CN101802349B - Steam turbine equipment - Google Patents

Steam turbine equipment Download PDF

Info

Publication number
CN101802349B
CN101802349B CN200980100134.8A CN200980100134A CN101802349B CN 101802349 B CN101802349 B CN 101802349B CN 200980100134 A CN200980100134 A CN 200980100134A CN 101802349 B CN101802349 B CN 101802349B
Authority
CN
China
Prior art keywords
pressure turbine
steam
high pressure
turbine
low
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200980100134.8A
Other languages
Chinese (zh)
Other versions
CN101802349A (en
Inventor
西本慎
田中良典
藤川立诚
山本隆一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Power Ltd
Original Assignee
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Ltd filed Critical Mitsubishi Heavy Industries Ltd
Publication of CN101802349A publication Critical patent/CN101802349A/en
Application granted granted Critical
Publication of CN101802349B publication Critical patent/CN101802349B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/02Blade-carrying members, e.g. rotors
    • F01D5/06Rotors for more than one axial stage, e.g. of drum or multiple disc type; Details thereof, e.g. shafts, shaft connections
    • F01D5/063Welded rotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/003Combinations of two or more machines or engines with at least two independent shafts, i.e. cross-compound
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D13/00Combinations of two or more machines or engines
    • F01D13/02Working-fluid interconnection of machines or engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/24Casings; Casing parts, e.g. diaphragms, casing fastenings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/16Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type
    • F01K7/22Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being only of turbine type the turbines having inter-stage steam heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05CINDEXING SCHEME RELATING TO MATERIALS, MATERIAL PROPERTIES OR MATERIAL CHARACTERISTICS FOR MACHINES, ENGINES OR PUMPS OTHER THAN NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES
    • F05C2201/00Metals
    • F05C2201/04Heavy metals
    • F05C2201/0433Iron group; Ferrous alloys, e.g. steel
    • F05C2201/0466Nickel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05DINDEXING SCHEME FOR ASPECTS RELATING TO NON-POSITIVE-DISPLACEMENT MACHINES OR ENGINES, GAS-TURBINES OR JET-PROPULSION PLANTS
    • F05D2220/00Application
    • F05D2220/30Application in turbines
    • F05D2220/31Application in turbines in steam turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Turbine Rotor Nozzle Sealing (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

Provided is steam turbine equipment that enables the turbine equipment to be increased in size while inhibiting the possibility of vibration generation and a significant increase in equipment cost even when the steam temperature adopted is 650 DEG C or higher. In a steam turbine equipment having a high-pressure turbine, an intermediate-pressure turbine, and a low-pressure turbine, the high-pressure turbine is separated into a first high-pressure turbine unit on the high-temperature, high-pressure side and a second high-pressure turbine unit on the low-temperature, low-pressure side; the intermediate-pressure turbine is separated into a first intermediate-pressure turbine unit on the high-temperature, high-pressure side and a second intermediate-pressure turbine unit on the low-temperature, low-pressure side; the first high-pressure turbine unit and the first intermediate-pressure turbine unit are integrated to configure a first integrated unit; the second high-pressure turbine unit and the second intermediate-pressure turbine unit are integrated to configure a second integrated unit; and at least one of the rotors or the casing of the turbine, into which steam at 650 DEG C or above is introduced, is configured by joining multiple members formed of an Ni-based alloy by welding.

Description

Steam turbine equipment
Technical field
The present invention relates to a kind of steam turbine equipment with high pressure turbine, middle-pressure turbine and low-pressure turbine.
Background technique
Current, as main electricity-generating method, use atomic power, firepower, these three kinds of methods of waterpower, from the viewpoint of stock number and energy density, anticipation from now on above-mentioned three kinds of electricity-generating methods still can be used as main electricity-generating method.Wherein, thermal power generation is as the high electricity-generating method of ability of safety and reply load change, and its value is high, and anticipation still can continue to play an important role at power field from now on.
The steam turbine equipment that the coal combustion heat power station that comprises steam turbine is used has high pressure turbine, middle-pressure turbine, low-pressure turbine conventionally.In this steam turbine equipment, use the steam of 600 ℃ of temperature levels, the rotor of high pressure turbine or middle-pressure turbine, shell (casing) etc. are exposed to the part of high temperature, use the ferrite material with respect to the steam of 600 ℃ of temperature levels with heat resistance and manufacturing and Economy excellence.
But, in recent years, in order to cut down CO 2discharge amount and further the raising thermal efficiency, just seeking to adopt 650 ℃ of temperature levels or the technology of the steam condition of 700 ℃ of higher temperature levels.So disclosing a kind of in patent documentation 1 can be the steam turbine equipment turning round under more than 650 ℃ high temperature in reheat steam condition.
Figure 14 means the summary system diagram of disclosed existing steam turbine equipment in patent documentation 1.Steam turbine power generating equipment 110 shown in Figure 14 is separated into the first middle-pressure turbine 112 of High Temperature High Pressure side and the second middle-pressure turbine 114 of low-temp low-pressure side by middle-pressure turbine, and high pressure turbine 116 and the second middle-pressure turbine 114 are integrally formed and form integrated device 122, on this basis, this integrated device 122 and the first middle-pressure turbine 112, low-pressure turbine 124 and the generator 126 of High Temperature High Pressure side are attached on same axis in the lump.
The main steam that is superheated to 600 ℃ of temperature levels in boiler 132 is fed to high pressure turbine 116 by main steam pipe 134.The steam that is fed to high pressure turbine 116 is discharged from after expansion working, and gets back to boiler 132 by cold reheat pipe 138.The steam of getting back to this boiler 132 is again heated and becomes the steam of 700 ℃ of temperature levels in boiler 132, and is delivered to the first middle-pressure turbine 112 by high temperature reheating pipe 140.The rotor of this first middle-pressure turbine 112 consists of the material (austenite-series heat-resistant steel) of high-temperature vapour that can resistance to 700 ℃ of temperature levels.Steam in the first middle-pressure turbine 112 after expansion working is reduced to 550 ℃ of temperature levels and is discharged from, and in process, splenium connecting tube 142 is delivered to the second middle-pressure turbine 114.The steam that is transported to the second middle-pressure turbine 114 is discharged from after expansion working, and is directed into low-pressure turbine 124 by cross pipe 144.The steam that is fed to low-pressure turbine 124 is discharged from after expansion working, and is transported to condenser 128.The steam that is transported to condenser 128 is condensed in condenser 128, and gets back in boiler 132 after utilizing feed water pump 130 to boost.Generator 126 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
In steam turbine equipment as above, middle-pressure turbine is cut apart, and only the first middle-pressure turbine 112 use can resistance to more than 650 ℃ steam material, thereby, can adopt 650 ℃ of above steam conditions, and, minimizing can be resistance to the use amount of material of 650 ℃ of above steams, thereby the manufacture cost of suppression equipment integral body.
But, in the disclosed technology of patent documentation 1, due to high pressure turbine do not use can be resistance to the material of 650 ℃ of above steams, therefore, when main steam is used more than 650 ℃ steams, be difficult to tackle.
And, if consider jumbo steam turbine equipment, be difficult to realize the equipment shown in Figure 14.This be because, in order to form the first middle-pressure turbine 112, use can resistance to more than 650 ℃ steam for example Ni base alloy time, from blank, manufacture the viewpoint of limit, be difficult to manufacture more than 10t turbine rotor and shell (casing), thereby can not manufacture large-scale turbine rotor and shell.
Therefore, as shown in figure 15, also can consider the first middle-pressure turbine 112 to be further divided into 1-2 middle-pressure turbine 113, but can produce following problem in this case, because of the increase of casing quantity, follow the building in this, the increase of pipe arrangement to cause the manufacture cost of equipment to increase.And, also produce following problem, because increasing, the number of axle (quantity of divided turbo machine) cause vibrative possibility to increase.
In addition, also can consider not use Ni base alloy and adopt ferrite material to deal with, but in this case, need in casing, import a large amount of cooled vapor, causing turbine interior Efficiency Decreasing.
Patent documentation 1:(Japan) No. 4074208 communique of special permission
Summary of the invention
Therefore, the present invention makes in view of the problem of above-mentioned prior art, its object is to provide a kind of steam turbine equipment, even if in the situation that adopt more than 650 ℃ steam conditions, also can suppress significantly rising and realizing the maximization of equipment of vibrative possibility and equipment cost.
In order to solve above-mentioned problem, in steam turbine equipment of the present invention, there is high pressure turbine, middle-pressure turbine and low-pressure turbine, this steam turbine equipment is characterised in that, described high pressure turbine is separated into the first high pressure turbine portion of High Temperature High Pressure side and the second high pressure turbine portion of low-temp low-pressure side, described middle-pressure turbine is separated into the first middle-pressure turbine portion of High Temperature High Pressure side and the second middle-pressure turbine portion of low-temp low-pressure side, the first integrated portion that formation is integrally formed described the first high pressure turbine portion and described the first middle-pressure turbine portion, and, be constituted to the second integrated portion that the second high pressure turbine portion and described the second middle-pressure turbine portion are integrally formed described in major general, the steam that is imported into 650 ℃ of above steams that forms described the first high pressure turbine portion and described the first middle-pressure turbine portion by Ni base alloy imports the rotor of turbo machine of side and at least either party in shell, and, by welding, a plurality of rotor parts or case member joint are formed to the whole rotor of described turbo machine and at least either party in whole shell.
Like this, by Ni base alloy, form the rotor of turbo machine of a side (steam importing side) that is imported into 650 ℃ of above steams and at least either party in shell (, the rotor of the steam importing side of the first high pressure turbine and the first middle-pressure turbine and at least one party in shell), and, by welding, a plurality of rotor parts or case member joint are formed to the whole rotor of turbo machine and at least either party in whole shell, even if at high pressure turbine, middle-pressure turbine is all imported under the steam condition of 650 ℃ of above steams, also can realize the maximization of equipment and can not increase casing (Trucks chamber), the number of axle (quantity of divided turbo machine) or blade progression.
In addition, in equipment as above, 650 ℃ of above steams are fed to described the first high pressure turbine and the first middle-pressure turbine.Therefore, by the first high pressure turbine and the first middle-pressure turbine are integrally formed, and be integrally formed being imported into less than the steam of 650 ℃ and second high pressure turbine that can be formed by ferrite material and the second middle-pressure turbine, thereby can reduce the use amount as the Ni base alloy of high-grade material, and the significantly rising of suppression equipment cost.In addition, owing to being imported into rotor and at least either party in shell of turbo machine of a side (steam importing side) of 650 ℃ of above steams, use Ni base alloy, therefore, do not need in turbo machine, to import a large amount of cooled vapor, can improve turbine interior efficiency yet.
In addition, also the ultra high pressure turbine that is imported into high compressed steam can be set, the pressure of steam that the pressure ratio of this high compressed steam is directed into described high pressure turbine is high, links this ultra high pressure turbine, described the first integrated portion, the second integrated portion and low-pressure turbine on same axis.
Thus, can make the further high-pressure trend of steam.
In addition, also 650 ℃ of above steams can be directed into the first high pressure turbine portion and the first middle-pressure turbine portion that forms described the first integrated portion, and, steam less than 650 ℃ is directed into the second high pressure turbine portion and the second middle-pressure turbine portion that forms described the second integrated portion, utilize the axle different from described the first integrated portion to link described the second integrated portion and low-pressure turbine, and, compare the union body of this second integrated portion and low-pressure turbine, described the first integrated portion is disposed to the position near boiler, it is overheated that this boiler makes to be fed to the steam of described high pressure turbine and middle-pressure turbine.
By being disposed near described boiler being imported into the first high pressure turbine portion of 650 ℃ of above steams and the first middle-pressure turbine portion, thereby can shorten boiler and the first high pressure turbine portion and piping length that boiler is connected with the first middle-pressure turbine portion, and can reduce the material that this pipe arrangement uses.Due to by the steam flowing more than 650 ℃ in described boiler and the first high pressure turbine portion and pipe arrangement that boiler is connected with the first middle-pressure turbine portion, therefore, need to be made by the Ni base alloy as high-grade material, but by shortening described pipe arrangement and cutting down materials'use amount, thereby can reduce the fabricating cost of whole equipment.
In addition, also the ultra high pressure turbine that is imported into high compressed steam can be set, this high compressed steam is higher than the pressure of steam that is fed to described high pressure turbine, links described the first integrated portion and described ultra high pressure turbine on same axis.
Thus, can make the further high-pressure trend of steam.
In addition, in the described second integrated portion of the steam turbine equipment of above-mentioned arbitrary structure, also can further make described low-pressure turbine be integrally formed.Thus, can reduce casing quantity, the number of axle, and seek to reduce equipment cost.
And, there is high pressure turbine, in the steam turbine equipment of middle-pressure turbine and low-pressure turbine, it is characterized in that, described high pressure turbine is separated into the first high pressure turbine portion of High Temperature High Pressure side and the second high pressure turbine portion of low-temp low-pressure side, described middle-pressure turbine is separated into the first middle-pressure turbine portion of High Temperature High Pressure side and the second middle-pressure turbine portion of low-temp low-pressure side, the first integrated portion that formation is integrally formed described the first high pressure turbine portion and described the first middle-pressure turbine portion, and, the steam that is imported into 650 ℃ of above steams that forms described the first high pressure turbine portion and described the first middle-pressure turbine portion by Ni base alloy imports the rotor of turbo machine of side and at least either party in shell, and, by welding, a plurality of rotor parts or case member are engaged at least either party who forms whole turbine rotor and whole shell.In addition, also the second middle-pressure turbine and low-pressure turbine can be integrally formed.
Owing to not making the second high pressure turbine and the second middle-pressure turbine be integrally formed, therefore, easily tackle high capacity.
In addition, if further make the second middle-pressure turbine and low-pressure turbine be integrally formed, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.
And, there is high pressure turbine, in the steam turbine equipment of middle-pressure turbine and low-pressure turbine, it is characterized in that, on same axis, link the turbo machine that is imported into more than 650 ℃ steams, and, on another different axis of the turbo machine from being imported into described more than 650 ℃ steam, link the turbo machine be imported into less than the steam of 650 ℃, compare the turbo machine that is imported into the described steam less than 650 ℃, by the turbine configurations that is imported into described 650 ℃ of above steams in the position near boiler, it is overheated that this boiler makes to be directed into the steam of described high pressure turbine and middle-pressure turbine, by Ni base alloy, form the rotor of turbo machine of an example (steam importing side) that is imported into described 650 ℃ of above steams and at least either party in shell, and, by welding, a plurality of rotor parts or case member are engaged at least either party who forms whole turbine rotor and whole shell.
By by the turbine configurations that is imported into 650 ℃ of above steams near described boiler, thereby can shorten boiler and be imported into the piping length that the turbo machine of 650 ℃ of above steams is connected, and can reduce the material of this pipe arrangement use.Due to the steam flowing more than 650 ℃ in the pipe arrangement described boiler is connected with the turbo machine that is imported into more than 650 ℃ steams, therefore need to be made by the Ni base alloy as high-grade material, but by shortening this pipe arrangement and cutting down materials'use amount, thereby can reduce the fabricating cost of whole equipment.
In addition, by Ni base alloy, formed rotor or the case member of the turbo machine of a side (steam importing side) that is imported into 650 ℃ of above steams, and, by welding, a plurality of rotor parts or case member joint are formed to the either party in whole turbine rotor and whole shell, even if be fed at more than 650 ℃ steams under the steam condition of the first middle-pressure turbine, also can realize the maximization of equipment and can not increase casing quantity, the number of axle or blade progression.
And, in thering is the steam turbine equipment of high pressure turbine, middle-pressure turbine and low-pressure turbine, it is characterized in that, be integrally formed to high pressure turbine described in major general and middle-pressure turbine, on same axis, link this integrated device and low-pressure turbine, by Ni base alloy, form the rotor of turbo machine of an example (steam importing side) that is imported into described 650 ℃ of above steams and at least either party in shell, and, by welding, a plurality of rotor parts or case member joint are formed at least either party in whole turbine rotor and whole shell.In addition, also described high pressure turbine, middle-pressure turbine and low-pressure turbine can be integrally formed.Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.
In addition, also the ultra high pressure turbine that is imported into high compressed steam can be set, the pressure of steam that the pressure ratio of this high compressed steam is fed to described high pressure turbine is high, links described the first integrated portion and described ultra high pressure turbine on same axis.
Thus, can make the further high-pressure trend of steam.
According to the present invention who records as mentioned above, a kind of steam turbine equipment can be provided, even if in the situation that adopt 650 ℃ of temperature levels or the steam condition of 700 ℃ of higher temperature levels, also the significantly rising of vibrative possibility and equipment cost can be suppressed, and the maximization of equipment can be realized.
Accompanying drawing explanation
Fig. 1 means the figure of the structure of the steam turbine power generating equipment in embodiment 1;
Fig. 2 means the figure of structure of steam turbine power generating equipment of embodiment 1 change local form;
Fig. 3 means the figure of structure of steam turbine power generating equipment of embodiment 1 change local form;
Fig. 4 means the figure of structure of steam turbine power generating equipment of embodiment 1 change local form;
Fig. 5 means the figure of the structure of the steam turbine power generating equipment in embodiment 2;
Fig. 6 means the figure of structure of steam turbine power generating equipment of embodiment 2 change local form;
Fig. 7 means the figure of the structure of the steam turbine power generating equipment in embodiment 3;
Fig. 8 means the figure of structure of steam turbine power generating equipment of embodiment 3 change local form;
Fig. 9 means the figure of the structure of the steam turbine power generating equipment in embodiment 4;
Figure 10 means the figure of structure of steam turbine power generating equipment of embodiment 4 change local form;
Figure 11 means the figure of the structure of the steam turbine power generating equipment in embodiment 5;
Figure 12 means the figure of the structure of the steam turbine power generating equipment in embodiment 6;
Figure 13 means the figure of the structure of the steam turbine power generating equipment in embodiment 7;
Figure 14 means the figure of the structure of the steam turbine power generating equipment in conventional example;
Figure 15 means the figure of the structure of the steam turbine power generating equipment in other conventional examples.
Embodiment
Below, with reference to accompanying drawing illustration describe the preferred embodiments of the present invention in detail.Wherein, be recorded in the size, material, shape of the component parts in this embodiment and relatively configuration etc. be not limited to specific record, its purport not by circumscription of the present invention in this, be only illustrative examples.
(embodiment 1)
Fig. 1 means the structural drawing of embodiment 1 steam turbine power generating equipment.
With reference to Fig. 1, the power generating equipment that the steam turbine equipment by embodiment 1 is formed describes.
Steam turbine power generating equipment 10 shown in Fig. 1 is mainly by forming as lower member: be separated into as described later the high pressure turbine of two, be divided into middle-pressure turbine, low-pressure turbine 24, generator 26, condenser 28, the boiler 32 of two as described later.Described high pressure turbine is separated into the first high pressure turbine 16 of High Temperature High Pressure side and the second high pressure turbine 18 of low-temp low-pressure side, described middle-pressure turbine is separated into the first middle-pressure turbine 12 of High Temperature High Pressure side and the second middle-pressure turbine 14 of low-temp low-pressure side, the first high pressure turbine 16 and the first middle-pressure turbine 12 are integrally formed and form integrated device 20, the second high pressure turbine 18 and the second middle-pressure turbine 14 are integrally formed and form integrated device 22.
In addition, be configured to described integrated device 20, integrated device 22, low-pressure turbine 24 and generator 26 links on same axis.
The steam of described the first high pressure turbine 16 and the first middle-pressure turbine 12 imports the rotor of side and at least either party of shell is formed by Ni base alloy, and, by welding, a plurality of rotor parts or case member are engaged at least either party who forms whole turbine rotor and whole shell.
The main steam being superheated in boiler 32 more than 650 ℃ is fed to the first high pressure turbine 16 by main steam pipe 34.After importing to the steam expanded work done of the first high pressure turbine 16, be discharged from, become the steam less than 650 ℃, and be directed into the second high pressure turbine 18 via high-voltage section connecting pipe 36, after this second high pressure turbine expansion working, be discharged from, and get back to boiler 32 by cold reheat pipe 38.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is delivered to the first middle-pressure turbine 12 by high temperature reheating pipe 40.Steam cooling to 550 ℃ temperature level after the first middle-pressure turbine 12 expansion workings and being discharged from, and be delivered to the second middle-pressure turbine 14 via middle splenium connecting pipe 42.The steam that is delivered to the second middle-pressure turbine 14 is discharged from after expansion working, and is delivered to low-pressure turbine 24 by cross pipe 44.The steam that is directed into low-pressure turbine 24 is discharged from after expansion working, and is delivered to condenser 28.The steam that is delivered to condenser 28 is condensed in condenser 28, gets back to boiler 32 after utilizing feed water pump 30 to boost.Generator 26 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
According to the steam turbine power generating equipment 10 of above-described embodiment's 1 mode, by Ni base alloy, formed the rotor of turbo machine (the first high pressure turbine 16, the first middle-pressure turbine 12) of a side (steam importing side) that is imported into 650 ℃ of above steams and at least either party of shell, and, as a whole, welding, a plurality of part bonding are consisted of, the first high pressure turbine 16, middle-pressure turbine 12 can make equipment enlarging and can not increase casing quantity, the number of axle or blade progression.
In addition, in equipment as above, 650 ℃ of above steams are fed to described the first high pressure turbine 16 and the first middle-pressure turbine 12, less than the steams of 650 ℃, are fed to the second high pressure turbine 18 and the second middle-pressure turbine 14.
Therefore, high pressure turbine, middle-pressure turbine is all separated into two, to by Ni base alloy, be formed rotor and at least one party in shell of a side (steam importing side) that is imported into 650 ℃ of above steams and by welding the first high pressure turbine 16 and the first middle-pressure turbine 12 that a plurality of part bonding are formed, be integrally formed gasifying device 20 as a whole, to be imported into less than the steam of 650 ℃ and be integrally formed and be integrally formed gasifying device with the second high pressure turbine 18 and the second middle-pressure turbine 14 that prior art similarly can consist of ferrite material, thereby can reduce the use amount as the Ni base alloy of high-grade material, and the significantly rising of suppression equipment cost.In addition, when the steam temperature being imported into surpasses 560 ℃, the rotor of the second high pressure turbine 18 and the second middle-pressure turbine 14 and shell adopt the welded structure of different materials (Iso material) (such as 12Cr steel and 2.25Cr steel, 12Cr steel and CrMoV steel etc.), thereby only in the part that needs high temperature strength, use high-grade material, can use cheap material not needing the part of high temperature strength, therefore, can make the use amount of high-grade material minimize.
In addition, as shown in Figure 2, the second high pressure turbine 18, the second middle-pressure turbine 14 and low-pressure turbine 24 are integrally formed and form integrated device 21, thereby, can reduce casing quantity, the number of axle, can seek to reduce equipment cost.In addition, the rotor of integrated device 21 and shell adopt different materials (for example, 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
On the other hand, by forming large capacity, as shown in Figure 3, also can form the structure that the second high pressure turbine 18 and the second middle-pressure turbine 14 are not integrally formed.
In addition, with respect to the example shown in Fig. 3, as shown in Figure 4, the second middle-pressure turbine 14 and low-pressure turbine 24 be integrally formed and be integrally formed gasifying device 23, thereby can reduce casing quantity, the number of axle, and seeking to reduce equipment cost.In addition, the rotor of integrated device 23 and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
(embodiment 2)
Fig. 5 means the figure of structure of embodiment 2 steam turbine power generating equipment.
Steam turbine power generating equipment 10 shown in Fig. 5 is compared with the steam turbine power generating equipment of the form of the embodiment 1 shown in Fig. 1, it is the form after partial alteration, and be configured to integrated device 22, low-pressure turbine 24 and generator 26 and link on same axis, in the position of more close boiler 32 in contrast, be configured to integrated device 20 and generator 27 and on same axis, link and configure.Integrated device 20 is more preferred the closer to boiler 32.
In addition, all identical with the steam turbine power generating equipment of embodiment 1 form.
According to the steam turbine power generating equipment 10 of above-described embodiment's 2 form, except the effect of embodiment 1 form, by being disposed near described boiler 32 being imported into the first high pressure turbine 16 of 650 ℃ of above steams and the first middle-pressure turbine 12, thereby can shorten boiler 32 and the first high pressure turbine 16 and piping length that boiler 32 is connected with the first middle-pressure turbine 12, and can reduce the material that this pipe arrangement uses.Due to by the steam flowing more than 650 ℃ in described boiler 32 and the first high pressure turbine 16 and pipe arrangement that boiler 32 is connected with the first middle-pressure turbine 12, therefore, need to be used as the Ni base alloy of high-grade material to make, but by shortening described pipe arrangement, cut down materials'use amount, thereby can reduce the fabricating cost of whole equipment.
In addition, with the example shown in Fig. 2 similarly, the second high pressure turbine 18, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device 21 and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
On the other hand, by forming large capacity, as shown in Figure 6, also can form the structure that the second high pressure turbine 18 and the second middle-pressure turbine 14 are not integrally formed.
In addition, with respect to the example shown in Fig. 6, with the example shown in Fig. 4 similarly, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device 23 and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
(embodiment 3)
Fig. 7 means the figure of structure of embodiment 3 steam turbine power generating equipment.
With reference to Fig. 7, the power generating equipment that the steam turbine equipment by embodiment 3 forms is described.
Steam turbine power generating equipment shown in Fig. 7 10 main by ultra high pressure turbine 19, be separated into the high pressure turbine of two as described later, be divided into middle-pressure turbine, low-pressure turbine 24, generator 26, condenser 28, the boiler 32 of two as described later and form.Described high pressure turbine is separated into the first high pressure turbine 16 of High Temperature High Pressure side and the second high pressure turbine 18 of low-temp low-pressure side, described middle-pressure turbine is separated into the first middle-pressure turbine 12 of High Temperature High Pressure side and the second middle-pressure turbine 14 of low-temp low-pressure side, the first high pressure turbine 16 and the first middle-pressure turbine 12 are integrally formed and form integrated device 20, the second high pressure turbine 18 and the second middle-pressure turbine 14 are integrally formed and form integrated device 22.
In addition, be configured to ultra high pressure turbine 19, described integrated device 20, integrated device 22, low-pressure turbine 24 and generator 26 links on same axis.
The rotor of described ultra high pressure turbine 19, the first high pressure turbine 16 and the first middle-pressure turbine 12 forms steam by Ni base alloy and imports side, and, by welding, a plurality of rotor parts or case member are engaged at least either party who forms whole turbine rotor and whole shell.
In boiler 32, be superheated to more than 650 ℃ main steam by main steam pipe 33 and be fed to ultra high pressure turbine 19.The steam that is fed to ultra high pressure turbine 19 is discharged from after expansion working, becomes less than the steam of 650 ℃, and gets back to boiler 32 by cold reheat pipe 35.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is directed into the first high pressure turbine 16 by high temperature reheating pipe 34.The steam that is fed to the first high pressure turbine 16 is discharged from after expansion working, become the steam less than 650 ℃, and be directed into the second high pressure turbine 18 via high-voltage section connecting pipe 36, after this second high pressure turbine expansion working, be discharged from, and get back to boiler 32 by cold reheat pipe 38.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is delivered to the first middle-pressure turbine 12 by high temperature reheating pipe 40.Steam cooling to 550 ℃ temperature level after the first middle-pressure turbine 12 expansion workings and being discharged from, and be delivered to the second middle-pressure turbine 14 via middle splenium connecting pipe 42.The steam that is delivered to the second middle-pressure turbine 14 is discharged from after expansion working, and is delivered to low-pressure turbine 24 by cross pipe 44.The steam that is fed to low-pressure turbine 24 is discharged from after expansion working, and is delivered to condenser 28.The steam that is transported to condenser 28 is condensed in condenser 28, and gets back to boiler 32 after utilizing feed water pump 30 to boost.Generator 26 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
According to the steam turbine power generating equipment 10 of above-described embodiment's 3 form, by welding, a plurality of part bonding that formed by Ni base alloy are formed to the rotor of turbo machine (ultra high pressure turbine 19, the first high pressure turbine 16, the first middle-pressure turbine 12) of a side that is imported into 650 ℃ of steams above and at least either party in shell, thereby ultra high pressure turbine, the first high pressure turbine 16, middle-pressure turbine 12 can be realized the maximization of equipment and can not increase casing quantity, the number of axle or blade progression.In addition, by ultra high pressure turbine 19 is set, thus can the higher steam of working pressure.
In addition, in equipment as above, 650 ℃ of above steams are fed to described ultra high pressure turbine 19, the first high pressure turbine 16 and the first middle-pressure turbine 12, less than the steams of 650 ℃, are fed to the second high pressure turbine 18 and the second middle-pressure turbine 14.
Therefore, high pressure turbine, middle-pressure turbine is all separated into two, to by Ni base alloy, be formed rotor and at least one party in shell of a side (steam importing side) that is imported into 650 ℃ of above steams and by welding the first high pressure turbine 16 and the first middle-pressure turbine 12 that a plurality of part bonding are formed, be integrally formed gasifying device 20 and link with ultra high pressure turbine 19 as a whole, to be imported into less than the steam of 650 ℃ and be integrally formed and be integrally formed gasifying device 22 with the second high pressure turbine 18 and the second middle-pressure turbine 12 that prior art similarly can consist of ferrite material, thereby can reduce the use amount as the Ni base alloy of high-grade material, and significantly rising that can suppression equipment cost.In addition, in the situation that the steam temperature importing is over 560 ℃, the rotor of the second high pressure turbine 18 and the second middle-pressure turbine 14 and shell adopt the welded structure of different materials (for example 12Cr steel and 2.25Cr, 12Cr and CrMoV steel), thereby similarly, can make the use amount of high-grade material minimize.
In addition, with the example shown in Fig. 2 similarly, the second high pressure turbine 18, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
On the other hand, by forming large capacity, as shown in Figure 8, also can make the second high pressure turbine 18 and the second middle-pressure turbine 14 not be integrally formed.
In addition, with respect to the example shown in Fig. 8, with the example shown in Fig. 4 similarly, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
(embodiment 4)
Fig. 9 means the figure of structure of embodiment 4 steam turbine power generating equipment.
Steam turbine power generating equipment 10 shown in Fig. 9 is compared with the steam turbine power generating equipment of the form of the embodiment 3 shown in Fig. 7, it is the form after partial alteration, be configured to integrated device 22, low-pressure turbine 24 and generator 26 links on same axis, in the position of more close boiler 32 in contrast, be configured to ultra high pressure turbine 19, integrated device 20 and generator 27 and on same axis, link and configure.Ultra high pressure turbine 19 and integrated device 20 more boiler 32 are more preferred.
In addition, all identical with the steam turbine power generating equipment of embodiment 3 form.
According to the steam turbine power generating equipment 10 of above-described embodiment's 4 form, except the effect of embodiment 3 form, by the ultra high pressure turbine 19, the first high pressure turbine 16 and the first middle-pressure turbine 12 that are imported into 650 ℃ of above steams being disposed near described boiler 32, thereby, can shorten by boiler 32 and ultra high pressure turbine 19, by boiler 32 and the first high pressure turbine 16 and piping length that boiler 32 is connected with the first middle-pressure turbine 12, and can reduce the material that this pipe arrangement uses.Due to by described boiler 32 and ultra high pressure turbine 19, by the steam flowing more than 650 ℃ in boiler 32 and the first high pressure turbine 16 and pipe arrangement that boiler 32 is connected with the first middle-pressure turbine 12, therefore, need to be made by the Ni base alloy as high-grade material, but by shortening described pipe arrangement and cutting down materials'use amount, can significantly reduce the fabricating cost of whole equipment.
In addition, with the example shown in Fig. 2 similarly, the second high pressure turbine 18, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (for example, 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
On the other hand, by forming large capacity, as shown in figure 10, also can form the structure that the second high pressure turbine 18 and the second middle-pressure turbine 14 are not integrally formed.
In addition, with respect to the example shown in Figure 10, with the example shown in Fig. 4 similarly, the second middle-pressure turbine 14 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
(embodiment 5)
Figure 11 means the figure of structure of embodiment 5 steam turbine power generating equipment.
With reference to Figure 11, the power generating equipment that the steam turbine equipment by embodiment 5 forms is described.
Steam turbine power generating equipment 10 shown in Figure 11 mainly consists of high pressure turbine 16, middle-pressure turbine 12, low-pressure turbine 24, generator 26,27, condenser 28 and boiler 32.
In addition, be configured to high pressure turbine 16, low-pressure turbine 24 and generator 26 and link on same axis, in the position of more close boiler 32 in contrast, middle-pressure turbine 12 and generator 27 link and configure on same axis.Middle-pressure turbine 12 is more preferred the closer to boiler 32.
In addition, the steam that is formed middle-pressure turbine 12 by Ni base alloy imports the rotor of side and at least either party in shell, and, by welding, a plurality of rotor parts or case member are engaged at least either party who forms whole turbine rotor and whole shell.
The main steam being superheated in boiler 32 less than 650 ℃ is fed to high pressure turbine 16 by main steam pipe 34.The steam that is fed to high pressure turbine 16 is discharged from after expansion working, and gets back to boiler 32 by cold reheat pipe 38.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is delivered to middle-pressure turbine 12 by high temperature reheating pipe 40.Steam after middle-pressure turbine 12 expansion workings is discharged from, and is delivered to low-pressure turbine 24 by cross pipe 44.The steam that is fed to low-pressure turbine 24 is discharged from after expansion working, is transported to condenser 28.The steam that is transported to condenser 28 is condensed in condenser 28, and gets back to boiler 32 after utilizing feed water pump 30 to boost.Generator 26,27 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
According to the steam turbine power generating equipment 10 of above-described embodiment's 5 form, by Ni base alloy, form the rotor of middle-pressure turbine 12 of a side that is imported into 650 ℃ of above steams and at least either party in shell, and, as a whole, by welding, a plurality of part bonding are formed, thereby can realize the maximization of equipment and can not increase casing quantity, the number of axle or the blade progression of middle-pressure turbine 12.
And, by the middle-pressure turbine 12 that is imported into 650 ℃ of above steams being disposed near described boiler 32, thereby can shorten the piping length that boiler 32 is connected with middle-pressure turbine 12, and can reduce the material of this pipe arrangement use.Due to the steam flowing more than 650 ℃ in the pipe arrangement described boiler 32 is connected with middle-pressure turbine 12, therefore, need to be used as the Ni base alloy of high-grade material to make, but by shortening described pipe arrangement, cut down materials'use amount, thereby can significantly reduce the fabricating cost of whole equipment.
(embodiment 6)
Figure 12 means the figure of structure of embodiment 6 steam turbine power generating equipment.
With reference to Figure 12, the power generating equipment that the steam turbine equipment by embodiment 6 forms is described.
Steam turbine power generating equipment 10 shown in Figure 12 mainly consists of high pressure turbine 16, middle-pressure turbine 12, low-pressure turbine 24, generator 26, condenser 28, boiler 32.
In addition, be configured to high pressure turbine 16, middle-pressure turbine 12, low-pressure turbine 24 and generator 26 and link on same axis, and, high pressure turbine 16 and middle-pressure turbine are integrally formed and are integrally formed gasifying device 25.
The steam that is formed described high pressure turbine 16 and middle-pressure turbine 12 by Ni base alloy imports the rotor of side and at least either party in shell, and, by welding, a plurality of rotor parts or case member joint are formed at least either party in whole turbine rotor and whole shell.
The main steam being superheated in boiler 32 more than 650 ℃ is directed into high pressure turbine 16 by main steam pipe 34.The steam that is imported into high pressure turbine 16 is discharged from after expansion working, becomes less than the steam of 650 ℃ and gets back to boiler 32 by cold reheat pipe 48.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is directed into middle-pressure turbine 12 by high temperature reheating pipe 40.Steam after middle-pressure turbine 12 expansion workings is discharged from, and is delivered to low-pressure turbine 24 by cross pipe 44.The steam that is directed into low-pressure turbine 24 is discharged from after expansion working, and is transported to condenser 28.The steam that is transported to condenser 28 is condensed in condenser 28, and gets back to boiler 32 after utilizing feed water pump 30 to boost.Generator 26 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
According to the steam turbine power generating equipment 10 of above-described embodiment's 6 form, by Ni base alloy, form the rotor of turbo machine (high pressure turbine 16, middle-pressure turbine 12) of a side that is imported into 650 ℃ of above steams and at least either party in shell, and as a whole, by welding, a plurality of part bonding are formed, and, form the integrated device 25 of high pressure turbine 16 and middle-pressure turbine 12, thereby can realize the maximization of equipment and can not increase casing quantity, the number of axle or blade progression.
In addition, high pressure turbine 16, middle-pressure turbine 12 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (such as 12Cr steel and 2.25Cr steel and 3.5Ni steel, 9Cr steel and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
(embodiment 7)
Figure 13 means the figure of structure of embodiment 7 steam turbine power generating equipment.
With reference to Figure 13, the power generating equipment that the steam turbine equipment by embodiment 7 forms is described.
Steam turbine power generating equipment 10 shown in Figure 13 mainly consists of ultra high pressure turbine 19, high pressure turbine 16, middle-pressure turbine 12, low-pressure turbine 24, generator 26, condenser 28, boiler 32.
In addition, be configured to ultra high pressure turbine 19, high pressure turbine 16, middle-pressure turbine 12, low-pressure turbine 24 and generator 26 are linked on same axis.
The steam that is formed described ultra high pressure turbine 19, high pressure turbine 16 and middle-pressure turbine 12 by Ni base alloy imports the rotor of side and at least either party in shell, and by welding, a plurality of rotor parts or case member joint is formed at least either party in whole turbine rotor and whole shell.
The main steam being superheated in boiler 32 more than 650 ℃ is fed to ultra high pressure turbine 19 by main steam pipe 33.The steam that is fed to ultra high pressure turbine 19 is discharged from after expansion working, becomes less than the steam of 650 ℃ and gets back to boiler 32 by cold reheat pipe 35.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is directed into high pressure turbine 16 by high temperature reheating pipe 34.The steam that is fed to high pressure turbine 16 is discharged from after expansion working, becomes less than the steam of 650 ℃ and gets back to boiler 32 by cold reheat pipe 38.The steam of getting back to this boiler 32 is again heated and becomes more than 650 ℃ steams in boiler 32, and is delivered to middle-pressure turbine 12 by high temperature reheating pipe 40.Steam after middle-pressure turbine 12 expansion workings is discharged from, and is delivered to low-pressure turbine 24 by cross pipe 44.The steam that is fed to low-pressure turbine 24 is discharged from after expansion working, and is transported to condenser 28.The steam that is transported to condenser 28 is condensed in condenser 28, and gets back to boiler 32 after utilizing feed water pump 30 to boost.Generator 26 is driven in rotation and generates electricity according to the expansion working of each turbo machine.
According to the steam turbine power generating equipment 10 of above-described embodiment's 7 form, by Ni base alloy, form the rotor of turbo machine (ultra high pressure turbine 19, high pressure turbine 16, middle-pressure turbine 12) of a side that is imported into 650 ℃ of above steams and at least either party in shell, and, as a whole, by welding, a plurality of part bonding are formed, thus, ultra high pressure turbine 19, high pressure turbine 16, middle-pressure turbine 12 can be realized the maximization of equipment and can not increase casing quantity, the number of axle or blade progression.In addition, by ultra high pressure turbine 19 is set, thus can the higher steam of working pressure.
On the other hand, also high pressure turbine 16, middle-pressure turbine 12 and low-pressure turbine 24 can be integrally formed and be integrally formed gasifying device (not shown).Thus, casing quantity, the number of axle can be reduced, and equipment cost can be sought to reduce.In addition, the rotor of integrated device and shell adopt different materials (such as Ni base alloy and 12Cr steel and 2.25Cr steel and 3.5Ni steel, Ni base alloy and 9Cr steel and 2.25Cr steel and 3.5Ni steel, Ni base alloy and 2.25Cr steel and 3.5Ni steel etc.) welded structure, thereby similarly, can make the use amount of high-grade material minimize.
Industrial applicibility
The present invention can be used as following steam turbine equipment and uses, even if in the situation that adopt 650 ℃ of temperature levels or the steam condition of 700 ℃ of higher temperature levels, also the significantly rising of vibrative possibility and equipment cost can be suppressed, and the maximization of turbine equipment can be realized.

Claims (5)

1. a steam turbine equipment, has high pressure turbine, middle-pressure turbine and low-pressure turbine, and this steam turbine equipment is characterised in that,
Described high pressure turbine is separated into the first high pressure turbine portion of High Temperature High Pressure side and the second high pressure turbine portion of low-temp low-pressure side,
Described middle-pressure turbine is separated into the first middle-pressure turbine portion of High Temperature High Pressure side and the second middle-pressure turbine portion of low-temp low-pressure side,
The first integrated portion that formation is integrally formed described the first high pressure turbine portion and described the first middle-pressure turbine portion, and,
Be constituted to the second integrated portion that the second high pressure turbine portion and described the second middle-pressure turbine portion are integrally formed described in major general,
650 ℃ of above steams are imported to the first high pressure turbine portion and the first middle-pressure turbine portion that forms described the first integrated portion, and,
Steam less than 650 ℃ is imported to the second high pressure turbine portion and the second middle-pressure turbine portion that forms described the second integrated portion,
Described the first integrated portion and generator are linked,
Utilize the axle different from described the first integrated portion by described the second integrated portion, low-pressure turbine and link with the generator that the generator that described the first integrated portion links is separately established, and,
Compare the union body of this second integrated portion and low-pressure turbine, described the first integrated portion is disposed to the position near boiler, it is overheated that this boiler makes to be fed to the steam of described high pressure turbine and middle-pressure turbine
By welding, by a plurality of part bonding that formed by Ni base alloy, and form the rotor of turbo machine of the steam importing side that is imported into 650 ℃ of above steams of described the first high pressure turbine portion and described the first middle-pressure turbine portion and at least either party in shell.
2. steam turbine equipment as claimed in claim 1, is characterized in that,
Setting is imported into the ultra high pressure turbine of high compressed steam, and the pressure of steam that the pressure ratio of this high compressed steam is fed to described high pressure turbine is high,
Described the first integrated portion and described ultra high pressure turbine are linked on same axis.
3. a steam turbine equipment, has high pressure turbine, middle-pressure turbine and low-pressure turbine, and this steam turbine equipment is characterised in that,
Described high pressure turbine is separated into the first high pressure turbine portion of High Temperature High Pressure side and the second high pressure turbine portion of low-temp low-pressure side,
Described middle-pressure turbine is separated into the first middle-pressure turbine portion of High Temperature High Pressure side and the second middle-pressure turbine portion of low-temp low-pressure side,
The first integrated portion that formation is integrally formed described the first high pressure turbine portion and described the first middle-pressure turbine portion, and,
Described the first integrated portion and generator are linked,
Be constituted to the second integrated portion that the second high pressure turbine portion and described the second middle-pressure turbine portion are integrally formed described in major general,
In described the second integrated portion, further described low-pressure turbine is integrally formed,
Utilize the axle different from described the first integrated portion by described the second integrated portion, low-pressure turbine and link with the generator that the generator that described the first integrated portion links is separately established,
By welding, by a plurality of part bonding that formed by Ni base alloy, and form the rotor of turbo machine of the steam importing side that is imported into 650 ℃ of above steams of described the first high pressure turbine portion and described the first middle-pressure turbine portion and at least either party in shell.
4. a steam turbine equipment, has high pressure turbine, middle-pressure turbine and low-pressure turbine, and this steam turbine equipment is characterised in that,
Described high pressure turbine is separated into the first high pressure turbine portion of High Temperature High Pressure side and the second high pressure turbine portion of low-temp low-pressure side,
Described middle-pressure turbine is separated into the first middle-pressure turbine portion of High Temperature High Pressure side and the second middle-pressure turbine portion of low-temp low-pressure side,
The first integrated portion that formation is integrally formed described the first high pressure turbine portion and described the first middle-pressure turbine portion,
Described the second high pressure turbine portion, described the second middle-pressure turbine portion and described low-pressure turbine are linked and form union body, this union body is linked by the axle different from described the first integrated portion, and,
Compare this union body, described the first integrated portion is disposed to the position near boiler, it is overheated that this boiler makes to be fed to the steam of described high pressure turbine and described middle-pressure turbine, and,
By welding, by a plurality of part bonding that formed by Ni base alloy, and form the rotor of turbo machine of the steam importing side that is imported into 650 ℃ of above steams of described the first high pressure turbine portion and described the first middle-pressure turbine portion and at least either party in shell.
5. steam turbine equipment as claimed in claim 4, is characterized in that,
Setting is imported into the ultra high pressure turbine of high compressed steam, and the pressure of steam that the pressure ratio of this high compressed steam is fed to described high pressure turbine is high,
Described the first integrated portion and described ultra high pressure turbine are linked on same axis.
CN200980100134.8A 2008-08-11 2009-07-30 Steam turbine equipment Active CN101802349B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2008207499 2008-08-11
JP207499/08 2008-08-11
PCT/JP2009/063909 WO2010018775A1 (en) 2008-08-11 2009-07-30 Steam turbine equipment

Publications (2)

Publication Number Publication Date
CN101802349A CN101802349A (en) 2010-08-11
CN101802349B true CN101802349B (en) 2014-11-05

Family

ID=41668920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200980100134.8A Active CN101802349B (en) 2008-08-11 2009-07-30 Steam turbine equipment

Country Status (6)

Country Link
US (1) US20110030374A1 (en)
EP (1) EP2180149B1 (en)
JP (1) JP4898956B2 (en)
KR (1) KR101214420B1 (en)
CN (1) CN101802349B (en)
WO (1) WO2010018775A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9194246B2 (en) 2011-09-23 2015-11-24 General Electric Company Steam turbine LP casing cylindrical struts between stages
EP2666977A1 (en) * 2012-05-21 2013-11-27 Alstom Technology Ltd High-temperature steam turbine power plant with double reheat
CN102705016A (en) * 2012-06-21 2012-10-03 哈尔滨汽轮机厂有限责任公司 Supercritical 600MW heat supplying extraction steam turbine
GB2541702A (en) * 2015-08-27 2017-03-01 Doosan Babcock Ltd Steam generation system and method

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2902831A (en) * 1958-08-22 1959-09-08 Gen Electric Governing system for reheat steam turbine powerplant
JPS6053415A (en) 1983-08-31 1985-03-27 Mazda Motor Corp Control device for car suspension
US5199256A (en) * 1989-01-26 1993-04-06 General Electric Company Overspeed protection for a gas turbine/steam turbine combined cycle
JPH04209903A (en) * 1990-12-03 1992-07-31 Toshiba Corp Turbine
JP3582848B2 (en) * 1994-03-14 2004-10-27 株式会社東芝 Steam turbine power plant
JP3772019B2 (en) * 1998-04-21 2006-05-10 株式会社東芝 Steam turbine
JP3977546B2 (en) * 1999-03-25 2007-09-19 株式会社東芝 Steam turbine power generation equipment
JP2000282808A (en) * 1999-03-26 2000-10-10 Toshiba Corp Steam turbine facility
JP2003343210A (en) * 2002-05-23 2003-12-03 Toshiba Corp Turbine casing having weldbonding structure, steam turbine making use thereof and manufacturing method of turbine casing
JP4074208B2 (en) * 2003-03-17 2008-04-09 株式会社東芝 Steam turbine power plant
JP4509664B2 (en) * 2003-07-30 2010-07-21 株式会社東芝 Steam turbine power generation equipment
EP1559872A1 (en) * 2004-01-30 2005-08-03 Siemens Aktiengesellschaft Turbomachine
JP2005344527A (en) * 2004-05-31 2005-12-15 Toshiba Corp Steam turbine rotor and method for manufacturing the same
US20060073026A1 (en) * 2004-10-06 2006-04-06 Shaw David N Oil balance system and method for compressors connected in series
US20060217216A1 (en) * 2004-12-06 2006-09-28 Macgregor Golf Company Fairway wood with titanium face member
JP4783053B2 (en) * 2005-04-28 2011-09-28 株式会社東芝 Steam turbine power generation equipment
JP4794254B2 (en) * 2005-09-26 2011-10-19 中国電力株式会社 Steam turbine plant and operation method thereof
EP1775430A1 (en) * 2005-10-17 2007-04-18 Siemens Aktiengesellschaft Steam power plant and method for retrofitting a steam power plant
EP1895094B1 (en) * 2006-08-25 2010-09-29 Siemens Aktiengesellschaft Swirl cooled rotor welding seam
JP4908137B2 (en) * 2006-10-04 2012-04-04 株式会社東芝 Turbine rotor and steam turbine
JP4520481B2 (en) * 2007-04-13 2010-08-04 株式会社日立製作所 High temperature steam turbine plant

Non-Patent Citations (8)

* Cited by examiner, † Cited by third party
Title
JP特开2000-274208A 2000.10.03 *
JP特开2000-282808A 2000.10.10 *
JP特开2004-278432A 2004.10.07 *
JP特开2006-307280A 2006.11.09 *
JP特开2007-85294A 2007.04.05 *
JP特开2008-88525A 2008.04.17 *
JP特开平4-209903A 1992.07.31 *
JP特开平7-247806A 1995.09.26 *

Also Published As

Publication number Publication date
EP2180149B1 (en) 2016-12-21
JPWO2010018775A1 (en) 2012-01-26
KR20100035171A (en) 2010-04-02
WO2010018775A1 (en) 2010-02-18
JP4898956B2 (en) 2012-03-21
EP2180149A4 (en) 2015-08-26
EP2180149A1 (en) 2010-04-28
KR101214420B1 (en) 2012-12-21
CN101802349A (en) 2010-08-11
US20110030374A1 (en) 2011-02-10

Similar Documents

Publication Publication Date Title
JP6556807B2 (en) New turbine generator unit
CN102325964B (en) Method and device for cooling steam turbine generating equipment
CN101765702B (en) Rotor of rotary machine and method for manufacturing same
JP4520481B2 (en) High temperature steam turbine plant
JP2008248822A (en) Thermal power plant
CN101802349B (en) Steam turbine equipment
CN101809252B (en) Steam turbine equipment
JP3977546B2 (en) Steam turbine power generation equipment
JP3582848B2 (en) Steam turbine power plant
CN109630221A (en) A kind of double reheat power generation sets system and method suitable for depth peak regulation
CN102392703A (en) Double reheat steam turbine
KR101664895B1 (en) Power generation system based on Brayton cycle
CN101772622A (en) Rotor for low pressure turbine
JP4028070B2 (en) Combined cycle power plant
CN103883364A (en) Method for solving combined heat and power generation, split-shaft heat supply turbine generating set, and operating method of split-shaft heat supply turbine generating set
Nomoto et al. Recent development of steam turbines with high steam temperatures
JP2010249050A (en) Steam turbine and steam turbine installation
CN105673093A (en) Efficient 700-DEGC ultra-supercritical 600 MW grade four-cylinder two-steam-discharge turbine
CN104481618A (en) High-parameter ultra-supercritical steam turbine generator unit
JP4322433B2 (en) Steam turbine plant
CN202756028U (en) Ultra-supercritical 1300-millon-watt (MW) steam turbine
JP4934738B2 (en) High temperature steam turbine plant
JP2004278432A (en) Steam turbine power generation plant
JP4745129B2 (en) Steam turbine and steam turbine plant
Law et al. Higher steam pressures, and their application to the steam turbine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161017

Address after: Kanagawa

Patentee after: Mitsubishi Hitachi Power System Ltd.

Address before: Tokyo, Japan, Japan

Patentee before: Mit-subishi Heavy Industries Ltd.

CP01 Change in the name or title of a patent holder

Address after: Kanagawa Prefecture, Japan

Patentee after: Mitsubishi Power Co., Ltd

Address before: Kanagawa Prefecture, Japan

Patentee before: MITSUBISHI HITACHI POWER SYSTEMS, Ltd.

CP01 Change in the name or title of a patent holder