductor has the groove that mates with another arc hole face of the second electron source contact hole in the middle of second; On electric conductor in the middle of second, also have the hole with the second electric energy meter loop contact hole coupling.
The first electrician source binding post of the present invention, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection post are cylindrical.
The first electric conductor of the present invention and the first insulator adopt seccotine to be adhesively fixed, and described the second electric conductor and the second insulator adopt seccotine to be adhesively fixed.
The first electrician source binding post of the present invention, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection, the first electric conductor, the second electric conductor all are made of copper.
The first insulating base of the present invention and the second insulating base all adopt the epoxy plate material to make.
The present invention compared with prior art has following positive effect: 1, reasonable in design; 2, adopt the present invention to need not to use in the situation of relay or universal switch and carry out smoothly two large functions switchings, cost and the complexity of the separated time that reduces simultaneously, not only cabling is attractive in appearance but also calibrating and any easy switching of the function of having good luck, production cost is low, the special high precision that also guarantees calibrating, but Cost reduction is more than 8000 yuan, and adopts copper material binding post and copper electric conductor to make electric conductivity reliable and stable.
Description of drawings
Fig. 1 is the connection diagram of prior art.
Fig. 2 is the structural representation of the embodiment of the invention.
Fig. 3 is the connection diagram between several critical elements of the embodiment of the invention.
Fig. 4 is the sectional structure schematic diagram of the first switching device shifter.
Fig. 5 be Fig. 4 C-C to the sectional structure schematic diagram.
Fig. 6 is the sectional structure schematic diagram of the second switching device shifter.
Fig. 7 be Fig. 6 D-D to the sectional structure schematic diagram.
Embodiment
The invention will be further described below in conjunction with accompanying drawing and by embodiment.
Embodiment:
Referring to Fig. 2~Fig. 7, the present invention includes the first dial framework A, the second dial framework B and clothes closet C.
Ammeter A1, No. 2 ammeter A2 are installed in the first dial framework A No. 1 ... No. 24 ammeter A24, No. 1 ammeter A1, No. 2 ammeter A2 ... No. 24 ammeter A24 connects successively.Ammeter B25, No. 26 ammeter B26 are installed in the second dial framework B No. 25 ... No. 48 ammeter B48, No. 25 ammeter B25, No. 26 ammeter B26 ... No. 48 ammeter B48 connects successively.Be fixed with a pair of the first electrician source binding post 11A, a pair of the first electric energy meter circuit connection post 13A, a pair of the first electron source binding post 12A at the first dial framework A.Be fixed with a pair of the second electrician source binding post 11B, a pair of the second electric energy meter circuit connection post 13B, a pair of the second electron source binding post 12B at the second dial framework B.Electrician source C1 and electron source C2 are installed on the clothes closet C.One of the first electrician source binding post 11A is connected with electrician source C1, and one of another root and the second electrician source binding post 11B is connected, and another root of the second electrician source binding post 11B is connected with electrician source C1.One of the first electron source binding post 12A is connected with electron source C2, and one of another root and the second electron source binding post 12B is connected, and another root of the second electron source binding post 12B is connected with electron source C2.One of the first electric energy meter circuit connection post 13A is connected with No. 1 ammeter A1, and another root is connected with No. 24 ammeter A24.One of the second electric energy meter circuit connection post 13B is connected with No. 25 ammeter B25, and another root is connected with No. 48 ammeter B48.
The equipment such as standard scale C3, control module C4, current lifting device C5, stepup transformer C6, relay control unit C7 also have been installed in clothes closet C, and the structure of each equipment, function, annexation are prior art among the clothes closet C, repeat no more.Ammeter loop in the first dial framework A and the second dial framework B also is prior art.
The first switching device shifter 2A is sleeved on the first electrician source binding post 11A, the first electric energy meter circuit connection post 13A, the first electron source binding post 12A, and the first switching device shifter 2A can be along the orientation move left and right of binding post.The first switching device shifter 2A comprises the first insulating base 23A and the first electric conductor 22A, and the first electric conductor 22A is adhesively fixed on the first insulating base 23A with seccotine.The first insulating base 23A adopts the epoxy plate material to make, and the first electric conductor 22A is made of copper.
Have a pair of the first electrician source contact hole 211A, a pair of the first electric energy meter loop contact hole 213A and a pair of the first electron source contact hole 212A at the first insulating base 23A.The first electrician source contact hole 211A, the first electric energy meter loop contact hole 213A and the first electron source contact hole 212A are mounting hole.The first electrician source contact hole 211A, the first electric energy meter loop contact hole 213A and the first electron source contact hole 212A are arranged in order.The first electrician source binding post 11A is positioned at the first electrician source contact hole 211A, and the first electric energy meter circuit connection post 13A is positioned at the first electric energy meter loop contact hole 213A, and the first electron source binding post 12A is positioned at the first electron source contact hole 212A.The equal in length of the first electron source contact hole 212A and the first electrician source contact hole 211A, the length of the first electric energy meter loop contact hole 213A is more than or equal to the first electron source contact hole 212A.
The first electric conductor 22A comprises the first left side electric conductor 221A, the first middle electric conductor 223A and the first right side electric conductor 222A, and electric conductor 223A and the first right side electric conductor 222A are spaced from each other in the middle of the first left side electric conductor 221A, first, do not contact.Have the groove 2211A that mates with the first electrician source contact hole 211A one arc hole face at the first left side electric conductor 221A, the first left side electric conductor 221A is connected with the first electrician source contact hole 211A by groove 2211A; And electric conductor 223A has the groove 2231A that mates with another arc hole face of the first electrician source contact hole 211A in the middle of first, and the first middle electric conductor 223A is connected with the first electrician source contact hole 211A by groove 2231A.Have the groove 2221A that mates with the first electron source contact hole 212A one arc hole face at the first right side electric conductor 222A, the first right side electric conductor 222A is connected with the first electron source contact hole 212A by groove 2221A; And electric conductor 223A has the groove 2232A that mates with another arc hole face of the first electron source contact hole 212A in the middle of first, and the first middle electric conductor 223A is connected with the first electron source contact hole 212A by groove 2232A.On electric conductor 223A in the middle of first, also have the hole 2233A with the first electric energy meter loop contact hole 213A coupling.Electric conductor 223A is divided into two that separate in the middle of first, does not contact between two, and wherein a slice contacts with first an electric energy meter circuit connection post 13A, and another sheet contacts with another root the first electric energy meter circuit connection post 13A.
Each root binding post contact hole corresponding with it can relatively move.
The first electrician source binding post 11A cooperates with the first left side electric conductor 221A by groove 2211A, cooperates by electric conductor 223A in the middle of the groove 2231A and first.The first electric energy meter circuit connection post 13A cooperates by electric conductor 223A in the middle of the hole 2233A and first.The first electron source binding post 12A cooperates with the first right side electric conductor 222A by groove 2221A, cooperates by electric conductor 223A in the middle of the groove 2232A and first.Concrete fit system is such: the first electric energy meter circuit connection post 13A contacts with electric conductor 223A in the middle of first all the time; When the first switching template 2A is moved to the left to extreme position, then the first electrician source binding post 11A contacts with groove 2231A, the first electrician source binding post 11A and the first electric energy meter circuit connection post 13A are connected, and the first electron source binding post 12A contacts with groove 2221A, and a pair of the first electron source binding post 12A is conducted by the first right side electric conductor 222A; Switch the template 2A extreme position that moves right when first, then the first electron source binding post 12A contacts with groove 2232A, the first electron source binding post 12A and the first electric energy meter circuit connection post 13A are connected, and the first electrician source binding post 11A contacts with groove 2211A, and a pair of the first electrician source binding post 11A is conducted by the first left side electric conductor 221A.
Principle of work: by the first switching device shifter 2A left and right sides translation being realized the switching between the different electrical power.When being moved to the left to extreme position, then the first electrician source binding post 11A and the first electric energy meter circuit connection post 13A are connected, and a pair of the first electron source binding post 12A is conducted by the first right side electric conductor 222A, keep electron source C2 to form simultaneously the loop when realizing electrician source C1 output, in order to realize the electron source output of other ammeter, and a pair of the first electron source binding post 12A is such as not conducting at this moment, and then electron source C2 can't form the loop, thereby can't realize simultaneously electron source C2 output.Then principle is opposite when the first switching device shifter 2A moves right extreme position.
The second switching device shifter 2B is sleeved on the second electrician source binding post 11B, the second electric energy meter circuit connection post 13B, the second electron source binding post 12B, and the second switching device shifter 2B can be along the orientation move left and right of binding post.The second switching device shifter 2B comprises the second insulating base 23B and the second electric conductor 22B, and the second electric conductor 22B is adhesively fixed on the second insulating base 23B with seccotine.The second insulating base 23B adopts the epoxy plate material to make, and the second electric conductor 22B is made of copper.
Have two couples of the second electrician source contact hole 211BB, two couples of the second electric energy meter loop contact hole 213BB and two couples of the second electron source contact hole 212BB at the second insulating base 23B.The second electrician source contact hole 211B, the second electric energy meter loop contact hole 213B and the second electron source contact hole 212B are mounting hole.The second electrician source contact hole 211B, the second electric energy meter loop contact hole 213B and the second electron source contact hole 212B are arranged in order.The second electrician source binding post 11B is positioned at the second electrician source contact hole 211B, and the second electric energy meter circuit connection post 13B is positioned at the second electric energy meter loop contact hole 213B, and the second electron source binding post 12B is positioned at the second electron source contact hole 212B.The equal in length of the second electron source contact hole 212B and the second electrician source contact hole 211B, the length of the second electric energy meter loop contact hole 213B is more than or equal to the second electron source contact hole 212B.
The second electric conductor 22B comprises the second left side electric conductor 221B, the second middle electric conductor 223B and the second right side electric conductor 222B, and electric conductor 223B and the second right side electric conductor 222B are spaced from each other in the middle of the second left side electric conductor 221B, second, do not contact.Have the groove 2211B that mates with the second electrician source contact hole 211B two arc hole faces at the second left side electric conductor 221B, the second left side electric conductor 221B is connected with the second electrician source contact hole 211B by groove 2211B; And electric conductor 223B has the groove 2231B that mates with other two arc hole faces of the second electrician source contact hole 211B in the middle of second, and the second middle electric conductor 223B is connected with the second electrician source contact hole 211B by groove 2231B.Have the groove 2221B that mates with the second electron source contact hole 212B two arc hole faces at the second right side electric conductor 222B, the second right side electric conductor 222B is connected with the second electron source contact hole 212B by groove 2221B; And electric conductor 223B has the groove 2232B that mates with other two arc hole faces of the second electron source contact hole 212B in the middle of second, and the second middle electric conductor 223B is connected with the second electron source contact hole 212B by groove 2232B.On electric conductor 223B in the middle of second, also have the hole 2233B with the second electric energy meter loop contact hole 213B coupling.Electric conductor 223B is divided into two that separate in the middle of second, does not contact between two, and wherein two contact with two the second electric energy meter circuit connection post 13B, other two contact with other two the second electric energy meter circuit connection post 13B.
Each root binding post contact hole corresponding with it can relatively move.
The second electrician source binding post 11B cooperates with the second left side electric conductor 221B by groove 2211B, cooperates by electric conductor 223B in the middle of the groove 2231B and second.The second electric energy meter circuit connection post 13B cooperates by electric conductor 223B in the middle of the hole 2233B and second.The second electron source binding post 12B cooperates with the second right side electric conductor 222B by groove 2221B, cooperates by electric conductor 223B in the middle of the groove 2232B and second.Concrete fit system is such: the second electric energy meter circuit connection post 13B contacts with electric conductor 223B in the middle of second all the time; When the second switching template 2B is moved to the left to extreme position, then the second electrician source binding post 11B contacts with groove 2231B, the second electrician source binding post 11B and the second electric energy meter circuit connection post 13B are connected, and the second electron source binding post 12B contacts with groove 2221B, and a pair of the second electron source binding post 12B is conducted by the second right side electric conductor 222B; Switch the template 2B extreme position that moves right when second, then the second electron source binding post 12B contacts with groove 2232B, the second electron source binding post 12B and the second electric energy meter circuit connection post 13B are connected, and the second electrician source binding post 11B contacts with groove 2211B, and a pair of the second electrician source binding post 11B is conducted by the second left side electric conductor 221B.
Principle of work: by the second switching device shifter 2B left and right sides translation being realized the switching between the different electrical power.When being moved to the left to extreme position, then the second electrician source binding post 11B and the second electric energy meter circuit connection post 13B are connected, and a pair of the second electron source binding post 12B is conducted by the second right side electric conductor 222B, keep electron source C2 to form simultaneously the loop when realizing electrician source C1 output, in order to realize the electron source output of other ammeter, and a pair of the second electron source binding post 12B is such as not conducting at this moment, and then electron source C2 can't form the loop, thereby can't realize simultaneously electron source C2 output.Then principle is opposite when the second switching device shifter 2B moves right extreme position.

Claims (10)

1. a detecting/reading integral device for intelligent electric energy meter comprises the first dial framework, the second dial framework and clothes closet; No. 1 ammeter is installed to the n ammeter in the first dial framework, No. 1 ammeter is connected successively to the n ammeter, and n is integer; The n+1 ammeter is installed to the m ammeter in the second dial framework, the n+1 ammeter is connected successively to the m ammeter, and m is integer; Electrician source and electron source are installed in the clothes closet; On the first dial framework, be fixed with successively a pair of the first electrician source binding post, a pair of the first electric energy meter circuit connection post, a pair of the first electron source binding post, on the second dial framework, be fixed with successively a pair of the second electrician source binding post, a pair of the second electric energy meter circuit connection post, a pair of the second electron source binding post; One of the first electrician source binding post is connected with the electrician source, and one of another root and the second electrician source binding post is connected, and another root of the second electrician source binding post is connected with the electrician source; One of the first electron source binding post is connected with electron source, and one of another root and the second electron source binding post is connected, and another root of the second electron source binding post is connected with electron source; One of the first electric energy meter circuit connection post is connected with No. 1 ammeter, and another root is connected with the n ammeter; One of the second electric energy meter circuit connection post is connected with the n+1 ammeter, and another root is connected with the m ammeter; It is characterized in that: also comprise switching device shifter, described switching device shifter comprises the first switching device shifter and the second switching device shifter;
The first switching device shifter comprises the first insulating base and the first electric conductor, and the first electric conductor is fixed on the first insulating base; Described the first electric conductor comprises the first left side electric conductor spaced apart from each other, the first middle electric conductor and the first right side electric conductor; Have two the first electrician source contact holes, two the first electric energy meter loop contact holes and two the first electron source contact holes at described the first insulating base, two the first electrician source contact holes all with the first left side electric conductor be connected in the middle of electric conductor be connected, two the first electric energy meter loop contact holes all are connected with electric conductor in the middle of first, two the first electron source contact holes all with the first right side electric conductor be connected the centre electric conductor and be connected; Two the first electrician source binding posts lay respectively in two the first electrician source contact holes, and two the first electrician source binding posts all cooperate with electric conductor in the middle of the first left side electric conductor and first; Two the first electric energy meter circuit connection posts lay respectively in two the first electric energy meter loop contact holes, and two the first electric energy meter circuit connection posts cooperate with electric conductor in the middle of first; Two the first electron source binding posts lay respectively in two the first electron source contact holes, and two the first electron source binding posts all cooperate with electric conductor in the middle of the first right side electric conductor and first;
The second switching device shifter comprises the second insulating base and the second electric conductor, and the second electric conductor is fixed on the second insulating base; Described the second electric conductor comprises the second left side electric conductor spaced apart from each other, the second middle electric conductor and the second right side electric conductor; Have two the second electrician source contact holes, two the second electric energy meter loop contact holes and two the second electron source contact holes at described the second insulating base, two the second electrician source contact holes all with the second left side electric conductor be connected in the middle of electric conductor be connected, two the second electric energy meter loop contact holes all are connected with electric conductor in the middle of second, two the second electron source contact holes all with the second right side electric conductor be connected the centre electric conductor and be connected; Two the second electrician source binding posts lay respectively in two the second electrician source contact holes, and two the second electrician source binding posts all cooperate with electric conductor in the middle of the second left side electric conductor and second; Two the second electric energy meter circuit connection posts lay respectively in the second electric energy meter loop contact hole, and two the second electric energy meter circuit connection posts all cooperate with electric conductor in the middle of second; Two the second electron source binding posts are positioned at the second electron source contact hole, and two the second electron source binding posts all cooperate with electric conductor in the middle of the second right side electric conductor and second.
2. detecting/reading integral device for intelligent electric energy meter according to claim 1, it is characterized in that: described the first switching device shifter can move along the orientation of the first electrician source binding post, the first electric energy meter circuit connection post, the first electron source binding post, and has two extreme positions; When the first switching device shifter moves to one of them extreme position, a pair of the first electrician source binding post contacts with the first left side electric conductor, a pair of the first electron source binding post contacts with electric conductor in the middle of first, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of first; When the first switching device shifter moves to another extreme position, a pair of the first electrician source binding post contacts with electric conductor in the middle of first, a pair of the first electron source binding post contacts with the first right side electric conductor, and a pair of the first electric energy meter circuit connection post contacts with electric conductor in the middle of first.
3. detecting/reading integral device for intelligent electric energy meter according to claim 1, it is characterized in that: described the second switching device shifter can move along the orientation of the second electrician source binding post, the second electric energy meter circuit connection post, the second electron source binding post, and has two extreme positions; When the second switching device shifter moves to one of them extreme position, a pair of the second electrician source binding post contacts with the second left side electric conductor, a pair of the second electron source binding post contacts with electric conductor in the middle of second, and a pair of electric energy meter circuit connection post contacts with electric conductor in the middle of second; When the first switching device shifter moves to another extreme position, a pair of the second electrician source binding post contacts with electric conductor in the middle of second, a pair of the second electron source binding post contacts with the second right side electric conductor, and a pair of the second electric energy meter circuit connection post contacts with electric conductor in the middle of first.
4. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: electric conductor is divided into two that separate in the middle of described first, and electric conductor is divided into two that separate in the middle of described second.
5. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: described the first electrician source contact hole, the first electron source contact hole, the first electric energy meter loop contact hole, the second electrician source contact hole, the second electron source contact hole, the second electric energy meter loop contact hole are mounting hole.
6. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: have the groove that mates with the first electrician source contact hole one arc hole face at the first left side electric conductor, electric conductor has the groove that mates with another arc hole face of the first electrician source contact hole in the middle of first; Have the groove that mates with the first electron source contact hole one arc hole face at the first right side electric conductor, electric conductor has the groove that mates with another arc hole face of the first electron source contact hole in the middle of first; On electric conductor in the middle of first, also have the hole with the first electric energy meter loop contact hole coupling; Have the groove that mates with the second electrician source contact hole one arc hole face at the second left side electric conductor, electric conductor has the groove that mates with another arc hole face of the second electrician source contact hole in the middle of second; Have the groove that mates with the second electron source contact hole one arc hole face at the second right side electric conductor, electric conductor has the groove that mates with another arc hole face of the second electron source contact hole in the middle of second; On electric conductor in the middle of second, also have the hole with the second electric energy meter loop contact hole coupling.
7. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: described the first electrician source binding post, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection post are cylindrical.
8. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: described the first electric conductor and the first insulating base adopt seccotine to be adhesively fixed, and described the second electric conductor and the second insulating base adopt seccotine to be adhesively fixed.
9. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: described the first electrician source binding post, the first electron source binding post, the first electric energy meter circuit connection post, the second electrician source binding post, the second electron source binding post, the second electric energy meter circuit connection, the first electric conductor, the second electric conductor all are made of copper.
10. according to claim 2 or 3 described detecting/reading integral device for intelligent electric energy meters, it is characterized in that: described the first insulating base and the second insulating base all adopt the epoxy plate material to make.
CN2010101922855A 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter Expired - Fee Related CN101852845B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101922855A CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101922855A CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Publications (2)

Publication Number Publication Date
CN101852845A CN101852845A (en) 2010-10-06
CN101852845B true CN101852845B (en) 2013-05-01

Family

ID=42804421

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101922855A Expired - Fee Related CN101852845B (en) 2010-06-03 2010-06-03 Integrated checking/counting device of intelligent electric energy meter

Country Status (1)

Country Link
CN (1) CN101852845B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104076318B (en) * 2014-04-18 2017-07-14 国家电网公司 The bug check platform and bug check method of a kind of intelligent electric meter
CN106443552B (en) * 2016-07-27 2019-03-01 国网重庆市电力公司电力科学研究院 A kind of analog measurement case running environment carries out the separate switching route of electricity consumption and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0360511A2 (en) * 1988-09-19 1990-03-28 General Electric Company Electric energy metering
CN2704051Y (en) * 2002-04-23 2005-06-08 江苏林洋电子有限公司 Three-phase multifunctional electric energy meter counting device
DE102005025108B3 (en) * 2005-06-01 2006-07-20 Ostmeier, Hubert, Dipl.-Ing. Device for testing protection, measuring or counting devices as component of medium or high voltage equipment has pole strip which can be attached on this device, whereby pole strip exhibits several pole openings arranged one behind other
CN201021936Y (en) * 2007-08-03 2008-02-13 重庆电力科学试验研究院 Integrated device for power meter calibration and operation pressure resistance
CN201716407U (en) * 2010-06-03 2011-01-19 海盐新跃电器有限公司 Detecting/reading integral device for intelligent electric energy meter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0360511A2 (en) * 1988-09-19 1990-03-28 General Electric Company Electric energy metering
CN2704051Y (en) * 2002-04-23 2005-06-08 江苏林洋电子有限公司 Three-phase multifunctional electric energy meter counting device
DE102005025108B3 (en) * 2005-06-01 2006-07-20 Ostmeier, Hubert, Dipl.-Ing. Device for testing protection, measuring or counting devices as component of medium or high voltage equipment has pole strip which can be attached on this device, whereby pole strip exhibits several pole openings arranged one behind other
CN201021936Y (en) * 2007-08-03 2008-02-13 重庆电力科学试验研究院 Integrated device for power meter calibration and operation pressure resistance
CN201716407U (en) * 2010-06-03 2011-01-19 海盐新跃电器有限公司 Detecting/reading integral device for intelligent electric energy meter

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李震虹等.多功能电能表全自动程控走字试验装置的一种方案设计.《仪表技术》.2010,(第5期),全文. *
沈滢.单相电能表多功能走字试验装置的应用实践.《上海电力学院学报》.2002,第18卷(第2期),全文. *

Also Published As

Publication number Publication date
CN101852845A (en) 2010-10-06

Similar Documents

Publication Publication Date Title
CN201955421U (en) Wiring detector for multifunctional electric energy metering device
CN103472433B (en) Intelligent substation electric energy measuring secondary system virtual load error detection device and method
CN207650253U (en) A kind of Multifunctional measuring special junction box
CN106443561B (en) Integral inspection method and device for electric energy metering device with voltage of 35kV or below
CN103809018A (en) Electric energy metering device and method
CN109471047A (en) A kind of Portable Automatic measuring device for alterating and direct current source calibration
CN110794207A (en) Three-phase manganin sampling alternating current guide rail meter
CN101852845B (en) Integrated checking/counting device of intelligent electric energy meter
CN2932394Y (en) Metering device with a wide current measuring range
CN106249192B (en) Metering equipment field operation detecting system
CN201435305Y (en) Current and voltage transformer module
CN201716407U (en) Detecting/reading integral device for intelligent electric energy meter
CN203658571U (en) Switching wiring circuit for double-loop ammeter detection instrument
CN201532417U (en) Electric quantity acquisition module
CN205941872U (en) Device of detection voltage mutual -inductor secondary pressure drop
CN206353174U (en) A kind of furnace transformer secondary current test device
CN202886585U (en) On-line test device for voltage/current transformer
CN202119811U (en) Miniature intelligent electric energy meter
CN102866378A (en) Voltage or current transformer on-line test device and voltage or current transformer on-line test method
CN201955466U (en) Multifunctional electric apparatus parameter test instrument
CN212483689U (en) Automatic change electric instrument precision testing arrangement
CN201716408U (en) Intelligent electric energy meter verification/running function switching device
CN211453723U (en) Direct current electric energy meter based on TMR current sensor
CN209418291U (en) A kind of modularization current-carrying mutual inductor
CN214174478U (en) Special terminal box of electric energy measurement

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130501

Termination date: 20150603

EXPY Termination of patent right or utility model