CN101737068A - 再造矸石承载体替代护巷煤柱的方法 - Google Patents

再造矸石承载体替代护巷煤柱的方法 Download PDF

Info

Publication number
CN101737068A
CN101737068A CN200910229903A CN200910229903A CN101737068A CN 101737068 A CN101737068 A CN 101737068A CN 200910229903 A CN200910229903 A CN 200910229903A CN 200910229903 A CN200910229903 A CN 200910229903A CN 101737068 A CN101737068 A CN 101737068A
Authority
CN
China
Prior art keywords
gangue
coal
roadway
driving
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910229903A
Other languages
English (en)
Inventor
刘立民
刘金辉
秦忠诚
曹君陟
高有存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN200910229903A priority Critical patent/CN101737068A/zh
Publication of CN101737068A publication Critical patent/CN101737068A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

本发明公开了一种再造矸石承载体替代护巷煤柱的方法,它主要是煤矿井下矸石直接在井下粉碎成5cm以下的颗粒状,加入普通硅酸盐水泥按比例混合,制成空心预制块,运至掘进施工现场;在掘进沿空留巷或沿空掘巷掘进时,将原设计预留的煤柱一块采出,边采出边在原设计预留煤柱的顶板上打锚杆进行顶板支护,然后垒砌预制块,将采出煤柱部分用空心预制块砌实,形成承载砌体,并将砌体墙面涂抹一层水泥浆形成巷道一侧的墙体,直至将掘进工作完成。本发明一方面取消了护巷煤柱,将煤炭资源充分回收,另一方面解决了矸石的再利用问题,为井下矸石利用开辟了一条新途径。

Description

再造矸石承载体替代护巷煤柱的方法
技术领域
本发明涉及地下煤矿的开采方法。
背景技术
目前,煤矿地下开采中,开拓沿空留巷及开拓沿空掘巷时,都要预留一定宽度的煤柱对巷道进行保护,同时还需要对预留煤柱两帮进行高强度支护。在当前资源紧缺的情况下,预留煤柱造成了煤炭资源的损失。
另外,在煤矿地下开采过程中,会产生大量的矸石,为了处理这些矸石,采取的措施是一般将矸石运到地面堆积,或者在井下另设置矸石粉碎充填***,将矸石破碎回填采空区。浪费大量的人力物力和财力。
发明内容
本发明的目的是为解决预留煤柱浪费资源的问题和井下矸石的利用问题,提供一种利用矸石替代护巷煤柱护巷的方法,该发明不但能够取消护巷煤柱,而且能够节省护巷煤柱两帮的支护费用,降低开采成本。
为解决上述问题,本发明采取的技术方案是:
1.将煤矿井下矸石直接在井下粉碎成5cm以下的颗粒状,加入普通硅酸盐水泥按比例混合,制成空心预制块,运至掘进施工现场;矸石与水泥的混合比例应保证制成的空心预制块的强度大于煤柱强度的20%以上,重量大小以施工人员搬动为宜。
2.在掘进沿空留巷或沿空掘巷掘进时,将原设计预留的煤柱一块采出,边采出边在原设计预留煤柱的顶板上打锚杆进行顶板支护,然后垒砌预制块,将采出煤柱部分用空心预制块砌实,形成承载砌体,并将砌体墙面涂抹一层水泥浆形成巷道一侧的墙体,直至将掘进工作完成。
本发明的有益效果是:
1、取消了护巷煤柱,将煤炭资源充分回收;减少原设计巷道的高强度支护,节省支护费用。同时该承载体的力学强度也远大于护巷煤柱的力学强度,稳定性好,延长矿井服务年限。
2、就地解决了矸石的再利用问题,为井下矸石利用开辟了一条新途径。
3、这种方法施工工艺简单,不需要投入复杂设备,应用前景广阔。
总之,本发明运用井下废矸石代替预留煤柱,不但使煤资源得到充分利用,而且节省了处理废矸石的费用,经济效益显著。
具体实施方式
1.将煤矿井下矸石直接在井下粉碎成5cm以下的颗粒状,加入水泥,按矸石与425#普通硅酸盐水泥(6-7)∶(1.5-2.0)比例混合,用压块机制成长×宽×高=40×30×30cm的空心预制块,
2.在掘进沿空留巷或沿空掘巷掘进时,一起将原设计预留的煤柱一起采出,边采出边在原预留煤柱的顶板打锚杆进行顶板支护,锚杆采用普通金属锚杆,锚杆长度应大于伪顶的厚度,按80×100cm的间距布置。然后垒砌预制块,将采出煤柱的空间用预制块砌实,形成承载砌体,并将砌体墙面涂抹一层水泥浆形成巷道一侧的墙体,直至将掘进工作完成。

Claims (1)

1.一种再造矸石承载体替代护巷煤柱的方法,其特征在于,它包括以下步骤:
第一步:将煤矿井下矸石直接在井下粉碎成5cm以下的颗粒状,加入普通硅酸盐水泥按比例混合,制成空心预制块,运至掘进施工现场;矸石与水泥的混合比例应保证制成的空心预制块的强度大于煤柱强度的20%以上;
第二步:在掘进沿空留巷或沿空掘巷掘进时,将原设计预留的煤柱一块采出,边采出边在原设计预留煤柱的顶板上打锚杆进行顶板支护,然后垒砌预制块,将采出煤柱部分用空心预制块砌实,形成承载砌体,并将砌体墙面涂抹一层水泥浆形成巷道一侧的墙体,直至将掘进工作完成。
CN200910229903A 2009-10-30 2009-10-30 再造矸石承载体替代护巷煤柱的方法 Pending CN101737068A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910229903A CN101737068A (zh) 2009-10-30 2009-10-30 再造矸石承载体替代护巷煤柱的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910229903A CN101737068A (zh) 2009-10-30 2009-10-30 再造矸石承载体替代护巷煤柱的方法

Publications (1)

Publication Number Publication Date
CN101737068A true CN101737068A (zh) 2010-06-16

Family

ID=42461035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910229903A Pending CN101737068A (zh) 2009-10-30 2009-10-30 再造矸石承载体替代护巷煤柱的方法

Country Status (1)

Country Link
CN (1) CN101737068A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337925A (zh) * 2011-08-31 2012-02-01 山东科技大学 一种用于综采放顶煤无煤柱开采巷道扩帮充填支护方法
CN102425454A (zh) * 2011-09-22 2012-04-25 中国矿业大学 一种砌筑填充组合式沿空留巷墙体的构筑方法
CN102748028A (zh) * 2012-07-18 2012-10-24 中南大学 地下采矿底部结构标准化预制模块积木式构筑方法
CN102900449A (zh) * 2012-10-11 2013-01-30 北京圆之翰煤炭工程设计有限公司 一种煤矿井下采空区顶板的支护方法
WO2020048094A1 (zh) * 2018-09-04 2020-03-12 中国矿业大学 一种外部支护替代式房式煤柱回收方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337925A (zh) * 2011-08-31 2012-02-01 山东科技大学 一种用于综采放顶煤无煤柱开采巷道扩帮充填支护方法
CN102337925B (zh) * 2011-08-31 2013-12-25 山东科技大学 一种用于综采放顶煤无煤柱开采巷道扩帮充填支护方法
CN102425454A (zh) * 2011-09-22 2012-04-25 中国矿业大学 一种砌筑填充组合式沿空留巷墙体的构筑方法
CN102748028A (zh) * 2012-07-18 2012-10-24 中南大学 地下采矿底部结构标准化预制模块积木式构筑方法
CN102900449A (zh) * 2012-10-11 2013-01-30 北京圆之翰煤炭工程设计有限公司 一种煤矿井下采空区顶板的支护方法
CN102900449B (zh) * 2012-10-11 2014-07-23 北京圆之翰煤炭工程设计有限公司 一种煤矿井下采空区顶板的支护方法
WO2020048094A1 (zh) * 2018-09-04 2020-03-12 中国矿业大学 一种外部支护替代式房式煤柱回收方法
US11021954B2 (en) 2018-09-04 2021-06-01 China University Of Mining And Technology Method of recovering room-and-pillar coal pillar by using external replacement supports

Similar Documents

Publication Publication Date Title
CN112360462B (zh) 短壁综采矸石充填注浆的开采工艺
CN102071941B (zh) 一种基于综采沿空留巷的砼块错缝纵码成墙方法
CN102155226B (zh) 中厚及以上煤层的巷道式充填开采方法
CN101852083B (zh) 大变形易冒落破碎松散巷道的快速支护方法及装置
CN103590831B (zh) 一种缓倾斜薄-中厚矿体的新型采矿方法
CN101949301B (zh) 煤矿井下沿空留巷不等强承载巷旁充填体
CN106894817B (zh) 一种机械化上向分层楔合混合充填采矿法
CN102705002A (zh) 沿空留巷巷旁适量让压不等强组合充填结构及施工方法
CN104763434B (zh) 一种无煤柱双巷掘进方法
CN104632220B (zh) 缓倾斜中厚矿体条柱再造采场结构尺寸可调可控采矿方法
CN103195443B (zh) 深部开采优化支护参数预防巷道滞后突水的方法
CN109184694A (zh) 一种上盘预锚分段凿岩阶段空场嗣后充填采矿法
CN103615285A (zh) 一种利于充填接顶的采场进路布置方式及方法
CN107829742A (zh) 一种崩落‑充填‑空场‑崩落采矿方法
CN110118089B (zh) 一种矿用frp格栅-煤矸石-自密实混凝土再生顶板及其施工方法
CN101737068A (zh) 再造矸石承载体替代护巷煤柱的方法
CN109209490A (zh) 一种矸石充填辅助末采阶段工作面回撤方法
CN104989408A (zh) 一种用于山区金属矿山安全高效的采矿方法
CN103061767B (zh) 下向水平分层干式充填采矿法
CN202360116U (zh) 一种u型棚巷道交叉点支护装置
CN104863613A (zh) 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法
CN109681212B (zh) 小断面黄土隧道的开挖施工方法
CN111594168A (zh) 一种岩矸配合成形的伪采空层支护限沉回采方法
CN100552185C (zh) 砼柱护顶采矿法
CN105909290B (zh) 一种柱式部分充填开采中控制顶板下沉的装置与方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100616