CN101772085B - eNB equipment and resource aligning method under abnormal conditions of eNB equipment - Google Patents

eNB equipment and resource aligning method under abnormal conditions of eNB equipment Download PDF

Info

Publication number
CN101772085B
CN101772085B CN200810241959A CN200810241959A CN101772085B CN 101772085 B CN101772085 B CN 101772085B CN 200810241959 A CN200810241959 A CN 200810241959A CN 200810241959 A CN200810241959 A CN 200810241959A CN 101772085 B CN101772085 B CN 101772085B
Authority
CN
China
Prior art keywords
resource
board
enb
information
abnormal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200810241959A
Other languages
Chinese (zh)
Other versions
CN101772085A (en
Inventor
苏宏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN200810241959A priority Critical patent/CN101772085B/en
Publication of CN101772085A publication Critical patent/CN101772085A/en
Application granted granted Critical
Publication of CN101772085B publication Critical patent/CN101772085B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Hardware Redundancy (AREA)

Abstract

The invention provides eNB equipment applicable to a long-term evolved mobile communication system of an access network and provides a method for realizing the inner source alignment of the eNB equipment under abnormal conditions. The method comprises the steps that: an abnormal single-board sends resource audition requests to related single-boards in an eNB system respectively; the related single-boards return resource audition request response information back to the abnormal single-board according to related resource information; and the abnormal single-board re-builds resources according to the response information. The equipment and the method realize the inner source alignment of the eNB under the abnormal conditions, so the resource suspension is avoided; and the other single-boards of the ENB can quickly perform normal access work without resetting, so the long-term activation is not required.

Description

The method of resource alignment under a kind of eNB equipment and the abnormal conditions thereof
Technical field
The present invention is applied to eNB (E-UTRAN Node B, the evolved Node B) equipment of Long Term Evolution (Long Term Evolution the is called for short LTE) GSM of Access Network, relates in particular to the method for resource alignment under a kind of eNB equipment and the abnormal conditions thereof.
Background technology
LTE (Long Term Evolution; Long Term Evolution) adopted flat architecture in the GSM; The RNC in the 3G GSM (Radio Network Controler, radio resource controller) and two network element unifications of Node B (Node B), be evolved into eNB; Omitted NBAP (Node B Application Part, the NodeB Application Part agreement) Signalling exchange between original RNC and the Node B.Access Network only comprises eNB equipment like this.ENB links to each other with core net through the S1 interface, and eNB is through Uu interface (interface between UE and UTRAN) and UE (User Equipment, subscriber equipment) communication.
In the 3G GSM; If abnormal conditions such as control board resetting appear in RNC; So after veneer re-powers, can between RNC and NodeB, carry out resource audit (the periodically process of audit is also arranged in addition), if resource is inconsistent between two network elements; Then RNC can initiate requests such as corresponding resource deletion or resource increase, to guarantee the resource alignment.That is to say, concerning RNC, if faults such as board resetting make local some resource information discharge unusually, cause RNC side resource not align, can be foundation according to the resource information that this side of NodeB exists then, rebulids resource.Fig. 1 shows the process of above-mentioned resource alignment thereof.
But above-mentioned alignment mechanism can not be used for the LTE GSM, unifies eNB equipment because RNC and NodeB have developed at the LTE GSM, can not carry out resource audit between network element in the Access Network side again.That is to say in the eNB of LTE GSM equipment, cause this locality to have resource exception to discharge, can't rely on other network elements that original resource information is provided, can only rely on the eNB device interior to address this problem if there is veneer to break down.
In the prior art, cause in the eNB equipment resource inconsistent, generally need to adopt means such as keep-alive to carry out the resource audit if veneer breaks down.Excessive for fear of the keep-alive message amount, often the time scale of keep-alive message is bigger, might reach minute level even higher, and the so long time is accomplished the also time of operate as normal needs much larger than board resetting.
Summary of the invention
The object of the present invention is to provide the method for resource alignment under a kind of eNB equipment and the abnormal conditions thereof; Be intended to solve under the LTE existing network framework; Resource appears in the eNB when inconsistent; Can't align through resource audit between network element, thereby cause the problem that eNB possibly can't normally insert even the resource extension is dead in one long period.
The present invention is achieved in that the implementation method that resource is alignd in the eNB under a kind of abnormal conditions, and said method comprises the steps:
Abnormal single-board is sent resource audit request respectively to the intrasystem related single-boards of said eNB;
Related single-boards is replied resource audit request responding information according to related resource information to abnormal single-board;
Abnormal single-board is rebuild resource according to response message.
Another object of the present invention is to provide the realization system that resource is alignd in the eNB under a kind of abnormal conditions, said system comprises:
Resource audit request generation module is used on abnormal single-board, generating resource audit solicited message;
Resource audit request respond module is used on the related single-boards of abnormal single-board, obtaining resource audit request responding information;
The resource alignment module is used on abnormal single-board, carrying out the resource alignment according to said resource audit request responding information.
The invention has the beneficial effects as follows that under some veneer abnormal conditions, said method or equipment carry out the resource alignment; It is dead to avoid resource to hang; And can make after Reset Board normally works on power, other veneers of eNB need not to reset and just can carry out normal cut-in operation rapidly, have practiced thrift unit exception recovery time largely; Avoided to pass through other board resettings or could discharge resource, thereby improved equipment dependability through long-time keep-alive.
Description of drawings
Fig. 1 is the resource alignment procedure between RNC and NodeB in the 3G GSM that provides of prior art;
Fig. 2 is the flow chart of resource alignment in the eNB under a kind of abnormal conditions of providing of the embodiment of the invention;
Fig. 3 is the method flow diagram that the eNB inner control veneer that provides of the embodiment of the invention carries out the resource alignment after unusual;
Fig. 4 is the method flow diagram that non-control veneer carries out the resource alignment in the eNB that provides of the embodiment of the invention;
Fig. 5 is the realization system of resource alignment in the eNB under the abnormal conditions that provide of the embodiment of the invention.
Embodiment
In order to make the object of the invention, technical scheme and advantage clearer,, the present invention is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the present invention, and be not used in qualification the present invention.
In embodiments of the present invention, resource occurs when unusual in the eNB, and unusual veneer sends resource audit solicited message to related single-boards, replys resource audit request responding information by related single-boards, and unusual veneer is rebuild resource according to response message.Thereby realize the resource alignment in the eNB.
Fig. 2 shows under a kind of abnormal conditions that the embodiment of the invention provides the flow process of the implementation method of resource alignment in the eNB.In embodiments of the present invention, suppose that the eNB entire equipment comprises A1, A2 ..., An is n veneer altogether, works in coordination and realized the function of eNB.The resource pool of supposing eNB can be divided into R1, R2, R3 ..., Rm is the m part altogether, wherein each veneer respectively management maintenance the different resources pond.For the ease of describing, the related resource assignment information of R1 resource pool of suppose the A1 veneer maintenance, and the A1 veneer owing to fault perhaps artificial reason reset.After veneer A 1 resets, need carry out the resource alignment again, thereby trigger the following method of carrying out.
In step S201, abnormal single-board related single-boards in the eNB system is sent resource audit request;
Take place unusual veneer A 1 respectively in the eNB system related resource veneer send resource audit request.
In step S202, related single-boards is replied resource audit request responding information according to related resource information to abnormal single-board;
After relevant resource veneer is received the resource audit request information of abnormal single-board A1, read all resources relevant, and tissue sends resource audit response message to abnormal single-board A1 with abnormal single-board A1.
In step S203, abnormal single-board is rebuild resource according to the response message of replying.
Abnormal single-board A1 according to the original resource information of these these plates of response message organized renewing, accomplishes the resource alignment after the response message that collects all resource audits.
Triggering the implementation method that resource is alignd in the eNB under the execute exception situation can also be to adopt periodically verification and Event triggered verification to combine, and triggers when the needs resource is alignd in verification.
The implementation method of above-mentioned resource alignment, when the veneer resource in eNB was inconsistent, it was dead to avoid resource to hang; After making that Reset Board normally works on power; Other veneers of eNB need not to reset, and have practiced thrift the recovery time of equipment largely, need not also to need not can discharge resource through long-time keep-alive through other board resettings; The alignment of realization resource has improved equipment dependability.
Fig. 3 shows the implementation method of resource alignment under the eNB inner control veneer abnormal conditions that the preferred embodiment of the present invention provides.In the present embodiment, eNB powers on and normally starts, and normally sets up resource, and in equipment work, because fault or manual operation etc. cause controlling board resetting, the control veneer re-powers completion, and after normal the operation, need carry out the resource alignment, and concrete steps are following:
In step S301, the control veneer is related resource veneer transmission resource audit request information in the eNB system respectively.
Control veneer organizational resources audit request information, the related resource veneer sends the resource audit request information in the eNB system.
In step S302, related single-boards is sent resource audit request responding information according to related resource information to the control veneer.
The related resource veneer reads the resource relevant with controlling veneer after receiving the resource audit request information of control veneer, and according to the resource of having distributed on this plate, organizational resources audit request responding information sends to the control veneer.Not only comprise resource information in the audit of the resource here request responding information, also will comprise the relation of continuing between the resource of this plate resource and control veneer.
In step S303; The control veneer according to response message recover its resource information and with other veneers on the relationship map that continues of resource, and preserve, as the control veneer; Be the promoter of other resource veneer resource allocations; In order to ensure the resource alignment,, initiate resource release request to all the other veneers according to resource information and the veneer resource relation of continuing that last step recovery obtains;
In step S304, after other veneer resources discharged completion, the control veneer was perhaps initiated resource again according to means such as database verifications according to the information of preserving and is set up.
After other veneer resources releases were accomplished, perhaps initiate resource again according to means such as database verifications set up process to the resource information that the control veneer is preserved according to step S303, made the eNB internal resource align.
Fig. 4 shows in the eNB that the preferred embodiment of the present invention provides the flow process of the implementation method of resource alignment under the non-control veneer abnormal conditions.In the present embodiment, eNB powers on and normally starts, and normally sets up resource; In equipment work, because fault or manual operation etc. cause a non-control board B to reset, non-control veneer re-powers completion; And after the normal operation, need carry out the resource alignment, concrete steps are following.
In step S401, non-control board B organizational resources audit request information, related single-boards is sent the resource audit request information in the eNB system;
In step S402, after related single-boards is received the resource audit request information of non-control board B, read and the relevant resource of non-control board B, according to the resource of having distributed on its this plate, organizational resources audit request responding message sends to non-control board B.Not only comprise resource information in the resource audit response here, also will comprise the relation of continuing between related resource veneer resource and the non-control board B resource.
In step S403; After non-control board B collects the resource audit response message of other resource veneers; According to resource information in these response messages and the relation of continuing; Recover on this plate resource information and with other veneers on the relationship map that continues of resource, according to these information, rebulid local resource.
Fig. 5 shows under the abnormal conditions that the embodiment of the invention provides the realization system of resource alignment in the eNB.For the ease of describing, only show the part relevant here with the present invention.This system can be integrated in the eNB equipment, makes eNB equipment under abnormal conditions, can accomplish the resource alignment.
Resource audit request generation module 501 is occurring generating resource audit solicited message on the unusual veneer; Concrete mode as stated.
Resource audit request respond module 502 is obtained resource audit request responding information on the related single-boards that unusual veneer occurs; Specifically as stated.
Resource alignment module 503 according to response message, is occurring carrying out the resource alignment on the unusual veneer.Concrete mode as stated.
Said system also can be integrated in each veneer in the eNB, under abnormal conditions, need carry out the resource audit request generation module 501 in the veneer of resource alignment, generates resource audit solicited message and also sends to related single-boards; Resource audit request respond module 502 in the related single-boards is carried out the veneer of resource alignment and is replied resource audit request responding information to needs; Need carry out the resource alignment module 503 in the veneer of resource alignment,, occur carrying out the resource alignment on the unusual veneer according to response message.Specifically as stated.The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. the method for resource alignment under the eNB system exception situation is rebuild the resource of abnormal single-board when local resource discharges unusually, it is characterized in that, comprises the steps:
Abnormal single-board is sent resource audit request respectively to the intrasystem related single-boards of said eNB;
Related single-boards is replied resource audit request responding information according to related resource information to abnormal single-board;
Abnormal single-board is rebuild resource according to response message.
2. the method for claim 1 is characterized in that, said resource audit request responding information comprises: the resource information that said abnormal single-board is relevant, and the relation information that continues between said related single-boards resource and the abnormal single-board resource.
3. method as claimed in claim 2; It is characterized in that; If said abnormal single-board is a control board; Said abnormal single-board is rebuild the resource step according to response message and is specially: said abnormal single-board is recovered the relationship map that continues of resource information and other veneer resource according to the resource information in the response message and the relation information that continues, and preserves;
The resource information and the veneer resource relation of continuing that obtain according to last step recovery are initiated resource release request to other veneer again;
After other veneer resource discharged and accomplishes, perhaps initiate resource again according to database verification means set up process to said abnormal single-board according to the resource information of preserving, and makes the alignment of eNB internal resource.
4. method as claimed in claim 2; It is characterized in that; When said abnormal single-board was non-control board, the step abnormal single-board was rebuild resource according to response message and is specially: abnormal single-board is according to resource information in the response message and continuing relation, recovers the relationship map that continues of resource on resource information and other veneers on this plate; Rebulid resource then, make resource alignment in the eNB.
5. an eNB equipment comprises a plurality of veneers, it is characterized in that, when local resource discharges unusually, rebuilds the resource of abnormal single-board, and said eNB equipment comprises:
Resource audit request generation module is used on abnormal single-board, generating resource audit solicited message;
Resource audit request respond module is used on the related single-boards of abnormal single-board, obtaining resource audit request response message;
The resource alignment module is used on abnormal single-board, carrying out the resource alignment according to said resource audit request responding information.
6. eNB equipment as claimed in claim 5 is characterized in that, said resource audit request generation module, resource audit request respond module and resource alignment module are integrated in each said veneer.
CN200810241959A 2008-12-26 2008-12-26 eNB equipment and resource aligning method under abnormal conditions of eNB equipment Expired - Fee Related CN101772085B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810241959A CN101772085B (en) 2008-12-26 2008-12-26 eNB equipment and resource aligning method under abnormal conditions of eNB equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810241959A CN101772085B (en) 2008-12-26 2008-12-26 eNB equipment and resource aligning method under abnormal conditions of eNB equipment

Publications (2)

Publication Number Publication Date
CN101772085A CN101772085A (en) 2010-07-07
CN101772085B true CN101772085B (en) 2012-09-05

Family

ID=42504587

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810241959A Expired - Fee Related CN101772085B (en) 2008-12-26 2008-12-26 eNB equipment and resource aligning method under abnormal conditions of eNB equipment

Country Status (1)

Country Link
CN (1) CN101772085B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1889050A (en) * 2006-07-26 2007-01-03 华为技术有限公司 System and method for raising single-board exception handling ability
CN101247615A (en) * 2008-03-07 2008-08-20 上海华为技术有限公司 Method and device for improving reliability of communication equipment
CN101267580A (en) * 2007-03-13 2008-09-17 中兴通讯股份有限公司 Recovery method for multimedia broadcast and multicast service

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1889050A (en) * 2006-07-26 2007-01-03 华为技术有限公司 System and method for raising single-board exception handling ability
CN101267580A (en) * 2007-03-13 2008-09-17 中兴通讯股份有限公司 Recovery method for multimedia broadcast and multicast service
CN101247615A (en) * 2008-03-07 2008-08-20 上海华为技术有限公司 Method and device for improving reliability of communication equipment

Also Published As

Publication number Publication date
CN101772085A (en) 2010-07-07

Similar Documents

Publication Publication Date Title
CA2966938C (en) Paging message transmission method, base station, mobility management entity, and user equipment
CN104185278B (en) A method of for calling optimization
US20220400415A1 (en) Information reporting method, information receiving method, terminal and network device
WO2011136181A1 (en) User device and method in mobile communication system
CN102572925A (en) Whole-network tracing method, base station and system
CN105228207A (en) A kind of method and device of verifying LTE network circuit domain dropping CSFB functional configuration
ATE550893T1 (en) METHOD FOR DECENTRALIZING THE COUNTING OF IRREGULAR CELL-BASED CONNECTIONS IN DIGITAL CELLULAR COMMUNICATION NETWORKS
CN103167479B (en) Realize that terminal is distant gets killed or the distant methods, devices and systems opened
WO2011136279A1 (en) User equipment and method in mobile communication system
CN101610579A (en) A kind of management method of Radio Network Temporary Identifier and device
CN101516100B (en) Measuring collocation method, device and system
EP2584814A1 (en) Method and radio network control for tracking the international mobile station equipment identity of user equipment
CN101772085B (en) eNB equipment and resource aligning method under abnormal conditions of eNB equipment
WO2011136182A1 (en) User device and method in mobile communication system
CN100461924C (en) Method for positioning analyzing of NodeB cell stage damage
CN100456698C (en) Base station starting method
CN101150789B (en) A base station resource management method
CN102833743A (en) Sending method, updating method and corresponding equipment for key updating information of public warning system (PWS)
CN103067953A (en) Method and device for neighborhood state reporting, acquiring, monitoring and controlling
CN102821378B (en) Warning information sending method, device and system
CN102388669A (en) Service setup method, system, wireless network controller and user terminal
CN102026421A (en) Storage method and device for aggregation maximum bit rate (AMBR)
US10979943B2 (en) Method and device for acquiring terminal context
CN102869029B (en) Method for remedying link failure and radio communication system
JP2012503377A (en) eNB resource audit method and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20100707

Assignee: SHENZHEN ZTE MICROELECTRONICS TECHNOLOGY CO., LTD.

Assignor: ZTE Corporation

Contract record no.: 2015440020319

Denomination of invention: eNB equipment and resource aligning method under abnormal conditions of eNB equipment

Granted publication date: 20120905

License type: Common License

Record date: 20151123

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120905

Termination date: 20171226

CF01 Termination of patent right due to non-payment of annual fee