CN101752908B CN201010034268A CN201010034268A CN101752908B CN 101752908 B CN101752908 B CN 101752908B CN 201010034268 A CN201010034268 A CN 201010034268A CN 201010034268 A CN201010034268 A CN 201010034268A CN 101752908 B CN101752908 B CN 101752908B
Authority
CN
China
Prior art keywords
recording
period
record ripple
data
wave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010034268A
Other languages
Chinese (zh)
Other versions
CN101752908A (en
Inventor
蒋晓荣
陈建军
肖远清
薛宏杰
范迪才
赵琳
白晋华
熊军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANGSHAN POWER SUPPLY CO NCGC
Beijing Sifang Automation Co Ltd
North China Grid Co Ltd
North China Power Engineering Beijing Co Ltd
Original Assignee
TANGSHAN POWER SUPPLY CO NCGC
Beijing Sifang Automation Co Ltd
North China Grid Co Ltd
North China Power Engineering Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANGSHAN POWER SUPPLY CO NCGC, Beijing Sifang Automation Co Ltd, North China Grid Co Ltd, North China Power Engineering Beijing Co Ltd filed Critical TANGSHAN POWER SUPPLY CO NCGC
Priority to CN201010034268A priority Critical patent/CN101752908B/en
Publication of CN101752908A publication Critical patent/CN101752908A/en
Application granted granted Critical
Publication of CN101752908B publication Critical patent/CN101752908B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a method for distributed wave recording of an intelligent substation, which adopts a data sharing network of the analog quantity, the state quantity and the signal quantity of an intelligent substation to distribute and integrate the fault wave recording function into a spacer layer protection device and to transmit recorded wave data files to a fault information sub-station for analysis of the technical personnel through the communication of the network in the spacer layer equipment and the fault information sub-station in the intelligent substation. The method requires no additional network communication equipment, thereby simplifying the secondary design of the substation. Due to the integrated design with the protection device, the wave recording strategy adopted in the method is more applicable to protection of professional needs, and the method has the value of practical application. The engineering practice shows that the method has advanced and practical features and is suitable for application of each voltage level in the intelligent substation.

Description

A kind of method that is used for distributed wave recording of intelligent substation
Technical field
The invention belongs to the technical field of Power System Intelligent transformer station, be specifically related to the method for intelligent substation failure wave-recording.
Background technology
The develop rapidly of the Along with computer technology and the network communications technology, electric power system have got into the digitizing technique epoch.Transformer station is as the node of electrical network, and the development of its digitizing technique has become the pith of intelligent grid development.
IEC61850 is based on the unique international standard of electric substation automation system of universal network communication platform, has represented the development trend of automatic technology.
In recent years along with electronic mutual inductor technology, the technological fast development of digital protection, and the practice throughout the country of each electric company, many experiences and achievement that digital transformer substation is built obtained.
The failure wave-recording of electric power system is mainly used in record and analyzes the change procedure of the related electrical parameters after electric power system disturbance (like short trouble, disconnection fault, system oscillation, electric voltage frequency collapse etc.) takes place and the action behavior of relaying protection and automatic safety device.
The birth of digital transformer substation has brought many technological changes.Certainly, proposed complete brand-new requirement, also be faced with the opportunity of new technical development and innovation simultaneously for the wave recording device of routine for the design of transformer station's failure wave-recording function.
Current, the centralized record ripple of the general employing of transformer station's failure wave-recording function, its main cause is:
(1) distributed wave recording of using at present is actually a kind of function between failure wave-recording and emergency review, although a lot of producer is referred to as failure wave-recording, it does not satisfy request of national standard.Since can not the synchronous recording protected circuit or the All other routes beyond the equipment or the waveform and the sampled data of device electrical parameters, therefore be unfavorable for fault is carried out the analysis of system.
(2) record ripple owing to be distributed to each protective device; Be confined to the size of internal memory, if device is not when sending the data to local supervisory control system or fault message substation, system has disturbance again; May cause previous data to be capped, therefore need hardware that jumbo internal memory is arranged.
But also there is following shortcoming in centralized record ripple:
(1) generally need dispose many oscillographs, also be not quite similar according to the equipping rules of various places and the discrepant quantity of transformer substation construction scale for 220kV and above transformer station.Because every oscillograph has separately CPU and sampling system, therefore the data sampling at full station is nonsynchronous, has certain error.
(2) according to the anti-requirement of arranging; The CT of fault oscillograph is different windings with the CT of protection; Therefore must give fault oscillograph by the independent one group of CT of each arranged spaced, cause to play the CT secondary circuit of protection the effect of supervision, also increase the complexity of the investment and the design of transformer station.
, bring certain difficulty for centralized failure wave-recording, but established solid foundation along with the technology of the communication technology, electronic mutual inductor, the The Application of Technology of intelligent high-pressure electrical equipment at intelligent substation for the distributing failure wave-recording.
Summary of the invention
In order to solve the problems referred to above that exist in the prior art, the invention discloses a kind of intelligent substation distributing that is used for
The method of record ripple.The following technical scheme of the concrete employing of the present invention:
A kind of method that is applicable to intelligent substation distributing failure wave-recording; This method is utilized the data sharing network of intelligent substation analog quantity, quantity of state, semaphore; The failure wave-recording function is disperseed to be integrated in the wall protective device,, the recorder data file is sent to the fault message substation through the network of bay device and the fault message substation communication in the transformer station; Supply the technical staff to analyze, said method comprising the steps of:
(1) the distributed wave recording plug-in unit is installed in every protective device of said intelligent substation wall;
(2) trigger the distributed wave recording plug-in unit and carry out failure wave-recording, said failure wave-recording is carried out by the following period in proper order:
The record ripple triggers the beginning status data of preceding period,
The record ripple triggers the status data of first period of back,
The record ripple triggers the status data of second period of back,
Wherein, second period followed closely after first period, and the time of second period, the sample frequency of second period was less than the sample frequency of first period greater than the time of first period;
(3) in triggering the failure wave-recording process of startup; When appearance triggers startup to said distributed wave recording plug-in unit once more again towards general object transformer substation case GOOSE breaker tripping and closing order; When if current record ripple is in said first period, according to repeating the record ripple from first period period to the second;
When if the record ripple is in said second period, according to the record ripple trigger period before the beginning, record ripple trigger first period of back, the record ripple triggers the order of second period of back and repeats the record ripple;
(4) termination of failure wave-recording: when said failure wave-recording time during greater than setting recording time and the involution of the whole group of protection, failure wave-recording stops;
(5) record ripple file is uploaded: record ripple file is uploaded to the fault message substation through the station level network with the recorder data file.
The system diagram of distributing failure wave-recording is shown in accompanying drawing 3.
The distributing failure wave-recording is realized mainly that the analog data at this interval obtains with GOOSE message reception information and is carried out classified and stored and merge cells (MU) communications status discrimination function.
The recorded type of failure wave-recording of the present invention is preferred:
A, analog quantity: record ripple plug-in unit links to each other with the intelligent analog quantity sampled value SMV of transformer station net, accepts from the online data of the sampled value SMV at this interval, and the data sync of standing entirely depends on MU, so data have synchronism.The analog quantity quality: defined the sampled data state among the IEC61850-9-1, comprised information such as whether synchronous the validity, MU of sampling channel having comprised these information in the sample data frames, these characteristics are referred to as the analog quantity quality.Device receives the moment of sample frame; Enclose a current time (hardware 16 digit counters when needing communication cpu to receive each sample frame; With us is unit, connects after the synchronisation source, and this is 0~4800 cyclic variation (sample rate is 4.8k) constantly); Record ripple CPU should be constantly as the analog quantity storage, record ripple, the analysis of the data of being convenient to stand entirely.
B, quantity of state information: the GOOSE plug-in unit of protective device and GOOSE net links to each other, receives the opening into information of this interval of the intelligent operation box collection of GOOSE plug-in unit broadcasting transmission from the GOOSE net, comprises control box breaker tripping and closing information.GOOSE plug-in unit communication in failure wave-recording plug-in unit and the protective device obtains these information.
The Starting mode of failure wave-recording of the present invention is preferred:
A, protective device can send notice when starting, and the record ripple CPU in the distributed wave recording plug-in unit triggers the record ripple after receiving starting command.
The GOOSE that b, protective device action are sent leaves signal enabling record ripple.
Record ripple CPU in c, the distributed wave recording plug-in unit receives the quantity of state startup record ripple that the GOOSE net sends.According to record ripple definite value be provided with selection " *
* open into triggering record ripple input/withdraw from ".
D, start definite value through setting current and voltage jump amount, the sudden change amount of carrying out phase current and phase voltage starts differentiation.
E, assign starting command by transformer station's station level equipment and start the record ripple.
The recording mode of failure wave-recording of the present invention is preferred:
The recording mode of a, recorder data is shown in accompanying drawing 4:
B, concrete recording mode
The record ripple triggers the preceding period of beginning, and the called after A period in this patent: the record ripple triggers the status data before the beginning, exports high speed original record waveform, 40~100ms writing time (can adjust), sample rate 4800 point/seconds (96 points of ripple weekly).
The record ripple triggers first period of back, the called after B period in this patent: the record ripple triggers the status data at back initial stage, output high speed original record waveform, 100~1000ms writing time (can adjust), sample rate 4800 point/seconds (96 points of ripple weekly).
The record ripple triggers second period of back, the called after C period in this patent: long-time recorder data, and output low speed original record waveform, ripple writes down 1 point data (effective value) weekly, and writing time is greater than 2s.
The preferred following mode of the recording process of failure wave-recording of the present invention:
A, startup for the first time
When meeting arbitrary entry condition, begin constantly to carry out the record ripple in proper order by the A-B-C period by S.
B, repeated priming
In the process that starts record, when GOOSE breaker tripping and closing order is arranged again,, then constantly begin to repeat thus along the B-C period if in the B period; If in the C period, begin constantly to repeat by the A-B-C period by S.
The automatic end condition of failure wave-recording of the present invention is preferably following:
A, writing time>3s and the involution of the whole group of protection.
B, lose the processing of sample frame
The sampled data that the real recorder of record ripple CPU is arrived is not derived and is asked for the sample frame data of losing, and therefore in AB section recorder data, the discontinuous situation of sampling label can occur, and the sampling label that lacks is the sampled data of losing.
The distributed wave recording of intelligent substation method that the present invention proposes need not increase the Secondary Design that any network communication apparatus has been simplified transformer station.This method adopts and the protective device integrated design simultaneously, and the record ripple strategy that is adopted is more suitable for protecting the needs of specialty, therefore has the value of practical application.Engineering practice shows that this method has the characteristics of advance, practicality, is applicable to the application scenario of each electric pressure of intelligent substation.
Description of drawings
Shown in Figure 1 is the SMV networking diagram;
Shown in Figure 2 is the GOOSE networking diagram;
Shown in Figure 3 is distributing fault recording system figure;
Shown in Figure 4 for recording the ripple sequential chart.
Specific embodiments
Below according to Figure of description and combine specific embodiment to the further detailed presentations of technical scheme of the present invention.
Intelligent transformer station analog quantity sample frequency is very high, forms the network of a sampled value SMV usually, hereinafter to be referred as the SMV net, shown in accompanying drawing 1.Quantity of state is formed towards general object transformer substation case GOOSE net, hereinafter to be referred as the GOOSE net, shown in accompanying drawing 2.
Because the wall protective device can obtain the analog quantity and the quantity of state at full station from SMV and GOOSE net, therefore adopt the distributing failure wave-recording very convenient.
In all route protection and protection equipment for transformers at interval, increase a distributed wave recording plug-in unit, record ripple plug-in unit has jumbo record ripple storage, stores 20 record ripples simultaneously.Fault message substation system of full station configuration obtains recorder data in case the covering of data from cell device in real time.
The distributing fault recording system is shown in accompanying drawing 3: present technique scheme record ripple adopts distributing; Do not need reconstructed network; Be divided into three layers; Access station control layer network in fault message substation realizes that the distributed wave recording plug-in unit of record wave energy is dispersed in the wall protection equipment, carries out failure wave-recording and forms behind the file through sending on the station level network.
The distributed wave recording plug-in unit is a plug-in unit of protective device, and the main sampled data and the GOOSE message reception information that receive merge cells (MU) of realizing is carried out classified and stored; Possess hardware check function, MU communications status discrimination function simultaneously.
(1) type of record data
A, analog quantity: from the SMV net at this interval, the data sync of standing entirely depends on MU, so data have synchronism.
B, analog quantity quality: defined the sampled data state among the IEC61850-9-1, comprised information such as whether synchronous the validity, MU of sampling channel having comprised these information in the sample data frames.Device receives the moment of sample frame; Enclose a current time (hardware 16 digit counters when needing communication cpu to receive each sample frame; With us is unit, connects after the synchronisation source, and this is 0~4800 cyclic variation (sample rate is 4.8k) constantly); Record ripple CPU should be constantly as the analog quantity storage, record ripple, the analysis of the data of being convenient to stand entirely.
C, quantity of state information: receive the opening of this interval of the intelligent operation box collection that the broadcasting of GOOSE plug-in unit sends from GOOSE net, comprise control box breaker tripping and closing information into information.
(2) start the mode of recording ripple
Can send when a) protection starts and trigger the record ripple after notice record ripple CPU receives starting command.
B) GOOSE that protects action to send leaves signal enabling record ripple.
C) receive the quantity of state startup record ripple that the GOOSE net sends.According to record ripple definite value selections " * * open into triggering and record ripple input/withdraw from " is set.
D) start definite value through setting current and voltage jump amount, the sudden change amount of carrying out phase current and phase voltage starts to be differentiated.
E) assign starting command by the backstage and start the record ripple.
(3) recording mode of record ripple
The recording mode of recorder data is shown in accompanying drawing 4:
Concrete recording mode is following:
The A period: the record ripple triggers the status data before the beginning, output high speed original record waveform, 40~100ms writing time (can adjust), sample rate 4800 point/seconds (96 points of ripple weekly).
The B period: the record ripple triggers the status data at back initial stage, output high speed original record waveform, 100~1000ms writing time (can adjust), sample rate 4800 point/seconds (96 points of ripple weekly).
The C period: long-time recorder data, output low speed original record waveform, ripple writes down 1 point data (effective value) weekly, and writing time is greater than 2s.
(4) recording process
Start for the first time:
When meeting arbitrary entry condition, begin constantly to carry out the record ripple in proper order by the A-B-C period by S.
Repeated priming:
In the process that starts record, when GOOSE breaker tripping and closing order is arranged again,, then constantly begin to repeat thus along the B-C period if in the B period; If in the C period, begin constantly to repeat by the A-B-C period by S.
(5) automatic end condition
Writing time>3s and the involution of the whole group of protection.
Lose the processing of sample frame:
The sampled data that the real recorder of record ripple CPU is arrived is not derived and is asked for the sample frame data of losing, and therefore in AB section recorder data, the discontinuous situation of sampling label can occur, and the sampling label that lacks is the sampled data of losing.

Claims (6)

1. method that is used for the distributing failure wave-recording of intelligent substation; This method is utilized the data sharing network of intelligent substation analog quantity, quantity of state, semaphore; The failure wave-recording function is disperseed to be integrated in the wall protective device; Through the fault message substation communication in station level network and the transformer station; The recorder data file is sent to the fault message substation, supplies the technical staff to analyze, the analog data of realizing this interval obtains with GOOSE message reception information and carries out classified and stored and merge cells communications status discrimination function; It is characterized in that, said method comprising the steps of:
(1) the distributed wave recording plug-in unit is installed in every protective device of said intelligent substation wall;
(2) trigger the distributed wave recording plug-in unit and carry out failure wave-recording, said failure wave-recording is carried out by the following period in proper order:
The record ripple triggers the beginning status data of preceding period,
The record ripple triggers the status data of first period of back,
The record ripple triggers the status data of second period of back,
Wherein, second period followed closely after first period, and the time of second period, the sample frequency of second period was less than the sample frequency of first period greater than the time of first period;
(3) in triggering the failure wave-recording process of startup; When appearance makes once more that towards general object transformer substation case GOOSE breaker tripping and closing order said distributed wave recording plug-in unit triggers startup again; When if current record ripple is in said first period, according to repeating the record ripple from first period period to the second;
When if the record ripple is in said second period, according to the record ripple trigger period before the beginning, record ripple trigger first period of back, the record ripple triggers the order of second period of back and repeats the record ripple;
(4) termination of failure wave-recording: when said failure wave-recording time during greater than setting recording time and the involution of the whole group of protection, failure wave-recording stops;
(5) the recorder data file is uploaded: the recorder data file is uploaded to the fault message substation through the station level network with the recorder data file.
2. the method for distributing failure wave-recording according to claim 1 is characterized in that, the type of record data comprises:
Analog quantity: from the intelligent analog quantity sampled value SMV of the transformer station net of said distributed wave recording plug-in unit place wall, analog data has synchronism; Analog quantity quality: defined the sampled data state among the IEC61850-9-1, comprised that whether the validity of sampling channel, merge cells MU is synchronous, comprised these analog quantity quality information in the sample data frames;
Quantity of state information: from receive towards general object transformer substation case GOOSE net that the broadcasting of GOOSE plug-in unit sends by the opening of this wall of intelligent operation box collection into information, comprise control box breaker tripping and closing information.
3. the method for distributing failure wave-recording according to claim 1 is characterized in that, the mode that the distributed wave recording plug-in unit carries out failure wave-recording startup record ripple comprises:
Send notice when protective device starts, the record ripple CPU in the distributed wave recording plug-in unit triggers the record ripple after receiving starting command;
The GOOSE that the protective device action is sent leaves signal enabling record ripple;
Record ripple CPU in the distributed wave recording plug-in unit receives the quantity of state startup record ripple that the GOOSE net sends;
Start definite value through setting current and voltage jump amount, the sudden change amount of carrying out phase current and phase voltage starts the record ripple;
Assign starting command by transformer station's station level equipment and start the record ripple.
4. the method for distributing failure wave-recording according to claim 1 is characterized in that:
During status data before the record ripple triggers beginning, writing time preferred 40~100ms, 4800 point/seconds of sample rate;
When the record ripple triggers the status data of first period of back, writing time preferred 100~1000ms,, 4800 point/seconds of sample rate;
When the record ripple triggered the status data of second period of back, preferably ripple write down 1 point data weekly, and writing time is greater than 2s.
5. the method for distributing failure wave-recording according to claim 1 is characterized in that:
Said setting recording time>3s.
6. the method for distributing failure wave-recording according to claim 1 is characterized in that:
Said distributing failure wave-recording plug-in unit is recorded the sampled data that receives truly, does not derive and asks for the sample frame data of losing, and when the discontinuous situation of sampling label in recorder data, occurring, the sampling label that is lacked is the sampled data of losing.
CN201010034268A 2010-01-19 2010-01-19 Method for distributed wave recording of intelligent substation Active CN101752908B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010034268A CN101752908B (en) 2010-01-19 2010-01-19 Method for distributed wave recording of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010034268A CN101752908B (en) 2010-01-19 2010-01-19 Method for distributed wave recording of intelligent substation

Publications (2)

Publication Number Publication Date
CN101752908A CN101752908A (en) 2010-06-23
CN101752908B true CN101752908B (en) 2012-10-03

Family

ID=42479450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010034268A Active CN101752908B (en) 2010-01-19 2010-01-19 Method for distributed wave recording of intelligent substation

Country Status (1)

Country Link
CN (1) CN101752908B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102035260B (en) * 2010-12-17 2012-08-15 国电南瑞科技股份有限公司 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system
CN103827678B (en) * 2011-06-30 2017-04-26 Abb研究有限公司 Method for distributed waveform recording in a power distribution system
CN104297580B (en) * 2013-07-18 2017-11-10 国家电网公司 Detect the method and system of the hard contact intake resolution ratio of intelligent terminal
CN103516055B (en) * 2013-10-22 2015-08-26 武汉国电武仪电气股份有限公司 The monitoring method of Intelligent substation merging unit state
CN103840554B (en) * 2014-03-04 2015-12-30 国电南京自动化股份有限公司 A kind of intelligent substation distributed fault record ripple and network analysis system
CN104064982B (en) * 2014-06-19 2016-03-30 国家电网公司 A kind of methods of exhibiting of intelligent substation fault message
CN111276929B (en) * 2020-02-27 2022-07-26 厦门盈盛捷电力科技有限公司 Information recording method for fault expert diagnosis of power system
CN112147447B (en) * 2020-09-27 2021-10-08 广东电网有限责任公司佛山供电局 Wave recording triggering method and system of relay protection device based on input amount
CN113075502B (en) * 2021-03-29 2024-02-23 深圳供电局有限公司 Fault recorder

Also Published As

Publication number Publication date
CN101752908A (en) 2010-06-23

Similar Documents

Publication Publication Date Title
CN101752908B (en) Method for distributed wave recording of intelligent substation
CN101854080B (en) Digitalized fault wave recording device
CN108414849B (en) Intelligent substation automatic test system and method
CN103827678B (en) Method for distributed waveform recording in a power distribution system
CN102937685B (en) The integrated testing platform of a kind of transformer station based on Real-time Simulation Technology
CN104539473B (en) Intelligent substation network virtual secondary circuit whole group of method of calibration and system
CN109103880A (en) The emulation of intelligent substation panorama and test macro
CN102710012B (en) Data resynchronization method for analyzing fault waveform of intelligent transformer substation
CN108205096B (en) Multisource fault data analysis method based on active time correction
CN107741549A (en) The intelligent substation synchronism tester synchronously occurred based on analog quantity and digital quantity
CN110378061B (en) Multi-simulation tool collaborative simulation method and device for extra-high voltage direct current converter station
CN107092198A (en) A kind of HVDC transmission system failure analysis methods and system
CN106647703A (en) Power fault intelligent analysis and inversion system and method
CN106208368A (en) A kind of Transformer Faults Analysis system and method based on dispatching comprehensive data platform
CN103812216B (en) A kind of regional power grid temporary overvoltage monitoring system
CN111276929B (en) Information recording method for fault expert diagnosis of power system
CN108445322A (en) A kind of relay protection fault back method
CN106546854A (en) A kind of combining unit for supporting to record wave energy
CN110672969A (en) On-site line protection device field test system
CN109581098A (en) The intelligent O&M test method of site protective device
CN209460598U (en) A kind of message and fault recorder data acquisition device
CN102508052B (en) Test method for field band channel operation of automatic bus transfer system of area network
CN201191450Y (en) Electricity fault dynamic recording device
CN112531911B (en) Equipment network measurement and control management system
CN105067949B (en) Method for synchronizing time and system based on circuit both end voltage phase contrast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant