CN101696575A - Method for lifting shipping caisson by capsule trolley - Google Patents

Method for lifting shipping caisson by capsule trolley Download PDF

Info

Publication number
CN101696575A
CN101696575A CN200910210973A CN200910210973A CN101696575A CN 101696575 A CN101696575 A CN 101696575A CN 200910210973 A CN200910210973 A CN 200910210973A CN 200910210973 A CN200910210973 A CN 200910210973A CN 101696575 A CN101696575 A CN 101696575A
Authority
CN
China
Prior art keywords
caisson
capsule
trolley
shipping
bearing beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910210973A
Other languages
Chinese (zh)
Other versions
CN101696575B (en
Inventor
刘德进
张宝昌
曲俐俐
陆连洲
张祚森
刘庆凯
赵建明
付大伟
范新堂
马淑文
董建全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Construction Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN 200910210973 priority Critical patent/CN101696575B/en
Publication of CN101696575A publication Critical patent/CN101696575A/en
Application granted granted Critical
Publication of CN101696575B publication Critical patent/CN101696575B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The invention relates to a method for lifting a shipping caisson by a capsule trolley, which comprises the following steps: (1) taking the trolleys in place; prearranging two shipping rails on a shipping route of a shipping caisson and respectively arranging trolley groups on the shipping rails, wherein the trolley groups are not exposed out of the shipping rails at the moment; drawing the trolleys under the caisson to be shipped in place by a winding engine at the rear part of trolley seats; (2) lifting: injecting water into capsules of all trolley units of the trolley groups, lifting a caisson support plate on the capsules, leading the caisson support plate to be higher than the shipping rails and support the caisson; (3) shipping: after the caisson is supported, pushing the trolley units by a push device to travel on the rails to a preset semi-submerged position; and (4) unloading: after the caisson arrives in the appointed position, discharging the water of the capsules, leading the caisson to be positioned on a cushion beam for carrying a transport ship and finishing the whole lifting and shipping procedures. Compared with the traditional way, the method greatly reduces the requirement for the ground and is simpler and more convenient to operate.

Description

Utilize the method for capsule trolley lifting shipping caisson
Technical field
The present invention relates to a kind of caisson and go out transportation method, specifically, relate to and a kind ofly utilize capsule to bear jacking effect, chassis to be responsible for that the novel caisson of delivery process goes out transportation method after the jacking.
Background technology
At home and abroad Large Caisson goes out in the fortune at present, and caisson jacking, migration mainly contain three kinds of modes:
Jack group jacking caisson, traction or pushing tow chassis migration technology: adopt 500t left and right sides jack jacking caisson; Caisson migration is adopted the traction of hoist engine pulley block system or is adopted hydraulic pushing system pushing tow heavy duty chassis migration caisson to seat floating dock, the end or half dive and refute out Yun Xiashui and install.This method is mainly used in the fixedly Large Caisson of the prefabricated different size of precasting yard at home.Its advantage is technical maturity, be convenient to grasp, equipment is durable; Shortcoming is a pedestal cost height, and equipment maintenance cost is many, and greasy dirt is serious, and it is low to go out to transport efficient.
The jacking of jack chassis, migration caisson technology: after adopting a plurality of jack of being fixed on the chassis with the caisson jacking, go out Yun Xiashui to the floating dock by hydraulic pushing system pushing tow jack chassis and caisson migration.This method is used for fixing precasting yard abroad and goes out to transport Large Caisson, is mainly used in the less relatively case beam of tonnage at home at present and goes out fortune.Its advantage chassis and jack unite two into one, and a procedure is saved in operation, and laying jack and chassis enter the caisson bottom and be combined into a step, and the pedestal structure is simple relatively; Shortcoming is that this method jack quantity is many, balance sysmte complexity, cost height.
Air bag jacking, migration caisson technology: adopt a plurality of elongated air bags to be placed on the caisson bottom, inflating and lifting, the traction caisson is by the rolling migration caisson of bottom air bag.This method is mainly used in the less relatively situation of interim precasting yard caisson weight.Advantage is to unite two into one with air bag replacement jack and chassis, and pedestal is simple in structure, and the construction period is short; Shortcoming is a complex procedures, and potential safety hazard is many, and it is low to go out to transport efficient.
Summary of the invention
The objective of the invention is to go out many deficiencies of transportation method and equipment existence, provide a kind of novel caisson that capsule is combined with chassis to go out transportation method at existing caisson.
The technical solution adopted in the present invention is: a kind of method of utilizing the capsule trolley lifting shipping caisson may further comprise the steps:
1) chassis is in place: go out to transport on the route at caisson, be preset with two and go out to transport the ditch rail, the chassis group is set going out to transport on the ditch rail respectively, this moment, the height of chassis group did not expose to out outside the fortune ditch rail, utilized pedestal rear hoist engine that the chassis traction is in place to the caisson that will go out fortune;
2) jacking: after the chassis group is in place, utilize the capsule water filling of high-pressure hydraulic pump to all trolley unit inside of chassis group, volume expansion after the capsule water filling, the caisson of jack-up capsule top is lifted plate, makes caisson lift plate hight and goes out out fortune ditch rail, and caisson is held up;
3) go out fortune: after caisson is held up, promote trolley unit by thrustor and advance in orbit, until preset semi-submerged position;
4) unloading: after caisson arrived assigned address, capsule discharged water, and made the caisson of trolley unit lift plate height decline, made caisson fall to being positioned on the bearing beam of carried and transported ship, and whole jacking goes out to transport operation and finishes.
Preferably, after described jacking process finished, caisson was held up, and shook the bearing beam towed equipment on the trolley unit at trolley unit two ends, made caisson lift on the bearing beam that plate falls within the bicycle unit, replaced capsule load-bearing in going out the fortune process with bearing beam.
Preferably, utilize the track rail clamping device to promote trolley movement to the half latent platform of refuting, half dives to refute a caisson bearing beam on the platform, the height of refuting the caisson bearing beam of diving this moment half also is lower than the height that caisson is lifted, after caisson arrives caisson bearing beam top fully, once more capsule is washed by water, with caisson jack-up, shake bearing beam to initial position, after this capsule discharges water, and caisson is lifted plate bottom projection once more in the middle of the crenel of bearing beam, in this process, the weight of caisson begins to refute the caisson bearing beam by partly diving to be born, and finishes out the fortune process.
Beneficial effect of the present invention is: at first, compare with traditional jack pushing tow mode, only need set in advance two goes out to transport track, gets final product as the orbit that goes out to transport chassis, and therefore the requirement for the place reduces greatly, is simpler and more convenient to operate; Secondly, wholely go out in the fortune process not need to use jack, and the jack that uses at present oil pressure type often, its pollution to environment is very serious, adopt the transportation method that of capsule trolley, can avoid out of the pollution of fortune process, and the cost of construction also obviously reduces than prior art environment; In addition, the capsule pushing tow that is adopted in this device only plays a role when lifting, and is born a heavy burden by the chassis car body in moving process, and therefore, it is safer to go out the fortune process, can not occur owing to the damaged accident that causes of capsule.
Description of drawings
Fig. 1 is the split structural representation of trolley unit of the present invention;
Fig. 2 is the combination cross-sectional view of trolley unit of the present invention;
Fig. 3 is the bearing beam structural representation of trolley unit of the present invention.
The specific embodiment
Chassis structural representation of the present invention as Fig. 1 to Fig. 3, a kind of caisson transportation capsule trolley, there are a plurality of trolley units to combine, each trolley unit comprises the base portion vehicle frame 4 that is installed on the track 13, be installed in the jacking support casing 3 on the base portion vehicle frame 4, be arranged on the jacking capsule 2 in the casing, and be installed in jacking support casing 3 tops and can lift plate 1 by the caisson that jacking capsule 2 is lifted, described jacking support casing 3 is provided with pipeline, and pipeline is connected with the pipeline opening of the jacking capsule 2 of box house.The base portion vehicle frame is placed on the track 13 by wheel track 12.
The upper surface of described base portion vehicle frame 4 is provided with section and is trapezoidal groove, and the surface of groove is provided with circular embedded hole 6, is provided with and the projection that matches at the soffit of jacking support casing, and projection is provided with the embedded block 5 that matches with embedded hole.
Described jacking support casing central authorities are a capsule chamber, and jacking capsule 2 is arranged in this cavity; Described caisson is lifted plate 1 and is comprised a piston body of lifting the lucky embedding capsule chamber of plate face and plate face below.The both sides of the edge of jacking support casing 3 are provided with slidably bearing beam, described bearing beam comprises a base plate 9, and the cushion block 11 of a plurality of formation city wall crenel shapes that install on the base plate 9, the both sides of the edge of lifting the plate face that described caisson is lifted plate 1 are provided with embedded block 7, embed bearing beam cushion block 11 and form in the crenel.The both sides of the edge of jacking support casing 3, the both sides of bearing beam base plate 9 are provided with the movable limitting casing of base plate, also are provided with in the end of base plate to be used for the lacing film 14 that is connected with the base plate of next trolley unit.The outside of both sides base plate also is installed with respectively strengthens side plate 10.
Carry out chassis when going out to transport, may further comprise the steps:
1) chassis is in place: go out to transport on the route at caisson, be preset with two and go out to transport the ditch rail, the chassis group is set going out to transport on the ditch rail respectively, this moment, the height of chassis group did not expose to out outside the fortune ditch rail, utilized pedestal rear hoist engine that the chassis traction is in place to the caisson that will go out fortune;
2) jacking: after the chassis group is in place, utilize capsule 2 water fillings of high-pressure hydraulic pump to all trolley unit inside of chassis group, volume expansion after capsule 2 water fillings, the caisson of jack-up capsule 2 tops is lifted plate 1, makes caisson lift plate 1 and exceeds fortune ditch rail, and caisson is held up;
3) load-bearing: after the jacking process finished, caisson was held up, and shook the bearing beam towed equipment on the trolley unit at trolley unit two ends, made caisson lift on the bearing beam that plate 1 falls within trolley unit, replaced capsule load-bearing in going out the fortune process with bearing beam;
4) go out fortune: after caisson is held up, promote trolley unit by thrustor and advance in orbit, until preset semi-submerged position;
5) unloading: utilize the track rail clamping device to promote trolley movement to the half latent platform of refuting, half dives to refute two caisson bearing beams on the platform, the height of refuting the caisson bearing beam of diving this moment half also is lower than the height that caisson is lifted, after caisson arrives caisson bearing beam top fully, once more capsule is washed by water, with caisson jack-up, shake bearing beam to initial position, after this capsule discharges water, caisson is lifted plate bottom projection once more in the middle of the crenel of bearing beam, in this process, the weight of caisson begins to refute the caisson bearing beam by partly diving to be born, and finishes out the fortune process.

Claims (3)

1. method of utilizing the capsule trolley lifting shipping caisson is characterized in that may further comprise the steps:
1) chassis is in place: go out to transport on the route at caisson, be preset with two and go out to transport the ditch rail, the chassis group is set going out to transport on the ditch rail respectively, this moment, the height of chassis group did not expose to out outside the fortune ditch rail, utilized pedestal rear hoist engine that the chassis traction is in place to the caisson that will go out fortune;
2) jacking: after the chassis group is in place, utilize the capsule water filling of high-pressure hydraulic pump to all trolley unit inside of chassis group, volume expansion after the capsule water filling, the caisson of jack-up capsule top is lifted plate, makes caisson lift plate hight and goes out out fortune ditch rail, and caisson is held up;
3) go out fortune: after caisson is held up, promote trolley unit by thrustor and advance in orbit, until preset semi-submerged position;
4) unloading: after caisson arrived assigned address, capsule discharged water, and made the caisson of trolley unit lift plate height decline, made caisson fall to being positioned on the bearing beam of carried and transported ship, and whole jacking goes out to transport operation and finishes.
2. the method for utilizing the capsule trolley lifting shipping caisson as claimed in claim 1, it is characterized in that: after described jacking process finishes, caisson is held up, shake the bearing beam push-pull device at fixed on the trolley unit at trolley unit two ends, make caisson lift on the bearing beam that plate falls within trolley unit, replace capsule load-bearing in going out the fortune process with bearing beam.
3. the method for utilizing the capsule trolley lifting shipping caisson as claimed in claim 2, it is characterized in that: utilize the track rail clamping device to promote trolley movement to the half latent platform of refuting, half dives to refute two caisson bearing beams on the platform, the height of refuting the caisson bearing beam of diving this moment half also is lower than the height that caisson is lifted, after caisson arrives caisson bearing beam top fully, once more capsule is washed by water, with caisson jack-up, shake bearing beam to initial position, after this capsule discharges water, and caisson is lifted plate bottom projection once more in the middle of the crenel of bearing beam, in this process, the weight of caisson begins to refute the caisson bearing beam by partly diving to be born, and finishes out the fortune process.
CN 200910210973 2009-11-13 2009-11-13 Method for lifting shipping caisson by capsule trolley Expired - Fee Related CN101696575B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910210973 CN101696575B (en) 2009-11-13 2009-11-13 Method for lifting shipping caisson by capsule trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910210973 CN101696575B (en) 2009-11-13 2009-11-13 Method for lifting shipping caisson by capsule trolley

Publications (2)

Publication Number Publication Date
CN101696575A true CN101696575A (en) 2010-04-21
CN101696575B CN101696575B (en) 2011-09-28

Family

ID=42141701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910210973 Expired - Fee Related CN101696575B (en) 2009-11-13 2009-11-13 Method for lifting shipping caisson by capsule trolley

Country Status (1)

Country Link
CN (1) CN101696575B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691313A (en) * 2012-05-29 2012-09-26 中交一航局第二工程有限公司 Immersed tube bottom capsule water filling fine adjusting system and adjusting technology
CN103991720A (en) * 2014-04-24 2014-08-20 中交二航局第三工程有限公司 System and method for transporting large concrete caisson boxes
CN104129477A (en) * 2014-07-23 2014-11-05 中交一航局第五工程有限公司 Longitudinal moving trolley fixing and caisson fixing method for caisson shipping of semi-submersible barge
CN107237340A (en) * 2017-06-16 2017-10-10 中交航局第工程有限公司 Large Caisson partly latent barge trim by stem dive goes out transportation method
CN110093984A (en) * 2019-04-22 2019-08-06 官木喜 The building method in the warehouse style house of large stereo
CN110093982A (en) * 2019-04-22 2019-08-06 官木喜 Stereo warehouse formula box-type house

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691313A (en) * 2012-05-29 2012-09-26 中交一航局第二工程有限公司 Immersed tube bottom capsule water filling fine adjusting system and adjusting technology
CN103991720A (en) * 2014-04-24 2014-08-20 中交二航局第三工程有限公司 System and method for transporting large concrete caisson boxes
CN104129477A (en) * 2014-07-23 2014-11-05 中交一航局第五工程有限公司 Longitudinal moving trolley fixing and caisson fixing method for caisson shipping of semi-submersible barge
CN104129477B (en) * 2014-07-23 2017-03-01 中交一航局第五工程有限公司 A kind of partly latent refutes the envelope car reinforcement means of caisson transportation
CN107237340A (en) * 2017-06-16 2017-10-10 中交航局第工程有限公司 Large Caisson partly latent barge trim by stem dive goes out transportation method
CN107237340B (en) * 2017-06-16 2019-03-29 中交一航局第一工程有限公司 Large Caisson barge trim by stem dive partly latent goes out transportation method
CN110093984A (en) * 2019-04-22 2019-08-06 官木喜 The building method in the warehouse style house of large stereo
CN110093982A (en) * 2019-04-22 2019-08-06 官木喜 Stereo warehouse formula box-type house
CN110093984B (en) * 2019-04-22 2024-03-01 官木喜 Method for building large-scale three-dimensional warehouse house

Also Published As

Publication number Publication date
CN101696575B (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN101696575B (en) Method for lifting shipping caisson by capsule trolley
CN1326733C (en) System for transporting and skew loading/unloading of cars in combined railway/road transport railway station and method for using same
MX2013008971A (en) Unloading and loading crane arrangement, container terminal and method for unloading and loading a ship.
CN106638687A (en) Foundation-aid accurate and quick assembly technique for prefabricated assembly of comprehensive pipe rack
KR20060066520A (en) A method for shipbuilding on the ground and launching ships using a skid launching system
WO2019000758A1 (en) Method for transporting ship from land to water
CN107905121A (en) Tire transportation technology under a kind of whole segment of Steel Bridge
CN105673070A (en) Transport system for inclined shaft in tunnel construction and installation method of system
CN109664903B (en) Multifunctional railway flatcar
CN102849470A (en) Shipping method for steel box girder section
RU2580389C2 (en) Wagon for transportation of self-propelled machinery
KR100940795B1 (en) Method for launching and transporting heavy weight structures using air bags
ES2288751T3 (en) UNDERGROUND ELEVATION SYSTEM FOR RAILWAY VEHICLES.
CN103774672B (en) The method of ramp caisson transportation
US8888410B2 (en) Modular heavy lift system
CN201560431U (en) Capsule trolley for caisson transportation
CN102264576A (en) Trailer for the transportation by road of containers
WO2019123337A1 (en) Equipment and method for autonomous transfer of a load between a load transfer receiver and a support structure
CN108749831A (en) Heavy-load transport vehicle super-heavy load transportation system
CN211712475U (en) Track hangs structure of going on and off ship
CN110743693B (en) Integral moving method for mine crushing station
KR102021981B1 (en) Slip way apparatus for docking of ship
CN103587663A (en) Floating-box type ship launching system
CN113482004A (en) Offshore multi-tube jacket foundation and wind power complete machine wharf launching construction method thereof
CN105019467A (en) Rubber-bag trolley jacking device and method for jacking and transporting caisson

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Baochang

Inventor after: Ma Shuwen

Inventor after: Dong Jianquan

Inventor after: Liu Dejin

Inventor after: Qu Lili

Inventor after: Lu Lianzhou

Inventor after: Zhang Zuosen

Inventor after: Liu Qingkai

Inventor after: Zhao Jianming

Inventor after: Fu Dawei

Inventor after: Fan Xintang

Inventor before: Liu Dejin

Inventor before: Ma Shuwen

Inventor before: Dong Jianquan

Inventor before: Zhang Baochang

Inventor before: Qu Lili

Inventor before: Lu Lianzhou

Inventor before: Zhang Zuosen

Inventor before: Liu Qingkai

Inventor before: Zhao Jianming

Inventor before: Fu Dawei

Inventor before: Fan Xintang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU DEJIN ZHANG BAOCHANG QU LILI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAOJIANMING FU DAWEI FAN XINTANG MA SHUWEN DONG JIANQUAN TO: ZHANG BAOCHANG LIU DEJIN QU LILI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAO JIANMING FU DAWEI FAN XINTANG MA SHUWEN DONG JIANQUAN

ASS Succession or assignment of patent right

Owner name: CHINA COMMUNICATIONS CONSTRUCTION COMPANY LTD.

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Baochang

Inventor after: Zhao Jianming

Inventor after: Fu Dawei

Inventor after: Fan Xintang

Inventor after: Ma Shuwen

Inventor after: Dong Jianquan

Inventor after: Liu Dejin

Inventor after: Qu Lili

Inventor after: Liu Zhendong

Inventor after: Peng Danyan

Inventor after: Gao Jingli

Inventor after: Lu Lianzhou

Inventor after: Zhang Zuosen

Inventor after: Liu Qingkai

Inventor before: Zhang Baochang

Inventor before: Ma Shuwen

Inventor before: Dong Jianquan

Inventor before: Liu Dejin

Inventor before: Qu Lili

Inventor before: Lu Lianzhou

Inventor before: Zhang Zuosen

Inventor before: Liu Qingkai

Inventor before: Zhao Jianming

Inventor before: Fu Dawei

Inventor before: Fan Xintang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG BAOCHANG LIU DEJIN QU LILI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAOJIANMING FU DAWEI FAN XINTANG MA SHUWEN DONG JIANQUAN TO: ZHANG BAOCHANG LIU DEJIN QU LILI LIU ZHENDONG PENG DANYAN GAO JINGLI LU LIANZHOU ZHANG ZUOSEN LIU QINGKAI ZHAO JIANMING FU DAWEI FAN XINTANG MA SHUWEN DONG JIANQUAN

TA01 Transfer of patent application right

Effective date of registration: 20110402

Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16

Applicant after: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

Co-applicant after: China Communications Construction Company Ltd.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16

Applicant before: The Second Engineering Co. of CCCC First Harbor Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20121113