CN101736760A - 一种预应力抗浮锚杆及其施工方法 - Google Patents

一种预应力抗浮锚杆及其施工方法 Download PDF

Info

Publication number
CN101736760A
CN101736760A CN200910200950A CN200910200950A CN101736760A CN 101736760 A CN101736760 A CN 101736760A CN 200910200950 A CN200910200950 A CN 200910200950A CN 200910200950 A CN200910200950 A CN 200910200950A CN 101736760 A CN101736760 A CN 101736760A
Authority
CN
China
Prior art keywords
anchor
anchor pole
anchor rod
grouting
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910200950A
Other languages
English (en)
Other versions
CN101736760B (zh
Inventor
陈富海
凌振健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhiping Foundation Engineering Co Ltd
Original Assignee
Shanghai Zhiping Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhiping Foundation Engineering Co Ltd filed Critical Shanghai Zhiping Foundation Engineering Co Ltd
Priority to CN2009102009508A priority Critical patent/CN101736760B/zh
Publication of CN101736760A publication Critical patent/CN101736760A/zh
Application granted granted Critical
Publication of CN101736760B publication Critical patent/CN101736760B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种预应力抗浮锚杆及其施工方法,其特点是由数根钢筋沿圆周均布构成的锚杆体内设有对中钢管,钢筋上设有数个倒刺,对中钢管为数个沿锚杆体的轴线间隔设置并与钢筋固接,倒刺与钢筋焊接。施工方法包括:注浆成桩;放置锚杆;锚杆锁定和封锚。本发明与现有技术相比具有结构简单,施工方便,抗浮效果好,造价低,尤其适合已建地下构筑物并存在承压水的旧建筑改造中使用。

Description

一种预应力抗浮锚杆及其施工方法
技术领域
本发明涉及地下构筑物结构的抗浮技术领域,尤其是一种预应力抗浮锚杆及其施工方法。
背景技术
锚杆以其用料省、工效快、施工方便,在国内外被广泛应用于边坡稳定工程、桥梁工程、深基坑工程、隧道与地下工程,同时也被应用于加固、抢修出现病害的构、建筑物等,但锚杆在地下构筑物抗浮上的应用却很少。随着深基础工程的不断增多,特别是对于深大地下室的抗浮要求,抗拔锚杆的应用给施工带来极大的方便。我国抗拔锚杆在岩土锚固工程中的应用还处在初级阶段,其相应的设计与施工规范及验收标准尚未完善。但随着沿海地区高层建筑的蓬勃发展,抗拔锚杆对于一大批软土深基坑工程却有着广阔的发展前景。
由于,目前广范应用的抗浮锚杆存在以下两个问题:①锚杆结构采用一根或多根钢筋绑焊,无倒刺,不能完全充分利用杆体与浆体的摩阻力;②成孔常采用钻机成孔、泥浆护壁的施工工艺,针对卵砾、淤泥质等易坍塌土层不易成孔,无法达到设计要求;并在旧建筑改造并存在承压水的已有地下室不宜使用。
发明内容
本发明的目的是针对现有技术的不足而提供的一种预应力抗浮锚杆及其施工方法,锚杆体与浆体的摩阻力大,解决了软土地层包括卵砾、淤泥质等易坍塌土层的地下室抗浮,尤其适合已建地下构筑物并存在承压水的旧建筑改造中使用,锚杆结构简单,造价低,施工方便,实为一种资源节约、环境友好型的施工方法。
本发明的目的是这样实现的:一种预应力抗浮锚杆,其特点是由数根钢筋沿圆周均布构成的锚杆体内设有对中钢管,钢筋上设有数个倒刺,对中钢管为数个沿锚杆体的轴线间隔设置并与钢筋固接,倒刺与钢筋焊接。
所述倒刺为杆状以20~40°夹角与钢筋固接,并以1~2米的间隔设置。
所述对中钢管为2~3米的间隔设置。
一种预应力抗浮锚杆的施工方法,其特点是该方法包括:注浆成桩、放置锚杆、锚杆锁定和防渗封锚,具体施工按下述步骤进行:
a、注浆成桩
采用高压喷射注浆成桩,桩径为φ500~φ800mm,钻杆垂直成孔,角度偏差<1°,成孔深度大于锚杆的设计长度0.5m,喷射注浆压力>25MPa,注浆流量>30L/min,钻孔提升速度<20cm/min;
b、放置锚杆
在注浆成桩孔内放置锚杆于桩底,清理桩头并在锚杆体端头安放锚桩头装置;
c、锚杆的锁定和封锚
待大底板浇筑完成且砼达到80%强度后,对锚杆体的钢筋进行张拉,先以0.1~0.2Nt(轴向拉力设计值)对锚杆预张拉1~2次,使锚杆体完全平直后,以1.05~1.10Nt(轴向拉力设计值)对锚杆进行张拉10~15min,然后卸荷至锁定荷载设计值进行锁定,锁定后桩头充填聚胺脂发泡剂进行防渗处理,浇筑C35微膨胀混凝土进行封锚。
本发明与现有技术相比具有结构简单,施工方便且灵活、工程进度快,工作效率高,造价低的优点,而且锚杆体与浆体的摩阻力大,抗浮效果好,尤其适合已建地下构筑物并存在承压水的旧建筑改造中使用。
附图说明
附图1为本发明结构示意图
附图2为附图1左视图
附图3为本发明实施例图
具体实施方式
参阅附图1~附图2,本发明由数根钢筋2沿圆周均布构成的锚杆体1内设有对中钢管3,钢筋2上设有数个倒刺4,对中钢管3为数个沿锚杆体1的轴线以2~3米的间隔设置,并与钢筋2固接;倒刺4为杆状以1~2米的间隔设置在钢筋2上,并以20~40°夹角与钢筋2固接。
下面以海南天邑国际大厦附楼抗拔锚杆工程为例,对本发明做进一步的阐述:
实施例1
海南天邑国际大厦附楼的原车库地下室结构为三层,根据车库需要改造成五层砼结构梁板,需拆除原地下车库边墙内的墙、柱、梁、板及南面边墙砼结构。紧邻原车库南侧新建长68(L)×30(B)×13(H)米的砼结构六层地下车库(基础底板约1m厚,边墙厚约0.5m),新增地下室抗浮采用高压喷射注浆法预应力抗拔锚杆,本工程抗拔锚杆抗拔力设计值为398KN。
参阅附图3,本发明按下述步骤进行:
(i)、首先施工围护桩并降地下水水位至基坑底0.5米左右。
(ii)、挖土至大底板6垫层底。
(iii)、按施工平面布置图放线定桩位,做好标记和预检,桩位误差控制在规范要求之内。
(iv)、喷射注浆前以钻机成孔,钻孔直径117mm,各桩成孔深度大于设计深度0.2m。成孔时钻机机架垫平,钻具垂直地面,成孔垂直度≤1%。
(v)喷射作业
旋喷机架就位,喷管下至超设计深度10cm时,开始拌送水泥浆,然后开启高压风及高压泥浆,待达到设计参数,孔口冒浆正常后,再开始旋喷提升,完成桩体9。
喷注中若遇故障等特殊情况时,喷管须下降10cm才能开始继续喷注,以保证旋喷加固体的垂向连续性。
压力控制:当注浆管置入钻孔,喷嘴达到设计标高即可喷射注浆。喷射注浆参数达到规定值后,按旋喷注浆的工艺要求,提升注浆管,由下而上喷射注浆。水射流的压力大于25MPa,流量大于30L/min。钻孔提升速度不大于20cm/min。
(vi)放置锚杆体
在桩体9内放置锚杆体1于桩底,沿钢筋2全长每间隔1米设置倒刺4,倒刺4与钢筋2以40°夹角呈喇叭状张开。
(vii)锚杆体张拉、锁定
首先清理桩头并安放套管5,套管5固定设置在锚杆体1的端头,待大底板6浇筑完成且砼达到80%强度后,对锚杆体1的钢筋2进行张拉,正式张拉前,取60KN拉力对锚杆体1预张拉1~2次,使锚杆体1完全平直,锚杆体1的各部位与注浆接触紧密,锚杆体1张拉至417.9KN时,对岩层、砂性土层保持10min,然后卸荷至锁定荷载398KN进行锁定。
(viii)浇筑C35微膨胀混凝土封锚
待锚杆体1张拉、锁定后,在套管5内充填聚胺脂发泡剂8对桩头进行防渗处理,然后浇筑C35微膨胀混凝土7进行封锚。

Claims (4)

1.一种预应力抗浮锚杆,其特征在于由数根钢筋沿圆周均布构成的锚杆体内设有对中钢管,钢筋上设有数个倒刺,对中钢管为数个沿锚杆体的轴线间隔设置并与钢筋固接,倒刺与钢筋焊接。
2.根据权利要求1所述预应力抗浮锚杆,其特征在于所述倒刺为杆状以20~40°夹角与钢筋固接,并以1~2米的间隔设置。
3.根据权利要求1所述预应力抗浮锚杆,其特征在于所述对中钢管为2~3米的间隔设置。
4.一种权利要求1所述预应力抗浮锚杆的施工方法,其特征在于该方法包括:注浆成桩、放置锚杆、锚杆锁定和防渗封锚,具体施工按下述步骤进行:
a、注浆成桩
采用高压喷射注浆成桩,桩径为φ500~φ800mm,钻杆垂直成孔,角度偏差<1°,成孔深度大于锚杆的设计长度0.5m,喷射注浆压力>25MPa,注浆流量>30L/min,钻孔提升速度<20cm/min;
b、放置锚杆
在注浆成桩孔内放置锚杆于桩底,清理桩头并在锚杆体端头安放锚桩头装置;
c、锚杆的锁定和封锚
待地下室大底板浇筑完成且砼达到80%强度后,对锚杆体的钢筋进行张拉,先以0.1~0.2Nt(轴向拉力设计值)对锚杆预张拉1~2次,使锚杆体完全平直后,以1.05~1.10Nt(轴向拉力设计值)对锚杆进行张拉10~15min,然后卸荷至锁定荷载设计值进行锁定,锁定后对桩头充填聚胺脂发泡剂进行防渗处理,然后浇筑C35微膨胀混凝土进行封锚。
CN2009102009508A 2009-12-25 2009-12-25 一种预应力抗浮锚杆施工方法 Active CN101736760B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102009508A CN101736760B (zh) 2009-12-25 2009-12-25 一种预应力抗浮锚杆施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102009508A CN101736760B (zh) 2009-12-25 2009-12-25 一种预应力抗浮锚杆施工方法

Publications (2)

Publication Number Publication Date
CN101736760A true CN101736760A (zh) 2010-06-16
CN101736760B CN101736760B (zh) 2012-06-06

Family

ID=42460746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102009508A Active CN101736760B (zh) 2009-12-25 2009-12-25 一种预应力抗浮锚杆施工方法

Country Status (1)

Country Link
CN (1) CN101736760B (zh)

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892666A (zh) * 2010-07-13 2010-11-24 张家港固耐特围栏***有限公司 立柱安装地桩
CN101914915A (zh) * 2010-07-24 2010-12-15 烟台市工程勘察有限公司 一种抗浮锚杆的施工方法及专用长螺旋钻机
CN102182196A (zh) * 2011-03-28 2011-09-14 北京鑫实路桥建设有限公司 公路岩石边坡的反循环式注浆锚杆加固法
CN102251660A (zh) * 2011-04-27 2011-11-23 湖南科技大学 一种现浇混凝土内模固定用自卡式锚固件及施工工艺
CN103205967A (zh) * 2013-03-14 2013-07-17 张强 筏板抗浮锚杆结构
CN103603379A (zh) * 2013-12-03 2014-02-26 葛建 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN103774663A (zh) * 2014-02-19 2014-05-07 深圳大学建筑设计研究院 地下室抗浮锚筋的防水构造及施工方法
CN103774664A (zh) * 2014-02-19 2014-05-07 深圳大学建筑设计研究院 地下室抗浮钢锚索的防水构造及施工方法
CN103924589A (zh) * 2014-03-14 2014-07-16 苏州市能工基础工程有限责任公司 预应力抗浮锚杆及其施工方法
CN104131560A (zh) * 2013-10-21 2014-11-05 中国建筑第四工程局有限公司 一种抗浮锚杆及其施工方法
CN104372793A (zh) * 2014-11-07 2015-02-25 岩土科技股份有限公司 采用旋喷桩法预应力锚索用于既有地下室抗浮的方法
CN105178328A (zh) * 2015-07-30 2015-12-23 葛加君 高压喷射扩张热熔锚杆基坑支护方法
CN105292828A (zh) * 2015-10-21 2016-02-03 中国石油化工股份有限公司 大型储罐的罐底板结构
CN105756059A (zh) * 2016-04-29 2016-07-13 武汉建工集团股份有限公司 一种后锚式抗浮锚杆及施工方法
CN105951823A (zh) * 2016-03-29 2016-09-21 中铁时代建筑设计院有限公司 一种搅拌桩抗浮锚杆对软土地基处理及施工方法
CN106661854A (zh) * 2015-05-26 2017-05-10 上江洲正直 锚桩及其设置方法
CN107012865A (zh) * 2017-03-31 2017-08-04 中国二十冶集团有限公司 锚杆防塌孔的施工方法
CN108370770A (zh) * 2017-11-22 2018-08-07 石城县松湖养殖专业合作社 一种杨梅种植大棚
CN110219300A (zh) * 2019-05-27 2019-09-10 北京建材地质工程有限公司 部分粘结预应力抗拔锚杆的施工工艺
CN111042843A (zh) * 2019-12-16 2020-04-21 中铁十四局集团大盾构工程有限公司 一种暗挖隧道预锚定方法
CN111608211A (zh) * 2020-06-11 2020-09-01 湖北鄂东桩基工程有限公司 锚杆及其安装方法
CN111975981A (zh) * 2020-07-28 2020-11-24 南京钜力智能制造技术研究院有限公司 一种预制构件、预制构件的端部张拉装置及张拉方法
CN114411820A (zh) * 2021-12-31 2022-04-29 中铁二十五局集团第二工程有限公司 一种岩溶微发育地区缓凝结预应力抗浮锚杆施工方法

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101892666A (zh) * 2010-07-13 2010-11-24 张家港固耐特围栏***有限公司 立柱安装地桩
CN101914915A (zh) * 2010-07-24 2010-12-15 烟台市工程勘察有限公司 一种抗浮锚杆的施工方法及专用长螺旋钻机
CN102182196A (zh) * 2011-03-28 2011-09-14 北京鑫实路桥建设有限公司 公路岩石边坡的反循环式注浆锚杆加固法
CN102251660A (zh) * 2011-04-27 2011-11-23 湖南科技大学 一种现浇混凝土内模固定用自卡式锚固件及施工工艺
CN102251660B (zh) * 2011-04-27 2012-12-12 湖南科技大学 一种现浇混凝土内模固定用自卡式锚固件及施工工艺
CN103205967A (zh) * 2013-03-14 2013-07-17 张强 筏板抗浮锚杆结构
CN103205967B (zh) * 2013-03-14 2015-02-25 中国建筑第八工程局有限公司 筏板抗浮锚杆结构
CN104131560A (zh) * 2013-10-21 2014-11-05 中国建筑第四工程局有限公司 一种抗浮锚杆及其施工方法
CN103603379A (zh) * 2013-12-03 2014-02-26 葛建 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺
CN103774664A (zh) * 2014-02-19 2014-05-07 深圳大学建筑设计研究院 地下室抗浮钢锚索的防水构造及施工方法
CN103774664B (zh) * 2014-02-19 2015-10-07 深圳大学建筑设计研究院 地下室抗浮钢锚索的防水构造及施工方法
CN103774663A (zh) * 2014-02-19 2014-05-07 深圳大学建筑设计研究院 地下室抗浮锚筋的防水构造及施工方法
CN103924589A (zh) * 2014-03-14 2014-07-16 苏州市能工基础工程有限责任公司 预应力抗浮锚杆及其施工方法
CN103924589B (zh) * 2014-03-14 2015-10-28 苏州市能工基础工程有限责任公司 预应力抗浮锚杆及其施工方法
CN104372793A (zh) * 2014-11-07 2015-02-25 岩土科技股份有限公司 采用旋喷桩法预应力锚索用于既有地下室抗浮的方法
CN106661854A (zh) * 2015-05-26 2017-05-10 上江洲正直 锚桩及其设置方法
CN106661854B (zh) * 2015-05-26 2019-05-31 上江洲正直 锚桩及其设置方法
CN105178328A (zh) * 2015-07-30 2015-12-23 葛加君 高压喷射扩张热熔锚杆基坑支护方法
CN105292828A (zh) * 2015-10-21 2016-02-03 中国石油化工股份有限公司 大型储罐的罐底板结构
CN105951823A (zh) * 2016-03-29 2016-09-21 中铁时代建筑设计院有限公司 一种搅拌桩抗浮锚杆对软土地基处理及施工方法
CN105756059B (zh) * 2016-04-29 2017-11-03 武汉建工集团股份有限公司 一种后锚式抗浮锚杆及施工方法
CN105756059A (zh) * 2016-04-29 2016-07-13 武汉建工集团股份有限公司 一种后锚式抗浮锚杆及施工方法
CN107012865A (zh) * 2017-03-31 2017-08-04 中国二十冶集团有限公司 锚杆防塌孔的施工方法
CN108370770A (zh) * 2017-11-22 2018-08-07 石城县松湖养殖专业合作社 一种杨梅种植大棚
CN108370770B (zh) * 2017-11-22 2020-07-31 石城县松湖养殖专业合作社 一种杨梅种植大棚
CN110219300B (zh) * 2019-05-27 2021-07-02 北京建材地质工程有限公司 部分粘结预应力抗拔锚杆的施工工艺
CN110219300A (zh) * 2019-05-27 2019-09-10 北京建材地质工程有限公司 部分粘结预应力抗拔锚杆的施工工艺
CN111042843A (zh) * 2019-12-16 2020-04-21 中铁十四局集团大盾构工程有限公司 一种暗挖隧道预锚定方法
CN111608211B (zh) * 2020-06-11 2021-07-02 湖北鄂东桩基工程有限公司 锚杆及其安装方法
CN111608211A (zh) * 2020-06-11 2020-09-01 湖北鄂东桩基工程有限公司 锚杆及其安装方法
CN111975981A (zh) * 2020-07-28 2020-11-24 南京钜力智能制造技术研究院有限公司 一种预制构件、预制构件的端部张拉装置及张拉方法
CN114411820A (zh) * 2021-12-31 2022-04-29 中铁二十五局集团第二工程有限公司 一种岩溶微发育地区缓凝结预应力抗浮锚杆施工方法

Also Published As

Publication number Publication date
CN101736760B (zh) 2012-06-06

Similar Documents

Publication Publication Date Title
CN101736760B (zh) 一种预应力抗浮锚杆施工方法
CN102518135B (zh) 水平旋喷土锚和灌注桩复合基坑支护施工工法
CN105155550B (zh) 联合支护开挖大厚度强风化砂岩层深基坑的施工方法
CN106193032B (zh) 一种抗浮锚杆施工方法
JP6279945B2 (ja) 土構造物ののり面表層すべり対策工法
CN108412519A (zh) 高原地区软岩轻微大变形单线隧道支护装置及施工方法
CN106498950A (zh) 锚头置于桩身的深基坑桩锚支护体系及其实施方法
CN105442605B (zh) 拔出phc桩再利用于深基坑支护施工方法
CN111997624A (zh) 一种浅埋大断面暗挖矩形隧道施工方法
CN103114595A (zh) 支护桩预留核心土双支墩斜内撑基坑支护方法及装置
CN106065628B (zh) 基于永临结合理念的大直径自来水管安全防护施工方法
CN101250878A (zh) 一种用无嵌固端桩锚结合锚板墙的深基坑支护方法
CN111852515A (zh) 一种隧道地层预加固综合注浆方法
CN110616740A (zh) 一种地铁矿山法建成区间扩建成渡线段的结构及其施工方法
CN102235007B (zh) 上钉下桩组合的深基支护方法
CN206408630U (zh) 锚头置于桩身的深基坑桩锚支护体系
CN108914945A (zh) 一种深基坑预应力管桩、预应力锚索联合支护施工方法
CN101694098B (zh) 可回收软土支护预应力锚索及其施工方法
CN205954638U (zh) 一种深基坑侧壁的半刚性半柔性支护结构
CN113216215A (zh) 一种复杂环境下深沟槽支护逆作施工方法
CN201077988Y (zh) 暗梁柱式预应力土钉墙
CN111456021A (zh) 利用rjp桩逆做围护结构的施工方法
CN105484270A (zh) 一种毗邻深基坑高陡老旧毛石挡土墙加固保护施工方法
CN109854281A (zh) 上土下岩复合断面地层顶管施工的支护方法
CN115717397A (zh) 拉森钢板桩与预应力锚索组合支护施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant