CN101748731A CN200910244841A CN200910244841A CN101748731A CN 101748731 A CN101748731 A CN 101748731A CN 200910244841 A CN200910244841 A CN 200910244841A CN 200910244841 A CN200910244841 A CN 200910244841A CN 101748731 A CN101748731 A CN 101748731A
Authority
CN
China
Prior art keywords
foundation
gas injection
basic
sinking
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910244841A
Other languages
English (en)
Inventor
张浦阳
丁红岩
练继建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd.
Original Assignee
Daoda Shanghai Wind Power Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daoda Shanghai Wind Power Investment Co Ltd filed Critical Daoda Shanghai Wind Power Investment Co Ltd
Priority to CN200910244841A priority Critical patent/CN101748731A/zh
Publication of CN101748731A publication Critical patent/CN101748731A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

一种厚壁筒型基础注气破土下沉方法,沿筒壁周长等间距设置且贯穿基础筒壁的竖向预留注气管,预留注气管均从基础密封顶盖穿出;在基础密封顶盖上的预留抽负压孔;实施步骤为:通过预留注气管向基础筒壁下端通入高压气体,将基础筒壁底部土体吹散,使基础继续下沉;当基础下沉阻力超过注气破土***提供的下沉力时,启用负压设备通过基础密封顶盖上的预留抽负压孔向基础内抽真空,使其继续下沉。本发明的优点是:该方法具有施工简便、效率高、结构简单,不受海况条件干扰的特点,下沉过程更加简单,安装速度大大提高,能避免环境条件的干扰,可实现下沉过程的全自动监控作业、保证下沉的施工质量和安全。

Description

一种厚壁筒型基础注气破土下沉方法
所属技术领域
本发明涉及一种厚壁筒型基础注气破土下沉方法。属于港口、海洋、水利和桥梁工程中的厚壁筒型基础下沉技术。
背景技术
目前在港口、海洋、水利和桥梁工程中,厚壁筒型基础的使用越来越广泛,目前将厚壁筒型基础结构沉入到地基土体中,可实施的方法主要有费用较高的基坑开挖法,适用范围有限的压载法,对设备要求较高的振动法及高压喷气和空气吸排等下沉方法。厚壁筒型基础结构下沉时,阻力主要来自筒壁内外侧土的摩擦和粘聚阻力和筒壁底端土阻力。尤其对于厚壁筒型基础结构型式,阻力会更大,传统的下沉方式将不能满足结构的有效下沉到位。
本发明就是针对解决这些问题,提高厚壁筒型基础的下沉质量和效率。
针对解决厚壁筒型基础下沉困难的问题,本发明可以提高厚壁筒型基础的效率,节约基础下沉的成本。
发明内容
本发明的目的是针对上述存在问题,提供一种厚壁筒型基础注气破土下沉方法,该方法具有施工简便、效率高、结构简单,不受海况条件干扰的特点。
本发明的技术方案:
一种厚壁筒型基础注气破土下沉方法,由基础筒壁的注气破土***和基础密封顶盖的抽负压***组成,基础筒壁的注气破土***包括沿筒壁周长等间距设置且贯穿基础筒壁的竖向预留注气管,预留注气管均从基础密封顶盖穿出;基础密封顶盖的负压***为在基础密封顶盖上的预留抽负压孔;实施步骤如下:1)将筒型基础靠自重下沉就位后,通过预留注气管向基础筒壁下端通入高压气体,高压气体将基础筒壁底部土体吹散,使基础继续下沉;2)当基础下沉阻力超过注气破土***提供的下沉力时,启用负压设备通过基础密封顶盖上的预留抽负压孔向基础内抽真空,使其继续下沉,直至下沉到设定的深度。
所述通入高压气体的压力不大于10个大气压。
所述基础内抽真空的负压值为不低于-0.6Mpa。
本发明的有益效果是:该方法具有施工简便、效率高、结构简单,不受海况条件干扰的特点,通过注气破土的基础下沉***,使厚壁筒型基础以经济的费用沉入到各种类型,尤其砂土质的地基土体中至预定的深度,下沉过程更加简单,安装速度大大提高,很大程度上能避免环境条件的干扰,可实现下沉过程的全自动监控作业、保证下沉的施工质量和安全。
附图说明
图1是应用本方法的基础注气破土***结构示意图。
图2是应用本方法的基础筒壁局部结构示意图。
图3是应用本方法的基础结构俯视示意图。
图4是应用本方法的基础结构仰视示意图。
图5是应用本方法的壁筒型基础下沉状态示意图。
图中:1.基础筒壁 2.基础密封顶盖 3.预留注气管 4.预留抽负压孔
具体实施方式
实施例:
一种厚壁筒型基础注气破土下沉方法,如图1所示,由基础筒壁1的注气破土***和基础密封顶盖2的抽负压***组成,基础筒壁1的注气破土***包括沿筒壁周长等间距设置且贯穿基础筒壁的竖向预留注气管3,预留注气管3均从基础密封顶盖2穿出;基础密封顶盖2的负压***为在基础密封顶盖2上的预留抽负压孔4;实施步骤如下:1)将筒型基础靠自重下沉就位后,通过预留注气管3向基础筒壁下端通入高压气体,高压气体将基础筒壁2底部土体吹散,使基础继续下沉;2)当基础下沉阻力超过注气破土***提供的下沉力时,启用负压设备通过基础密封顶盖2上的预留抽负压孔4向基础内抽真空,使其继续下沉,直至下沉到设定的深度。
该实施例中:基础是一个直径35m、高15m的混凝土筒型基础,基础的筒壁厚度为0.5m,在基础筒壁上沿周长等间隔设置12个直径为0.06m的竖向预留注气管;通入高压气体的压力为不大于10个大气压;基础内抽真空的负压值为不低于-0.6Mpa。
该实施例实践结果表明:该方法具有结构简单、施工简便、效率高、不受海况条件干扰的特点,同时安装速度快、成本低、安全性强,并可实现下沉过程的全自动监控作业。

Claims (3)

1.一种厚壁筒型基础注气破土下沉方法,其特征在于:由基础筒壁的注气破土***和基础密封顶盖的抽负压***组成,基础筒壁的注气破土***包括沿筒壁周长等间距设置且贯穿基础筒壁的竖向预留注气管,预留注气管均从基础密封顶盖穿出;基础密封顶盖的负压***为在基础密封顶盖上的预留抽负压孔;实施步骤如下:1)将筒型基础靠自重下沉就位后,通过预留注气管向基础筒壁下端通入高压气体,高压气体将基础筒壁底部土体吹散,使基础继续下沉;2)当基础下沉阻力超过注气破土***提供的下沉力时,启用负压设备通过基础密封顶盖上的预留抽负压孔向基础内抽真空,使其继续下沉,直至下沉到设定的深度。
2.根据权利要求1所述厚壁筒型基础注气破土下沉方法,其特征在于:所述通入高压气体的压力不大于10个大气压。
3.根据权利要求1所述厚壁筒型基础注气破土下沉方法,其特征在于:所述基础内抽真空的负压值为不低于-0.6Mpa。
CN200910244841A 2009-12-17 2009-12-17 一种厚壁筒型基础注气破土下沉方法 Pending CN101748731A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910244841A CN101748731A (zh) 2009-12-17 2009-12-17 一种厚壁筒型基础注气破土下沉方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910244841A CN101748731A (zh) 2009-12-17 2009-12-17 一种厚壁筒型基础注气破土下沉方法

Publications (1)

Publication Number Publication Date
CN101748731A true CN101748731A (zh) 2010-06-23

Family

ID=42476308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910244841A Pending CN101748731A (zh) 2009-12-17 2009-12-17 一种厚壁筒型基础注气破土下沉方法

Country Status (1)

Country Link
CN (1) CN101748731A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9004819B2 (en) 2010-07-12 2015-04-14 Daoda (Shanghai) Wind Power Investment Co., Ltd. Installation method and recovery method for offshore wind turbine
CN104975612A (zh) * 2015-06-23 2015-10-14 连卫东 水上沉井施工新工艺
CN106948355A (zh) * 2017-03-20 2017-07-14 天津大学 一种分舱式沉箱基础下沉姿态馈控***
CN106988335A (zh) * 2017-03-20 2017-07-28 天津大学 一种复合筒型基础下沉姿态馈控***
CN109881663A (zh) * 2019-04-09 2019-06-14 中交一航局第二工程有限公司 混凝土管桩及其沉桩***和海域沉桩施工方法
CN117569742A (zh) * 2024-01-16 2024-02-20 浙江省第一水电建设集团股份有限公司 一种预冲孔气刀装置及钢管桩打设方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9004819B2 (en) 2010-07-12 2015-04-14 Daoda (Shanghai) Wind Power Investment Co., Ltd. Installation method and recovery method for offshore wind turbine
CN104975612A (zh) * 2015-06-23 2015-10-14 连卫东 水上沉井施工新工艺
CN104975612B (zh) * 2015-06-23 2017-06-27 连卫东 水上沉井施工新工艺
CN106948355A (zh) * 2017-03-20 2017-07-14 天津大学 一种分舱式沉箱基础下沉姿态馈控***
CN106988335A (zh) * 2017-03-20 2017-07-28 天津大学 一种复合筒型基础下沉姿态馈控***
CN106988335B (zh) * 2017-03-20 2019-10-29 天津大学 一种复合筒型基础下沉姿态馈控***
CN106948355B (zh) * 2017-03-20 2019-10-29 天津大学 一种分舱式沉箱基础下沉姿态馈控***
CN109881663A (zh) * 2019-04-09 2019-06-14 中交一航局第二工程有限公司 混凝土管桩及其沉桩***和海域沉桩施工方法
CN117569742A (zh) * 2024-01-16 2024-02-20 浙江省第一水电建设集团股份有限公司 一种预冲孔气刀装置及钢管桩打设方法

Similar Documents

Publication Publication Date Title
CN101718096B (zh) 一种导流和负压技术相结合的大壁厚基础下沉方法
CN101748731A (zh) 一种厚壁筒型基础注气破土下沉方法
CN109208589B (zh) 一种植入型大直径嵌岩单桩灌浆***及施工方法
CN202039341U (zh) 用于盾构隧道水下进洞工艺中洞门圈的土体加固装置
CN103233693B (zh) 钻孔桩桩基二次清孔装置及清孔方法
CN105178289A (zh) 建筑基坑内预制降水管桩及其使用方法
CN101748732B (zh) 一种带承力环结构筒型基础的下沉方法
CN102322074B (zh) 一种导管架基础结构及施工方法
CN103669330A (zh) 超声波真空预压法
CN203296047U (zh) 水下锚桩打入扶正器
CN103352472A (zh) 一种无钢护筒的深水桩基施工方法
CN110593296A (zh) 一种内压载筒型基础结构
CN102286986B (zh) 一种五脚架基础结构及施工方法
CN205012325U (zh) 建筑基坑内预制降水管桩
CN211547793U (zh) 一种适用于深远海桩基导管架基础桩内壁清淤及密封装置
CN204703180U (zh) 一种基坑降水封井装置
CN101748743B (zh) 一种气置换水的筒型基础地基加固方法
CN206220114U (zh) 一种八桩高桩承台基础
CN101736748A (zh) 一种气置换水的筒型基础下沉方法
CN200988964Y (zh) 钻孔桩钢护筒
CN204225780U (zh) 隔水管、海上钻井***
CN103195065B (zh) 即旋即用一次性水下混凝土导管头
CN210621738U (zh) 一种适用于软弱深厚沉积层的海上风电单桩基础
CN204300687U (zh) 一种用于海上lng接收终端的抗冰冰锥结构
CN102758434A (zh) 中掘预应力离心管桩(方桩)沉桩装置及其新型沉桩法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd.

Assignor: Daoda (Shanghai) Wind Power Investment Co., Ltd.

Contract record no.: 2011320000097

Denomination of invention: Method of breaking ground and sinking thick-walled cylinder type foundation through gas injection

License type: Exclusive License

Open date: 20100623

Record date: 20110225

ASS Succession or assignment of patent right

Owner name: JIANGSU DAODA OFFSHORE WIND POWER ENGINEERING TECH

Free format text: FORMER OWNER: DAODA (SHANGHAI) WIND POWER INVESTMENT CO., LTD.

Effective date: 20110412

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 201206 ROOM 210, NO. 212, LINGHE ROAD, PUDONG NEW DISTRICT, SHANGHAI TO: 226259 KAIXUAN ROAD, ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE, QIDONG CITY, JIANGSU PROVINCE, CHINA

TA01 Transfer of patent application right

Effective date of registration: 20110412

Address after: 226259 triumph Road, Qidong economic and Technological Development Zone, Jiangsu, China

Applicant after: Jiangsu Daoda Offshore Wind Power Engineering Technology Co., Ltd.

Address before: 201206 Shanghai city Pudong New Area Linghe Road No. 212 room 210

Applicant before: Daoda (Shanghai) Wind Power Investment Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100623