CN101806057A - Immediate processing method for hydraulic filling ultra-soft foundation by modified vacuum preloading and water-covering preloading - Google Patents

Immediate processing method for hydraulic filling ultra-soft foundation by modified vacuum preloading and water-covering preloading Download PDF

Info

Publication number
CN101806057A
CN101806057A CN 201010158412 CN201010158412A CN101806057A CN 101806057 A CN101806057 A CN 101806057A CN 201010158412 CN201010158412 CN 201010158412 CN 201010158412 A CN201010158412 A CN 201010158412A CN 101806057 A CN101806057 A CN 101806057A
Authority
CN
China
Prior art keywords
vacuum
water
mud
processing method
precompressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010158412
Other languages
Chinese (zh)
Other versions
CN101806057B (en
Inventor
刘汉龙
曾国海
高有斌
高明军
丁选明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201010158412XA priority Critical patent/CN101806057B/en
Publication of CN101806057A publication Critical patent/CN101806057A/en
Application granted granted Critical
Publication of CN101806057B publication Critical patent/CN101806057B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention relates to an immediate processing method for hydraulic filling an ultra-soft foundation by modified vacuum preloading and water-covering preloading. The technical proposal of the invention comprises the following steps of: building a float bridge on a mud area in a causeway, laying a plastic woven cloth on the mud area, fixing the plastic woven cloth on the causeway and the float bridge, horizontally laying a water discharge branch pipe on the plastic woven cloth, inserting a plastic water discharge board around the water discharge branch pipe in the mud of the mud area, horizontally laying a water discharge main pipe on the plastic woven cloth in the direction perpendicular to the water discharge branch pipe, connecting one end of the water discharge main pipe to a vacuum pump, laying a geotextile on the water discharge main pipe and the water discharge branch pipe, laying a vacuum film on the geotextile, and arranging a water load on the vacuum film. The invention solves the technical problems of unenforceable construction existing in the traditional vacuum preloading foundation treatment method, and has the advantages of simple process, convenient construction and lowered cost. Besides, after the hydraulic filling of the foundation is completed, the foundation can be immediately processed, thereby greatly shortening the foundation processing period, and ensuring that the invention is a very economical and practical soft foundation processing method.

Description

The precompressed of hydraulic reclamation ultra-soft foundation modified vacuum is in conjunction with the water covering prepressing immediate processing method
Technical field
The present invention relates to a kind of method for processing foundation, the precompressed of particularly a kind of hydraulic reclamation ultra-soft foundation modified vacuum is in conjunction with the water covering prepressing immediate processing method.
Background technology
In recent years, the construction land deficiency has become and has restricted the particularly bottleneck of coastal area economy and social development, so the coastal area engineering of reclaiming fields from the sea on a large scale.But, the geological condition complexity of reclaiming fields from the sea, it is zero that new hydraulic reclamation mud mainly shows as mud content height, poor permeability, intensity, is in the ultra-soft state, personnel and construction machinery can't directly enter the place.
Before the present invention, often adopt vacuum preloading to carry out consolidation process for mud matter soft foundation, make it to have certain intensity.Method is to adopt machinery to plug plastic draining board earlier, re-lays sand cushion as the horizontal drainage system, lays geotextiles again, lays work such as vacuum diaphragm and layout vacuum pump, and these are all realized on land-based area.But for the hydraulic reclamation ultra-soft foundation, foundation soil strength is zero, in fact is in flow regime, is similar on the waters and constructs, and the traditional vacuum precompressed can't be implemented at all.Particularly, there is following shortcoming in traditional vacuum prepressing ground foundation treatment method:
(1) for the hydraulic reclamation mud of ultra-soft state because construction machinery can't be marched into the arena, therefore can't set plastic draining board, also can't lay the horizontal drainage sand cushion, this limitations restrict the application of traditional vacuum precompressed.
(2) some places lack the sand source, the price of sand constantly raises up, though and plastic draining blind pipe and three-dimensional composite drainage network have come out, but cost is too high, the large-area construction construction costs is difficult to bear, and the difficulty that same existence can't be constructed for ultra-soft foundation exists.
(3) conventional process worker method construction and cycle of handling long, this can influence programming to a great extent.
(4) in the traditional vacuum precompressed, take PVC pipe and pipe with holes as drain header and branch drain, PVC thick-walled tube cavity is big, rigidity is very much not yielding, but every pipe length only is 6m, therefore joint is a lot, it is slow that the joint amount too much can be brought tube head connection operation when constructing on ultra-soft foundation, and quality of connection is not good, and can cause splice failure when differential settlement.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, proposes the precompressed of a kind of hydraulic reclamation ultra-soft foundation modified vacuum in conjunction with the water covering prepressing immediate processing method.
Technical scheme of the present invention is:
The precompressed of a kind of hydraulic reclamation ultra-soft foundation modified vacuum comprises and lays pontoon bridge, modified vacuum precompressed, and in conjunction with the water covering prepressing technology, mainly comprise following technical step in conjunction with the water covering prepressing immediate processing method:
(1) lays pontoon bridge in the mud district in embankment;
(2) in the mud district, lay plastic woven cloth, be fixed on embankment and the pontoon bridge;
(3) level is laid branch drain on plastic woven cloth, and plastic draining board inserts in the mud in mud district around branch drain;
(4) level is laid drain header on plastic woven cloth, moves towards vertical with branch drain, and drain header one end connects vacuum pump;
(5) drain header, with branch drain on lay geotextiles, on geotextiles, lay vacuum diaphragm;
(6) on vacuum diaphragm, place water ballast(ing).
Advantage of the present invention and effect are:
(1) pontoon bridge is an operation platform on the mud of the present invention, provide convenience for personnel and materials arrival, and be again the fixed support of plastic woven cloth, and when shop geotextiles and shop vacuum diaphragm, personnel can stand on the pontoon bridge and provide traction to constructor and material;
(2) rubbery foam plate of the present invention is the beformable body material, and buoyancy is big; Bamboo offset plate intensity height, good rigidly, on the rubbery foam plate, lay two-layer bamboo offset plate, hard and soft combination, the bamboo offset plate can play uniform rubbery foam plate upward pressure when load-bearing, improve the integral rigidity and the stability of pontoon bridge, avoid rubbery foam plate local distortion excessive, the generation of the phenomenon of easily digging on every side makes pontoon bridge have the characteristics of the good and good stability of planeness.
(3) the present invention lays the plastic woven cloth of one deck porous on hydraulic reclamation mud, and plastic woven cloth is a loaded filter, stops that fine particle in the mud enters the horizontal drainage system on it.
(4) after plastic woven cloth being fixed on the column of pontoon bridge on embankment and the mud, the kickboard that plate personnel and transport of materials are used can move on woven cloth easily; When the constructor walked on plastic woven cloth, as safe as a house though both legs have certain being absorbed in as inflatable life cushion, personnel can carry out construction operation easily on plastic knitting.
(5) the present invention has cancelled sand cushion, adopts novel horizontal drainage system to quicken the discharging consolidation of ultra-soft foundation, compares with sand cushion, has saved a large amount of sand sources, has saved construction costs greatly; And sand operation on can't carrying out on the ultra-soft foundation, the density of sand is native bigger than ultra-soft, also can sink in the mud even sand has been spread on the surface.In area in short supply, sand source, even there are not enough sand sources to handle use for the hydraulic reclamation ultra-soft foundation at all.
(6) the present invention adopt diameter 63mm or 50mm the ripple chimney filter as drain header under the film and branch drain, with the common novel horizontal drainage system that forms of two-layer geotextiles, can guarantee the efficient transmission of vacuum; The ripple chimney filter belongs to half firm half beformable body material, and its rigidity can satisfy the requirement of transmitting negative pressure, and its flexibility and retractility have the ability that can adapt to the place inhomogeneous deformation simultaneously.The every dish length of ripple chimney filter can be 200m when dispatching from the factory, in the venue can be and intercepting arbitrarily according to each row drain header or branch drain length, and a lot of joints are saved in the centre, have improved operating efficiency.
(7) when being connected with branch drain, adopts plastic draining board the loose winding method of nature, the 20cm horizontal segment is set during connection, twine the opposite side that branch drain after one week inserts the plastic draining board of residue length branch drain loosely, form the vertical drainage system that one is long and the other is short.
(8) the described 20cm of setting horizontal segment can increase the contact area of plastic draining board and branch drain and horizontal drainage system, increases the transmission effect of vacuum under the film.Because in the hydraulic reclamation ultra-soft foundation, particle is tiny, always having the outsourcing filter membrane that small quantities of particles passes plastic draining board enters in the cavity, to such an extent as to enter the horizontal drainage system and move up, after certain horizontal segment is set, contact area enlarges markedly, and has entered tiny soil particle in the plastic draining board cavity and has been unlikely to concentrate on certain complete clogging a bit takes place.
(9) after drain header is vacuumized, can form with the plastic draining board is " earth pillar " at center, and " earth pillar " overhead height is higher than surrounding soil, if branch drain then can form waveform just on branch drain, thereby be stowed and turn round and drag, drainability can obviously weaken.Plastic draining board when twining is if be provided with horizontal segment, then branch drain moves between two rows' " earth pillar " in fact just, cause inhomogeneous deformation even vacuumize, then branch drain is totally comparatively mild, has also alleviated earth pillar drawing and turning round and drag phenomenon branch drain.
(10) the present invention adopts modified vacuum precompressed and water covering prepressing to unite ground is produced the precompressed effect, covering hydraulic pressure water is water-retaining cofferdam (or in conjunction with existing embankment) is set on film, carry out the film overlying water, can increase prefabricating load on the film after covering water, accelerate the rate of consolidation of the soil body.The vacuum preloading of ultra-soft foundation was generally 3-4 month, during the sun tan by the sun with strong wind very greatly to the erosion of vacuum diaphragm, so vacuum diaphragm is aging and damaged easily, can significantly protect vacuum diaphragm behind the water covering prepressing, prevents and slows down the aging and damaged of vacuum diaphragm.
(12) though on the mud of the present invention exploitation materials such as rubbery foam plate, bamboo offset plate, ripple chimney filter, plastic woven cloth for being applied to the ground processing first, but material requested can be bought on market, need not to develop separately again and customize, therefore, not only material cost can be do not increased, Master Cost can be reduced greatly yet.
(13) the present invention has realized can carrying out immediately after hydraulic fill foundation is finished the ground processing, and treatment effect is better, can carry out the construction of marching into the arena of town road construction and enterprise immediately, saved 8-12 month ground processing time, therefore, the present invention has saved valuable time for building early to go into operation the morning of enterprise.
In a word, method of the present invention has solved traditional vacuum and has been pressed in the technical barrier that can't implement on the ultra-soft foundation in advance, and technology is simple, easy construction, reduced cost, and after hydraulic fill foundation finishes, can carry out ground immediately and handle, having shortened the ground treatment construction phase greatly, is a kind of soft base processing method of very economical practicality.
Other advantages of the present invention and effect will go on to say below.
Description of drawings
Fig. 1---hydraulic reclamation ultra-soft foundation layout plan among the present invention.
Fig. 2---pontoon bridge schematic diagram on the mud of the present invention.
Fig. 3---modified vacuum precompressed of the present invention is in conjunction with covering the water generalized section.
Fig. 4---modified vacuum precompressed floor map of the present invention.
The 1-embankment; The 2-pontoon bridge; 3-rubbery foam plate; The 4-column; 5-bamboo offset plate; The 6-railing; The 7-plastic woven cloth; The 8-branch drain; The 9-plastic draining board; The 10-geotextiles; The 11-vacuum diaphragm; The 12-water ballast(ing); The 13-drain header; The 14-vacuum pump.
The specific embodiment
Shown in Fig. 1,2,3 and 4:
(1) according to the position of ground processing region shape size and embankment 1, measure unwrapping wire, planning mud extraction float the position of bridge 2 and each processing region (A, B among Fig. 1, C ...) the position, each is handled zone subdivision and becomes some vacuum preloading blocks;
(2) begin to spread pontoon bridge 2 on the mud from an end of reinforcing the place, earlier rubbery foam plate 3 is lain on the hydraulic reclamation mud, join end to end;
(3) circular hole of 2 diameter 2cm is bored at every rubbery foam plate 3 two ends, and the circular hole of two blocks of adjacent rubbery foam plates 3 before and after wearing with rope connects all rubbery foam plates 3 head and the tail in turn;
(4) set four mao bamboon bars as column 4 every rubbery foam plate 3 both sides, the lower end is passed hydraulic reclamation thickness and is gone into hardpan 50cm, and mud face 100cm is exposed in the upper end;
(5) at rubbery foam plate 3 near near the circular hole that sets diameter 2cm the columns 4, with rope rubbery foam plate 3 is fixed on the column 4; When the mud face changes, can regulate the height of lanyard;
(6) the two-layer bamboo offset plate 5 in shop on rubbery foam plate 3, every block of bamboo offset plate of lower floor 5 connects two blocks of rubbery foam plates 3; Two blocks of bamboo offset plates 5 below every block of bamboo offset plate in upper strata 5 connects.Rubbery foam plate 3 and two-layer bamboo offset plate 5 form meshing structure;
(7) pontoon bridge 2 left and right sides two root posts, 4 usefulness iron wires side by side are close to connection above the bamboo offset plate 5, to increase the stability of pontoon bridge 2.Equally can be according to the position of the Height Adjustment iron wire of mud face; Above bamboo offset plate 5, be adjacent to the column 4 that bamboo offset plate 5 connects pontoon bridge 2 the right and lefts, rubbery foam plate 3 and bamboo offset plate 5 were fixed between mud face and the iron wire by " tightly ", improve the stability of pontoon bridge 2 as far as possible with iron wire.When face of land SEA LEVEL VARIATION or surface subsidence cause pontoon bridge 2 to fluctuate, should in time regulate the position of iron wire.
(8) on the column 4 of pontoon bridge 2 both sides, railing 6 is set respectively;
(9) plastic woven cloth 7 is processed, plastic woven cloth 7 porous (the colour bar Polypropylence Sheet of non-not porous), the breadth that dispatches from the factory is 4m, needs according to the place size woven cloth to be spliced in advance, sew up twice in the breadth junction with portable sewing machine, form and be slightly larger than the area of reinforcing block.
(10) plastic woven cloth 7 is slowly launched at the mud face, four limits or relative at least both sides are fixed on embankment 1 or the column 4.After fixing, woven cloth is thrown the net as one.Plastic woven cloth 7 effects have two: one, as loaded filter, can stop that fine particle enters the horizontal drainage system in the mud; The 2nd, under the effect of plastic woven cloth 7 tension force, personnel and material can walk on plastic woven cloth and transport;
(11) kickboard of usefulness rubbery foam plate 3 and bamboo offset plate 5 area 2m * 2m customized, kickboard is for the plate operating personnel use of walking on mud, and in the middle of the place, transport materials such as branch drain 8 and plastic draining board 9, kickboard can move on plastic woven cloth 7 easily from boat or by two tractions of long rope on embankment 1 or pontoon bridge 2.
(12) branch drain 8 is set earlier at a certain distance, its spacing is the array pitch of plastic draining board 9;
(13) construction area is carried out plastic draining board 9 examinations and insert, determine plastic draining board 9 construction depths, be as the criterion to penetrate mud when examination is inserted, intercept plastic draining board 9 according to construction depth, upper end length in reserve; And plastic draining board 9 two ends are processed, processing method is upwards to dig 5cm at the filter membrane of plastic draining board 9 bottoms, with scissors the muscle core is cut 3cm, and then the filter membrane of digging is turned down.It is back folding to a side that the filter membrane wall is close together, and the muscle core is twisted in the inside fully, uses stapler the bottom stickfast.The other end is also done same processing.
(14) position that plugs to plastic draining board 9 positions, apart from the place of branch drain 8 about 20cm, with blade plastic woven cloth 7 to be scratched, aperture length is slightly larger than plastic draining board 9 width, the aperture be must guard against excessive, in case mud enters in the horizontal drainage system on upper strata from the aperture.
(15) with the slightly folding 10cm in plastic draining board 9 lower ends, aim at the aperture of scratching, at the uniform velocity vertically insert in the mud, be inserted into hydraulic reclamation mud bottom with artificial plate device; When pulling out on the plate device, suitably pull out in the rotation more earlier, in case plastic draining board 9 is rewinded.
(16) to inserting the length of good plastic draining board 9 upper end remainders, paste ground placement 20cm earlier and form certain horizontal segment 10, twined for 1 week from the top down to contiguous branch drain 8 places, the diameter of winding is greater than 1.5-2 times of branch drain 8 diameters, naturally twine, avoid locking.Again the short slab part 11 of remainder is inserted in the opposite side mud, formed the vertical drainage system of a long slab one short slab, to increase the transmission of vacuum.
(17) perpendicular to branch drain 8 directions, arrange drain header 13, spacing is 10~15m, and drain header 13 is connected with branch drain 8 usefulness threeways or four-way.Drain header 13 sets out fenestra at the membrane place, so that vacuum pump 14 connects.
(18) lay two-layer 180g/m 2Geotextiles 10, because plastic woven cloth 7 has very big tension force, be absorbed in can walking freely though people's this moment can walk in the above, does not have the danger that is absorbed in.The geotextiles 10 of whole volume lifted marches into the arena, during laying from the several constructors of an end that the handle block geotextiles 10 of overturning side by side, simultaneously in block other end traction geotextiles 10.
(19) the two-layer vacuum diaphragm 11 in shop is polyethylene sheeting, and thick 0.14mm, laying method be with geotextiles 10, but will note protecting vacuum diaphragm 11, avoids being torn.
(20) because the hydraulic reclamation ultra-soft foundation is in flow regime, do not need to dig the sealing ditch, only need to play sealing effectiveness stepping at least below the 1.5m degree of depth around the vacuum diaphragm 11.Before stepping on film, unclamp the limit that is fixed of plastic woven cloth 7 earlier, all be wrapped within the diaphragm seal plastic woven cloth 7 of lower floor and geotextiles 10 after press mold again.During press mold, should fully stir the mud of boundary, guarantee vacuum diaphragm 11 border seal effects.
(21) vacuum pump 14 equal vacuum drainage systems are installed, are circulated and open 30% vacuum pump 14, examination vacuumized (taking out slowly) 15 days, and whether checking leaks gas is strengthened the vacuum maintenance; Examination is avoided loading too fast when taking out, necessary circulation turn on pump is to avoid the plastic draining board 9 too fast fixed and stifled resistance hole of soil on every side.
(22) after examination vacuumizes 15 days, progressively open all vacuum pumps 14, formally load at full capacity, require under the film vacuum, when not reaching vacuum and require, must take to add the pump measure and check the sealing situation more than or equal to 80kPa.
(23) beginning film overlying water 50-100cm to increase precompressed water ballast(ing) 12, prevents that vacuum diaphragm 11 is tanned by the sun with strong wind by the sun and corroded delaying aging.
(24) carry out every field monitoring, draw sedimentation-time curve, treat that settlement stability meets unloading condition after, removal vacuum load is removed pumped vacuum systems.
Pontoon bridge is made up of column, rubbery foam plate and bamboo offset plate on the described mud.The material of rubbery foam plate is a polyethylene foam sheet, and light weight buoyancy is big, and belongs to elastic material, has very strong toughness and intensity, and is anti-dilatory and anti-knife wound ability is strong, thickness 5~8cm, and monolithic is of a size of 1.2m * 2.4m, and monolithic weight is 10~15kg.Column is arranged on the both sides of rubbery foam plate, after the horizontal level of rubbery foam plate is fixed, double swerve does not take place.Column adopts mao bamboon bar (or steel pipe), and the lower end is passed hydraulic reclamation thickness and entered hardpan, and stretch out about mud face 1m the upper end.
Pontoon bridge is an operation platform on the described mud, is again the fixed support of plastic woven cloth, and when shop geotextiles and shop film, personnel can stand on the pontoon bridge and provide traction to shop cloth shop film constructor and material.
Described modified vacuum precompressed adopts plastic woven cloth as loaded filter, and plastic draining board is carried out anti-silting processing, and ripple chimney filter and geotextiles are formed novel horizontal drainage system.
Described branch drain and drain header are the ripple chimney filter of overcoat filter membrane.

Claims (7)

1. hydraulic reclamation ultra-soft foundation modified vacuum precompressed comprises and lays pontoon bridge, modified vacuum precompressed, and in conjunction with the water covering prepressing technology, mainly comprise following technical step in conjunction with the water covering prepressing immediate processing method:
(1) lays pontoon bridge in the mud district in embankment;
(2) in the mud district, lay plastic woven cloth, be fixed on embankment and the pontoon bridge;
(3) level is laid branch drain on plastic woven cloth, and plastic draining board twines in the mud in branch drain insertion mud district;
(4) level is laid drain header on plastic woven cloth, moves towards vertical with branch drain, and drain header one end connects vacuum pump;
(5) drain header, with branch drain on lay geotextiles, on geotextiles, lay vacuum diaphragm;
(6) on vacuum diaphragm, place water ballast(ing).
2. a kind of hydraulic reclamation ultra-soft foundation modified vacuum according to claim 1 precompressed is in conjunction with the water covering prepressing immediate processing method, it is characterized in that pontoon bridge is made up of rubbery foam plate, column, the rubbery foam plate is laid on the mud in mud district, column is arranged on around the rubbery foam plate, column lower end enters pan soil, and the upper end is higher than mud.
3. a kind of hydraulic reclamation ultra-soft foundation modified vacuum according to claim 2 precompressed is characterized in that being provided with on the pontoon bridge railing in conjunction with the water covering prepressing immediate processing method.
4. a kind of hydraulic reclamation ultra-soft foundation modified vacuum according to claim 1 precompressed is characterized in that in conjunction with the water covering prepressing immediate processing method bamboo offset plate is laid on the rubbery foam plate and connection.
According to the precompressed of the described a kind of hydraulic reclamation ultra-soft foundation modified vacuum of claim 1 in conjunction with the water covering prepressing immediate processing method, it is characterized in that drain header, branch drain, form the horizontal drainage system jointly with geotextiles.
6. a kind of hydraulic reclamation ultra-soft foundation modified vacuum according to claim 1 precompressed is characterized in that the earlier slow pump drainage water person in charge in conjunction with the water covering prepressing immediate processing method, and vacuum is slowly risen, and the plastic draining board surrounding soil is fixed in order.
7. a kind of hydraulic reclamation ultra-soft foundation modified vacuum according to claim 1 precompressed is characterized in that being provided with water-retaining cofferdam in conjunction with the water covering prepressing immediate processing method on vacuum diaphragm, carry out the precompressed of film overlying water.
CN201010158412XA 2010-04-28 2010-04-28 Immediate processing method for hydraulic fill of ultra-soft foundation by modified vacuum preloading and water-covering preloading Active CN101806057B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010158412XA CN101806057B (en) 2010-04-28 2010-04-28 Immediate processing method for hydraulic fill of ultra-soft foundation by modified vacuum preloading and water-covering preloading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010158412XA CN101806057B (en) 2010-04-28 2010-04-28 Immediate processing method for hydraulic fill of ultra-soft foundation by modified vacuum preloading and water-covering preloading

Publications (2)

Publication Number Publication Date
CN101806057A true CN101806057A (en) 2010-08-18
CN101806057B CN101806057B (en) 2012-03-28

Family

ID=42608000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010158412XA Active CN101806057B (en) 2010-04-28 2010-04-28 Immediate processing method for hydraulic fill of ultra-soft foundation by modified vacuum preloading and water-covering preloading

Country Status (1)

Country Link
CN (1) CN101806057B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296590A (en) * 2011-06-09 2011-12-28 宁波高新区围海工程技术开发有限公司 High-strength reinforcing method of supersoft foundation
CN102704458A (en) * 2012-06-27 2012-10-03 河海大学 Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN104005401A (en) * 2014-06-12 2014-08-27 天津大学 Vacuum preloading solidification drainage channel
CN104746506A (en) * 2013-12-30 2015-07-01 深圳市工勘岩土工程有限公司 Soft soil combined preloading structure and construction method
CN104775414A (en) * 2015-03-24 2015-07-15 华中科技大学 Super-soft dredger fill surface layer solidification crusting and foundation treatment method
CN109403305A (en) * 2018-10-19 2019-03-01 杭州永创基建工程科技股份有限公司 A kind of compacted modified enhancing processing method of the discharging consolidation soil body joint soil body of mechanical compression
CN110206016A (en) * 2019-06-17 2019-09-06 盐城市京兆机泵制造有限公司 A kind of soft foundation treatment process using vacuum preloading
CN112921995A (en) * 2021-02-26 2021-06-08 三峡大学 Pre-pressure drainage system and method for reservoir bank slope soil filling area by reservoir water pressure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10325136A (en) * 1997-05-27 1998-12-08 Maruyama Kogyo Kk Construction method for improving soft ground
JP2003166233A (en) * 2001-11-29 2003-06-13 Hazama Gumi Ltd Ground improvement structure and construction method by vacuum consolidation
US20070127988A1 (en) * 2004-05-20 2007-06-07 Kazuyoshi Nakakuma Method for improving soft ground
CN101225656A (en) * 2008-01-31 2008-07-23 中交第四航务工程局有限公司 Method for rapidly reinforcing ultra-soft soil superficial zone and packaged technology
CN101591905A (en) * 2009-06-03 2009-12-02 叶凝雯 The newly hydraulically filled mucky soil soft foundation straw mattress preloading consolidation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10325136A (en) * 1997-05-27 1998-12-08 Maruyama Kogyo Kk Construction method for improving soft ground
JP2003166233A (en) * 2001-11-29 2003-06-13 Hazama Gumi Ltd Ground improvement structure and construction method by vacuum consolidation
US20070127988A1 (en) * 2004-05-20 2007-06-07 Kazuyoshi Nakakuma Method for improving soft ground
CN101225656A (en) * 2008-01-31 2008-07-23 中交第四航务工程局有限公司 Method for rapidly reinforcing ultra-soft soil superficial zone and packaged technology
CN101591905A (en) * 2009-06-03 2009-12-02 叶凝雯 The newly hydraulically filled mucky soil soft foundation straw mattress preloading consolidation method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《中小企业管理与科技》 20100228 陈永亮 浅谈软基处理工程的施工技术要点 155,158 , 第2期 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296590A (en) * 2011-06-09 2011-12-28 宁波高新区围海工程技术开发有限公司 High-strength reinforcing method of supersoft foundation
CN102704458A (en) * 2012-06-27 2012-10-03 河海大学 Sand-free cushion layer vacuum-surcharge preloading reinforcement device and method for soft ground
CN104746506A (en) * 2013-12-30 2015-07-01 深圳市工勘岩土工程有限公司 Soft soil combined preloading structure and construction method
CN104005401A (en) * 2014-06-12 2014-08-27 天津大学 Vacuum preloading solidification drainage channel
CN104775414A (en) * 2015-03-24 2015-07-15 华中科技大学 Super-soft dredger fill surface layer solidification crusting and foundation treatment method
CN104775414B (en) * 2015-03-24 2017-05-03 华中科技大学 Super-soft dredger fill surface layer solidification crusting and foundation treatment method
CN109403305A (en) * 2018-10-19 2019-03-01 杭州永创基建工程科技股份有限公司 A kind of compacted modified enhancing processing method of the discharging consolidation soil body joint soil body of mechanical compression
CN110206016A (en) * 2019-06-17 2019-09-06 盐城市京兆机泵制造有限公司 A kind of soft foundation treatment process using vacuum preloading
CN112921995A (en) * 2021-02-26 2021-06-08 三峡大学 Pre-pressure drainage system and method for reservoir bank slope soil filling area by reservoir water pressure

Also Published As

Publication number Publication date
CN101806057B (en) 2012-03-28

Similar Documents

Publication Publication Date Title
CN101806057B (en) Immediate processing method for hydraulic fill of ultra-soft foundation by modified vacuum preloading and water-covering preloading
CN101906772B (en) Fast consolidation method of blow-filled soft soil for land reclamation
CN101225656B (en) Method for rapidly reinforcing ultra-soft soil superficial layer
CN104775415B (en) Blow and fill out workplatform and the constructional method that super soft ground is reinforced fast
CN107268636A (en) The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
CN206034408U (en) A back pitching pile formula jacket structure for marine booster station
CN105274922A (en) Anti-slide tie-steel pipe pile composite structure for repairing cave-in roadbed and method
CN106120803B (en) Base pit stand construction in the case of artesian water
CN111305141B (en) Drainage method for underground comprehensive pipe gallery in dry season canal penetrating
CN201695378U (en) Spur dike with geogrid enrockment capturing structure
CN109083100B (en) River channel excavation construction process after mud blowing and landing
CN107620316A (en) A kind of rocky bed large volume deepwater foundation construction method
CN103243704A (en) Shallow mud foundation treatment method
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN109056784B (en) Construction method of stable gabion retaining wall
CN105256763A (en) Diking method based on bamboo raft frame structure
CN210002430U (en) kinds of earth-rock cofferdam foundation impervious curtain
CN110792063A (en) Application of novel gabion
CN219808189U (en) Coastal beach road structure
CN215105430U (en) Tide-sensitive river section steel pipe pile anchor pulling combined cofferdam
KR102487487B1 (en) Construction of tidal and wave power generating station under water
CN202577320U (en) Dry dock slope for large-size immersed tunnel
CN104594368A (en) Bamboo raft pile oversized cofferdam and construction method for sea reclamation by adopting same
CN109750655A (en) A kind of homogeneous earth dam axis of dam downstream vertical row water layer and construction method
CN218933121U (en) Flexible water-blocking curtain wall sinking system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant