CN101718819B - Batch automatic terminal event testing method and system thereof - Google Patents

Batch automatic terminal event testing method and system thereof Download PDF

Info

Publication number
CN101718819B
CN101718819B CN2009101100133A CN200910110013A CN101718819B CN 101718819 B CN101718819 B CN 101718819B CN 2009101100133 A CN2009101100133 A CN 2009101100133A CN 200910110013 A CN200910110013 A CN 200910110013A CN 101718819 B CN101718819 B CN 101718819B
Authority
CN
China
Prior art keywords
terminal
configuration
setting
incident
power source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009101100133A
Other languages
Chinese (zh)
Other versions
CN101718819A (en
Inventor
张军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Lian Intellectual Property Service Center
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN2009101100133A priority Critical patent/CN101718819B/en
Publication of CN101718819A publication Critical patent/CN101718819A/en
Application granted granted Critical
Publication of CN101718819B publication Critical patent/CN101718819B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a batch automatic terminal event testing method, comprising the following steps: A. physical arrangement is carried out to serially connect all phase currents of the terminal and a power source and connected all phase voltages and the power source in parallel; B configuration setting is carried out to the terminal and the power source, and the corresponding configuration is carried out to an analog meter; C connection establishment is carried out for connecting a working table, the terminal, the analog meter and the power source; D terminal detection is carried out to detect whether a terminal event happens or not; E a detection report is formed.

Description

Batch automatic terminal event testing method and system thereof
Technical field
The present invention relates to a kind of power domain, particularly about a kind of batch automatic terminal event testing method and system thereof.
Background technology
In electric system, can various negative control terminals, distribution transformer terminals all need ways of producing correct be examined and determine its incident before networking, and whether the incident that detection method is related to the terminal ways of producing correct, and whether the time relationship of detection is to enhancing productivity.Present most detection all is that detection method, the method for taking the handicraft workshop formula are more single; The path of detecting is not comprehensive, not only the time of cost long, and can not guarantee to detect comprehensive; Can not guarantee the stability of product; Can not detect automatically, the incident that in the process that detects, has need repeatedly change the supply voltage at terminal and the angle between electric current and the electric current and voltage, and can not detect simultaneously many station terminals simultaneously; The event detection that has need the change table relevant parameter, experimental cost is very big.
Summary of the invention
In order to overcome the deficiency of above-mentioned prior art, the present invention provides a kind of experimental cost low, and parameter is provided with simple batch automatic terminal event testing method and system thereof.
The technical solution adopted for the present invention to solve the technical problems is: a kind of batch automatic terminal event testing method is provided; It may further comprise the steps: A physics is provided with; Be used for each phase current of terminal and power source are connected in series, each phase voltage and power source are connected in parallel; B disposes setting, and to said terminal, said power source, said simulation table carries out corresponding configuration; C connects, and is used for worktable and said terminal, and simulation table and said power source connect; D detects described terminal, and whether the sense terminals incident produces; E forms examining report.
The scheme of the further technical solution problem of the present invention is: said step B specifically comprises: the power source parameter is set; Said power source parameter comprises voltage, electric current, the phase angle of said power source, the serial ports that system communicates by letter with power source, baud rate, check bit and power source mailing address; Terminal parameter is set, and said terminal parameter comprises communication serial port, baud rate, check bit and the terminal address at said terminal; The mode of connection, rated voltage, rated current, the line frequency at said terminal are set; Parameter and the path of test of the detection method of each incident are set; Simulation table parameter is set, comprises and dispose the relevant simulation table and the value of contiguous items.
The scheme of the further technical solution problem of the present invention is: among the described step C; Worktable and terminal with serial ports change that 232 lines connect, worktable and power source connect with 232 special serial ports or TCP/UDP mode, terminal and simulation table change 485 lines through 232 and connect.
The scheme of the further technical solution problem of the present invention is: batch automatic terminal event testing method according to claim 1 is characterized in that: among the described step D, detect all incidents during the event detection of said detection automatically.
The scheme of the further technical solution problem of the present invention is: among the described step D, detect each incident during the event detection of said detection separately, single-step operation detects.
The scheme of the further technical solution problem of the present invention is: said step e is that the data that produce in the above-mentioned steps are formed document, and said document is managed.
The scheme of the further technical solution problem of the present invention is: a kind of batch automatic terminal event test macro is provided; It comprises worktable; Many station terminals, and power source, each phase current of said terminal and said power source polyphone; Each phase voltage of said terminal is parallelly connected with said power source, and said worktable and said terminal and said power source change serial ports or TCP/UDP agreement through 232 and be connected and carry out information transmission.
Compared to prior art; The advantage of batch automatic terminal event testing method of the present invention is: through many station terminals are detected simultaneously; Avoided the problem that traditional workshop-based efficient that is prone to is low, stability is not high, not only be beneficial to testing, configuration parameter is convenient and quick in testing process; Simultaneously can write down the data message in the testing process again, for later data analysis provides convenience.The mode at this automatic batch detection terminal has not only improved production efficiency, has reduced cost of labor again.
Description of drawings
Fig. 1 is the schematic flow sheet of batch automatic terminal event testing method provided by the invention.
Fig. 2 is the communication connection and the wiring schematic diagram of batch automatic terminal event testing method provided by the invention.
Fig. 3 is that simulation table communication connection synoptic diagram is copied at the terminal of batch automatic terminal event testing method provided by the invention.
Embodiment
Following content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.
As shown in Figure 1, the invention provides a kind of batch automatic terminal event testing method, it comprises the steps: the setting of A physics, is used for each phase current of terminal and power source are connected in series, each phase voltage and power source are connected in parallel; B disposes setting, and to said terminal, said power source, said simulation table carries out corresponding configuration; C connects, and is used for worktable and said terminal, and simulation table and said power source connect; D detects described terminal, and whether the sense terminals incident produces; E forms examining report.
Said step B specifically comprises: the power source parameter is set, and said power source parameter comprises voltage, electric current, the phase angle of said power source, the serial ports that system communicates by letter with power source, baud rate, check bit and power source mailing address; Terminal parameter is set, and said terminal parameter comprises communication serial port, baud rate, check bit and the terminal address at said terminal; The mode of connection, rated voltage, rated current, the line frequency at said terminal are set; Parameter and the path of test of the detection method of each incident are set; Simulation table parameter is set, comprises and dispose the relevant simulation table and the value of contiguous items.
Among the described step C, worktable and terminal with serial ports change that 232 lines connect, worktable and power source connect with 232 special serial ports or TCP/UDP mode, terminal and simulation table change 485 lines through 232 and connect.
Among the described step D; The incident of said detection comprises ERC1, ERC3, ERC5, ERC6, ERC7, ERC8, ERC10, ERC11, ERC12, ERC13, ERC17, ERC18, ERC19, ERC20, ERC21, ERC22, ERC24, ERC25, ERC26, ERC27, ERC29, ERC30; All incidents that detect had automatically both been comprised during detection; Also can detect each incident separately, also can single-step operation detect.
The parameter of ERC1 configuration has the setting of terminal affair recording configuration, and the path of detection comprises terminal staging and parameter and the initialization of all data fields.
The parameter of ERC3 configuration has the setting of terminal affair recording configuration, the parameter of a change of configuration.
The parameter of ERC5 configuration has the setting of terminal affair recording configuration, and the setting of the parameter of remote control tripping operation.
The parameter of ERC6 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, always adds that configuration set, the configuration of power control coherence, terminal power control period are provided with, power control calculate the slippage time be provided with, setting of power control alarm time and the control coherence that will operate and always add the group number configuration.The path of detecting comprises that period control incident, factory day-off control incident, business newspaper stop control incident, the current power control incident of floating downward.
The parameter of ERC7 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point to dispose, always add configuration set, the configuration of automatically controlled coherence and the control round that will operate and always adds the group number configuration.The path of detecting comprises a month automatically controlled incident, purchases automatically controlled incident.
The parameter of ERC8 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal time interval of checking meter to be provided with, and the measurement period that will operate disposes with table address.The path of detecting comprises the change of electric energy meter tariff period, the change of electric energy meter programming period, electric energy meter check meter a day change, the change of electric energy meter pulse constant, the change of meter mutual inductor multiplying power, the zero clearing of electric energy meter maximum demand.
The parameter of ERC10 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal check meter the time interval be provided with, the setting of measurement point basic parameter, and the table address that will operate configuration.The path of detecting comprises phase failure setting and decompression setting.
The parameter of ERC11 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal check meter the time interval be provided with, the setting of measurement point basic parameter, and the table address that will operate configuration.The path of detecting comprises that voltage phase sequence is unusual and the electric current phase sequence is unusual.
The parameter of ERC12 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal check meter the time interval be provided with, the setting of measurement point basic parameter, and the configuration of the table address that will operate, terminal to the time be provided with and the overproof setting of electric energy meter time.
The parameter of ERC13 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal check meter the time interval be provided with, the setting of measurement point basic parameter, and the table address that will operate configuration.The path of detecting comprises that electric energy meter phase failure number of times changes, electric energy meter decompression number of times changes, the electric energy meter frequency of power cut changes, the electric energy meter battery is under-voltage, the electric energy meter programming number of times changes and the zero clearing of electric energy meter requirement.
The parameter of ERC17 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal the check meter time interval, the setting of measurement point basic parameter and the configuration of the table address that will operate.The path of detecting comprises that the Voltage unbalance degree is out-of-limit out-of-limit with the current imbalance degree.
The parameter of ERC18 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal to check meter, and the time interval settings, settings of measurement point basic parameter, capacitor parameters setting, capacitor switching operational factor are provided with, the setting of capacitor protection parameter, the setting of capacitor control mode, and the table address that will operate disposes.The path of detecting comprises capacitor self-locking overvoltage, capacitor self-locking device fault and capacitor execution loop fault.
The parameter of ERC19 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point to dispose, always add group setting, purchase the setting of electric weight control parameter.
The parameter of ERC20 configuration has the setting of terminal affair recording configuration, the setting of terminal message parameters for authentication, the configuration that a parameter is set, the setting of terminal message parameters for authentication.
The parameter of ERC21 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal time interval of checking meter to be provided with.
The parameter of ERC22 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point to dispose, always add configuration set setting, differential out-of-limit event argument setting.
The parameter of ERC24 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration, terminal check meter the time interval be provided with, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter, and the table address that will operate configuration.The path of detecting comprises the voltage upper limit and the more following lower limit of voltage.
The parameter of ERC25 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration to be provided with, time interval setting is checked meter at the terminal, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter, and the configuration of the table address that will operate.The path of detecting comprises the electric current upper limit and the electric current upper limit more.
The parameter of ERC26 configuration have the setting of F8 terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point setting, terminal check meter the time interval be provided with, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter; And the configuration of the table address that will operate, the out-of-limit setting of applied power.
The parameter of ERC27 configuration have the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point setting, terminal check meter the time interval be provided with, the setting of electric energy meter anomalous discrimination threshold values; And the configuration of the table address that will operate, the configuration of electric energy meter forward active energy indicating value.
The parameter of ERC29 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration to be provided with, time interval setting, the setting of electric energy meter anomalous discrimination threshold values are checked meter in the terminal; And the configuration of the table address that will operate, the configuration of electric energy meter forward active energy indicating value.
The parameter of ERC30 configuration has the setting of terminal affair recording configuration, the setting of terminal configuration schedule of quantities, measurement point configuration to be provided with, time interval setting, the setting of electric energy meter anomalous discrimination threshold values are checked meter in the terminal; And the configuration of the table address that will operate, the configuration of electric energy meter forward active energy indicating value.
The detection method first step of ERC1 is carried out the incident setting according to the event configuration of incident 1 to the terminal.Second step operated according to the configuration path of incident 1, if the path of selecting be parameter and all data initializations then parameter and the operation of all data initializations carried out in the terminal, if the path is terminal staging then updating operation is carried out at the terminal.The 3rd step inquiry terminal incident detects the incident 1 that whether produces.
The detection method first step of ERC3 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 3 to the terminal.The 3rd step was provided with according to incident 3 change configuration parameters carries out the parameter setting to the terminal.The 4th step inquiry terminal incident detects the incident 3 that whether produces.
The detection method first step of ERC5 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 5 to the terminal.The 3rd step was carried out the remote control tripping operation according to the configuration of incident 5 remote control trip parameters to the terminal.The 4th step inquiry terminal incident detects the incident 5 that whether produces.
The detection method first step of ERC6 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 6 to the terminal.The 3rd step according to incident 6 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, always add that group setting, power control coherence are provided with, the terminal power control period is provided with, power control calculate the slippage time be provided with, the setting of power control alarm time.The 4th step operated according to the configuration path of incident 6, if selection is that the period control is provided with the setting of period power control definite value to the terminal earlier, to the unsteady coefficient setting of terminal period power control, then the period power control was carried out at the terminal and was dropped into again.If what select is that the factory day-off control is first to the setting of terminal factory day-off control definite value, then the factory day-off input is carried out at the terminal.If what select is to do business to report to stop controlling earlier business newspaper in terminal is stopped controlling the parameter setting, is then carried on the business to report in the terminal and stop controlling input.If what select is that the current power control of floating downward is carried out the current power control of floating downward to the terminal and dropped into.Whether the 4th step inquiry terminal incident, it is correct to detect the tripping operation round and the power control classification that whether produce incident 6 and correspondence.
The detection method first step of ERC7 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 7 to the terminal.The 3rd step carried out the setting of terminal configuration schedule of quantities, measurement point setting, always adds group setting, automatically controlled round setting the terminal according to incident 7 parameter configuration.The 4th step operated according to the configuration path of incident 7, if select be month automatically controlled elder generation to the automatically controlled parameter setting of the terminal moon, to the automatically controlled unsteady coefficient setting of the terminal moon, then the automatically controlled input of the moon is carried out at the terminal again.If what select is to purchase the electric weight control earlier electric weight control setting to be purchased at the terminal, then the electric weight control is purchased at the terminal and dropped into.Whether the 4th step inquiry terminal incident, it is correct to detect the tripping operation round and the automatically controlled classification that whether produce incident 7 and correspondence.
The detection method first step of ERC8 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 8 to the terminal.The 3rd step according to incident 8 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, checking meter is provided with at interval.The 4th step operated according to the configuration path of incident 8, if select be the electric energy meter tariff period then revise the value of data item relevant in the simulation table with tariff period.If that selects is the electric energy meter programming time then revises in the simulation table value with the data item of electric energy meter programming time correlation.If what select is that electric energy meter is checked meter day then revised in the simulation table and the check meter value of relevant data item of day of electric energy meter.If that selects is electric energy meter pulse constant then revises the value of data item relevant with electric energy meter pulse constant in the simulation table.If what select is meter mutual inductor multiplying power then configuration is provided with the terminal according to incident 8 meter mutual inductor multiplying powers.If that selects is the zero clearing of electric energy meter maximum demand then revises the value of data item relevant with the zero clearing of electric energy meter maximum demand in the simulation table.Whether the 5th step inquiry terminal incident, it is correct to detect the change sign that whether produces incident 8 and incident.
The detection method first step of ERC10 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 10 to the terminal.The 3rd step according to incident 10 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, check meter be provided with at interval, the setting of measurement point basic parameter.The 4th step operated according to the configuration path of incident 10; If what select is phase failure setting; If the table address that is provided with belongs to ac sampling device, then, let the terminal reach phase failure condition according to the angle between voltage, electric current, phase place and the electric current and voltage of phase failure configuration parameter change power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to phase failure configuration parameter.If what select is the decompression setting,, then, let the terminal reach the decompression condition according to the angle between voltage, electric current, phase place and the electric current and voltage of decompression configuration parameter change power source if the table address that is provided with belongs to ac sampling device; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to the decompression configuration parameter.Whether the 5th step inquiry terminal incident, it is correct to detect the zone bit that whether produces incident 10 and incident.
The detection method first step of ERC11 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 11 to the terminal.The 3rd step was carried out the setting of terminal configuration schedule of quantities, measurement point setting, the setting of measurement point basic parameter according to incident 11 parameter configuration to the terminal.The 4th step operated according to the configuration path of incident 11; If what select is that voltage phase sequence is provided with unusually; Then, let the terminal reach voltage phase sequence exception condition according to the angle between voltage, electric current, phase place and the electric current and voltage of the unusual configuration parameter change of voltage phase sequence power source; If what select is that the electric current phase sequence is provided with unusually, then, let the terminal reach electric current phase sequence exception condition according to the angle between voltage, electric current, phase place and the electric current and voltage of the unusual configuration parameter change of electric current phase sequence power source; The 5th step inquiry terminal incident detects the incident 11 that whether produces.
The detection method first step of ERC12 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 12 to the terminal.The 3rd step according to incident 12 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, the setting of measurement point basic parameter, terminal check meter the time interval be provided with, system to the time be provided with.The 4th step was provided with the time of the simulation table of configuration in the incident 12 according to the overproof setting of 12 times of incident; The 5th step inquiry terminal incident detects the incident 12 that whether produces.
The detection method first step of ERC13 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 13 to the terminal.The 3rd step carried out the setting of terminal configuration schedule of quantities, measurement point setting, the setting of measurement point basic parameter, terminal time interval of checking meter according to incident 13 parameter configuration to the terminal and is provided with.The 4th step operated according to the configuration path of incident 13, if what select is that electric energy meter phase failure number of times changes then changes the value of data item relevant with the phase failure in the simulation table; If what select is that electric energy meter decompression number of times changes then changes the value of data item relevant with the decompression number of times in the simulation table; If what select is that the electric energy meter frequency of power cut changes then changes the value of data item relevant with the electric energy meter frequency of power cut in the simulation table; If what select is that the electric energy meter battery is under-voltage then change in the simulation table value with the under-voltage relevant data item of electric energy meter battery; If that selects is the electric energy meter programming number of times then changes the value of data item relevant with the electric energy meter programming number of times in the simulation table; If select be the electric energy meter maximum demand clearly then change the value of data item relevant clearly in the simulation table with the electric energy meter maximum demand; Whether the 5th step inquiry terminal incident, it is consistent to detect the abnormality mark position that whether produces incident 13 and incident.
The detection method first step of ERC17 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 17 to the terminal.The 3rd step according to incident 17 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, check meter be provided with at interval, the setting of measurement point basic parameter.The 4th step operated according to the configuration path of incident 17; If what select is the setting of Voltage unbalance degree; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach Voltage unbalance degree condition according to the angle between voltage, electric current, phase place and the electric current and voltage of Voltage unbalance degree configuration parameter change power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to Voltage unbalance degree configuration parameter.If what select is that the current imbalance degree is out-of-limit; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach the out-of-limit condition of current imbalance degree according to the angle between voltage, electric current, phase place and the electric current and voltage of the out-of-limit configuration parameter change of current imbalance degree power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to the out-of-limit configuration parameter of current imbalance degree.Whether the 5th step inquiry terminal incident, it is consistent to detect the abnormality mark position that whether produces incident 17 and incident.
The detection method first step of ERC18 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 18 to the terminal.The 3rd step according to incident 18 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, at interval settings of checking meter, settings of measurement point basic parameter, capacitor parameters setting, capacitor switching operational factor are provided with, the setting of capacitor protection parameter, the setting of capacitor control mode, and the table address that will operate disposes.The 4th step operated according to the configuration path of incident 18; If what select is capacitor self-locking overvoltage setting; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach capacitor self-locking overpressure condition according to the angle between voltage, electric current, phase place and the electric current and voltage of capacitor self-locking overvoltage configuration parameter change power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to capacitor self-locking overvoltage configuration parameter.If what select is capacitor self-locking device fault; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach capacitor self-locking device fault condition according to the angle between voltage, electric current, phase place and the electric current and voltage of capacitor self-locking device fault configuration parameter change power source; If the communication protocol type of table address belong to the DL/T645 stipulations table according to voltage, the electric current of this table in the capacitor self-locking device fault configuration parameter modification simulation table.If what select is that capacitor is carried out loop fault; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach capacitor and carry out the loop fault condition according to the angle between voltage, electric current, phase place and the electric current and voltage of capacitor execution loop fault configuration parameter change power source; If the communication protocol type of table address belongs to the table of DL/T645 stipulations then carries out voltage, the electric current that the loop fault configuration parameter is revised this table in the simulation table according to capacitor.Whether the 5th step inquiry terminal incident, it is consistent to detect the abnormality mark position that whether produces incident 18 and incident.
The detection method first step of ERC19 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 19 to the terminal.The 3rd step according to incident 19 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, always add group setting, purchase the setting of electric weight control parameter.The 4th step inquiry terminal incident detects the incident 19 that whether produces.
The detection method first step of ERC20 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 20 to the terminal.The 3rd step was carried out terminal message authentication setting, measurement point setting, terminal terminal message authentication setting according to incident 20 parameter configuration to the terminal.The 4th step inquiry terminal incident detects the incident 20 that whether produces.
The detection method first step of ERC21 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 21 to the terminal.The 3rd step was configured schedule of quantities setting, measurement point setting, terminal time interval of checking meter according to incident 21 parameter configuration to the terminal and is provided with, according to the table address of configuration be provided with this table in the simulation table be arranged to invalid.The 4th step inquiry terminal incident detects the incident 21 that whether produces.
The detection method first step of ERC22 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 22 to the terminal.The 3rd step was configured schedule of quantities setting, measurement point setting, always adds group setting, differential out-of-limit setting the terminal according to incident 22 parameter configuration.The 4th step inquiry terminal incident detects the incident 22 that whether produces.
The detection method first step of ERC24 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 24 to the terminal.The 3rd step according to incident 24 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, check meter be provided with at interval, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter.The 4th step operated according to the configuration path of incident 24; If what select is the setting of the voltage upper limit; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach the last upper bound condition of voltage according to the angle between voltage, electric current, phase place and the electric current and voltage of voltage upper limit configuration parameter change power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to voltage upper limit configuration parameter.If what select is the voltage lower limit,, then, let the terminal reach the more following lower limit condition of voltage according to the angle between voltage, electric current, phase place and the electric current and voltage of voltage lower limit configuration parameter change power source if the table address that is provided with belongs to ac sampling device; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to voltage lower limit configuration parameter.The 5th step inquiry terminal incident, detection whether produces incident 24 and whether out-of-limit sign is correct.
The detection method first step of ERC25 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 25 to the terminal.The 3rd step according to incident 25 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, check meter be provided with at interval, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter.The 4th step operated according to the configuration path of incident 25; If what select is the setting of the electric current upper limit; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach the last upper bound condition of electric current according to the angle between voltage, electric current, phase place and the electric current and voltage of electric current upper limit configuration parameter change power source; , the communication protocol type of table address revises voltage, the electric current of this table in the simulation table if belonging to the table of DL/T645 stipulations according to electric current upper limit configuration parameter.If what select is that electric current is got over the upper limit, if the table address that is provided with belongs to ac sampling device, then get over the angle between voltage, electric current, phase place and the electric current and voltage that upper limit configuration parameter changes power source according to electric current, let the terminal reach electric current and get over upper bound condition; If the communication protocol type of table address belongs to the table of DL/T645 stipulations then gets over voltage, the electric current that upper limit configuration parameter is revised this table in the simulation table according to electric current.The 5th step inquiry terminal incident, detection whether produces incident 25 and whether out-of-limit sign is correct.
The detection method first step of ERC26 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 26 to the terminal.The 3rd step according to incident 26 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, check meter be provided with at interval, the measurement point basic parameter is provided with, the setting of measurement point limit value parameter.The 4th step was carried out the out-of-limit setting of applied power according to the configuration of incident 26; If the table address that is provided with belongs to ac sampling device; Then, let the terminal reach the out-of-limit condition of applied power according to the angle between voltage, electric current, phase place and the electric current and voltage of the out-of-limit configuration parameter change of applied power power source; If the communication protocol type of table address belong to the DL/T645 stipulations table according to voltage, the electric current of this table in the out-of-limit parameter modification simulation of the applied power table.The 5th step inquiry terminal incident, detection whether produces incident 26 and whether out-of-limit sign is correct.
The detection method first step of ERC27 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 27 to the terminal.The 3rd step according to incident 27 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, terminal check meter the time interval be provided with, the setting of electric energy meter anomalous discrimination threshold values.Revise the value of the meritorious data phase of being correlated with of forward of simulation table according to the configuration parameter of electric energy meter degree of a representation decline.The 5th step inquiry terminal incident detects the incident 27 that whether produces.
The detection method first step of ERC29 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 29 to the terminal.The 3rd step according to incident 29 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, terminal check meter the time interval be provided with, the setting of electric energy meter anomalous discrimination threshold values.The configuration parameter that flies away according to electric energy meter is revised the value of the meritorious relevant data phase of the forward of simulation table.The 5th step inquiry terminal incident detects the incident 29 that whether produces.
The detection method first step of ERC30 is carried out data field initialization setting to the terminal.Second step was carried out the incident setting according to the event configuration of incident 30 to the terminal.The 3rd step according to incident 30 parameter configuration to the terminal carry out the setting of terminal configuration schedule of quantities, measurement point setting, terminal check meter the time interval be provided with, the setting of electric energy meter anomalous discrimination threshold values.The configuration parameter that stops walking according to electric energy meter is revised the value of the meritorious relevant data phase of the forward of simulation table.The 5th step inquiry terminal incident detects the incident 30 that whether produces.
Said step e is specially the data that produce in the above-mentioned steps is formed document, and said document is managed.
As shown in Figure 2, the present invention provides a kind of batch automatic terminal event test macro, and it comprises worktable 101; Many station terminals 102; And power source 103, said terminal 102 each phase current and said power source 103 polyphones, said terminal 102 each phase voltage are parallelly connected with said power source 103; Said worktable 101 and said terminal 102 and said power source 103 change serial ports or TCP/UDP agreement through 232 and are connected and carry out information transmission.
As shown in Figure 3, be provided with checking meter the time interval of terminal, be provided with start the order of checking meter after, the terminal is through the 485 mouthful data of copying the simulation table of checking meter, and revises through worktable that corresponding data item realizes producing the corresponding event item in the simulation table.
Can carry out testing automatically through worktable 101, through multithreading, time repeating query mechanism realizes.Each serial ports transceive data respectively starts a thread, through confirming how long to carry out next action the time delay that is provided with, judges the current executed situation according to the data that each serial ports receives.
Batch automatic terminal event testing method of the present invention is through detect many station terminals simultaneously; Avoided the problem that traditional workshop-based efficient that is prone to is low, stability is not high; Not only be beneficial to testing; Configuration parameter is convenient and quick in testing process, can write down the data message in the testing process again simultaneously, for later data analysis provides convenience.The mode at this automatic batch detection terminal has not only improved production efficiency, has reduced cost of labor again.

Claims (7)

1. batch automatic terminal event testing method, it may further comprise the steps: A physics is provided with, and is used for each phase current of terminal and power source are connected in series, and each phase voltage and power source are connected in parallel; B disposes setting, and simulation table, said terminal, said power source are carried out corresponding configuration; C connects, and is used for worktable and said terminal, and simulation table and said power source connect; D detects described terminal, and whether the sense terminals incident produces; E forms examining report.
2. batch automatic terminal event testing method according to claim 1; It is characterized in that: said step B specifically comprises: the power source parameter is set; Said power source parameter comprises voltage, electric current, the phase angle of said power source, the serial ports that system communicates by letter with power source, baud rate, check bit and power source mailing address; Terminal parameter is set, and said terminal parameter comprises communication serial port, baud rate, check bit and the terminal address at said terminal; The mode of connection, rated voltage, rated current, the line frequency at said terminal are set; Parameter and the path of test of the detection method of each incident are set; Simulation table parameter is set, comprises and dispose the relevant simulation table and the value of contiguous items.
3. batch automatic terminal event testing method according to claim 1; It is characterized in that: among the described step C; Worktable and terminal with serial ports change that 232 lines connect, worktable and power source connect with 232 special serial ports or TCP/UDP mode, terminal and simulation table change 485 lines through 232 and connect.
4. batch automatic terminal event testing method according to claim 1 is characterized in that: among the described step D, detect all incidents during the event detection of said detection automatically.
5. batch automatic terminal event testing method according to claim 1 is characterized in that:, among the described step D, detect each incident during the event detection of said detection separately, single-step operation detects.
6. batch automatic terminal event testing method according to claim 1 is characterized in that: said step e is that the data that produce in the above-mentioned steps are formed document, and said document is managed.
7. batch automatic terminal event test macro; It is characterized in that: it comprises worktable; Many station terminals, and power source, each phase current of said terminal and said power source polyphone; Each phase voltage of said terminal is parallelly connected with said power source, and said worktable and said terminal and said power source change serial ports or TCP/UDP agreement through 232 and be connected and carry out information transmission.
CN2009101100133A 2009-11-06 2009-11-06 Batch automatic terminal event testing method and system thereof Expired - Fee Related CN101718819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101100133A CN101718819B (en) 2009-11-06 2009-11-06 Batch automatic terminal event testing method and system thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101100133A CN101718819B (en) 2009-11-06 2009-11-06 Batch automatic terminal event testing method and system thereof

Publications (2)

Publication Number Publication Date
CN101718819A CN101718819A (en) 2010-06-02
CN101718819B true CN101718819B (en) 2012-07-25

Family

ID=42433423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101100133A Expired - Fee Related CN101718819B (en) 2009-11-06 2009-11-06 Batch automatic terminal event testing method and system thereof

Country Status (1)

Country Link
CN (1) CN101718819B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101943734A (en) * 2010-06-17 2011-01-12 深圳市科陆电子科技股份有限公司 Method for automatically detecting terminals in batch based on IEC62056 protocol
CN102338865B (en) * 2011-06-17 2013-11-06 杭州炬华科技股份有限公司 Method for quickly calibrating error of three-phase intelligent electric energy meter
CN102333006B (en) * 2011-09-20 2017-08-29 深圳市科陆电子科技股份有限公司 A kind of collector device hardware interface test method
CN103983934B (en) * 2014-05-21 2016-09-21 国家电网公司 A kind of inspection terminal pulse constant the most normal method of change event recording function
CN108802663B (en) * 2018-04-18 2020-12-01 电子科技大学 Intelligent electric energy meter function verification method based on source regulation parameter vector optimization
CN108828494B (en) * 2018-04-18 2020-06-12 电子科技大学 Intelligent electric energy meter function verification method based on genetic algorithm
CN112213582B (en) * 2020-09-29 2024-05-10 北京智芯微电子科技有限公司 Detection system, detection method, detection device and storage medium for electronic module

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206252A (en) * 2006-12-22 2008-06-25 鸿富锦精密工业(深圳)有限公司 System and method for measuring digital multimeter
CN101437252A (en) * 2008-12-05 2009-05-20 深圳市科陆电子科技股份有限公司 Communication service system and method for energy management terminal test
CN101464502A (en) * 2008-12-30 2009-06-24 深圳市科陆电子科技股份有限公司 Method for batch automatic terminal calibration
CN201327517Y (en) * 2008-12-12 2009-10-14 江苏省电力试验研究院有限公司 Integrated detection device of electric power terminal

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101206252A (en) * 2006-12-22 2008-06-25 鸿富锦精密工业(深圳)有限公司 System and method for measuring digital multimeter
CN101437252A (en) * 2008-12-05 2009-05-20 深圳市科陆电子科技股份有限公司 Communication service system and method for energy management terminal test
CN201327517Y (en) * 2008-12-12 2009-10-14 江苏省电力试验研究院有限公司 Integrated detection device of electric power terminal
CN101464502A (en) * 2008-12-30 2009-06-24 深圳市科陆电子科技股份有限公司 Method for batch automatic terminal calibration

Also Published As

Publication number Publication date
CN101718819A (en) 2010-06-02

Similar Documents

Publication Publication Date Title
CN101718819B (en) Batch automatic terminal event testing method and system thereof
CN103501058B (en) Based on the energy efficiency management system of Intelligent platform zone
CN102928808A (en) Power consumer on-site electric energy meter fault remote judging method
CN103944265B (en) A kind of interactive intelligent adapted electric energy monitoring device and method
CN102230948B (en) Active high voltage direct current switch oscillation loop parameter on-line measuring system and method thereof
CN105529823A (en) Terminals and terminal building system based on electric load management intelligent recognition system
CN105554012B (en) A kind of EtherCAT slave station based on DSP turns the communication unit of Canopen main website
CN107464146A (en) Resident's class client's electricity charge accounting method and device
CN104269040A (en) Power utilization information acquisition and orderly power utilization management system
JP5742357B2 (en) Monitoring system for photovoltaic power generation
CN203811739U (en) Phase-to-ground fault detection apparatus
CN102520298A (en) On-site detecting system for electrical power load management terminal and detecting method thereof
CN201278000Y (en) Multi-charge rate double loop electric meter with resistive load monitoring
CN104361531A (en) Identification method and system for high-risk failure equipment of substation automation system
CN201584812U (en) Domestic intelligent power distribution terminal
CN105634122A (en) Ammeter remote control system
CN204376530U (en) Electric power data supervisory control system
CN103810834A (en) Wireless wifi (Wireless Fidelity) intelligent read-free ammeter
CN201464636U (en) Detection device for network electric energy meter
CN106208384A (en) A kind of housed device Electrical Safety learning system
CN102879669B (en) Failure current simulation device and working method thereof
CN202057425U (en) An intelligent long-distance temperature acquisition and transmission module
CN206773119U (en) A kind of multi-channel long networking electrical equipment online supervision configures system
CN207398928U (en) A kind of intelligent domestic leakage protection system
CN208046218U (en) A kind of zero curve detecting system and power supply unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210624

Address after: 518000 Room 202, block B, aerospace micromotor building, No.7, Langshan No.2 Road, Xili street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen LIAN intellectual property service center

Address before: Five, T2 building, 518057 South District, Nanshan District science and Technology Park, Guangdong, Shenzhen

Patentee before: Shenzhen Clou Electronics Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20211106

CF01 Termination of patent right due to non-payment of annual fee