CN101763110B - Flexible assembly line monitoring system - Google Patents

Flexible assembly line monitoring system Download PDF

Info

Publication number
CN101763110B
CN101763110B CN2010103011368A CN201010301136A CN101763110B CN 101763110 B CN101763110 B CN 101763110B CN 2010103011368 A CN2010103011368 A CN 2010103011368A CN 201010301136 A CN201010301136 A CN 201010301136A CN 101763110 B CN101763110 B CN 101763110B
Authority
CN
China
Prior art keywords
software
database
streamline
computer
state
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010103011368A
Other languages
Chinese (zh)
Other versions
CN101763110A (en
Inventor
陈湘明
邓友银
宋夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Fortec Automation Engineering Coltd
Original Assignee
Wuxi Fortec Automation Engineering Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Fortec Automation Engineering Coltd filed Critical Wuxi Fortec Automation Engineering Coltd
Priority to CN2010103011368A priority Critical patent/CN101763110B/en
Publication of CN101763110A publication Critical patent/CN101763110A/en
Application granted granted Critical
Publication of CN101763110B publication Critical patent/CN101763110B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Testing And Monitoring For Control Systems (AREA)

Abstract

The invention relates to a flexible assembly line monitoring system, which comprises a supervisory computer and subordinate computers, wherein the supervisory computer is communicated with the plurality of subordinate computers through buses. The flexible assembly line monitoring system is characterized in that: supervisory computer software comprises a assembly line overall monitoring part, scheduling software and a database; the monitoring part adopts configuration software as a development platform which can exchange data with the database; the database allows the monitoring part to work together with the scheduling software; the monitoring part transmits the data which is transmitted from the subordinate computer into the database and the scheduling software writes a command which is to be executed into the database according to the data and a process flow; and the monitoring part controls the subordinate computer to work in real time according to the state of the subordinate computer and a command. The system is prepared by using the configuration software, so the production process is visualized; and the monitoring system and the scheduling software realize seamless interface through the database.

Description

A kind of flexible assembly line monitoring system
Technical field
The present invention relates to a kind of assembly line monitoring system, particularly relate to a kind of flexible assembly line monitoring system.
Background technology
For streamline production, in order to catch up with the quick and various market demand, at the flowing water tissue, the manufacturer generally has two kinds of selections: the one, according to the different model of product different streamlines is set, and namely a kind of product correspondence a streamline; The another kind of selection be, every streamline carried out can adapting to after the simple transformation flowing water of Multiple Type product, and namely a streamline correspondence multiple product.The former has high input, but produce fixing, need not conversion, therefore efficient is high, be suitable for flowing water in enormous quantities, matured product; And latter's dirigibility is stronger, carries out the adjustment of equipment but need to take time during the flowing water different product, thereby inefficiency, is suitable for the flowing water of short run, new product.Although the latter can fill oneself to different product after treatment, only be confined to the less different product of product differentiation, for the different product that differs greatly, this processing Room formula still is not suitable for.
The development of modern production makes many kinds, many types of swinging cross production become inexorable trend.Existing flexible assembly line need to move according to certain production management method, and in the link of administrative law operation, contains again manual intervention composition (such as balanced adjustment, the processing of doing over again, progress monitoring etc.).How to make these interventions more timely, effective, more quick, smooth to impel whole production run, be the target that many production management methods and production manager are looked for.
There is following shortcoming in flexible assembly line monitoring system of the prior art: it is slow that the situation in (1) production run feeds back to managerial personnel's speed, so that can not in time process and deal with problems; (2) inconvenient monitoring and management to operator's state; (3) in the situation that all computer automatic dispatching and management are very difficult with half-finished state in the artificial method understanding buffer pool, thereby can not realize efficiently monitoring and management to the buffer pool state; (4) managerial personnel can not make evaluation to operative employee's task efficiency; (5) record of significant trouble is imperfect, is not easy to on-the-spot and analyzes afterwards, diagnosis and safeguarding; (6) can not realize seamless interfacing with process schedule software.
Summary of the invention
The purpose of this invention is to provide a kind of can Real-time Feedback information, be convenient to operator's state monitoring and management, can realize efficiently to the buffer pool state monitoring and management, be convenient to managerial personnel and operative employee's task efficiency made evaluations, be convenient to the scene of the accident and carried out analyzing and diagnosing and maintenance afterwards, can realize and the flexible assembly line monitoring system of the seamless interfacing of process schedule software.
For solving the problems of the technologies described above, the present invention takes following technical scheme: a kind of flexible assembly line monitoring system, comprise host computer and slave computer, described host computer carries out communication by bus and a plurality of described slave computer, and it is characterized in that: upper computer software comprises streamline overall monitoring part, dispatcher software and database; Described monitor portion adopts configuration software as development platform, can carry out exchanges data between itself and the described database; Described database is so that described monitor portion and dispatcher software associated working; The data upload that described monitor portion transmits described slave computer is to described database, and described dispatcher software writes the order that will carry out in the described database according to described data and technological process; Described monitor portion is carried out operation according to state and the described slave computer of the in good time control of described order of slave computer.
Native system adopts at present popular in the world configuration software to make, and has advantages of following:
(1) the new visual field of process automation, all operation on the streamline, moving of car and duty etc. all uses the animation configuration picture to represent, makes production run visual, transparence, livelyization.Managerial personnel can understand the problem in the production run more at a glance, in time process and deal with problems;
(2) monitoring of operator's state and management: managerial personnel can understand operator's state aborning in time by monitored picture.As: this station is idle condition, or at solicited status, or is in the duty of certain task;
(3) monitoring of buffer pool state and management: in the situation that all computer automatic dispatching and management are difficult to understand half-finished state in the buffer pool with artificial method.Can know clear, in detail the production code member of each workpiece in the buffer pool and the sequence number of technological process by monitored picture;
(4) record of work efficiency files: the human-based management of computing machine allows the operator own decision when start working and to finish the work.But to each workpiece, the time that the operator finishes the work from starting working to has record to file, and can check at any time.Make managerial personnel make evaluation to operative employee's task efficiency with data;
(5) record of significant trouble files: each significant trouble has the file of record from time and the type that occurs to end, is convenient to the scene and analyzes diagnosis and maintenance afterwards;
(6) with the seamless interfacing of process schedule software: process schedule software is the program of independent operating, also is the core of total system operation.This supervisory system is to be undertaken by the exchanges data in the MS SQL2005 database with the process schedule software interface.In same database, the data in the tables of data are separately only appended by each system, read the related data that newly increases in the other side's tables of data, but so each system's independent operating, be independent of each other, really realized seamless interfacing.
Embodiment
It is host computer that supervisory system among the present invention adopts the PC industrial computer, and the PCI plug-in card of the ProfiBus (5614) by Siemens Company carries out communication with bus form and the next (PLC200, PLC300) machine.UPS (500W) uninterrupted power source keeps back-up source as short supply interruption.The site of native system (PC) in the ProfiBus bus is " 3 ".
System software adopts the configuration software WinCC6.2 version of Siemens Company as development platform, and background data base is the MS SQL2005 of Microsoft.Adopt the IndustrialDataBridge software of Siemens Company as the bridge of WinCC6.2 and MSSQL2005 data change between database and flash data.Adopt the User Archive software of Siemens Company as the logging software of work efficiency.By the SQL2005 database, with mode and the associated working of process schedule software of uploading data and downloading data.
The related datas such as the request that described system transmits slave computer, worker's item write in the uploading data table, and dispatcher software, is written to the order that will carry out and information in the downloading data table behind the analyzing and processing uploading data according to the requirement of technological process.Native system is according to the newer command of downloading in the table, and the step-by-step processing related data is also in time issued slave computer according to the state of slave computer.
The upper computer software of described system is comprised of five major parts: streamline overall monitoring part, each station job record information table, alarm logging information table, debugging enironment, database link software and dispatcher software.
Described streamline overall monitoring part mainly shows the state of whole streamline with configuration software, comprise the motion state of dolly, the actual stop position of dolly, whether workpiece is arranged on the dolly, whether dolly is just in ready state, each station duty is (such as " task 1 ", " task 2 ", " task 3 ", " task 4 ", " free time ", " request ", " time-out " etc.), each station send workpiece or gets the state of workpiece, each station door switch and buffer pool door state, whether buffer pool is ready, various faults, report to the police, warning, each station job record information table.
Described each station job record information table mainly comprises: station is finished the explanation of time sheet that every workpiece consumes, duty that the date is selected control, current station, " time-out " condition selecting frame, station technique information etc.
Described alarm logging information table records all start time and concluding times that warning occurs.Divide three ones and be placed on respectively in three tables, that is: failure logging table, alarm logging table, warning record sheet.Show ten records that occur recently in every table, select to trace fault, warning, the warning record that in the past occured any time by control.
Described debugging enironment is that the debugging for whole pipeline system designs, and can directly control the data in slave computer (PLC200, PLC300), the storehouse that reads and writes data and the operation of control dolly, and misoperation can be brought harm to whole system.
Described database link software and dispatcher software are the programs at running background, are the parts of system running environment.Native system is automatic runtime database link software and dispatcher software when opening.
Before described dispatcher software is started working, confirm at first whether buffer pool is ready, preferably, will have at least one to be ready state in two buffer pools, otherwise system can not work.For simplifying control procedure, the newer command that native system issues dispatcher software is divided into two step timesharing and issues.That is: the first step is that empty wagons arrives the purpose station, and second step is to have on the dolly in the workpiece situation to the purpose station.

Claims (6)

1. a flexible assembly line monitoring system comprises host computer and slave computer, and described host computer carries out communication by bus and a plurality of described slave computer, it is characterized in that:
Upper computer software comprises streamline overall monitoring part, dispatcher software and database; Described monitor portion adopts configuration software as development platform, can carry out exchanges data between itself and the described database; Described database is so that described monitor portion and dispatcher software associated working, and described upper computer software also can be used for recording the work efficiency of each station;
The data upload that described monitor portion transmits described slave computer is to described database, described dispatcher software writes the order that will carry out in the described database according to described data and technological process, described monitor portion can show the state of whole streamline, and described state comprises: whether workpiece, dolly are arranged whether just in ready state on the motion state of the dolly on the streamline, the actual stop position of dolly, the dolly; Each station duty, each station send workpiece or get state, each station door switch of workpiece on the streamline; Whether the buffer pool door state of streamline, buffer pool be ready; In the various faults of streamline, warning, the warning one or more;
Described monitor portion is carried out operation according to state and the described slave computer of the in good time control of described order of described slave computer;
Also comprise buffer pool, each station job record information table and/or alarm logging information table, after the buffer pool of streamline was ready, described dispatcher software was just started working.
2. the system as claimed in claim 1 is characterized in that: described system comprises that also short supply interruption keeps back-up source.
3. the system as claimed in claim 1, it is characterized in that: described slave computer is PLC.
4. the system as claimed in claim 1, it is characterized in that: described buffer pool is a plurality of, after one of them was ready, described debugging software just can be started working.
5. the system as claimed in claim 1, it is characterized in that: the newer command timesharing ground that described system issues dispatcher software and be divided into for two steps and be issued to described slave computer, wherein, the first step is that empty wagons arrives the purpose station, and second step is to have on the dolly in the workpiece situation to the purpose station.
6. the system as claimed in claim 1, it is characterized in that: described upper computer software also comprises debugging enironment, it can directly control the operation of slave computer, the described database of read-write and/or control dolly.
CN2010103011368A 2010-02-03 2010-02-03 Flexible assembly line monitoring system Expired - Fee Related CN101763110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010103011368A CN101763110B (en) 2010-02-03 2010-02-03 Flexible assembly line monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010103011368A CN101763110B (en) 2010-02-03 2010-02-03 Flexible assembly line monitoring system

Publications (2)

Publication Number Publication Date
CN101763110A CN101763110A (en) 2010-06-30
CN101763110B true CN101763110B (en) 2013-04-03

Family

ID=42494316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010103011368A Expired - Fee Related CN101763110B (en) 2010-02-03 2010-02-03 Flexible assembly line monitoring system

Country Status (1)

Country Link
CN (1) CN101763110B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103513178A (en) * 2013-06-28 2014-01-15 上海工程技术大学 Breaker detecting and assembly line production management system
CN106101619A (en) * 2016-06-15 2016-11-09 环山集团有限公司 Feed production accident detection device
JP6406365B2 (en) * 2017-01-06 2018-10-17 住友電気工業株式会社 Switch device, communication control method, and communication control program
CN113703764B (en) * 2021-08-16 2023-12-05 深圳市顶控科技有限公司 Configuration software based on original ecological MS window system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1959767A (en) * 2006-11-29 2007-05-09 深圳职业技术学院 Practicing teaching system of flexible automatic production line based on network control
CN101013312A (en) * 2007-01-15 2007-08-08 大连光洋科技工程有限公司 Private chip for implementing bus controller function in ring bus numerical control system
CN201163365Y (en) * 2007-12-19 2008-12-10 江苏天奇物流***工程股份有限公司 Vehicle soldering assembly line control system based on PROFINET on-site bus
CN101419448A (en) * 2007-10-24 2009-04-29 中兴通讯股份有限公司 Production line real time acquiring and data accounting system and method
CN101477368A (en) * 2009-01-21 2009-07-08 上海威士机械有限公司 Clothing product line equipment control method and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1959767A (en) * 2006-11-29 2007-05-09 深圳职业技术学院 Practicing teaching system of flexible automatic production line based on network control
CN101013312A (en) * 2007-01-15 2007-08-08 大连光洋科技工程有限公司 Private chip for implementing bus controller function in ring bus numerical control system
CN101419448A (en) * 2007-10-24 2009-04-29 中兴通讯股份有限公司 Production line real time acquiring and data accounting system and method
CN201163365Y (en) * 2007-12-19 2008-12-10 江苏天奇物流***工程股份有限公司 Vehicle soldering assembly line control system based on PROFINET on-site bus
CN101477368A (en) * 2009-01-21 2009-07-08 上海威士机械有限公司 Clothing product line equipment control method and system

Also Published As

Publication number Publication date
CN101763110A (en) 2010-06-30

Similar Documents

Publication Publication Date Title
CN108919765B (en) Intelligent manufacturing factory virtual debugging and virtual monitoring method and system based on digital twin
CN107844098A (en) A kind of digital factory management system and management method
CN101763110B (en) Flexible assembly line monitoring system
CN101408767A (en) Correlation of non-times series events in industrial systems
CN107656749A (en) A kind of device version management-control method and device
CN102915479A (en) Power plant asset management system
CN109146253A (en) A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking
GREGOR et al. DESIGNOF SIMULATION-EMULATION LOGISTICS SYSTEM
Eversheim et al. Tool management: the present and the future
CN103942726A (en) Intelligent inspection method for condition evaluation work of power grid equipment
CN110232504A (en) A kind of quality manufacturing execution system platform and terminal
CN112462702A (en) Intelligent monitoring and intelligent scheduling system based on industrial internet
CN106843162A (en) A kind of industrial lathe automation remote intelligence control system
CN116165484A (en) Fault positioning robot-assisted fixed inspection, inspection and scheduling method based on electric power automation operation and maintenance
CN109150653A (en) A kind of remote hardware is in ring HIL automated testing method and system
CN106652646B (en) Ship power system embedded simulation training system based on actual monitoring system
CN110611312A (en) On-line simulation system and method for panoramic data of substation bay level
CN101201601A (en) Method for monitoring assembly line
CN105446289B (en) By the method and system of the timestamp of manufacturing execution system collection work state
CN109426229A (en) System and method for carrying out time planning and monitoring to machine state
KR20130049457A (en) Manufacturing execution system, and recording medium for the same
CN2931503Y (en) Automation computer control apparatus for electrolysis plant purification workshop
CN201857397U (en) Under-tank fault diagnosis and treatment system of blast furnace
CN110555218A (en) Production model update system, apparatus, method, and computer-readable medium
CN110955222A (en) Test method and test system of engine data recorder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130403

Termination date: 20180203