CN101848170B - MCU (Microprogrammed Control Unit) resource scheduling method and system - Google Patents

MCU (Microprogrammed Control Unit) resource scheduling method and system Download PDF

Info

Publication number
CN101848170B
CN101848170B CN201010208939.9A CN201010208939A CN101848170B CN 101848170 B CN101848170 B CN 101848170B CN 201010208939 A CN201010208939 A CN 201010208939A CN 101848170 B CN101848170 B CN 101848170B
Authority
CN
China
Prior art keywords
mcu
resource
terminal
until
distributing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010208939.9A
Other languages
Chinese (zh)
Other versions
CN101848170A (en
Inventor
李宁
彭峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201010208939.9A priority Critical patent/CN101848170B/en
Publication of CN101848170A publication Critical patent/CN101848170A/en
Priority to PCT/CN2011/073141 priority patent/WO2011160490A1/en
Application granted granted Critical
Publication of CN101848170B publication Critical patent/CN101848170B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/16Arrangements for providing special services to substations
    • H04L12/18Arrangements for providing special services to substations for broadcast or conference, e.g. multicast
    • H04L12/1813Arrangements for providing special services to substations for broadcast or conference, e.g. multicast for computer conferences, e.g. chat rooms
    • H04L12/1818Conference organisation arrangements, e.g. handling schedules, setting up parameters needed by nodes to attend a conference, booking network resources, notifying involved parties
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/14Systems for two-way working
    • H04N7/15Conference systems
    • H04N7/152Multipoint control units therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Telephonic Communication Services (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The invention discloses MCU (Microprogrammed Control Unit) resource scheduling method and system, applied to a plurality of MCU cascaded video conference systems. The method comprises the following steps of: firstly, selecting MCUs one by one and distributing terminals until the terminals to be distributed are all distributed; executing the following steps on the MCU selected each time: reserving resources of M cascaded ports, wherein M is less than a preset value, distributing the terminals to the MCU until the resources, except the reserved resource, are all occupied, carrying out resource validation, and setting a main MCU; secondly, judging whether the number N of the selected MCUs is M+1 or not; and if so, finishing the MCU resource scheduling. According to the technical scheme provided by the invention, the problem that the resource scheduling utilization ratio is low when the cascade connection of multiple MCUs is adopted for convoking a video session is solved, thereby a cascaded port can be flexibly reserved, and the waste of resource in the scheduling process is reduced.

Description

MCU resource regulating method and system
Technical field
The present invention relates to the communications field, in particular to a kind of multipoint control unit (Multipoint Control Unit, referred to as MCU) resource regulating method and system.
Background technology
Video conference is through development for many years; when current video conferencing networking scale is increasing; multipoint control unit (the Multipoint Control Unit of single-stage; referred to as MCU) TV conference system can not meet the needs of meeting; thus the MCU passing through cascade provides support for holding extensive meeting, has become a necessary function of TV conference system.
In view of the time particularity of meeting and the less feature of MCU resource, generally needed to preengage in advance before formal meeting, the essence of conference reservation is preengage MCU resource, is generally divided into following step: first dispatching MCU resource, for the terminal of participating in reservation selects suitable MCU; Secondly resource authentication method is adopted to calculate the MCU resource after scheduling, to verify the reasonability of scheduling of resource.Current most of TV conference system both provides the function of dispatching MCU resource, therefore needs dispatching long middle enhancing to the utilance of existing MCU resource, avoids wasting unnecessary resource.
Inventor finds, following problem is there is: be static when cascade port is reserved in automatic cascade in correlation technique, assuming that whole service server has X MCU, when preengaging subtended conference, first X-1 cascade port can be reserved for each MCU, and then distributing terminals, again cascade port is adjusted after all terminal distribution, so not only waste resource, may cause when multiple MCU actually can preengaging successful meeting and preengaging now unsuccessful.
Summary of the invention
For when adopting multiple MCU cascade holding video conference in correlation technique, the problem that scheduling of resource utilance is lower, the object of the present invention is to provide a kind of MCU resource regulating method and system, to solve the problem one of at least.
According to an aspect of the present invention, a kind of MCU resource regulating method is provided.
According to MCU resource regulating method of the present invention, be applied to the video conferencing system of multiple MCU cascade, comprise: first one by one choose MCU and distributing terminals, until need the terminal of distributing all to be assigned; Wherein, for the MCU chosen at every turn, all perform following steps: the resource of reserved its M cascade port, wherein, M is less than preset value; To its distributing terminals until its other resources except reserved resource are occupied full; Resource authenticates is carried out to it, wherein, main MCU is set; Whether the number N of the MCU selected by secondly judging is M+1; If so, then MCU scheduling of resource is completed.
According to a further aspect in the invention, a kind of MCU resource scheduling system is provided.
According to MCU resource scheduling system of the present invention, be applied to the video conferencing system of multiple MCU cascade, comprise: processing module, for one by one choosing MCU and distributing terminals, until need the terminal of distributing all to be assigned, wherein, for the MCU chosen at every turn, all perform following process: the resource of reserved its M cascade port, wherein, M is less than predetermined value, to its distributing terminals until its other resources except reserved resource are occupied full, resource authenticates is carried out to it, wherein, be verified first MCU is set to main MCU; Judge module, for judging whether the number N of selected MCU is M+1; Determination module, for when judge module exports as being, has determined MCU scheduling of resource.
By the present invention, one by one choose MCU and distributing terminals, until need the terminal of distributing all to be assigned, when the number N of selected MCU is when the cascade port number of be verified first MCU is added 1, determine the success of MCU scheduling of resource.Solve in correlation technique when adopting multiple MCU cascade holding video conference, the problem that scheduling of resource utilance is lower, and then cascade port can be reserved flexibly, reduce the waste of resource in scheduling process.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide a further understanding of the present invention, and form a application's part, schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the MCU resource regulating method of the embodiment of the present invention;
Fig. 2 is the Organization Chart of the video conferencing system of multiple MCU cascades of the preferred embodiment of the present invention;
Fig. 3 is the flow chart of the MCU resource regulating method of the preferred embodiment of the present invention;
Fig. 4 is the structured flowchart of the MCU resource scheduling system of the embodiment of the present invention; And
Fig. 5 is the structured flowchart of the MCU resource scheduling system of the preferred embodiment of the present invention.
Embodiment
Hereinafter also describe the present invention in detail with reference to accompanying drawing in conjunction with the embodiments.It should be noted that, when not conflicting, the embodiment in the application and the feature in embodiment can combine mutually.
In correlation technique, in the video conferencing system needing multiple MCU cascade, assuming that whole service server has X MCU, when preengaging subtended conference, first X-1 cascade port can be reserved for each MCU, and then distributing terminals, again cascade port is adjusted after all terminal distribution.Adopt this resource scheduling scheme, resource utilization is lower.
Fig. 1 is the flow chart of the MCU resource regulating method of the embodiment of the present invention.As shown in Figure 1, this MCU resource regulating method comprises following process:
Step S102: one by one choose MCU and distributing terminals, until need the terminal of distributing all to be assigned;
Wherein, for the MCU chosen at every turn, all following steps are performed:
(1) resource of reserved its M cascade port;
(2) to its distributing terminals until its other resources except reserved resource are occupied full;
(3) resource authenticates is carried out to it, wherein, be verified first MCU is set to main MCU;
Whether the number N of step S104: the MCU selected by judgement is M+1;
Step S106: if then complete MCU scheduling of resource.
Adopt said method, one by one choose MCU and distributing terminals, until need the terminal of distributing all to be assigned, when the number N of selected MCU is when the cascade port number of be verified first MCU is added 1, determine the success of MCU scheduling of resource.By the scheduling of resource of the method, when dispatching, number that is complete and MCU has nothing to do, and reserved cascade port, decreases the waste of resource, really accomplished the scheduling of automatic subtended conference flexibly.
Preferably, in step s 102, for the MCU chosen at every turn, a cascade port (i.e. M=1) can be reserved.Certainly, in specific implementation process, the cascade port of other numbers (such as, 2,3 etc.) can also be reserved to each MCU.But consider the problem of saving resource, M settings should be determined as the case may be, a predetermined value should be less than.
The preferred implementation each MCU being reserved to a cascade port is described below in conjunction with Fig. 2.
Fig. 2 is the Organization Chart of the video conferencing system of multiple MCU cascades of the preferred embodiment of the present invention.As shown in Figure 2, adopt cascade system as shown in Figure 1 (for each reserved cascade port), can form the topological structure of following MCU cascade: the MCU that first resource authenticates passes through is main MCU, main MCU is connected from MCU (i.e. non-first resource authenticates pass through MCU) with multiple respectively.
Wherein, above-mentioned resource authenticates mode can adopt verification mode of the prior art, such as, and checking success holding video conference etc.
Preferably, in step s 102, MCU can be chosen in the following manner:
(1) MCU in video conferencing system is sorted according to surplus resources size;
(2) choose the maximum MCU of surplus resources at every turn.
In preferred implementation process, the maximum MCU of surplus resources can be chosen in advance, distributing terminals successively, adopt this scheme, the quantity of the MCU used in this scheduling of resource process can be saved as far as possible, thus effectively save MCU resource.
Preferably, can in the following manner to MCU distributing terminals: for each MCU, after there is the terminal of a cascade port and multi-capacity to its distribution, by the terminal distribution in set of terminal maximum for current total bandwidth to this MCU, when also having surplus resources in this MCU, successively by the terminal distribution in the set of terminal of unallocated terminal to this MCU, until the resource of this MCU is occupied full.
Wherein, the terminal of above-mentioned multi-capacity, refers to that terminal has multi abilities, such as, and high definition, SD etc.For each MCU, the terminal with a cascade port and multi-capacity is distributed to it, owing to cascade MCU can not notify in advance the terminal of distributing which kind of ability, therefore each cascade MCU must hold mixing meeting, when giving each MCU distributing terminals, must also distribute one the terminal of other abilities, reserve multi-capacity resource to allow resource algorithm.
In preferred implementation process, first need the terminal of distribution cascade port and multi-capacity.And then follow the greedy algorithm principle be as far as possible finished, preferentially the terminal distribution in set of terminal maximum for total bandwidth is then considered simultaneously the restriction of these two aspects of terminal number that bandwidth sum can be accessed by this MCU, MCU resource.If the terminal in a set of terminal also has surplus resources after all putting into this MCU, then attempt continuing the terminal distribution in next set of terminal to this MCU; If the terminal in a set of terminal can not all be assigned to this MCU, then can distribute how many how much just as far as possible distribution, complete for the resource consumption of this MCU.
Adopt above-mentioned process, the distribution ratio of terminal can be made more concentrated, and effectively can improve allocative efficiency.
Preferably, when the number N of selected MCU is not M+1, method can also comprise following process: remove the terminal on main MCU, and the terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1, wherein, other MCU are the MCU newly increased and/or the MCU not being occupied full resource.
By above-mentioned continuous adjustment, decrease the waste of resource, really accomplish the scheduling of automatic subtended conference.
Such as, current main MCU has reserved a cascade port, and when distributing terminal, employs three MCU altogether.The number N (being now 3) of then selected MCU is not M+1 (being now 2).So need to adjust the cascade port number of main MCU.
In preferred implementation process, the cascade port number adjusting main MCU mainly comprises following process: remove the terminal on main MCU, and the terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1, wherein, other MCU above-mentioned are the MCU newly increased and/or the MCU not being occupied full resource.
Below in conjunction with Fig. 3, above-mentioned preferred implementation process is described.
Fig. 3 is the flow chart of the MCU resource regulating method of the preferred embodiment of the present invention.As shown in Figure 3, the MCU resource regulating method of the preferred embodiment of the present invention comprises following process:
Step S302: before scheduling of resource, needs initialization conferencing resource, comprises veneer resource, terminal resource, MCU resource, and these are all that MCU scheduling of resource is necessary;
Step S304: according to the principle of load balancing, sorts to the order that the residue IP bandwidth of all candidate MCU is carried out from big to small, attempts distributing terminals on these MCU successively in order;
Step S306: distributing terminals on MCU, until the Resourse Distribute of this MCU is complete.
In preferred implementation process, the process to a MCU distributing terminals is as follows: the terminal first needing distribution cascade port and multi-capacity.And then follow the algorithm principle be as far as possible finished, preferentially the terminal distribution in set of terminal maximum for total bandwidth is then considered simultaneously the restriction of these two aspects of terminal number that bandwidth sum can be accessed by this MCU, MCU resource.If the terminal in a set of terminal also has surplus resources after all putting into this MCU, then attempt continuing the terminal distribution in next set of terminal to this MCU; If the terminal in a set of terminal can not all be assigned to this MCU, then can distribute how many how much just as far as possible distribution, until complete for the resource consumption of this MCU.
Step S308: after step S306 completes, carries out resource authenticates to this MCU.
Step S310: if step S308 resource authenticates passes through, if also do not arrange main MCU, is just set to main MCU by this MCU.
Step S312: judge whether terminal is assigned, if be assigned, carries out step S314; Otherwise, carry out step S318.Judge whether all MCU are assigned, if be not assigned, continue to distribute on next MCU, from step S306; Otherwise dispatch unsuccessfully, return step S320.
Step S314: step S316 is a key algorithm of the present invention, and original technical scheme is improved.Judge whether cascade port number satisfies condition: M=N-1, wherein M is the number of cascade port on main MCU, and N is the number of the MCU that meeting uses.If satisfied condition, dispatch successfully, return step S320; Otherwise, enter step S316;
Step S316: cascade port is adjusted, mainly main MCU is adjusted, until the number of cascade port satisfies condition on main MCU, certainly the cascade port on main MCU is added, remove corresponding terminal, resource authenticates on winner MCU is passed through, and then distributes the terminal removed, continue step S306 and start.
Fig. 4 is the structured flowchart of the MCU resource scheduling system of the embodiment of the present invention.Wherein, this MCU resource scheduling system is applied to the video conferencing system of multiple MCU cascade, and as shown in Figure 4, this MCU resource scheduling system comprises: processing module 40, judge module 42, determination module 44.
Processing module 40, for one by one choosing MCU and distributing terminals, until need the terminal of distributing all to be assigned.
Wherein, for the MCU chosen at every turn, processing module 40 all performs following process:
(1) resource of reserved its M cascade port, wherein, M is less than predetermined value;
(2) to its distributing terminals until its other resources except reserved resource are occupied full,
(3) resource authenticates is carried out to it, wherein, be verified first MCU is set to main MCU;
Judge module 42, for judging whether the number N of selected MCU is M+1;
Determination module 44, for when judge module exports as being, has determined MCU scheduling of resource.
Adopt said system, processing module 40 one by one chooses MCU and distributing terminals, until need the terminal of distributing all to be assigned, when the number N of selected MCU is when the cascade port number of be verified first MCU is added 1, determine the success of MCU scheduling of resource.This system number that is complete and MCU when scheduling resource has nothing to do, and reserved cascade port, decreases the waste of resource, really accomplished the scheduling of automatic subtended conference flexibly.
Preferably, processing module 40, when for each MCU distributing terminals, can reserve the resource of 1 (i.e. M=1) cascade port.
Preferably, as shown in Figure 5, processing module 40 can also comprise: sequencing unit 400, for being sorted according to surplus resources size by MCU in video conferencing system; Choose unit 402, for choosing the maximum MCU of surplus resources at every turn.
Preferably, as shown in Figure 5, processing module 40 can also comprise: allocation units 404, for for each MCU, for its distribute there is the terminal of a cascade port and multi-capacity after, by the terminal distribution in set of terminal maximum for current total bandwidth to this MCU, in this MCU also have surplus resources time, successively by the terminal distribution in the set of terminal of unallocated terminal to this MCU, until this MCU resource is occupied full.
Preferably, as shown in Figure 5, said system can also comprise: adjusting module 46, for when the number N of selected MCU is not M+1, remove the terminal on main MCU, and the terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1, wherein, other MCU are the MCU newly increased and/or the MCU not being occupied full resource.
In preferred implementation process, processing module 40, when choosing certain MCU, first can reserve a cascade port, then by terminal scheduling to this MCU, until this MCU resource takes.Carry out resource authenticates afterwards, wherein, be set to main MCU by first by the MCU of checking.
Afterwards, processing module 40 continues to dispatch unappropriated terminal according to above-mentioned process.
In preferred implementation process, after distributing terminal, whether the number N needing the MCU selected by judging is M+1; If so, then this scheduling of resource completes.Otherwise, need to adjust the cascade port of main MCU.Namely the cascade port number on main MCU is adjusted, remove corresponding terminal on the cascade port that needs to increase, and the terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1.
Wherein, other MCU above-mentioned can be the MCU that newly increases and/or the MCU not being occupied full resource.
It should be noted that the preferred working method of above-mentioned MCU resource scheduling system specifically see Fig. 1 and Fig. 3, can repeat no more herein.
In sum, by above-described embodiment provided by the invention, according to the corresponding relation of each terminal capabilities set and MCU, determine the topological relation of subtended conference; On MCU, flexible allocation cascade port terminal when distributing terminals, reduces the waste of spare resources; Main MCU is determined by the terminal MCU situation of distributing; Automatic adjustment cascade port is reallocated.Compared with prior art, by the optimization on original scheduling strategy, reserve cascade port in real time when distributing terminals, after all terminals are all assigned, then cascade port is adjusted, until finally dispatch successfully.By the scheduling of resource of the method, when dispatching, number that is complete and MCU has nothing to do, and reserved cascade port, decreases the waste of resource, really accomplished the scheduling of automatic subtended conference flexibly.
Obviously, those skilled in the art should be understood that, above-mentioned of the present invention each module or each step can realize with general calculation element, they can concentrate on single calculation element, or be distributed on network that multiple calculation element forms, alternatively, they can realize with the executable program code of calculation element, thus, they can be stored and be performed by calculation element in the storage device, and in some cases, step shown or described by can performing with the order be different from herein, or they are made into each integrated circuit modules respectively, or the multiple module in them or step are made into single integrated circuit module to realize.Like this, the present invention is not restricted to any specific hardware and software combination.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for a person skilled in the art, the present invention can have various modifications and variations.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a multipoint control unit MCU resource regulating method, is applied to the video conferencing system of multiple MCU cascade, it is characterized in that, comprising:
One by one choose MCU and distributing terminals, until need the terminal of distributing all to be assigned;
Wherein, for the MCU chosen at every turn, all following steps are performed:
The resource of reserved its M cascade port, wherein, described M is less than preset value;
To its distributing terminals until its other resources except described reserved resource are occupied full;
Resource authenticates is carried out to it, wherein, main MCU is set;
Whether the number N of the MCU selected by judgement is M+1;
If so, then MCU scheduling of resource is completed.
2. method according to claim 1, is characterized in that, described M is 1.
3. method according to claim 1, is characterized in that, chooses MCU in the following manner:
MCU in described video conferencing system is sorted according to surplus resources size;
Choose the MCU that surplus resources is maximum at every turn.
4. method according to claim 1, is characterized in that, in the following manner to MCU distributing terminals:
For each MCU, after there is the terminal of a cascade port and multi-capacity to its distribution, by the terminal distribution in set of terminal maximum for current total bandwidth to this MCU, when also having surplus resources in this MCU, successively by the terminal distribution in the set of terminal of unallocated terminal to this MCU, until this MCU resource is occupied full.
5. method according to any one of claim 1 to 4, it is characterized in that, when the number N of selected MCU is not M+1, described method also comprises: remove the terminal on described main MCU, and the described terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1, wherein, other MCU described are the MCU newly increased and/or the MCU not being occupied full resource.
6. a multipoint control unit MCU resource scheduling system, is applied to the video conferencing system of multiple MCU cascade, it is characterized in that, comprising:
Processing module, for one by one choosing MCU and distributing terminals, until need the terminal of distributing all to be assigned, wherein, for the MCU chosen at every turn, all perform following process: the resource of reserved its M cascade port, wherein, M is less than predetermined value, to its distributing terminals until its other resources except described reserved resource are occupied full, resource authenticates is carried out to it, wherein, be verified first MCU is set to main MCU;
Judge module, for judging whether the number N of selected MCU is M+1;
Determination module, for when described judge module exports as being, has determined MCU scheduling of resource.
7. system according to claim 6, is characterized in that, described processing module, when for each MCU distributing terminals, reserves the resource of 1 cascade port.
8. system according to claim 6, is characterized in that, described processing module also comprises:
Sequencing unit, for sorting MCU in described video conferencing system according to surplus resources size;
Choose unit, for choosing the maximum MCU of surplus resources at every turn.
9. system according to claim 6, is characterized in that, described processing module also comprises:
Allocation units, for for each MCU, for its distribute there is the terminal of a cascade port and multi-capacity after, by the terminal distribution in set of terminal maximum for current total bandwidth to this MCU, when also having surplus resources in this MCU, successively by the terminal distribution in the set of terminal of unallocated terminal to this MCU, until this MCU resource is occupied full.
10. the system according to any one of claim 6 to 9, is characterized in that, described system also comprises:
Adjusting module, for when the number N of selected MCU is not M+1, remove the terminal on described main MCU, and the described terminal removed is reassigned to other MCU, until the number N of selected MCU is M+1, wherein, other MCU described are the MCU newly increased and/or the MCU not being occupied full resource.
CN201010208939.9A 2010-06-21 2010-06-21 MCU (Microprogrammed Control Unit) resource scheduling method and system Expired - Fee Related CN101848170B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201010208939.9A CN101848170B (en) 2010-06-21 2010-06-21 MCU (Microprogrammed Control Unit) resource scheduling method and system
PCT/CN2011/073141 WO2011160490A1 (en) 2010-06-21 2011-04-21 Multipoint control unit resource scheduling method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010208939.9A CN101848170B (en) 2010-06-21 2010-06-21 MCU (Microprogrammed Control Unit) resource scheduling method and system

Publications (2)

Publication Number Publication Date
CN101848170A CN101848170A (en) 2010-09-29
CN101848170B true CN101848170B (en) 2015-05-13

Family

ID=42772633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010208939.9A Expired - Fee Related CN101848170B (en) 2010-06-21 2010-06-21 MCU (Microprogrammed Control Unit) resource scheduling method and system

Country Status (2)

Country Link
CN (1) CN101848170B (en)
WO (1) WO2011160490A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101848170B (en) * 2010-06-21 2015-05-13 中兴通讯股份有限公司 MCU (Microprogrammed Control Unit) resource scheduling method and system
WO2016086371A1 (en) * 2014-12-03 2016-06-09 华为技术有限公司 Conference resource scheduling method and apparatus
CN104836983B (en) * 2015-05-26 2018-11-20 苏州科达科技股份有限公司 video conference resource management system and resource server
CN106331579A (en) * 2015-07-02 2017-01-11 三亚中兴软件有限责任公司 Multimedia conference access method, device and system, and multipoint control unit
CN109547730A (en) * 2015-09-30 2019-03-29 杭州华为企业通信技术有限公司 A kind of dispatching method and device of multipoint control unit resource
CN105357469A (en) * 2015-11-06 2016-02-24 国家电网公司 MCU (multi control unit) resource pool deploying method and apparatus
CN105657328B (en) * 2016-01-04 2019-07-09 杭州华为企业通信技术有限公司 A kind of method, apparatus and system of port operation meeting resource
CN106559640A (en) * 2016-11-10 2017-04-05 国网浙江省电力公司金华供电公司 Two-stage MCU strange land is in real time mutually for device
CN108243320B (en) * 2016-12-23 2020-05-08 杭州华为企业通信技术有限公司 Conference control method, device and system
CN107147653B (en) * 2017-05-22 2020-01-31 福建星网智慧科技股份有限公司 media distribution cascading method and system
CN110430386B (en) * 2019-07-26 2020-08-11 四川新东盛科技发展有限公司 Video conference system based on cloud resource pool technology and working method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227533A (en) * 2008-01-31 2008-07-23 华为技术有限公司 Apparatus and method for establishing audio conference connection
CN101582917A (en) * 2009-06-18 2009-11-18 中兴通讯股份有限公司 Method for dispatching MCU resource, business server and system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101848170B (en) * 2010-06-21 2015-05-13 中兴通讯股份有限公司 MCU (Microprogrammed Control Unit) resource scheduling method and system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101227533A (en) * 2008-01-31 2008-07-23 华为技术有限公司 Apparatus and method for establishing audio conference connection
CN101582917A (en) * 2009-06-18 2009-11-18 中兴通讯股份有限公司 Method for dispatching MCU resource, business server and system

Also Published As

Publication number Publication date
CN101848170A (en) 2010-09-29
WO2011160490A1 (en) 2011-12-29

Similar Documents

Publication Publication Date Title
CN101848170B (en) MCU (Microprogrammed Control Unit) resource scheduling method and system
CN101582917B (en) Method for dispatching MCU resource, business server and system
CN108268317B (en) Resource allocation method and device
CN101179692B (en) Video signal conference system MCU resource scheduling method
CN111782355B (en) Cloud computing task scheduling method and system based on mixed load
CN104268018B (en) Job scheduling method and job scheduler in a kind of Hadoop clusters
CN104239154B (en) Job scheduling method and job scheduler in a kind of Hadoop clusters
CN102523422B (en) Multi-party communication control system, multi-party communication system and multi-party communication processing method
CN111176846B (en) Task allocation method and device
CN102215481A (en) Mobile terminal and resource downloading method
CN106714000A (en) Control method, system and device of conference terminal authority
CN111078391A (en) Service request processing method, device and equipment
CN112398949A (en) Transaction confirmation method, system, device and computer equipment
CN101594642B (en) Resource allocation method and resource allocation device used for communication network element device
Zhao et al. Joint reducer placement and coflow bandwidth scheduling for computing clusters
CN108933675B (en) Conference resource allocation method, device and storage medium
CN111209098A (en) Intelligent rendering scheduling method, server, management node and storage medium
CN104918256A (en) Transmission scheduling method and device
CN103299298B (en) The method and system of process business
CN101193262A (en) Backup MCP selection method for video conference system
JP2013196695A (en) Virtual machine allocation system and method of the same
CN106331074B (en) A kind of certification switching method
CN110516902A (en) A kind of intelligent dispatching method, device, computer system and readable storage medium storing program for executing
CN100431306C (en) Dynamic-network connecting allocation system and method
CN115664988A (en) Kubernetes-oriented complex service deployment and scheduling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150513

Termination date: 20170621