CN101691760A - Composite foundation combining anchor rods with excavation and construction method thereof - Google Patents

Composite foundation combining anchor rods with excavation and construction method thereof Download PDF

Info

Publication number
CN101691760A
CN101691760A CN200910093283A CN200910093283A CN101691760A CN 101691760 A CN101691760 A CN 101691760A CN 200910093283 A CN200910093283 A CN 200910093283A CN 200910093283 A CN200910093283 A CN 200910093283A CN 101691760 A CN101691760 A CN 101691760A
Authority
CN
China
Prior art keywords
foundation
anchor pole
excavation
master muscle
digging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910093283A
Other languages
Chinese (zh)
Other versions
CN101691760B (en
Inventor
鲁先龙
程永锋
苏荣臻
丁士君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2009100932838A priority Critical patent/CN101691760B/en
Publication of CN101691760A publication Critical patent/CN101691760A/en
Application granted granted Critical
Publication of CN101691760B publication Critical patent/CN101691760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention provides a composite foundation combining anchor rods with excavation and a construction method thereof, and is mainly applicable to the tower foundation of a transmission line. The composite foundation is jointly formed by an anchor rod foundation and an excavation foundation and comprises an excavation foundation part and an anchor rod foundation part, wherein, the anchor rod foundation part is located in the rock formation of the surface of the earth and comprises at least one cylindrical or polygonal rock anchor rod; the rock anchor rod comprises an anchor rod main reinforcement and concrete or cement mortar surrounding the anchor rod main reinforcement; the anchor rod main reinforcement extends into the excavation foundation part; the excavation foundation part is located in the soil layer of the surface of the earth and comprises reinforcing bars and concrete; and the excavation foundation part and the anchor rod foundation part are connected by the anchor rod main reinforcement which extends into the excavation foundation part. The invention further provides a specific construction method.

Description

A kind of composite foundation combining anchor rods with excavation and job practices thereof
Technical field
The present invention relates to the foundation construction technical field of transmission line of electricity, relate in particular to a kind of composite foundation combining anchor rods with excavation and job practices thereof.
Background technology
Often run in the transmission line of electricity basis that shallow-layer is arranged is soil layer; and the depths is the geological conditions of rock stratum slightly; the base form that adopts before under this geological conditions is generally basis (the big slab foundation of excavation backfill class; footing foundation) or digging foundation; when load of roadway is big; the foundation bed degree of depth need surpass the rock stratum end face; the bearing capacity on basis could satisfy the load of roadway requirement; like this because digging foundation can not be drawn the rock stratum digs and can't adopt; and adopt big slab foundation and footing foundation will carry out methods such as explosion to the rock stratum so that the excavation of rock stratum part; so just bring very big difficulty to construction; huge earthwork excavated volume is arranged simultaneously; destroy undisturbed soil, be unfavorable for protecting environment.
Summary of the invention
In order to overcome defective of the prior art, the object of the present invention is to provide a kind of explosion rock stratum that need not, be convenient to construction, reduce the composite foundation combining anchor rods with excavation of earthwork excavated volume, mainly be applied in the electric power line pole tower basis.
Another object of the present invention is to provide a kind of job practices of composite foundation combining anchor rods with excavation.
For this reason, the present invention proposes a kind of composite foundation combining anchor rods with excavation, comprise digging foundation and anchor pole basis, described anchor pole basis is arranged in the rock stratum on the face of land, it comprises at least one cylindrical or polygonal rock bolt, described rock bolt has anchor pole master muscle and centers on the concrete or the cement mortar of anchor pole master muscle, and described anchor pole master muscle extend in the digging foundation; Described digging foundation is arranged in the soil layer on the face of land, and it is made of arrangement of reinforcement and concrete; Described digging foundation is connected by the anchor pole master muscle that extend in the digging foundation with the anchor pole basis.
Wherein, the described anchor pole master muscle length that extend into digging foundation is more than or equal to 40 times of anchor pole master muscle diameter.
Wherein, described around anchor pole master muscle concrete or the end face of cement mortar extend into the height h of digging foundation more than or equal to 10 centimetres.
Wherein, described digging foundation the cross sectional shape of vertical direction be the infundibulate of back-off or rectangle or on bottom side length trapezoidal in the bottom.
The present invention also provides a kind of job practices of composite foundation combining anchor rods with excavation, and construction process is as follows:
1) pore-forming utilizes jumbolter to get out armature boring in the soil layer on the face of land and rock stratum;
2) after pore-forming finishes, put into and fixing described anchor pole master muscle, make described anchor pole master muscle extend into digging foundation length partly 40 times more than or equal to anchor pole master muscle diameter, pour into described anchor pole then partly around the concrete or the cement mortar of anchor pole master muscle, make describedly to extend into the height of digging foundation part more than or equal to 10 centimetres around the concrete of anchor pole master muscle or the end face of cement mortar;
3) partly draw the foundation ditch that digs out the digging foundation part at the soil layer on the face of land;
4) partly lay and fixing described digging foundation part arrangement of reinforcement, concreting then at digging foundation.
Composite foundation combining anchor rods with excavation of the present invention can be used for that shallow-layer is a soil layer, the depths is the geological conditions of rock stratum slightly, mainly be applied in the electric power line pole tower basis, this composite foundation is united by anchor pole basis and digging foundation and is formed, because the digging foundation bottom surface places the rock stratum end face, therefore when stressed, bear main downforce by digging foundation, digging foundation and anchor pole basis are born uplift force and horizontal force jointly, so just can satisfy the transmission line of electricity load requirement.
Beneficial effect of the present invention is: this composite foundation combining anchor rods with excavation need not the explosion rock stratum, is convenient to construction, reduces earthwork excavated volume, utilizes undisturbed soil, is beneficial to the protection environment.
Description of drawings
Fig. 1 is the big slab foundation of prior art or the structural representation of footing foundation;
Fig. 2 is first kind of organigram of composite foundation combining anchor rods with excavation of the present invention;
Fig. 3 is the schematic flow sheet of composite foundation combining anchor rods with excavation of the present invention and job practices thereof;
Fig. 4 is the concrete structure size schematic diagram of Fig. 2, and wherein Fig. 4-1 is the sectional view of Fig. 2, and Fig. 4-2 is the vertical view of Fig. 2;
Fig. 5 is second kind of organigram of composite foundation combining anchor rods with excavation of the present invention;
Fig. 6 is the third organigram of composite foundation combining anchor rods with excavation of the present invention;
Wherein, the I-soil layer, the II-rock stratum, the 1-digging foundation, 2-anchor pole basis, the 3-rock bolt, 4-anchor pole master muscle, 5-is around the concrete or the cement mortar of anchor pole master muscle, 6-arrangement of reinforcement, 7-concrete, 8-armature boring, the foundation ditch of 9-digging foundation.
The specific embodiment
Below in conjunction with accompanying drawing composite foundation combining anchor rods with excavation of the present invention is described further.
As shown in Figure 2, composite foundation combining anchor rods with excavation of the present invention comprise digging foundation 1 and anchor pole basis 2, described anchor pole basis 2 is arranged in the rock stratum II on the face of land, it comprises at least one cylindrical or polygonal rock bolt 3, this rock bolt 3 has anchor pole master muscle 4 and centers on the concrete or the cement mortar 5 of anchor pole master muscle, and anchor pole master muscle 4 extend in the digging foundation 1; Described digging foundation 1 is arranged in the soil layer I on the face of land, and the bottom surface of its digging foundation 1 places rock stratum II end face, and it is made of arrangement of reinforcement 6 and concrete seven; Described digging foundation 1 is connected by the anchor pole master muscle 4 that extend in the digging foundation with anchor pole basis 2, and digging foundation 1 is the infundibulate of back-off at the cross sectional shape of vertical direction.Shown in Fig. 5-6, digging foundation 1 the cross sectional shape of vertical direction also can be rectangular or the top be longer than following trapezoidal.
As shown in Figure 4, the physical dimension of composite foundation combining anchor rods with excavation of the present invention can adopt following parameter: soil layer I is a loess formation, and the rock stratum II below the soil layer is the gentle breeze rock stratum, and the narrow end diameter in the top of described digging foundation 1 is 0.8m, and length is 1m; The diameter of lower enlarged end is 1.2cm, and length is 0.5m.Top digging foundation 1 is arranged in the thick loess formation of 1.5m.Four rock bolts 3 by arranged in squares are set in the gentle breeze rock stratum, rock bolt 3 spacings are that 40cm, its diameter are 0.15m, it is 6m that anchor pole master muscle 4 adopts HRB335II level screw-thread steel, its length of 36mm diameter, waters to be filled in anchor pole master muscle 4 concrete on every side or the cement mortar of cement mortar 5 employing C20 concrete or M20.The length that anchor pole master muscle enters digging foundation is 1.44m.This composite foundation combining anchor rods with excavation can bear 150 tons uplift force.
Fig. 3 shows the construction schematic diagram on basis of the present invention.Concrete construction process is as follows:
1) pore-forming utilizes jumbolter to get out armature boring in the soil layer on the face of land and rock stratum;
2) after pore-forming finishes, put into and fixing described anchor pole master muscle, make length that described anchor pole master muscle extend into digging foundation 40 times more than or equal to anchor pole master muscle diameter, pour into described anchor pole then partly around the concrete or the cement mortar of anchor pole master muscle, make describedly to extend into the height of digging foundation more than or equal to 10 centimetres around the concrete of anchor pole master muscle or the end face of cement mortar;
3) partly draw the foundation ditch that digs out digging foundation at the soil layer on the face of land;
4) lay and fixing described digging foundation arrangement of reinforcement, concreting then at digging foundation.
In addition, anchor pole of the present invention basis, footing foundation, board-like greatly, digging foundation are known base form, are usually used in the transmission line of electricity basis.
Fig. 5 is second kind of organigram of composite foundation combining anchor rods with excavation of the present invention, and Fig. 6 is the third organigram of composite foundation combining anchor rods with excavation of the present invention.Wherein, described digging foundation the cross sectional shape of vertical direction be the infundibulate of back-off or rectangle or on bottom side length trapezoidal in the bottom.
Invention has been described according to specific exemplary embodiment herein.It will be conspicuous carrying out suitable replacement to one skilled in the art or revise under not departing from the scope of the present invention.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present invention, scope of the present invention is by appended claim definition.

Claims (5)

1. composite foundation combining anchor rods with excavation, comprise digging foundation (1) and anchor pole basis (2), it is characterized in that: described anchor pole basis (2) is arranged in the rock stratum (II) on the face of land, it comprises at least one cylindrical or polygonal rock bolt (3), described rock bolt (3) has anchor pole master muscle (4) and centers on the concrete or the cement mortar (5) of anchor pole master muscle, and described anchor pole master muscle (4) extend in the digging foundation (1); Described digging foundation (1) is arranged in the soil layer (I) on the face of land, and it is made of arrangement of reinforcement (6) and concrete (7); Described digging foundation (1) is connected by the anchor pole master muscle (4) that extend in the digging foundation with anchor pole basis (2).
2. composite foundation combining anchor rods with excavation as claimed in claim 1 is characterized in that: the length that described anchor pole master muscle (4) extend into digging foundation (1) is more than or equal to 40 times of anchor pole master muscle (4) diameter.
3. composite foundation combining anchor rods with excavation as claimed in claim 1 or 2 is characterized in that: described around anchor pole master muscle concrete or the end face of cement mortar (5) extend into the height h of digging foundation (1) more than or equal to 10 centimetres.
4. as the described composite foundation combining anchor rods with excavation of claim 1-3, it is characterized in that: described digging foundation (1) is the infundibulate of back-off or rectangle or top at the cross sectional shape of vertical direction and is longer than following trapezoidal.
5. job practices as the described composite foundation combining anchor rods with excavation of claim 1-4, construction process is as follows:
1) pore-forming utilizes jumbolter to get out armature boring in the soil layer on the face of land and rock stratum;
2) after pore-forming finishes, put into and fixing described anchor pole master muscle, make described anchor pole master muscle extend into digging foundation length partly 40 times greater than anchor pole master muscle diameter, pour into described anchor pole then partly around the concrete or the cement mortar of anchor pole master muscle, make describedly to extend into the height of digging foundation part greater than 10 centimetres around the concrete of anchor pole master muscle or the end face of cement mortar;
3) partly draw the foundation ditch that digs out the digging foundation part at the soil layer on the face of land;
4) partly lay and fixing described digging foundation part arrangement of reinforcement, concreting then at digging foundation.
CN2009100932838A 2009-09-25 2009-09-25 Composite foundation combining anchor rods with excavation and construction method thereof Active CN101691760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100932838A CN101691760B (en) 2009-09-25 2009-09-25 Composite foundation combining anchor rods with excavation and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100932838A CN101691760B (en) 2009-09-25 2009-09-25 Composite foundation combining anchor rods with excavation and construction method thereof

Publications (2)

Publication Number Publication Date
CN101691760A true CN101691760A (en) 2010-04-07
CN101691760B CN101691760B (en) 2011-07-27

Family

ID=42080470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100932838A Active CN101691760B (en) 2009-09-25 2009-09-25 Composite foundation combining anchor rods with excavation and construction method thereof

Country Status (1)

Country Link
CN (1) CN101691760B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147456A (en) * 2013-03-08 2013-06-12 中节能风力发电股份有限公司 Prestressed combination pile structure and construction method thereof
CN108019086A (en) * 2017-12-06 2018-05-11 浙江飞英电力器材有限公司 A kind of large bending moment electrical pole and its installation method
CN108589759A (en) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 A kind of shaft tower composite foundation
CN111576469A (en) * 2020-04-02 2020-08-25 国网浙江省电力有限公司湖州供电公司 Novel power transmission line tower foundation and construction method
CN111910671A (en) * 2020-07-20 2020-11-10 国网浙江省电力有限公司丽水供电公司 Prestressed anchor rod combined excavation composite foundation and construction method thereof
CN111910670A (en) * 2020-07-20 2020-11-10 国网浙江省电力有限公司丽水供电公司 Assembly type rock anchor rod composite foundation and construction method thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000046452A1 (en) * 1999-02-05 2000-08-10 Northern Technologies, Inc. Support structure for elevating and supporting monopoles and associated equipment
NO311184B1 (en) * 2000-03-10 2001-10-22 Norsk Miljoekraft As Method and apparatus for attaching a foundation to the bedrock
CN201232193Y (en) * 2008-07-16 2009-05-06 钱自力 Wind motor tower foundation anchor pile structure on rock foundation
CN201485863U (en) * 2009-09-04 2010-05-26 中国电力工程顾问集团东北电力设计院 Digging rock bolt compound environment-protection basis
CN201495554U (en) * 2009-09-25 2010-06-02 中国电力科学研究院 Anchor bolt combination excavating compound base

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147456A (en) * 2013-03-08 2013-06-12 中节能风力发电股份有限公司 Prestressed combination pile structure and construction method thereof
CN108019086A (en) * 2017-12-06 2018-05-11 浙江飞英电力器材有限公司 A kind of large bending moment electrical pole and its installation method
CN108589759A (en) * 2018-05-15 2018-09-28 中国电力科学研究院有限公司 A kind of shaft tower composite foundation
CN111576469A (en) * 2020-04-02 2020-08-25 国网浙江省电力有限公司湖州供电公司 Novel power transmission line tower foundation and construction method
CN111910671A (en) * 2020-07-20 2020-11-10 国网浙江省电力有限公司丽水供电公司 Prestressed anchor rod combined excavation composite foundation and construction method thereof
CN111910670A (en) * 2020-07-20 2020-11-10 国网浙江省电力有限公司丽水供电公司 Assembly type rock anchor rod composite foundation and construction method thereof

Also Published As

Publication number Publication date
CN101691760B (en) 2011-07-27

Similar Documents

Publication Publication Date Title
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN103321244B (en) Sand foundation existing building sets up the construction method of basement
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN202117068U (en) Micropile plate-type composite foundation
CN104895089A (en) Construction method of permanent retaining system characterized by joint work of basement floor slabs and retaining piles
CN104818728A (en) Permanent supporting system with basement floor and supporting piles capable of working together
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN207959264U (en) Soft clay foundation adjoins High-filled emkankment pipe gallery
CN201232194Y (en) Anti-deformation power transmission tower
CN210395412U (en) Prestressed anchor pile uplift foundation suitable for overhead transmission line in mountain area
CN103866766A (en) Steel anchor pier for landslide emergency treatment and construction method thereof
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN106088133B (en) Power transmission line composite foundation for desert area
CN108331015A (en) Soft clay foundation adjoins High-filled emkankment pipe gallery and its construction technology
CN103015414A (en) Precast concrete post grouting pile and grouting process
CN201502065U (en) Anchor rod joint excavation compound basis
CN111058463A (en) Rock steep slope high cantilever slope-collecting reinforcing structure and construction method
CN101691759A (en) Construction method for digging composite environmental protection base of anchorage bar adding rock
CN203741848U (en) Steel tube plate type retaining structure
CN203361150U (en) Composite anti-floating anchor pile
CN205399503U (en) Anti floating botton board anchor slab formula of basement machinery anchor stock that excels in
CN201495554U (en) Anchor bolt combination excavating compound base
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN203639929U (en) Split open caisson and pile composite anchor foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130129

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130129

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee after: China Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Patentee before: China Electric Power Research Institute