CN101776910A - 基于一体化五防操作票***的变电站程序化控制*** - Google Patents
基于一体化五防操作票***的变电站程序化控制*** Download PDFInfo
- Publication number
- CN101776910A CN101776910A CN201010034269A CN201010034269A CN101776910A CN 101776910 A CN101776910 A CN 101776910A CN 201010034269 A CN201010034269 A CN 201010034269A CN 201010034269 A CN201010034269 A CN 201010034269A CN 101776910 A CN101776910 A CN 101776910A
- Authority
- CN
- China
- Prior art keywords
- control
- integrated
- programmed control
- tickets
- host computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
基于一体化五防操作票***的程序化控制***,是一种新型的变电站程序化操作实现方式。本***从已经模拟预演完成的操作票中,将配置为可进行程序化控制的操作项,按照顺序自动遥控完成。这个***不需要投运前预先设置各个间隔的运行状态和运行状态之间转换的操作票,而是在操作前开具操作票。本***在操作票***框架内,允许预存票和重载票,因此也支持各种预置的软压板程控操作。同时,本***支持配合电脑钥匙进行现场操作。基于一体化五防操作票***的程序化控制***,不需要提前设置各个间隔的运行状态,不需要提前设置间隔运行状态之间转换的操作票,也不需要在工程验收前进行复杂的检验和验收工作,节省了工程人员程序化控制配置以及运行人员验收程序化控制票的工作;本***将原来需要在后台人工遥控的部分变成自动执行,符合先预演再操作的规程。
Description
技术领域
本发明属于电力***自动化领域,更具体地涉及变电站自动化***。
背景技术
1.五防操作票***
变电站传统的操作流程是:在五防操作票***中开具操作票,并进行模拟预演,然后再执行。根据要执行的任务,开具出具体的操作票;将此操作票进行五防操作预演,预演的过程中检查五防逻辑;五防逻辑检查通过后,进行实际设备操作。实际设备操作可以在监控***遥控完成,也可以传到电脑钥匙,到现场操作完成。
传统的操作流程,是积累了大量实际操作经验和教训形成的,对于变电站安全操作起了很大作用;可是由于操作都是单步执行,对于大量设备的操作,效率比较低,需要的时间会比较长。
2.当前的变电站程序化控制技术
当前的变电站程序化控制通过程序来自动执行预先定义的操作序列,以期达到“一键式”操作的目的。在这个过程中操作序列存储在操作票中,操作票中包括多步有先后顺序的操作步骤,每一步包括防误逻辑、操作内容、操作后确认逻辑等。
当前的程序化控制都是“预置式态转换”的方式,这种方案的程序化控制是指预先设置间隔不同的运行状态(比如有运行态、冷备用态、热备用态、检修态等),并且态之间转换的操作票也预先编制好,而在执行程序化操作的时候以当前的状态为源态,要达到的态为目标态,根据源态和目标态获取要执行的操作票,然后自动执行。如图1所示。
这个方案的程序化将间隔内态之间转换视为原子操作,提高了操作效率,节省了操作时间,但也有不足的地方:
■操作需要预先定义态(如运行态、冷备用态等)、以及态之间的程序化控制操作票(如运行转冷备用操作票等)。所有的票都需要预先定义,工程制作和验收工作量非常大。
■对于一些地区而言,所有操作必须满足开票-预演-执行的操作流程,而这个方案程序化操作的操作票预先开好,无需进行开票和预演,这也是和地区规程有所冲突的。
■该方案对一次设备的要求比较高,要求一次设备都可以遥控操作,并且一次设备可靠性要高;对于现场操作,特别是有电脑钥匙的现场操作是不支持的。
发明内容
为了克服现有技术中存在的上述问题,本发明公开了一种基于一体化五防操作票***实现的程序化控制***。
本发明具体采用以下技术方案:
基于一体化五防操作票***的变电站程序化控制***,包括4部分:监控主机、测控装置、监控网络、以及可选的电脑钥匙和锁具。在一体化五防操作票***基础上,实现程序化控制功能。其特征在于:
监控主机通过监控网络(以太网)和测控装置通信,监控主机通过通信方式(串口或以太网)和电脑钥匙通信,测控装置实现对可遥控设备的控制以及信息采集,电脑钥匙配合现场锁具实现对现场操作设备的控制和位置信息采集。
一体化五防操作票***是指防误操作票***集成于监控***中,在监控***中即具备防误逻辑判断、开具操作票等功能。监控主机承担变电站后台监控***主机和变电站防误***主机两种角色,同时实现监控***和防误操作票***两种功能。后台监控***主机和变电站防误***采用同一个数据库,共用同一套图形***。
变电站程序化控制***是基于一体化五防操作票***基础上实现的。在监控主机完成模拟预演后就在监控主机形成了操作序列,其中配置为参与程序化控制的操作,所述控制***通过控制测控装置自动进行程序化控制操作,操作前检查操作前逻辑以判断能否操作,操作完成要检查操作后逻辑以判断操作是否结束。未配置参与程序化控制,但是也可进行后台监控遥控的操作,由运行人员按照常规遥控进行操作,操作前***检查五防逻辑。未配置参与程序化控制,并且需要到现场进行的操作,包括不具备遥控功能必须到现场进行的手动操作,已经即使具备遥控功能但是按照规程应该到现场进行的操作等,需要从监控主机传到电脑钥匙后到就地操作。
操作前逻辑指的是在设备操作之前必须满足的逻辑,如果此逻辑不满足此设备不可操作;操作后逻辑指的是在操作完成之后必须满足的逻辑,如果此逻辑不满足则认为操作没有完全成功。
将经过模拟预演形成的操作票中配置参与程序化控制的操作项进行自动的程序化操作,手动操作可使用电脑钥匙和锁具到现场完成。电脑钥匙和锁具是可选的,如果变电站有通过电脑钥匙和锁具进行现场操作的需求就配置电脑钥匙和锁具;如果变电站所有设备都是遥控的不需要到现场通过电脑钥匙和锁具进行操作,则可以不配置电脑钥匙和锁具。本***适用于这两种情况。
配置参与程序化控制的操作,***自动进行程序化控制操作,操作前检查操作前逻辑以判断能否操作,操作完成要检查操作后逻辑,以判断操作是否结束。未配置参与程序化控制,但是也可进行后台监控遥控的操作,由运行人员按照常规遥控进行操作,操作前***自动检查五防逻辑;现场操作,传到电脑钥匙后到就地操作。此方案所有操作满足先预演,再执行的流程。
附图说明
图1是预置式态转换方案的示意图;
图2是本发明的***结构示意图。
具体实施方式
下面结合说明书附图,对本发明的技术方案做进一步详细说明。
基于一体化五防的变电站程序化控制***在具体实施上有独到的优势。
先开列操作票,开列操作票的工作可以再变电站单独的操作票***中完成,也可以在一体化五防***中完成。
然后一体化五防***中模拟预演,保证每一步操作都满足五防逻辑,并形成程序化操作序列。在预演的过程中,对于可遥控的操作,需要配置是否参与程序化控制。某一步遥控操作是否参与程序化控制在开票过程中都是可以修改的,但是在开票完成后即固定下来不可再修改。
预演结束后,开始进入执行过程。根据形成的操作序列,每一步操作满足如下3种情形之一:
1.对于配置为参与程序化控制的遥控操作,所述程序化控制***自动进行操作:先操作前检查操作前逻辑以判断能否操作,操作前逻辑满足***自动发出遥控令,并且在一定时间持续检查操作后逻辑,以判断操作是否结束。
2.对于配置为不参与程序化控制,但是也可进行后台监控遥控的操作,由运行人员按照常规遥控进行操作。此种操作与常规的变电站操作完全相同,操作前***检查五防逻辑,以决定此操作能否完成。
3.对于需要到现场完成的操作,传到电脑钥匙后到就地操作。此种操作也是变电站常规操作。
基于一体化五防操作票***的程序化控制方案,是从已经模拟预演完成的操作票中,将配置为参与程序化控制的操作项,按照顺序自动遥控完成;配置为不参与程序库控制的操作,按照原先的常规操作完成。这个方案不需要预先设置各个运行状态和操作票,而是在操作前开具操作票,这满足先预演后执行的操作规程。此方案在操作票***框架内,允许预存票和重载票,因此也支持各种预置的软压板程控操作。同时,此方案支持配合电脑钥匙进行现场操作。
基于一体化五防操作票***的程序化控制***,在一体化五防的基础上,将传统的操作票***和程序化控制有效结合,不需要提前做典型票,节省了工程人员程序化控制配置以及运行人员验收程序化控制票的工作,符合先预演再操作的规程,适合于更广范围的变电站实现程序化控制,是变电站程序化控制技术未来的方向之一。
Claims (3)
1.基于一体化五防操作票***的变电站程序化控制***,所述控制***包括监控主机、测控装置、监控网络、以及电脑钥匙和锁具,在一体化五防操作票***基础上,实现程序化控制功能;其特征在于:
监控主机通过监控网络和测控装置通信,监控主机通过串口或以太网和电脑钥匙通信,测控装置实现对可遥控设备的控制以及信息采集,电脑钥匙配合锁具实现对现场操作设备的控制和位置信息采集;
在监控主机完成模拟预演后就在监控主机形成了操作序列,其中,对于配置为程序化控制的操作,所述***通过控制测控装置自动进行程序化控制操作,操作前检查操作前逻辑以判断能否操作,操作完成要检查操作后逻辑以判断操作是否结束;
对于未配置为程序化控制,同时也可进行后台监控遥控的操作,由运行人员按照常规遥控进行操作,操作前***自动检查五防逻辑;
对于配置为程序化控制,需要到现场进行的操作,将所述操作序列从监控主机传到电脑钥匙后到现场就地操作。
2.根据权利要求1所述的变电站程序化控制***,其特征在于:所述一体化五防操作票***是将防误***集成到变电站的监控***中,图形数据库均在监控***内部实现;所述监控主机承担变电站监控***主机和变电站防误***主机两种角色,同时实现监控***和防误操作票***两种功能,后台监控***主机和变电站防误***采用同一个数据库,共用同一套图形***。
3.根据权利要求1或2所述的变电站程序化控制***,其特征在于:将经过模拟预演形成的操作票中,配置为程序化控制的操作项进行自动顺序操作;对于需要到现场进行的操作,则使用电脑钥匙和锁具到现场完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010034269A CN101776910A (zh) | 2010-01-19 | 2010-01-19 | 基于一体化五防操作票***的变电站程序化控制*** |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010034269A CN101776910A (zh) | 2010-01-19 | 2010-01-19 | 基于一体化五防操作票***的变电站程序化控制*** |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101776910A true CN101776910A (zh) | 2010-07-14 |
Family
ID=42513390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010034269A Pending CN101776910A (zh) | 2010-01-19 | 2010-01-19 | 基于一体化五防操作票***的变电站程序化控制*** |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101776910A (zh) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976883A (zh) * | 2010-10-14 | 2011-02-16 | 北京四方继保自动化股份有限公司 | 基于以太网通信的自适应一体化五防*** |
CN101976617A (zh) * | 2010-09-14 | 2011-02-16 | 华北电网有限公司北京十三陵蓄能电厂 | 利用防误闭锁***防止机械措施发生交叉作业事故的方法 |
CN102361224A (zh) * | 2011-06-21 | 2012-02-22 | 福建省电力有限公司福州电业局 | 变电站操作全过程危险点警示预控*** |
CN102594910A (zh) * | 2012-03-15 | 2012-07-18 | 天津市电力公司 | 采用数据服务总线实现单实例的变电站程序化处理方法 |
CN103309336A (zh) * | 2013-06-19 | 2013-09-18 | 中国能源建设集团广东省电力设计研究院 | 变电站在线五防***及其解锁方法 |
CN103368262A (zh) * | 2013-07-12 | 2013-10-23 | 中国南方电网有限责任公司 | 基于智能远动的程序化控制方法及*** |
CN105243717A (zh) * | 2015-10-30 | 2016-01-13 | 国家电网公司 | 电话许可工作票管控***及方法 |
CN105511409A (zh) * | 2014-09-23 | 2016-04-20 | 国家电网公司 | 一种变电站自动化的控制和操作方法 |
CN105869072A (zh) * | 2016-04-07 | 2016-08-17 | 南京国电南自电网自动化有限公司 | 一种自动创建变电站五防数据库的方法 |
CN106155023A (zh) * | 2016-08-04 | 2016-11-23 | 南京国电南自美卓控制***有限公司 | 一种通用型分散控制***的防误操作***及其方法 |
CN106712299A (zh) * | 2017-01-24 | 2017-05-24 | 国网上海市电力公司 | 一种用于智能化变电站的五防*** |
CN108599380A (zh) * | 2018-06-07 | 2018-09-28 | 国网山东省电力公司聊城供电公司 | 一种变电站操作防误***和方法 |
CN110852697A (zh) * | 2019-10-08 | 2020-02-28 | 国家电网有限公司 | 一种变电站倒闸操作票自动生成*** |
CN110865630A (zh) * | 2019-11-14 | 2020-03-06 | 深圳供电局有限公司 | 智能变电站内置程序的验收方法和*** |
CN110941249A (zh) * | 2019-11-30 | 2020-03-31 | 长园共创电力安全技术股份有限公司 | 化工工艺中倒换流程的防误控制***及方法 |
-
2010
- 2010-01-19 CN CN201010034269A patent/CN101776910A/zh active Pending
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101976617A (zh) * | 2010-09-14 | 2011-02-16 | 华北电网有限公司北京十三陵蓄能电厂 | 利用防误闭锁***防止机械措施发生交叉作业事故的方法 |
CN101976883B (zh) * | 2010-10-14 | 2012-11-14 | 北京四方继保自动化股份有限公司 | 基于以太网通信的自适应一体化五防*** |
CN101976883A (zh) * | 2010-10-14 | 2011-02-16 | 北京四方继保自动化股份有限公司 | 基于以太网通信的自适应一体化五防*** |
CN102361224A (zh) * | 2011-06-21 | 2012-02-22 | 福建省电力有限公司福州电业局 | 变电站操作全过程危险点警示预控*** |
CN102361224B (zh) * | 2011-06-21 | 2015-04-29 | 国家电网公司 | 变电站操作全过程危险点警示预控*** |
CN102594910A (zh) * | 2012-03-15 | 2012-07-18 | 天津市电力公司 | 采用数据服务总线实现单实例的变电站程序化处理方法 |
CN103309336A (zh) * | 2013-06-19 | 2013-09-18 | 中国能源建设集团广东省电力设计研究院 | 变电站在线五防***及其解锁方法 |
CN103368262B (zh) * | 2013-07-12 | 2016-11-23 | 中国南方电网有限责任公司 | 基于智能远动的程序化控制方法及*** |
CN103368262A (zh) * | 2013-07-12 | 2013-10-23 | 中国南方电网有限责任公司 | 基于智能远动的程序化控制方法及*** |
CN105511409A (zh) * | 2014-09-23 | 2016-04-20 | 国家电网公司 | 一种变电站自动化的控制和操作方法 |
CN105243717A (zh) * | 2015-10-30 | 2016-01-13 | 国家电网公司 | 电话许可工作票管控***及方法 |
CN105243717B (zh) * | 2015-10-30 | 2019-01-22 | 国家电网公司 | 电话许可工作票管控***及方法 |
CN105869072A (zh) * | 2016-04-07 | 2016-08-17 | 南京国电南自电网自动化有限公司 | 一种自动创建变电站五防数据库的方法 |
CN106155023B (zh) * | 2016-08-04 | 2018-10-30 | 南京国电南自维美德自动化有限公司 | 一种通用型分散控制***的防误操作***及其方法 |
CN106155023A (zh) * | 2016-08-04 | 2016-11-23 | 南京国电南自美卓控制***有限公司 | 一种通用型分散控制***的防误操作***及其方法 |
CN106712299A (zh) * | 2017-01-24 | 2017-05-24 | 国网上海市电力公司 | 一种用于智能化变电站的五防*** |
CN106712299B (zh) * | 2017-01-24 | 2019-08-20 | 国网上海市电力公司 | 一种用于智能化变电站的五防*** |
CN108599380A (zh) * | 2018-06-07 | 2018-09-28 | 国网山东省电力公司聊城供电公司 | 一种变电站操作防误***和方法 |
CN110852697A (zh) * | 2019-10-08 | 2020-02-28 | 国家电网有限公司 | 一种变电站倒闸操作票自动生成*** |
CN110865630A (zh) * | 2019-11-14 | 2020-03-06 | 深圳供电局有限公司 | 智能变电站内置程序的验收方法和*** |
CN110941249A (zh) * | 2019-11-30 | 2020-03-31 | 长园共创电力安全技术股份有限公司 | 化工工艺中倒换流程的防误控制***及方法 |
CN110941249B (zh) * | 2019-11-30 | 2024-03-15 | 长园共创电力安全技术股份有限公司 | 化工工艺中倒换流程的防误控制***及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101776910A (zh) | 基于一体化五防操作票***的变电站程序化控制*** | |
CN103269130B (zh) | 一种对变电站的遥控操作进行远程确认的方法 | |
CN104424512A (zh) | 操作计划决策方法和操作计划决策*** | |
CN108233536A (zh) | 一种智能程序化遥控操作*** | |
CN101951032A (zh) | 一种测控单元实现变电站动态防误功能的方法 | |
CN106685085A (zh) | 一种电网调度远方程序化操作*** | |
CN102025195A (zh) | 一种配电网模拟调度管理*** | |
CN103279333A (zh) | 一种基于scada***的多节点顺序控制的方法 | |
CN103165207A (zh) | 适用于核电站的顺序控制方法及*** | |
CN102937789B (zh) | 一种电力调度程序化控制***与方法 | |
CN202475014U (zh) | 区域电网一体化五防*** | |
CN107598925A (zh) | 一种机器人集群控制方法 | |
CN102064602A (zh) | 一种b/s构架网络化电子模拟图板***的工作方法 | |
CN106936217A (zh) | 一种远方投退软压板方法、调控主站、稳控装置及*** | |
CN110276099B (zh) | 一种半自动化铁路客车a5修配线布线图纸输出方法 | |
CN202353316U (zh) | 一种操作站在线防误操作装置 | |
CN110516929A (zh) | 基于多源信息的输变电闭环数据处理方法 | |
CN107424077B (zh) | 一种复杂电网多级日内发电计划及同步安全校核设计方法 | |
CN109977388A (zh) | 基于电气主接线图识别的遥信点表自动生成方法及工具 | |
CN103792920B (zh) | 一种教室用电设备节能控制装置 | |
CN111931960B (zh) | 一种物联网动态反馈的电站工作票智能运管*** | |
CN204442012U (zh) | 变电站的在线式五防*** | |
CN107844090A (zh) | 一种变电站数据通信网关机的互锁方法和装置 | |
Riccobono et al. | Systematic method for the development of future active distribution network automation architectures | |
CN113554273B (zh) | 根据电网检修单智能生成操作票的流程方法、*** |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20100714 |