CN101667283A - Operation analysis apparatus - Google Patents

Operation analysis apparatus Download PDF

Info

Publication number
CN101667283A
CN101667283A CN200910172110A CN200910172110A CN101667283A CN 101667283 A CN101667283 A CN 101667283A CN 200910172110 A CN200910172110 A CN 200910172110A CN 200910172110 A CN200910172110 A CN 200910172110A CN 101667283 A CN101667283 A CN 101667283A
Authority
CN
China
Prior art keywords
operator
time
flow chart
data
actual job
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910172110A
Other languages
Chinese (zh)
Inventor
藤本美音
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juki Corp
Original Assignee
Juki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Juki Corp filed Critical Juki Corp
Publication of CN101667283A publication Critical patent/CN101667283A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Sewing Machines And Sewing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an operating analysis apparatus, which can correctly adjust process distribution of operator, and realize improvement of the production efficiency. The invention includes: a data acquiring unit, which acquires operation recording data D including operator ID, process ID and production pitch time data from each sewing machine; a operation requiring time calculation unit, inthe integral or part of the range of each operation recording data, production pitch time of each operator is calculated for each operation process; as well as actual job time calculation unit, against each operator, the production pitch time of each operation process is totaled for calculating an actual job time; an actual job time calculation unit, an operation process exists in each operationrecording data, that is under the instance of division of operation by multiple operators, the required time specific information is the averaged required time of the operation process operated by operators through conciliation and equilibration, based on the required time of each operation for calculating actual job time.

Description

Operation analysis apparatus
Technical field
The present invention relates to a kind of operation analysis apparatus, related charge book data gather, analyze in the production of the product that it is made the flow chart implementing simultaneously to be shared, demonstration or export its analysis result to the outside.
Background technology
For example, making in the factory, generally dividing and make flow chart, sharing by a plurality of operators and respectively make flow chart, operation sewing machine and implement to make operation for the parts of each quilt.
Make that operation is divided into a plurality of flow charts and under the situation about sharing that product is related, preferred All Jobs operation is carried out simultaneously, produce delay etc. with the flow chart that a part of operator is shared, in order to make the operation high efficiency, must reduce the fluctuation of each operator's operation required time.
Therefore, existing operation analysis apparatus, for example such as in the patent documentation 1 record, according to the operator's customizing messages that is used for determining the operating personnel, the operation customizing messages that is used for definite flow chart and the operation required time of each flow chart, certain flow chart that each operating personnel is carried out and needed time of each flow chart is record one by one, collects this data, passes through operation analysis apparatus, they are gathered, analyze, the display analysis result.
As shown in figure 16, in the manufacturing of sofa, show, separately the flow chart of the parts shared is made the example of operation by five operators.
In Figure 17, the combined data that shows following data with form, promptly, the actual job time that the operation ID of the operation that each operator distributed (operation customizing messages), each operation are once made the needed productive temp time of operation (operation required time) and at each operator productive temp time of each operation added up to, data D1 represents to carry out process distribution and adjusts preceding state, and data D2 represents the adjusted state of process distribution.
In addition, Figure 18 represents operator and the relation of actual job between the time, and broken line L1 is based on that data D1 makes, and broken line L2 is based on that data D2 makes.
Here, so-called " actual job time ", be meant and sharing by a plurality of operators under the situation of the flow chart that belongs to a certain product, the value that productive temp time of each operation is added up to.Promptly, the actual job time, being expression, needed to make operation all for product, the value of each operator's working time, by so that the mode that is evenly distributed of practical operation time is distributed each operation to each operator, thereby eliminate the delay that the delay owing to a part of operation causes product to be finished, can realize obtaining the high efficiency common operation of line balancing.
By broken line L1 as can be known, in all operations person, the operator's of operator ID1113 the actual job time is longer, and the operator's of operator ID1106 the actual job time is shorter, and line balancing is relatively poor.In this case, will distribute to operator (1106) and adjust a part of flow chart, for example operation 71 that operator (1113) distributes.Thus, shown in broken line L2, each operator's actual job lead time descends significantly, and it is good that line balancing becomes.
Existing operation analysis apparatus, in order successfully to carry out above-mentioned analysis and adjustment, it has following function, promptly, the charge book data of collecting from each sewing machine are gathered, carry out generation and the demonstration of above-mentioned data D1, the editing operating of the line data of going forward side by side.In addition, in the handled combined data of operation analysis apparatus, productive temp time of each operation, be with carried out many working times of making operation divided by number of packages calculating mean value, carry out the generation of data D1, and on average calculate the average productive temp time of this moment by addition.
But, at the scene of making operation, produce under the situation about postponing in a part of operation that certain operator distributed, there is not the operator of work temporarily to help at hand to a part of making predetermined number of packages that postpones in the operation.In this case, the operator who helps imports by the operation ID of help operation, and the part that will help counts in the charge book data.
With form the example of operation analysis apparatus to the combined data D3 of this charge book data sink General Logistics Department is shown among Figure 19.As the operation benchmark, that is, the content of the charge book data after gathering gathers at each operation this combined data D3 with above-mentioned data D1.
The regional A1 of this combined data D3, the example that operation is carried out to operation (45) in expression operator (1106), (1067), (1105).In addition, in combined data D3, " average productive temp time (1) " is the average productive temp time (the average productive temp time that also can be called operator's benchmark) of each operator each operation of carrying out, " average productive temp time (2) " is the average productive temp time (the average productive temp time that also can be called the operation benchmark) of each operation, two average productive temp times (1) and (2), is identical value in each operation under by the situation of single operation person operation, but shown in operation (45), being divided the work situation that operation carries out by a plurality of operators under, an operation is different values.
And in existing operation analysis apparatus, a plurality of operators divide the work the calculating of average productive temp time (2) of the operation benchmark under the situation of operation to an operation, calculate by the addition average treatment.Specifically, shown in the regional A1 of combined data D3, the average productive temp time (1) three operators is respectively 85[s], 103[s], 69[s] situation under, average productive temp time (2)=(the 85+103+69)/3=86[s of operation benchmark], by will take on divide the work operation the operator separately " average productive temp time (1) phase adduction calculates divided by number.
In addition, existing operation analysis apparatus, as shown in figure 20, also carrying out with operator is the calculating of the combined data D4 of benchmark.This combined data D4 is at each operator, the data that average productive temp time (2) of the production quantity of the operation ID of operation distribution, each operation, each operation, each operator's the actual job time is gathered.
The regional A2 of this combined data D4, expression is divided the work average productive temp time (2) of operation (45) of operation by operator (1106), (1067), (1105) three people, here also is to adopt three operators' average productive temp time (1) addition is average and average productive temp time (2) of obtaining (=86[s]).
And, shown in combined data D4, in existing operation analysis apparatus, calculating actual job during the time at each operator, for operation (45), also be with and average productive temp time (2)=86[s that obtain average by above-mentioned addition by operation that a plurality of operator divides the work] as take on divide the work operation each operator the shared average productive temp time and use.
Patent documentation 1: the spy of Japan opens flat 04-13546 communique
Summary of the invention
But, as mentioned above, whenever for dividing the work the operation of operation by a plurality of people, during the average productive temp time (2) of calculation process benchmark, only be that to carry out everyone addition of productive temp time average, can't obtain correct mean value.That is, described here correct mean value is meant to have a plurality of operators' the operator of average ability of operation is divided the work in same operation operation, finish this operation required in case of necessity between.
The productive temp time with described operator (1106), (1067), (1105) is that example describes.If the unit of the average productive temp time (1) shown in the combined data D3 is second ([s]), then the processing speed [part/s] of each individual operation (45) is respectively (1/85) [part/s], (1/103) [part/s], (1/69) [part/s], if so carry out operation (45) jointly, then this required time is ((1/85)+(1/103)+(1/69)) -1=27.8[s].Thus,, then need 3 times time if carry out operation (45) by people of the operator with average ability, thus the correct average productive temp time (2) should for
Figure A20091017211000071
But above-mentioned addition mean value is 86[s], with correct required time 83[s] inconsistent.
Thus, there is following problem, promptly, an operation is being divided the work under the situation of operation, can't correctly calculate the actual job time that is used to estimate line balancing,, also can not enhance productivity actual job time even adjust operator's process distribution based on this.
And, in the computing method of existing actual job time, an operation is being divided the work under the situation of operation, do not consider each operator's operation ratio.If dividing the work the situation of operation with described operator (1106), (1067), (1105) is that example describes, then for example shown in the combined data D4, operator (1105) has carried out 30 making for operation (41), (42), (44), but has only made 5 for operation (45).That is, although carried out other operation sixth make quantity, when the calculating of actual job time conduct and other operation equal number make thing, obtain the average productive temp time (2) by additive operation.
Also, can't correctly calculate the actual job time, thereby can't realize enhancing productivity by the process distribution of adjusting the operator owing to this reason.
The objective of the invention is, correctly adjust operator's process distribution, realize the raising of production efficiency.
The invention of technical scheme 1 record, be that the charge book data relevant with the production of following product are gathered, analyze on this basis, and its analysis result is shown or export to the outside, described product is produced by the operation that a plurality of operators carry out the flow chart of sharing separately simultaneously, it is characterized in that, have: data capture unit, it obtains the charge book data, and these charge book data comprise operator's customizing messages, the flow chart customizing messages of bearing described each flow chart, the operation required time customizing messages that reaches each flow chart; Operation required time computing unit, it for each flow chart, obtains each operator's operation required time in all or a part of scope of described each charge book data; And actual job time calculating unit, it is for each described operator, the operation required time of the flow chart that this operator is carried out adds up to, calculate the actual job time, described actual job time calculating unit, when in described each charge book data, existing a flow chart to divide the work operation required time customizing messages under the situation of operation by a plurality of operators, utilize harmonic average to make it equalization by operation required time with these operators' described flow chart, based on the operation required time of obtaining by this equalization, calculate each described operator's the actual job time.
The invention of technical scheme 2 records, it is characterized in that, has the identical formation of invention with technical scheme 1 record, simultaneously, in described each charge book data, comprise the production quantity information of each operator in each flow chart, described actual job time calculating unit, when in described each charge book data, existing a flow chart to divide the work operation required time customizing messages under the situation of operation by a plurality of operators, on the operation required time that calculates utilizing described averaging of harmonic average, multiply by each operator's the production quantity production quantity shared ratio all with respect to the flow chart of described division of labor operation, on this basis, add up to the operation required time of other flow chart, thus the actual job time of calculating described each operator.
In addition, " operation required time customizing messages " and " the production quantity information " of " charge book data ", its content is not limited to directly show required time or production quantity, also can be by carrying out computing, as a result of obtaining the indirect consequence of required time and production quantity.For example be the expression sewing machine make beginning or the information of the finish time etc. at every turn, obtain required time according to these differences constantly, perhaps also can for once make must the record some information, obtain production quantity by the number of this information in specified time limit is counted.
In addition, above-mentioned " flow chart customizing messages ", the identifying information (identifying information so long as ID and other information that can discern by the device that carries out data processing get final product) of for example representing all classification of making flow chart etc. of sewing machine, for example, in various identifications of making batch to be under the situation of unit management operation, as long as comprise the information that can discern each batch.
The effect of invention
The operation analysis apparatus of the invention of technical scheme 1 record, by obtaining the charge book data, and, which operator needing in which flow chart and this flow chart to carry out how many operation required times to gather to by operator's customizing messages, flow chart customizing messages and operation required time customizing messages that the utilization of operation required time computing unit comprises in the charge book data.
And, the actual job time calculating unit, for each operator, the operation required time that this operator is carried out the flow chart of operation adds up to, and carries out the calculating of actual job time.
Then, in a plurality of charge book data that gather, exist by a plurality of operators and divide the work under the situation of the flow chart that operation carries out, for this flow chart, with each operator's operation required time based on harmonic average and equalization.
For example, be that t1, t2, t3 carry out under the situation of same flow chart with the operation required time respectively at operator A, B, C, according to the notion of harmonic average, its mean value is calculated by ta=3/ ((1/t1)+(1/t2)+(1/t3)).Because this value just in time is equivalent to carry out 3 times of required time under the situation of described flow chart jointly at operator A, B, C, carries out the needed operation required time of this flow chart so can become the operator of the average ability with operator A, B, C.
As mentioned above, even share by a plurality of operators making whole flow charts, wherein Yi Bufen flow chart contains under the situation of common operation, owing to make operation required time equalization by the method that reflects each operator's work capacity, so in order to make under the situation that each operator's actual job time and work capacity are impartial as far as possible accordingly and adjust, can more meet the destination and calculate the actual job time, by using as operation analysis apparatus of the present invention, can correctly adjust operator's process distribution, realize the raising of production efficiency.
The invention of technical scheme 2 records, be the information of production quantity information that in the charge book data, comprises each flow chart of each operator, a flow chart is divided the work the situation of operation by a plurality of operators under, the actual job time calculating unit, when the calculating of actual job time of each operator, operation required time for the flow chart that carries out jointly, be not with the value of equalization by harmonic average directly and the operation required time of other flow chart add up to, but on the operation required time after harmonic averageization, multiply by an operator's the production quantity production quantity proportion all with respect to common operation, on this basis, the operation required time of flow chart with other adds up to and the computational tasks required time.
The notion of actual job time is, in all required whole required times of the operation of being made up of whole flow charts, the time scale that each individual of operator is shared quantizes.
On the other hand, for the flow chart that carries out operation jointly,, do not carry out operation with other operation equal number owing to be not to carry out an operation integral body by independent operator, so in the calculating of actual job, can not carry out additive operation in the same manner with other operation.Thus, shown in above-mentioned actual job time calculating unit, multiply by the operation required time by the production quantity of the operator being carried out operation separately with respect to all quantity proportions, can reflect the time scale that operator individual shared in all whole required times of operation more reliably.
Thus, the operation analysis apparatus of the application of the invention can be obtained the actual job time more reliably, correctly adjusts operator's process distribution, can realize the raising of production efficiency.
Description of drawings
Fig. 1 is the block diagram that the summary of the job analysis system of expression sewing machine constitutes.
Fig. 2 is that expression comprises the block diagram of production management sewing machine in the summary formation of interior job analysis system.
Fig. 3 is the key diagram of expression as the record structure of making operation moment data of charge book data.
The process flow diagram of the processing that the recording processing program of Fig. 4 charge book data that to be expression carry out based on the CPU by the production management sewing machine carries out.
Fig. 5 is the demonstration example of key frame.
Fig. 6 is the process flow diagram that is illustrated in the display process that CPU carries out in the key frame.
Fig. 7 is the process flow diagram that is illustrated in the selection processing that CPU carries out in the key frame.
Fig. 8 is the demonstration example of the operation complete list picture of operation benchmark.
Fig. 9 is the process flow diagram of the display process of expression operation complete list picture.
Figure 10 is the process flow diagram that is illustrated in the equalization processing of the productive temp time of carrying out in the display process of operation complete list picture.
Figure 11 is the demonstration example of the chart display frame of average productive temp time (2).
Figure 12 is the demonstration example of the operation complete list picture of operator ID benchmark.
Figure 13 is the process flow diagram of the display process of expression operation complete list picture.
Figure 14 is the process flow diagram that is illustrated in the computing of the actual job time of carrying out in the display process of operation complete list picture.
Figure 15 is the demonstration example of the chart display frame of actual job time.
Figure 16 has represented that five operators share the key diagram of example of situation of each operation of making operation of sofa.
Figure 17 is the chart of the combined data of expression actual job time of having shown each operation of belonging to the operator in the charge book data of operation shown in Figure 16 and each operation required time and each operator with form.
Figure 18 shows the line chart of making the operator in the operation and concerning between activity duration time shown in Figure 16 with broken line.
The chart of Figure 19 combined data that to be expression gather the charge book data pin to operation.
The chart of Figure 20 combined data that to be expression gather the charge book data pin to the operator.
Embodiment
(one-piece construction of working of an invention mode)
Below, with reference to accompanying drawing,, describe at the job analysis system 100 of interior sewing machine comprising the operation analysis apparatus that relates to 101 shown in the present based on Fig. 1 to Figure 15.
As shown in Figure 1, this job analysis system 100 has: many production management sewing machines 10; And operation analysis apparatus 101, it can carry out the transmission/reception of charge book data by sending artificially/receive between each production management sewing machine 10 and information recording carrier.
As above-mentioned operation analysis apparatus 101, use personal computer or workstation.In addition, the transmission/reception of the charge book data between operation analysis apparatus 101 and each the production management sewing machine 10 also can utilize wireless or wire communication unit such as WLAN and wired lan.
(production management sewing machine)
In Fig. 2, each production management sewing machine 10 has: sewing machine electromotor 11, and it is the drive source that the needle bar that keeps suture needle is driven up and down; Not shown reciprocating mechanism, its rotary driving force with sewing machine electromotor 11 is transformed to and moves up and down driving force, to the needle bar transmission; Not shown cloth feed mechanism; Not shown line adjusting device; Cutter driving solenoid 12, it carries out the line cutter driving that suture cuts off making to make after finishing; Operating pedal 13, it is by preceding stepping on the starting order of input sewing machine electromotor 11, by the driving command of post legged input cutter driving solenoid 12; Guidance panel 20, it has the operating key 21 that carries out various inputs described later and carries out the display part 22 that the regulation picture shows; Counter switch 23, it is pressed when making of a flow chart finished; ROM 32, and its storage is used to carry out the various programs and the primary data of various processing described later; CPU 31, and it carries out various program RAM 33, its with the various data storage relevant with the processing of CPU 31 in the perform region; EEPROM35, it is stored in the charge book data of record in the production management sewing machine 10; Flash card 36 and read and write-in apparatus 37 thereof, this flash card 36 are to be used for recording medium that the charge book data in the EEPROM 35 are transmitted between this production management sewing machine 10 and operation analysis apparatus 101.
(charge book data)
Above-mentioned production management sewing machine 10 in the process of making, generate as shown in Figure 3 as the charge book data make operation data D constantly, be recorded among the EEPROM 35.In addition, this make operation constantly data D duplicate and transmit to flash card 36 from EEPROM 35 to operation analysis apparatus 101.
Making operation moment data D forms by following manner, promptly, whenever carrying out one when making work unit and being making of flow chart, CPU 31 constantly (also comprises the date by this being made operation, the omission diagram) writes down one by one and generate, if it is input operation person ID and operation ID's is some in the middle of this record, then corresponding and in the middle of respectively making operation data constantly, insert with input time.The above-mentioned operation record constantly of making carries out when pressing counter switch 23 when sewing finishing.In addition, when the primary power of production management sewing machine 10 is connected, write down sewing machine ID among the data D constantly to making operation.
In addition, so-called sewing machine ID is to be used to distinguish each sewing machine and label that each production management sewing machine 10 is distributed respectively.
In addition, so-called operator ID, be a plurality of operators (operator) use each production management sewing machine 10 and the flow chart that carries out being shared separately make operation the time, the label that each operator is distributed respectively in order to distinguish each operator.
In addition, so-called operation ID is in order to distinguish each flow chart over against various sewn objects, the label that each flow chart is distributed respectively.
Here, as flow chart, kind for each sewn object, flow chart is discerned as different operations, but for sewn object of the same race, under different situation such as size, color, pattern, material category, also can distribute different ID, so that these flow charts can be discerned as different operations.
In addition, for corresponding, the production of sewn object batch to be under the unit situation about managing, under the situation that is different batches, also be can be used as different flow charts and discerns with the volume production of sewn object.
In addition, make among the operation moment data D above-mentioned, record " operator's customizing messages ", " flow chart customizing messages ", " operation required time customizing messages " reach " production quantity information " respectively.Specifically, as " operator's customizing messages ", the operator's of each flow chart operator ID born in record, as " flow chart customizing messages ", and record operation ID.In addition, " operation required time customizing messages " is the information of determining the used time of operation of each flow chart, as this " operation required time customizing messages ", operation data constantly made in record, this operation constantly data by calculate from previous make operation constantly data to the next one make constantly institute's elapsed time till the data, determine the operation required time indirectly.
And " the making operation data constantly " that can obtain production quantity indirectly is equivalent to " production quantity information ".That is,, can determine production quantity indirectly by the number of making operation moment data in specified time limit is counted.
In Fig. 4, at first, if connect primary power, then rate-of-turn record timer (not shown) picks up counting (step S1), and this rate-of-turn record timer carries out timing to the cycle that is used for detecting periodically the sewing machine rotating speed.Then, write down sewing machine ID (step S2) among the data D constantly to making operation.
Then, the indication of CPU 31 display requirement input operation person ID and operation ID in display part 22 is if receive these inputs from operating key group 21, then to making operation recording operation person ID and operation ID (step S3) in the data ID constantly.
Then, utilize not shown onboard clock, write down (step S4) among the data D constantly to making operation constantly as making operation with reference to current time.
In addition, each ID and make operation and constantly carry out record according to the order of executive logging respectively as long as make operation each data group of the content of data D constantly with reference to becoming in order, just can know the order that is write down.
Then, in step S5, judge whether that new operator ID, the processing that enters step S7 under situation about not importing are imported in the changing shifts etc. owing to the operator.Under the situation that has input, to making operation data D recording operation person ID (step S6) constantly.
Then, in step S7, judge whether to import new operation ID because of the change of operation, the processing that enters step S9 under the situation that does not have input is under the situation that has input, to making operation data D record operation ID (step S8) constantly.
In step S9, judge whether to exist the input of counter switch 23, under the situation that does not have input, turn back to the processing of step S5.In addition, under the situation that has input, make operation back (step S10) constantly, return the processing of step S5 to making operation moment data D record.
Above-mentioned processing continued to carry out before the primary power of production management sewing machine 10 disconnects, and thus, operation data D constantly made in record in the EEPROM 35 of production management sewing machine 10.
(operation analysis apparatus)
The operator of a plurality of sewing machines uses above-mentioned production management sewing machine 10 respectively, implement the making operation of flow chart of sharing separately simultaneously and produce product, operation analysis apparatus 101, on the basis that the charge book data related to the production of this product gather, analyze, will be presented on the display 103 as " the operation required time " and " actual job time " of its analysis result.This operation analysis apparatus 101 has: keyboard 102, and it carries out various input described later; As the display 103 of display unit, its picture of stipulating shows; ROM104, it stores base program and primary data; CPU 105, and it carries out various program RAM106, its with each data storing relevant with the processing of CPU 105 in the perform region; As the HD (hard disk) of storage unit device 108, its storage is used to carry out each program of handling of aftermentioned and makes operation data D constantly from what each production management sewing machine 10 received; As the flash card 36 and the read and write-in apparatus 109 thereof of data capture unit, this flash card 36 is used for obtaining from production management sewing machine 10 makes operation data D constantly; And mouse 110, it carries out the move operation of the cursor of demonstration in display 103 and the input of determining.In addition, because following explanation display frame is selected by mouse 110 and the input operation that determines is known, so omit its principle and detailed description.
(key frame)
In operation analysis apparatus 101, make operation data D constantly if obtain from each production management sewing machine 10, then, key frame M1 is presented on the display 103 by the predetermined process program.In Fig. 5, key frame M1 is the demonstration of complete list form, it is illustrated in from making the operation moment data D that each production management sewing machine 10 obtains, and whether the data of (time on date) exist during belonging to certain identifying information (operator ID and operation ID) and being in certain.In this key frame M1, the identifying information of guide look display operation person ID and operation ID on the longitudinal axis, they become the selector switch of ID simultaneously, during showing according to time series on the transverse axis, the selector switch during they become simultaneously.In addition, the Show Color of the cell that exists at the cell that begins from ID arbitrarily to arrange with horizontal row, with position that the cell that beginning during is arbitrarily arranged with vertical row is reported to the leadship after accomplishing a task mutually, whether expression exists data in ID arbitrarily is during any.
In addition,, can be chosen among longitudinal axis display operation person ID and the operation ID which, by assigned switch M12 during showing being operated the operation of the indication range during can carrying out by mouse by change-over switch M11 being operated by mouse.
And key frame M1 works as " selected cell ", that is, and and in order to be selected to the data of the object that the demonstration of carrying out recorded content or form show, during some in selecting during identifying information and the data recording (time on date).Promptly, as mentioned above, show that the longitudinal axis represents that ID, transverse axis represent the chequer on date, because grid cell separately becomes selector switch, so by respectively they being selected by mouse action, thereby, specify and be extracted in the data that the selected time on date obtained for selecteed ID.
Based on Fig. 6, the processing that CPU 105 carries out in above-mentioned key frame M1 is described.Here, be that example describes with the situation of on the longitudinal axis, having selected operator ID.
At first, illustrate when key frame M1 shows, to the processing of carrying out color differentiating and showing that has or not of each ID and the data during each.
This processing, at first, with make operation constantly data D begin to read in (step S21) from the prostatitis of data ordering, whether the record of judging first operator ID exists (step S22), under the situation of the record of finding operator ID, the nearest operation time information (step S23) of making that is positioned at its rear is compared in search with this operator ID, make the time on date (step S24) of sense data record the operation time information from this.By in the gamut of respectively making operation moment data D, carrying out this operation (step S25), can obtain whole record dates and the time of first operator ID.By the operator ID after it is carried out identical processing, can determine whether to exist the charge book data to each operator ID, each time on date, thus, the color differentiating of carrying out each cell shows control.
In addition, selecting in the processing of above-mentioned steps S22, to judge whether to exist operation ID under the situation of operation ID on the longitudinal axis by change-over switch M11.
Below, based on Fig. 7, the processing that CPU 105 is carried out is described under the situation that key frame M1 works as selected cell.Here, be that example describes with the situation of on the longitudinal axis, having selected operator ID.
In the show state of key frame M1, CPU 105 has judged whether to select the some operator ID (step S31) on the longitudinal axis, has judged whether then to select (step S32) during some on the transverse axis.And, judge whether to have selected operator ID and during the two (step S33).
Its result, under the situation that both all select, CPU 105 is for the data (step S34) of making operation data D constantly, extracting the person ID that belongs to the selection operation.The method of extracting is, begins to carry out reading of data, search operaqtion person ID in the prostatitis of data D constantly from making operation.If detect operator ID, judge then whether this operator ID is selecteed operator ID, only under the situation of its person ID that is the selection operation, extract data and record till next operator ID.In the gamut of rotary speed data D1, carry out detection, judgement, the data extract of operator ID, all data that extract are stored among the RAM 106 as temporary transient extraction data.
Then, if carried out the extraction of temporary transient extraction data, then for these temporary transient data of extracting, CPU 105 belongs to the extraction (step S35) of the extraction data during the selection.
The method of extracting is, begin to read from this temporary transient prostatitis of extracting data and respectively make operation data constantly, judge the represented moment of each data whether be in selected during in, extract under the situation in only during being in, be recorded among the RAM 106, carry out this operation for the gamut of temporary transient extraction data.Thus, for making operation data D constantly, extract with selected operator ID and suitable extraction data during selecting.
In addition, selecting on the longitudinal axis under the situation of operation ID by change-over switch M11, CPU 105 judges whether selected operation ID in the processing of above-mentioned steps S31, extracts to belong to the temporary transient extraction data of selecting operation ID in the processing of step S34.
And, operator ID or operation ID and during selection certainly be a plurality of.And in this case, the extraction of temporarily extracting data and extracting data is selected to carry out respectively during ID and each for each.
(operation complete list [1])
In each display frame, have and carry out tag switches M13~M16 that display category is switched,, can switch display category by they are carried out mouse action.In addition, here, below the shown operational situation monitor of the M14 relevant with the present invention is described.Display category is being switched under the situation of operational situation monitor by above-mentioned tag switches M14, on display 103, can show operation complete list picture M2 shown in Figure 8.
This operation complete list picture M2 is to be the picture of benchmark with operation ID, show operation ID at left column, adjacent right row display operation person ID at this operation ID, the adjacent right average productive temp time (1) that is listed as demonstration as the operation required time at this operator ID, be listed as the average productive temp time (2) that shows as the operation required time on the adjacent right side of this average productive temp time (1).In addition, in this operation complete list picture M2, projects are arranged explicitly along horizontal row and are shown, promptly, the ID that shows the operator who carries out the represented flow chart of this operation ID at the adjacent right row of each operation ID, the average productive temp time (1) when the right side of this operator ID shows that this operator carries out this flow chart is in the average productive temp time (2) of the right side of this average productive temp time (1) demonstration based on the average productive temp time (1).
Here, the so-called average productive temp time (1), be with second [s] be unit, represent that each operator makes mean value of making the productive temp time (operation required time) of thing of production in the operation at each.This average productive temp time (1), make operation constantly in the scope of the extraction data of data D above-mentioned, calculate according to the operation mistiming constantly of making of front and back.
That is, the CPU 105 of operation analysis apparatus 101 averages the calculating of productive temp time (1) by utilizing said method, thereby works as " operation required time computing unit ".
And, as by same operator to so many situations of making of same flow chart, in extracting data, there be identical a plurality of the making under the operation situation constantly of operator and flow chart, by all make operation total constantly divided by making number of times with these, equalization averages the calculating of productive temp time (1) by addition is average.
The average productive temp time (2) calculated based on the average productive temp time (1), was used for the calculating of actual job time described later.
This average productive temp time (2) is unit representation with second [s] also, it is in the scope of extracting data, the division of labor operation determination processing that utilization is undertaken by CPU 105, whether judgement carries out operation by a plurality of operators for a flow chart, be judged as negative, judge that promptly a flow chart is only undertaken under the situation of operation by an operator, according to the average productive temp time (1)=on average the productive temp time (2) calculates, be judged as certainly, judge that promptly a flow chart divided the work under the situation of operation by a plurality of operators, each operator's the average productive temp time (1) is continued by harmonic average equalization, calculate.
Specifically, operation (45) in operation complete list picture M2 is by operator (1067), (1105), (1106) division of labor operation, in this case, with each individual's the average productive temp time (1) is 85[s], 103[s], 69[s] equalization according to the notion of harmonic average, calculate this mean value and be
Figure A20091017211000181
Figure A20091017211000182
Because this value just in time is equivalent to 3 times of required time 1/ ((1/85)+(1/103)+(1/69)) [s] under the situation of being carried out described flow chart by operator (1067), (1105), (1106) jointly, carries out the required operation required time of this flow chart so this value can be called the operator of the average ability with operator (1067), (1105), (1106).
That is, the CPU 105 of operation analysis apparatus 101 averages the calculating of productive temp time (2) by said method, thereby acts on as " the operation required time computing unit " of this operation analysis apparatus 101.
In Fig. 9, during CPU 105 selects at each selection operation person ID and each, for from making the extraction data that operation is extracted the data D constantly, begin to read in (step S41) from prostatitis.
And, the process that begins to read in from the prostatitis of extracting data, carry out the detection of operation ID and operator ID, and, poor according to the surrounding time of making operation moment data related with it, calculating in order and making required time is productive temp time (step S42).
Then, carry out removing the time processing (step S43) of deviation value from the productive temp that calculates in order.
Be described in detail the above-mentioned deviation value of removal that CPU 105 carries out and an example of the processing of calculating mean value here.
At first, in extracting the scope of data, at the set of identical a plurality of productive temp time of each operator ID and operation ID and basis of calculation deviation S.Standard deviation S is calculated based on following formula (1)~(3).That is,, calculate the mean value of productive temp time to each above-mentioned scope.Here, symbol x represents to become each productive temp time of object range, and the x that has line represents its mean value.In addition, symbol n is the sample number that becomes the productive temp time of object range.
And,, from the mean value of obtaining, calculate square deviation s based on following formula (2) 2, based on following formula (3), by its square root basis of calculation deviation s.
[several 1]
x ‾ = Σx n · · · ( 1 )
s 2 = Σ ( x - x ‾ ) 2 n - 1 · · · ( 2 )
s = Σ ( x - x ‾ ) 2 n - 1 · · · ( 3 )
Then, calculate the mean value of 3 σ scopes according to standard deviation s.
That is, obtain+3 σ=(mean value of x)+(s * 3) and-3 σ=(mean value of x)-(s * 3), only extract the productive temp time in ± 3 σ scopes (more than or equal to-3 σ and be less than or equal to+3 σ), remove deviation value.
Then, average by addition, to each productive temp time the averaging processing once more in each scope behind the removal deviation value, to each range computation average productive temp time (1) (step S44).
Then, calculate the processing (step S45) of average productive temp time (2).
This equalization is handled shown in the process flow diagram of Figure 10, at first, judges whether to divide the work operation (division of labor operation determination processing) (step S451) by a plurality of operators for certain flow chart.
That is, will extract data, judge whether there are a plurality of operators that belong to each operation according to each operation classification.Only exist under an operator's the situation for an operation, the value that belongs to the average productive temp time (1) of this operation directly becomes the average productive temp time (2) (step S452).
In addition, exist under a plurality of operators' the situation for an operation, will belong to each operator's of this operation the value of average productive temp time (1), the equalization by harmonic average is calculated the average productive temp time (2) (step S453).
If obtain the average productive temp time (2) for all process steps that extracts data, then CPU 105 calculates the addition mean value of the average productive temp time (2) in all process steps.And, multiply by the regulation ratio by this compound average, calculating upper limit value (=mean value ÷ 0.85) and lower limit (=mean value * 2-higher limit) (step S46).
Then, carry out the demonstration of described operation complete list picture M2, perhaps carry out the demonstration (step S47) of graphic presentation picture M3.Under the situation of the demonstration of carrying out graphic presentation picture M3, as shown in figure 11, mark and draw the value of the average productive temp time (2) of each operation, carry out broken line graphic presentation, simultaneously, the mean value line M31 and the higher limit line M32 of higher limit, the lower limit line M33 of lower limit that in this graphics display area, show comprehensive mean value.Thus, by when showing the figure of average productive temp time (2), each line M31 and M32 of showing higher limit and lower limit simultaneously, the supvr who makes operation as standard, can easily judge the degree of fluctuation of the average productive temp time (2) of each operation with each line M31 of this higher limit and lower limit and M32.
The switching of table and figure is undertaken by the Shape Display Toggle M22 in the picture is carried out mouse action.
(operation complete list [2])
Operation complete list picture M2 is to be the picture of benchmark with operation ID as mentioned above, and change-over switch M21 is set, and it will be that to switch to operator ID be benchmark to benchmark with operation ID.That is, if this change-over switch of mouse action M21, then as shown in figure 12, it is the operation complete list picture M4 of benchmark that demonstration is switched to operator ID.
In this operation complete list picture M4, at left column display operation person ID, show operation ID in the right side of this operator ID adjacent column, show production quantity in the right side of this operation ID adjacent column, show the average productive temp time (2) in the right side of this production quantity adjacent column, show the actual job time in the right side of this average productive temp time (2) adjacent column.And, in operation complete list picture M4, projects are arranged demonstration explicitly along horizontal row, promptly, right side at each operator ID, show that this operator carries out the operation ID of the flow chart of operation, right side at this operation ID, show that this operator carries out the production quantity of this flow chart, right side in this production quantity, show the average productive temp time (2) when this operator carries out this flow chart,, show the actual job time based on the average productive temp time (2) on the right side of this average productive temp time (2).
Here, as the actual job time, in principle, be by with described make operation constantly the represented whole flow chart of operation ID in the extraction data area of data D distribute to each operator, the average productive temp time (2) that will belong to each operator's flow chart adds up to and calculates.
But, divide the work by a plurality of operators under the situation of flow chart of operation existing, shown in area B, for dividing the work the operator of operation, with the production number of packages with this operator on duty of average productive temp time (2) ratio with respect to whole production numbers of packages of this flow chart, on this basis, add up to, calculate the actual job time with other average productive temp time (2) of each flow chart.
As mentioned above, operation (45) is by operator (1067), (1105), (1106) division of labor operation, if with operator (1105) is that example describes, then this operator (1105) is approximately 83[s the average productive temp time (2) in operation (45)] (with reference to Fig. 8), but whole production quantities of operation (45) are 5+15+10=30, wherein, because operator's (1105) production quantity is 5, so at 83[s] on multiply by 5/30, become
Figure A20091017211000211
Figure A20091017211000212
Thus, operator's (1105) the actual job time, add up to by the average productive temp time (2) the flow chart of above-mentioned value and other, calculate be 88+194+72+14=368[s].
That is, the CPU 105 of operation analysis apparatus 101 by carrying out the calculating of actual job time by said method, works as " actual job time calculating unit ".
In Figure 13, CPU 105, at each selection operation person ID and during selecting, to from making the extraction data that operation is extracted the data D constantly, begin to read in (step S51) from prostatitis.
Then, the process that begins to read in from the prostatitis of extracting data, carry out the detection of operation ID and operator ID, and, make operation the surrounding time of data is poor constantly according to related with it, calculating in order and making required time is the productive temp time.And, the number of making operation moment data that operation is consistent with the operator is counted, calculate production quantity (step S52).
Then, carry out the processing (step S53) of removing deviation value the time from the productive temp of calculating in order.The method of removing deviation value is identical with described step S43.
Then, average by addition on the basis of having removed deviation value, with each productive temp time averaging processing once more of each scope of operator and operation unanimity, for each range computation average productive temp time (1) (step S54).
Then, average the computing (step S55) of productive temp time (2) and actual job time.
This is handled, shown in the process flow diagram of Figure 14, with step S451 in the same manner, judge whether to be divided the work operation (division of labor operation determination processing) (step S551) for some operations by a plurality of operators.
And, not divide the work under the situation of operation, the value of average productive temp time (1) that will belong to this operation is directly as the average productive temp time (2) (step S552).
In addition,,, will belong to each operator's of this operation the value equalization of average productive temp time (1), calculate the average productive temp time (2) (step S553) by harmonic averageization dividing the work under the situation of operation.
And,, on the value of the average productive temp time (2) that calculates, multiply by each operator's production quantity ratio (production quantity that production quantity/operation of operator individual is all) (step S554) for dividing the work each operator of operation.
And at each operator, the average productive temp time (2) of each operator being carried out the operation of operation adds up to calculating.At this moment, for dividing the work average productive temp time (2) of operation of operation, as mentioned above, add up to (step S555) with multiply by the value that obtains after the production quantity ratio.Handle the actual job time of calculating each operator by this.
If the whole operators for extracting data obtain the actual job time, then CPU105 calculates the addition mean value of whole operators' actual job time.And, multiply by the regulation ratio by this compound average, calculating upper limit value (=mean value ÷ 0.85) and lower limit (=mean value * 2-higher limit) (step S56).
Then, carry out the demonstration of described operation complete list picture M4, perhaps carry out the demonstration (step S57) of graphic presentation picture M5.Under the situation of display graphics display frame M5, as shown in figure 15, mark and draw the value of each operator's actual job time, carry out broken line graphic presentation, simultaneously, the mean value line M51 and the higher limit line M52 of higher limit, the lower limit line M53 of lower limit that in this graphics display area, show comprehensive mean value.As mentioned above, by when the graphic presentation of actual job time, each line M51 and M52 of showing higher limit and lower limit simultaneously, the supvr who makes operation is a standard with each the line M51 and the M52 of this higher limit and lower limit, can easily judge the degree of fluctuation of actual job time.
In this case, also can show switching by the Shape Display Toggle M22 in the picture is carried out mouse action with figure.
(effect of working of an invention mode)
In the job analysis system 100 of sewing machine, based on a plurality of operation data D constantly that make that from a plurality of production management sewing machines 10, obtain, operation analysis apparatus 101, utilization is made operator ID, the operation ID that comprises among the operation moment data D and is made the operation time information, which flow chart which operator is carried out, and this flow chart needs how many productive temps time to gather.Then, a plurality of making in the extraction data of extracting the operation moment data D from gathering, existence is divided the work by a plurality of operators under the situation of flow chart of operation, by operator at each division of labor operation, the value of the average productive temp time (1) of will be average and obtaining by addition, the equalization by harmonic average is calculated the average productive temp time (2) once more.Thus, the operator of average ability that can obtain the operator with division of labor operation carries out the required productive temp time of this flow chart, and the method for work capacity that can be by having reflected each operator is obtained the actual job time.
Thus, impartial as far as possible for the actual job time that makes each operator is corresponding with work capacity, under the situation about adjusting, can more meet the destination and calculate the actual job time, by using operation analysis apparatus 101, can correctly adjust operator's process distribution, realize the raising of production efficiency.
In addition, in the job analysis system 100 of sewing machine, divide the work by a plurality of operators under the situation of flow chart of operation existing, operation analysis apparatus 101 is when each operator's actual job Time Calculation, to dividing the work average productive temp time (2) of flow chart of operation, multiply by each operator's production quantity ratio, on this basis, add up to, calculate the actual job time with other average productive temp time (2) of flow chart.Thus, can be in the hope of the following actual job time, this actual job time has been reflected the time scale that the operator individual in all whole required times of the flow chart that carries out jointly shares more reliably, can correctly adjust operator's process distribution, realizes the raising of production efficiency.
In addition, operation analysis apparatus of the present invention is not limited to above-mentioned embodiment, can carry out various distortion.For example, in the above-described embodiment, divide the work by a plurality of operators under the situation of flow chart of operation existing, always utilize the average productive temp time of obtaining by harmonic average and calculate the actual job time, but also can with have a plurality of operators that have no way of divide the work operation flow chart irrespectively, the switching selected cell is set, it can switch to for whole operators, average productive temp time that use is on average obtained by addition and calculate the actual job time, corresponding with the situation of operation field and select wherein one.
In addition, in the above-described embodiment, operation analysis apparatus of the present invention, the analysis result that only makes opposite joint manufacturing moment data D gather, analyze is that " operation required time " and " actual job time " is presented on the display of operation analysis apparatus main body, but the not shown interface that can communicate with the printer of outside and memory element etc. also can be set on operation analysis apparatus, with this analysis result to outputs such as the printer of outside and memory elements.
And, in the above-described embodiment, for operation analysis apparatus of the present invention, with situation about being analyzed by the manufacturing of sewing machine opposite joint is that example is illustrated, but operation analysis apparatus of the present invention is not limited to above-mentioned embodiment, so long as carry out the operation of the flow chart of sharing separately simultaneously and produce product and get final product, certainly be suitable for the production of various products by a plurality of operators.

Claims (2)

1. operation analysis apparatus, be that the charge book data relevant with the production of following product are gathered, analyze on this basis, and its analysis result is shown or export to the outside, described product is produced by the operation that a plurality of operators carry out the flow chart of sharing separately simultaneously
It is characterized in that having:
Data capture unit, it obtains the charge book data, and these charge book data comprise operator's customizing messages, the flow chart customizing messages of bearing described each flow chart, the operation required time customizing messages that reaches each flow chart;
Operation required time computing unit, it for each flow chart, obtains each operator's operation required time in all or a part of scope of described each charge book data; And
The actual job time calculating unit, it is for each described operator, and the operation required time of the flow chart that this operator is carried out adds up to, and calculates the actual job time,
Described actual job time calculating unit, when in described each charge book data, existing a flow chart to divide the work operation required time customizing messages under the situation of operation by a plurality of operators, utilize harmonic average to make it equalization by operation required time with these operators' described flow chart, based on the operation required time of obtaining by this equalization, calculate each described operator's the actual job time.
2. operation analysis apparatus as claimed in claim 1 is characterized in that,
In described each charge book data, comprise the production quantity information of each operator in each flow chart,
Described actual job time calculating unit, when in described each charge book data, existing a flow chart to divide the work operation required time customizing messages under the situation of operation by a plurality of operators,
On the operation required time that calculates utilizing described averaging of harmonic average, multiply by each operator's the production quantity production quantity shared ratio all with respect to the flow chart of described division of labor operation, on this basis, add up to the operation required time of other flow chart, thus the actual job time of calculating described each operator.
CN200910172110A 2008-09-05 2009-09-04 Operation analysis apparatus Pending CN101667283A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008228237A JP5130159B2 (en) 2008-09-05 2008-09-05 Work analysis device
JP2008228237 2008-09-05

Publications (1)

Publication Number Publication Date
CN101667283A true CN101667283A (en) 2010-03-10

Family

ID=41803896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910172110A Pending CN101667283A (en) 2008-09-05 2009-09-04 Operation analysis apparatus

Country Status (2)

Country Link
JP (1) JP5130159B2 (en)
CN (1) CN101667283A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013082A (en) * 2009-09-07 2011-04-13 Juki株式会社 Sewing skill determination method of sewing machine and device thereof
CN102418243A (en) * 2010-09-28 2012-04-18 Juki株式会社 Operation analysis device and method for sewing machine
CN102443971A (en) * 2010-09-30 2012-05-09 Juki株式会社 Sewing machine operation analysis device and sewing machine operation analysis method
CN103345209A (en) * 2013-06-04 2013-10-09 张舒 Method and system for production monitoring
CN103985004A (en) * 2013-02-07 2014-08-13 飞马缝纫机制造株式会社 Wireless operation management system
CN107239869A (en) * 2016-03-28 2017-10-10 兄弟工业株式会社 Server unit, terminal installation determine method
CN107741422A (en) * 2016-09-28 2018-02-27 研祥智能科技股份有限公司 distributed detection system
CN109208186A (en) * 2017-06-30 2019-01-15 Juki株式会社 Production management system, sewing machine and production management device
CN109695106A (en) * 2018-12-27 2019-04-30 西安标准工业股份有限公司 A kind of Internet of Things sewing machine
CN110699863A (en) * 2019-09-24 2020-01-17 杰克缝纫机股份有限公司 Timing method, system, computer readable storage medium and server
CN111793906A (en) * 2019-04-01 2020-10-20 Juki株式会社 Sewing management system and sewing management method
CN111919229A (en) * 2018-12-03 2020-11-10 日东电工株式会社 Operator selection system, operator selection method, operator selection computer, and program
CN112805639A (en) * 2018-10-05 2021-05-14 三菱电机株式会社 Job management device and job management method

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012078896A (en) * 2010-09-30 2012-04-19 Mitsubishi Heavy Ind Ltd Method and system for updating standard work hour
CN101963810A (en) * 2010-10-22 2011-02-02 北京理工大学 Batch flowline production accumulated part number analysis method
KR101276528B1 (en) * 2011-01-11 2013-06-24 서울시립대학교 산학협력단 Method for Review Process for Cost Plus Time Contracting in Bidding Phase Using Daily Productivity Data
JP2017207889A (en) * 2016-05-18 2017-11-24 三菱電機株式会社 Line managing system, display device for worker to manage line, server for managing line, and display device for manager to manage line
JP7338965B2 (en) * 2018-12-05 2023-09-05 Juki株式会社 Monitoring system
CN113770961B (en) * 2021-09-22 2024-03-12 上海优拜机械股份有限公司 Wireless torque wrench confirmation method, system, device and storage medium
CN117556185A (en) * 2022-08-02 2024-02-13 杰克科技股份有限公司 Intelligent process identification and counting method, system, terminal and medium of sewing equipment

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH043284A (en) * 1990-04-20 1992-01-08 Brother Ind Ltd Work state grasping device
JPH0413546A (en) * 1990-05-01 1992-01-17 Brother Ind Ltd Line balance management device on production line
JPH0584373A (en) * 1991-09-30 1993-04-06 Juki Corp Production control system for sewing factory and device therefor
JP3244576B2 (en) * 1993-09-28 2002-01-07 アマノ株式会社 Work record system
JP3720289B2 (en) * 2001-09-28 2005-11-24 シャープ株式会社 Line balance management device, line balance management method, and program for managing line balance
JP2006163810A (en) * 2004-12-07 2006-06-22 Sharp Corp Work process simulation method and work process simulation device
JP2007115134A (en) * 2005-10-21 2007-05-10 Sharp Corp Operation record collection system
JP2007156988A (en) * 2005-12-07 2007-06-21 Sharp Corp Work distribution device, work distribution method, work distribution program and recording medium with work distribution program recorded thereon

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102013082A (en) * 2009-09-07 2011-04-13 Juki株式会社 Sewing skill determination method of sewing machine and device thereof
CN102013082B (en) * 2009-09-07 2016-01-27 Juki株式会社 The skill determination method of sewing of Sewing machines and device thereof
CN102418243A (en) * 2010-09-28 2012-04-18 Juki株式会社 Operation analysis device and method for sewing machine
CN102418243B (en) * 2010-09-28 2015-04-29 Juki株式会社 Operation analysis device and method for sewing machine
CN102443971A (en) * 2010-09-30 2012-05-09 Juki株式会社 Sewing machine operation analysis device and sewing machine operation analysis method
CN102443971B (en) * 2010-09-30 2015-04-29 Juki株式会社 Sewing machine operation analysis device and sewing machine operation analysis method
CN103985004A (en) * 2013-02-07 2014-08-13 飞马缝纫机制造株式会社 Wireless operation management system
CN103345209A (en) * 2013-06-04 2013-10-09 张舒 Method and system for production monitoring
CN107239869A (en) * 2016-03-28 2017-10-10 兄弟工业株式会社 Server unit, terminal installation determine method
CN107741422A (en) * 2016-09-28 2018-02-27 研祥智能科技股份有限公司 distributed detection system
CN109208186A (en) * 2017-06-30 2019-01-15 Juki株式会社 Production management system, sewing machine and production management device
CN112805639A (en) * 2018-10-05 2021-05-14 三菱电机株式会社 Job management device and job management method
CN111919229A (en) * 2018-12-03 2020-11-10 日东电工株式会社 Operator selection system, operator selection method, operator selection computer, and program
CN109695106A (en) * 2018-12-27 2019-04-30 西安标准工业股份有限公司 A kind of Internet of Things sewing machine
CN111793906A (en) * 2019-04-01 2020-10-20 Juki株式会社 Sewing management system and sewing management method
CN110699863A (en) * 2019-09-24 2020-01-17 杰克缝纫机股份有限公司 Timing method, system, computer readable storage medium and server

Also Published As

Publication number Publication date
JP2010061519A (en) 2010-03-18
JP5130159B2 (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN101667283A (en) Operation analysis apparatus
CN101469486B (en) Operation analysis device of sewing machine
JP7060926B2 (en) Production control system and production control equipment
CN103917708B (en) Embroidery design production management equipment and method
CN108036941B (en) A kind of steam turbine bearing abnormal vibration analysis method based on correlation visual analysis
CN111922784B (en) State monitoring device and method, storage medium and computer device
CN103114429A (en) Type setting method and type setting system of leather and cloth
JP4131876B2 (en) Numerical controller for wire electric discharge machine
CN105388876A (en) Method and device for obtaining team-based intermittent-type chemical production process conformity
Heydecker A decomposition approach for signal optimisation in road networks
CN1861877B (en) Sewing machine
CN111460010A (en) Gantt chart generation method and device, computer equipment and storage medium
CN103069351A (en) Data retrieval system
CN105425743B (en) A kind of product material object state acquisition and alarm system based on Internet of Things
CN107941256A (en) A kind of numerical value personalized indication method of high precision measuring instrument
CN117371947A (en) Construction project informatization management method and system
EP2436817B1 (en) Work analyzing apparatus in cooperating system of a plurality of sewing machines
CN102443971B (en) Sewing machine operation analysis device and sewing machine operation analysis method
CN112100271B (en) EOS consensus mechanism utility visualization method based on workload ranking difference
CN113449352B (en) Equipment layout method and system
CN115908435A (en) Garment cutting path planning method and system based on vision
CN108270727A (en) Abnormal data analysis method and device
EP2436816B1 (en) Sewing machine work analyzing device and sewing machine work analysis method
RU2748031C1 (en) Method of computerized processing of working data of a technical system
CN210181877U (en) Economics statistics model display device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100310