CN101781913A - 钢柱与砌体联结防裂装置及其工艺方法 - Google Patents

钢柱与砌体联结防裂装置及其工艺方法 Download PDF

Info

Publication number
CN101781913A
CN101781913A CN 201010120173 CN201010120173A CN101781913A CN 101781913 A CN101781913 A CN 101781913A CN 201010120173 CN201010120173 CN 201010120173 CN 201010120173 A CN201010120173 A CN 201010120173A CN 101781913 A CN101781913 A CN 101781913A
Authority
CN
China
Prior art keywords
masonry
steel column
binded
cracking device
glue
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010120173
Other languages
English (en)
Other versions
CN101781913B (zh
Inventor
王明聪
沈家文
张国林
庄军国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No1 Water Resources And Hydropower Construction Co ltd
Ycih No4 Construction Co ltd
Yunnan Construction Engineering Group Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
Original Assignee
Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd filed Critical Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd
Priority to CN2010101201739A priority Critical patent/CN101781913B/zh
Publication of CN101781913A publication Critical patent/CN101781913A/zh
Application granted granted Critical
Publication of CN101781913B publication Critical patent/CN101781913B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Building Environments (AREA)

Abstract

本发明涉及到钢柱与砌体联结防裂方面的技术领域,公开了钢柱与砌体联结防裂装置,钢柱和砌体,所述钢柱和砌体的结合部分填充胶,通过胶把钢柱和砌体联结一起,所述的砌体通过胶粘在钢柱一侧。能够防止钢柱与砌体联结部位开裂,提高建筑物的质量。

Description

钢柱与砌体联结防裂装置及其工艺方法
技术领域
本发明涉及到建筑施工方面的技术领域,特别涉及到钢柱与砌体联结防裂方面的技术领域。
背景技术
砌体简称为墙,砌体也可以称为墙体。一般建筑物,先把柱子做好,在进行砌墙。
传统的砌体、钢柱联结材料为砂浆,由于头缝砂浆不饱满、钢柱和砌体材料的热膨胀系数差异较大,造成胀缩不一致,砌体、钢柱联结处经常出现裂缝。
砌体和钢柱之间有裂缝,会使外面粉刷装饰裂开,严重影响美观。影响建筑的质量,使建筑物的质量下降。
发明内容
本发明目的旨在提供钢柱与砌体联结防裂装置及其工艺方法,能够防止钢柱与砌体联结部位开裂,提高建筑物的质量。
为实现上述目的,本发明采用的技术方案为:钢柱与砌体联结防裂装置,钢柱和砌体,所述钢柱和砌体的结合部分填充胶,通过胶把钢柱和砌体联结一起,所述的砌体通过胶粘在钢柱一侧。
所述钢柱与砌体联结防裂装置,该钢柱与砌体联结防裂装置所用的胶是弹性胶。
所述钢柱与砌体联结防裂装置,该钢柱与砌体联结防裂装置所述的弹性胶把砌体粘在钢柱一侧,并留槎。
所述钢柱与砌体联结防裂装置,于该钢柱与砌体联结防裂装置所述的钢柱一侧、砌体一侧分别加钢丝网。
钢柱与砌体联结防裂装置工艺方法,
先放线,根据所使用砌体材料的规格及砌体灰缝的要求,准备放出砌体与钢柱结合位置的尺寸;
粘砖:用一种所述的弹性胶把砌体粘在钢柱一侧,并按规范要求留槎;
砌体:其他部分砌体按正常工艺操作;
节点处理:在粉刷前,对钢柱和砌体进行处理;
最后进行粉刷。
所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述的砌体,当砌体高度小于1米时,可把砌体一次粘好,当砌体高度大于1米时,可边粘边砌。
所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述节点处理,在钢柱一侧15厘米,砌体一侧15厘米范围内加钢丝网,使钢柱、砌体结合处得到进一步加强。
所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述的粉刷按照正常的工艺方法进行操作。
本发明有益效果
钢柱与砌体联结防裂技术是采用先粘后砌的方法,使结合部位有一定的弹性,以达到防止开裂的目的。该技术方法的使用,使墙、柱结合部开裂的质量通病得到治理,建筑物质量得到提高。建筑物的美观度得到提升。还具有如下特点:
a)工人不需培训即可操作。
b)增加的费用少,效果明显。
c)使建筑物的观感质量得到提高。
附图说明
图1钢柱与砌体联结防裂装置示意图
图2钢柱与砌体联结防裂装置示意图
具体实施方式
下面结合附图及实施例对本发明作进一步描述。
1-钢柱          2-砌体
3-弹性胶        4-钢丝网
如图1和图2所示,在建筑物中,首先先把钢柱1建立好,比如建房子的时候,先支撑房子的几个大柱子框架造好,再进行砌墙。先造好钢柱1,再进行砌墙。钢柱与砌体联结防裂装置,由钢柱1、砌体2和胶3组成,所述钢柱1和砌体2的结合部分填充胶3,通过胶3把钢柱1和砌体2联结一起,所述的砌体2通过胶3粘在钢柱1一侧。所述的胶是弹性胶,钢柱与砌体联结防裂装置,由钢柱1、砌体2和弹性胶3组成,所述钢柱1和砌体2的结合部分填充弹性胶3,通过弹性胶3把钢柱1和砌体2联结一起,所述的砌体2通过弹性胶3粘在钢柱1一侧。用一种弹性胶3把砌体2粘在钢柱1侧,并按规范要求留槎。
钢柱与砌体联结防裂装置,由钢柱1、砌体2和弹性胶3组成,所述钢柱1和砌体2的结合部分填充弹性胶3,通过弹性胶3把钢柱1和砌体2联结一起,所述的砌体2通过弹性胶3粘在钢柱1一侧;钢柱1一侧、砌体2一侧分别加钢丝网4,用钢丝网4把钢柱1和砌体2联结起来,钢丝网4和弹性胶3一起作用于该防裂装置,增加了拉力,使砌体、钢柱柱结合处得到进一步加强。钢柱与砌体联结防裂技术是采用先粘后砌的方法,使结合部位有一定的弹性,以达到防止开裂的目的。该技术方法的使用,使砌体、钢柱结合部开裂的质量通病得到治理,观感质量得到提高。
钢柱与砌体联结防裂装置主要施工工艺流程:放线——粘砖——砌体——节点处理——粉刷。
该工艺方法步骤及其条件要求为:
i.放线:根据所使用砌体材料的规格及砌体灰缝的要求,准备放出砌体与钢柱结合位置的尺寸。
ii.粘砖:用一种特殊胶把砌体粘在钢柱侧,并按规范要求留槎。当砌体高度小于1米时,可把砌体一次粘好,当砌体高度大于1米时,可边粘边砌。
iii.砌体:中间的砌体施工没有特殊要求,按正常的工艺要求施工。
iv.节点处理:在粉刷前,需对墙柱交接处进行处理。在柱侧15厘米、墙侧1厘米范围内加钢丝网,使墙、柱结合处得到进一步加强。
V.粉刷:按正常的工艺进行操作可满足要求。
钢柱与砌体联结防裂装置工艺方法,先放线,根据所使用砌体材料的规格及砌体灰缝的要求,准备放出砌体与钢柱结合位置的尺寸;粘砖:用一种所述的弹性胶把砌体粘在钢柱一侧,并按规范要求留槎;砌体:其他部分砌体按正常工艺操作;节点处理:在粉刷前,对钢柱和砌体进行处理;最后进行粉刷。所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述的砌体,当砌体高度小于1米时,可把砌体一次粘好,当砌体高度大于1米时,可边粘边砌。所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述节点处理,在钢柱一侧15厘米,砌体一侧15厘米范围内加钢丝网,使钢柱、砌体结合处得到进一步加强。所述钢柱与砌体联结防裂装置工艺方法,该钢柱与砌体联结防裂装置工艺方法所述的粉刷按照正常的工艺方法进行操作。
该工艺方法产生的效果:
d)工人不需培训即可操作。
e)增加的费用少,效果明显。
f)使建筑物的观感质量得到提高。

Claims (8)

1.钢柱与砌体联结防裂装置,钢柱和砌体,其特征在于所述钢柱和砌体的结合部分填充胶,通过胶把钢柱和砌体联结一起,所述的砌体通过胶粘在钢柱一侧。
2.根据权利要求1所述钢柱与砌体联结防裂装置,其特征在于该钢柱与砌体联结防裂装置所用的胶是弹性胶。
3.根据权利要求1或2所述钢柱与砌体联结防裂装置,其特征在于该钢柱与砌体联结防裂装置所述的弹性胶把砌体粘在钢柱一侧,并留槎。
4.根据权利要求1所述钢柱与砌体联结防裂装置,其特征在于该钢柱与砌体联结防裂装置所述的钢柱一侧、砌体一侧分别加钢丝网。
5.根据权利要求1钢柱与砌体联结防裂装置工艺方法,其特征在于先放线,根据所使用砌体材料的规格及砌体灰缝的要求,准备放出砌体与钢柱结合位置的尺寸;
粘砖:用一种所述的弹性胶把砌体粘在钢柱一侧,并按规范要求留槎;
砌体:其他部分砌体按正常工艺操作;
节点处理:在粉刷前,对钢柱和砌体进行处理;
最后进行粉刷。
6.根据权利要求5所述钢柱与砌体联结防裂装置工艺方法,其特征在于该钢柱与砌体联结防裂装置工艺方法所述的砌体,当砌体高度小于1米时,可把砌体一次粘好,当砌体高度大于1米时,可边粘边砌。
7.根据权利要求5所述钢柱与砌体联结防裂装置工艺方法,其特征在于该钢柱与砌体联结防裂装置工艺方法所述节点处理,在钢柱一侧15厘米,砌体一侧15厘米范围内加钢丝网,使钢柱、砌体结合处得到进一步加强。
8.根据权利要求5所述钢柱与砌体联结防裂装置工艺方法,其特征在于该钢柱与砌体联结防裂装置工艺方法所述的粉刷按照正常的工艺方法进行操作。
CN2010101201739A 2010-03-03 2010-03-03 一种用于制作钢柱与砌体联结防裂装置的方法 Active CN101781913B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101201739A CN101781913B (zh) 2010-03-03 2010-03-03 一种用于制作钢柱与砌体联结防裂装置的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101201739A CN101781913B (zh) 2010-03-03 2010-03-03 一种用于制作钢柱与砌体联结防裂装置的方法

Publications (2)

Publication Number Publication Date
CN101781913A true CN101781913A (zh) 2010-07-21
CN101781913B CN101781913B (zh) 2011-07-27

Family

ID=42522059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101201739A Active CN101781913B (zh) 2010-03-03 2010-03-03 一种用于制作钢柱与砌体联结防裂装置的方法

Country Status (1)

Country Link
CN (1) CN101781913B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485445A (zh) * 2013-09-23 2014-01-01 云南建工水利水电建设有限公司 一种加气混凝土砌块与钢柱连接方法及装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916309A (zh) * 2006-08-10 2007-02-21 威海华元节能建筑材料有限公司 框架结构建筑的一种梁柱外墙保温柔性抗裂防水施工方法
CN201024621Y (zh) * 2007-03-27 2008-02-20 黄振利 外保温装饰板
CN101230593A (zh) * 2008-02-01 2008-07-30 山东莱钢建设有限公司 一种内墙板接缝处理技术
CN101586370A (zh) * 2008-05-19 2009-11-25 王建荣 陶粒轻质墙板的施工方法
CN201358516Y (zh) * 2009-01-21 2009-12-09 济南市住宅产业化发展中心 内隔墙板安装接缝结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1916309A (zh) * 2006-08-10 2007-02-21 威海华元节能建筑材料有限公司 框架结构建筑的一种梁柱外墙保温柔性抗裂防水施工方法
CN201024621Y (zh) * 2007-03-27 2008-02-20 黄振利 外保温装饰板
CN101230593A (zh) * 2008-02-01 2008-07-30 山东莱钢建设有限公司 一种内墙板接缝处理技术
CN101586370A (zh) * 2008-05-19 2009-11-25 王建荣 陶粒轻质墙板的施工方法
CN201358516Y (zh) * 2009-01-21 2009-12-09 济南市住宅产业化发展中心 内隔墙板安装接缝结构

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485445A (zh) * 2013-09-23 2014-01-01 云南建工水利水电建设有限公司 一种加气混凝土砌块与钢柱连接方法及装置
CN103485445B (zh) * 2013-09-23 2014-10-08 云南建工水利水电建设有限公司 一种加气混凝土砌块与钢柱连接方法及装置

Also Published As

Publication number Publication date
CN101781913B (zh) 2011-07-27

Similar Documents

Publication Publication Date Title
CN109653245A (zh) 一种预制拼装综合管廊企口式接头防水构造及方法
CN202831626U (zh) 一种使用双壁波纹管作为圆柱模板的支设结构
CN103774817B (zh) 异形体装饰石材墙面粘贴方法
CN209211748U (zh) 一种装配式天棚辐射***的构造节点
CN207063187U (zh) 一种预制单向叠合板板侧连接构造
CN101781913B (zh) 一种用于制作钢柱与砌体联结防裂装置的方法
CN207277609U (zh) 一种装配式拉杆约束多腔组合墙
CN209179496U (zh) 铝模板根部塞缝结构
CN201665935U (zh) 钢柱与砌体联结防裂装置
CN209603183U (zh) 一种预制拼装综合管廊企口式接头防水构造
CN204983237U (zh) 一种框架组合外墙体系
CN207934486U (zh) 一种砌体结构加固墙面与基础的连接结构
CN204311666U (zh) 一种土建软体保温卷材
CN204571282U (zh) 清水饰面混凝土施工用组合模板***
CN103967216B (zh) L形截面轻钢‑小径木材组合承重柱及制作方法
CN207211388U (zh) 预制剪力墙的竖向连接结构
CN205135246U (zh) 一种预制窗台板的连接机构
CN203307985U (zh) 一种建筑用砖
CN206844394U (zh) 一种预制剪力墙竖向连接节点
CN207177124U (zh) 一种可再分散黏合乳胶粘合度增强结构
CN106894579A (zh) 一种装配式建筑的基础与墙体连接结构
CN206308907U (zh) 一种用于钢筋预留的锚固装置
CN209308222U (zh) 一种带企口预制剪力墙的连接结构
CN208815855U (zh) 一种外墙线条加固装置
CN207405923U (zh) 一种具有马赛克贴面的柱状曲面建筑结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YUNNAN CONSTRUCTION ENGINEERING GROUP CO., LTD. FO

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 650000 NO. 78, DONGJIAO ROAD, KUNMING CITY, YUNNAN PROVINCE TO: 650041 NO. 78, DONGJIAO ROAD, GUANDU DISTRICT, KUNMING CITY, YUNNAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20110421

Address after: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Co-applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Co-applicant after: THE FOURTH CONSTRUCTION CO.,LTD. OF YUNNAN ARCHITECTURAL ENGINEERING Group

Address before: 650000, 78 east suburb Road, Yunnan, Kunming

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 650501 the 28 floor of Chun Xi building, 256 Lin Xi Road, Kunming economic and Technological Development Zone, Yunnan.

Co-patentee after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee after: YCIH NO.4 CONSTRUCTION CO.,LTD.

Address before: 650041 east suburb Road, Guandu District, Kunming, Yunnan Province, No. 78

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Co-patentee before: THE FOURTH CONSTRUCTION CO.,LTD. OF YUNNAN ARCHITECTURAL ENGINEERING Group

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181213

Address after: 650501 the 28 floor of Chun Xi building, 256 Lin Xi Road, Kunming economic and Technological Development Zone, Yunnan.

Co-patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee after: YCIH NO.4 CONSTRUCTION CO.,LTD.

Address before: 650501 the 28 floor of Chun Xi building, 256 Lin Xi Road, Kunming economic and Technological Development Zone, Yunnan.

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Patentee before: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Co-patentee before: YCIH NO.4 CONSTRUCTION CO.,LTD.