CN101660344A - Method for constructing fire-fighting sprinkling pipeline embedded in floor slab - Google Patents

Method for constructing fire-fighting sprinkling pipeline embedded in floor slab Download PDF

Info

Publication number
CN101660344A
CN101660344A CN200810146996A CN200810146996A CN101660344A CN 101660344 A CN101660344 A CN 101660344A CN 200810146996 A CN200810146996 A CN 200810146996A CN 200810146996 A CN200810146996 A CN 200810146996A CN 101660344 A CN101660344 A CN 101660344A
Authority
CN
China
Prior art keywords
fire
fighting
floor
embedded
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810146996A
Other languages
Chinese (zh)
Inventor
麻高霈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUANXIN CO Ltd
Original Assignee
YUANXIN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUANXIN CO Ltd filed Critical YUANXIN CO Ltd
Priority to CN200810146996A priority Critical patent/CN101660344A/en
Publication of CN101660344A publication Critical patent/CN101660344A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The invention provides a method for constructing a fire-fighting sprinkling pipeline embedded in a floor slab, which enables a water pipe to be embedded in the floor slab without occupying the heightof a building, and can avoid the sense of pressure for residents. Moreover, the constructing method even can avoid the construction of ceiling decoration, and save the decoration cost. After a template is detached, the constructing method can carry out cement construction and varnishing operation, and directly carry out the action of changing a sprinkler head so as to effectively shorten the construction period.

Description

Be embedded in the method for constructing fire-fighting sprinkling pipeline in the floor
[technical field]
The present invention mainly discloses a kind of method for constructing fire-fighting sprinkling pipeline, refers to be embedded in the fire-fighting sprinkling pipeline job practices in the floor especially.
[background technology]
Please refer to Figure 10, spread the structural representation of wetting system for the fire-fighting of traditional exposed conduit setting, it lies in floor and is installed with full tooth screw rod 2 for 1 time and suspends iron water pipe 3 in midair with iron hoop, and wetting system is spread in the fire-fighting that forms the exposed conduit configuration, afterwards again outside ceiling 4 perforates are exposed to for washing head 5.
This conventional construction has considerable shortcoming in construction, because it is to be configured in whole floor 1 below that the water pipe 3 of wetting system is spread in fire-fighting, and must maintain 25 to 30 centimeters construction space, therefore cause the high problem in building that takies, form the constriction of resident family easily, not liked by the customer.For example originally be 35 meters building height,, wait decoration ceiling building height afterwards, only remaining 28 meters building height the building height that only is left 29 meters.
Moreover, full tooth screw rod 2 is to be screwed onto on the screw that is embedded in advance in the floor, and the construction operation of this pre-buried screw has expended the man-hour of once burying underground, and waits for after the stripping, the full tooth screw rod 2 that needs again to be spirally connected once more reaches the construction operation that suspends water pipe 3 with iron hoop in midair, and suitable loses time.
And cut and the pipeline group of iron water pipe 3 are stood inconvenient, because iron water pipe 3 is except weight is heavier, the constructor also must carry equipment such as sawing machine, car tooth machine, in order to cut water pipe 3 to required size, and get on the bus the system thread for being spirally connected etc. in pipe, it is quite inconvenient and consuming time to apply.
Again, the structure with full tooth screw rod 2 and iron hoop suspention water pipe 3 also has the unsteady disappearance of water pipe 3 structures and exists; Particularly in the time of the test loine pressure, can cause the shake of pipeline, influence structural strength.
And, after stripping, after floor 1 also needs process mud to do the operation of construction and japanning, just assemble fire-fighting and spread wetting system and water power piping engineering, only, so the floor of making dirty easily and having completed with paint causes the construction dispute easily, so it is the puzzlement greatly of one in the engineering construction that the period of different engineerings cooperates.
In addition; wetting system is spread in the fire-fighting that is exposed to floor 1 below; disorderly water pipe 3 influences are attractive in appearance, and the scruple on the geomantic omen is arranged especially, therefore also need usually to add in addition to ceil 4 to be covered up; only; so processing mode not only causes the increase of decoration expense, more causes the high reduction in building, forms the invisible constriction of resident family; it is very impracticable that this kind do not meet the design that industry utilizes, so the necessity of improvement is arranged.
Because the disappearance of above-mentioned conventional construction, this case creator improvement of concentrating on studies then, and then invent out a kind of " being embedded in the interior method for constructing fire-fighting sprinkling pipeline of floor ", it is all disappearances that can overcome above-mentioned conventional construction.
[summary of the invention]
The present invention's " be embedded in floor in method for constructing fire-fighting sprinkling pipeline ", the technical problem of institute's desire solution tie up in, a kind of high fire-fighting sprinkling pipeline job practices in building that increases is provided.
The present invention " is embedded in the method for constructing fire-fighting sprinkling pipeline in the floor ", and it includes following steps:
One. the upright fire-fighting assembly of group: joint connector, sheath body and blocking are assembled in regular turn, are a fire-fighting assembly to organize upright.
Two. fixing fire-fighting assembly: the fire-fighting assembly is placed precalculated position, template top according to working drawing, this sheath body is fixed on the template; Carry out the operation of colligation first floor reinforcing bar afterwards.
Three. connect fire main: on this joint connector, connect water pipe,, carry out the colligation operation of second layer reinforcing bar afterwards to connect first fire main.
Four. floor grouting: concrete perfusion on template, fire-fighting assembly and fire main are imbedded in the concrete.
Five. remove blocking: after treating stripping, can carry out mud to floor and do construction and japanning operation, then directly unload the blocking that is positioned at sheath body.
Six. assembling washing head: the fire-fighting washing head is bolted in joint connector place, finishes the construction of fire-fighting sprinkling pipeline.
Other purpose, advantage and novelty of the present invention will be more obvious with relevant accompanying drawing by following detailed description.
[description of drawings]
Fig. 1 ... be method for constructing fire-fighting sprinkling pipeline flow chart of the present invention
Fig. 2 ... three-dimensional exploded view for fire-fighting assembly of the present invention
Fig. 3 ... for fire-fighting component groups of the present invention is loaded on the template schematic diagram
Fig. 4 ... schematic diagram for template grouting of the present invention
Fig. 5 ... unload the schematic diagram of blocking for the present invention
Fig. 6 ... for the present invention assembles schematic diagram behind the washing head
Fig. 7 ... for the present invention assembles schematic diagram behind the plaque
Fig. 8 ... three-dimensional exploded view for fire-fighting sprinkling pipeline of the present invention
Fig. 9 ... be embodied as the schematic diagram of two-piece structure for sheath body of the present invention
Figure 10 ... spread the constructing structure schematic diagram of wetting system for traditional fire-fighting
Among the figure:
(conventional construction)
1 floor
2 full tooth screw rods
3 water pipes
4 ceilings
5 washing heads
(the present invention)
10a fire-fighting assembly
The 10b fire main
11 water pipes
12 joint connectors
121 links
13 sheath bodies
121 abutting parts
132 locating holes
133 location hooks
134 iron nails
14 blockings
15 washing heads
16 plaques
17 sheath bodies
171 abutting parts
172 locating holes
173 location hooks
90 templates
91 concrete
92 first floor reinforcing bars
93 second layer reinforcing bars
[specific embodiment]
The technology that relevant the present invention adopted, means and effect thereof, after lifting a preferred embodiment now and cooperating diagram to be specified in, this only for the usefulness of explanation, is not subjected to the restriction of this kind structure in patent application.
With reference to Fig. 1, method for constructing fire-fighting sprinkling pipeline of the present invention includes following steps:
The upright fire-fighting assembly of group: joint connector 12, sheath body 13 and blocking 14 are assembled in regular turn, are a fire-fighting assembly 10a to organize upright, as Fig. 2.
This joint connector 12 has a link 121 can be for being spirally connected this blocking 14.And this sheath body 13 is a mat blocking 14 and being fixed between joint connector 12 and the blocking 14.These sheath body 13 1 end ring are established an abutting part 131, and this abutting part 131 is provided with locating hole 132 and location hook 133.
Fixing fire-fighting assembly: fire-fighting assembly 10a is placed precalculated position, template 90 top according to working drawing, make the abutting part 131 of this sheath body 13 be contacted with template 90 tops, locating hole 132 places of surplus sheath body 13 hammer into iron nail 134 and sheath body 13 are fixed on the template 90, as Fig. 3.So this sheath body 13 can make link 121 axis directions of this joint connector 12 and template 90 keep plumbness, avoids taking place the problem of angular deflection.Can carry out the operation of colligation first floor reinforcing bar 92 afterwards.
Connect fire main: on this joint connector 12, connect water pipe 11, to connect the first fire main 10b.After treating that the 93 colligation operations of second layer reinforcing bar are finished, fire main 10b can be fixed in second layer reinforcing bar 93, fire main 10b walks when preventing to be in the milk.This fire main 10b system is fixed in water pipe 11 on the second layer reinforcing bar 93 with fastening straps.
This fire main 10b also keeps the pressure of an end for test fire main 10b, and the pressure of its applied voltage test is 12kg.This fire main 10b can be connected in the fire fighting supply end after by applied voltage test.
Be to utilize binder to cohere mutually between this water pipe 11 and the joint connector 12.In present embodiment, this water pipe 11 is that employing is not made by the material of concrete erosion with joint connector 12, as chlorinated polyvinyl chloride (Chlorinated polyvinyl chloride; CPVC).And binder also is to utilize that to be same as water pipe 11 be that the chlorinated polyvinyl chloride of joint connector 12 materials is material, and so this water pipe 11 is tied to form integrative-structure after cohering with joint connector 12, and the intensity of cohering the place is non-1 5 times of cohering the place.
Floor grouting: concrete perfusion 91 on template 90, and fire-fighting assembly 10a and fire main 10b are imbedded in the concrete 91, make the location hook 133 of concrete 91 inflow sheath bodies 13, as Fig. 4.Concrete 91 can firmly combine with the location hook 133 of sheath body 13 after solidifying, and sheath body 13 comes off when preventing stripping 90.
Remove blocking: treat that stripping is after 90s, can carry out mud to floor and do construction and japanning operation, then directly unload the blocking 14 that is positioned at sheath body 13, as Fig. 5.
Assembling washing head: washing head 15 is bolted in link 121 places of joint connector 12, finishes the construction of fire-fighting sprinkling pipeline 10c, as Fig. 6.
Certainly, after the step of washing head is finished in assembling, can also carry out following steps:
Assembling plaque: plaque 16 is installed on the washing head 15, this plaque 16 is hidden in the open end of this sheath body 13, use and reach the effect of beautifying outward appearance, as Fig. 7, Fig. 8.
By the job practices of aforementioned fire-fighting sprinkling pipeline 10c, water pipe 11 is embedded in the floor, need not to take the building height, and can avoid forming the constriction of resident family.So not only can save the expense of decorations such as ceiling, more can stimulate the gas of buying of real estate, be one to have the job practices of industry applications.
Moreover the job practices of fire-fighting sprinkling pipeline 10c of the present invention promptly can be replaced blocking 14 fast by washing head 15, and load onto plaque 16 and finish construction after the operation of imbedding concrete 91, and the integral construction time only needs 1/3rd of traditional exposed conduit configuration.Not only can exempt the complicated construction method of tradition with full tooth screw rod and iron hoop suspention water pipe 11, the more effective saving engineering time, and also can reach the effect of strong fix water pipe 11.
In addition, the job practices of fire-fighting sprinkling pipeline 10c of the present invention not only meets building fire protection and fire-fighting relevant laws and regulations, also can make the outward appearance of floor more attractive in appearance, do not have random water pipe 11 structures of exposed preface, and the operation of assembling washing head 15 and plaque 16, the floor that can make dirty and coat with lacquer is not a real method of simplifying construction sequence.
With reference to Fig. 9, this sheath body 17 can be two formula punching press compacting structures, and using the structural strength that makes this sheath body 17 increases.
Can summarize the present invention with regard to the above and have following advantage:
One. the present invention " is embedded in the method for constructing fire-fighting sprinkling pipeline in the floor ", wherein the water pipe of fire-fighting assembly can be embedded in the floor, need not to take the building height, and can avoid forming the constriction of resident family, so not only can save decoration expenses such as ceiling, more can stimulate the gas of buying of real estate, be one to have the job practices of industry applications.
Two. the present invention " is embedded in the method for constructing fire-fighting sprinkling pipeline in the floor ", it only need submerge the concrete activity duration, promptly can replace blocking fast by washing head afterwards, and load onto plaque and finish construction, can exempt the complicated construction method of tradition with full tooth screw rod and iron hoop suspention water pipe, effectively save the engineering time, and reach the effect of strong fix water pipe.
Three. the present invention " is embedded in the method for constructing fire-fighting sprinkling pipeline in the floor ", it not only meets building fire protection and fire-fighting relevant laws and regulations, also can make the outward appearance of floor more attractive in appearance, do not have the random water pipe structure of exposed preface, and the operation of assembling washing head and plaque, the floor that can make dirty and coat with lacquer is not a real method of simplifying construction sequence.
Looking at it from this point of view value on the present invention and the tool industry; And not seeing again has identical or similar invention to come across domestic and international publication or public use, and the real positive and passive important document that has met patent statute ought to be accurate in patent of invention.
Only, the above sincerely is the preferred embodiment of this creation, is not the practical range that is used for limiting this creation.The equalization variation that Fan Yiben creation claim is done is all this creation claim with modification and contains.

Claims (13)

1. one kind is embedded in the interior method for constructing fire-fighting sprinkling pipeline of floor, and it is characterized in that: it includes following steps:
The upright fire-fighting assembly of group: joint connector, sheath body and blocking are assembled in regular turn, are a fire-fighting assembly to organize upright;
Fixing fire-fighting assembly: the fire-fighting assembly is placed precalculated position, template top, and sheath body is fixed in the template top, can carry out the operation of colligation first floor reinforcing bar afterwards;
Connect fire main: on this joint connector, connect water pipe,, carry out the operation of second layer reinforcing bar binding afterwards to connect first fire main;
Floor grouting: concrete perfusion on template, fire-fighting assembly and fire main are imbedded in the concrete;
Remove blocking: after treating stripping, can unload the blocking that is positioned at sheath body;
Assembling washing head: washing head is bolted in the link place of joint connector, finishes the construction of fire-fighting sprinkling pipeline.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: after the step of its assembling washing head, can also carry out following steps:
Assembling plaque: plaque is installed on the washing head, makes this plaque hide open end, use and reach the effect person who beautifies outward appearance in this sheath body.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it is in the step of the upright fire-fighting assembly of group, and this sheath body is a mat blocking and being fixed between joint connector and the blocking.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: wherein, the joint connector has a link can be for being spirally connected this blocking or this washing head.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: in the step of the upright fire-fighting assembly of its group, this sheath body one end ring is established an abutting part, this abutting part is provided with locating hole, and the abutting part of this sheath body is contacted with the template top, hammer into iron nail in the locating hole place of sheath body and sheath body is fixed on the template, make the link axis direction of this joint connector and template keep plumbness.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it is in the step of the upright fire-fighting assembly of group, also be provided with location hook on this sheath body abutting part, for location hook firm combine of concrete with sheath body.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it is in the step of the upright fire-fighting assembly of group, and this sheath body is two formula punching press compacting structures, using the structural strength that makes this sheath body increases.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it is in the step that connects fire main, and second layer reinforcing bar is fixed in this fire main system.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it is in the step that connects fire main, and this water pipe and joint connector system adopt and not made by the material of concrete erosion.
According to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: wherein, this water pipe and joint connector system adopt chlorinated polyvinyl chloride (Chlorinated polyvinyl chloride; CPVC) material is made.
11. according to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: wherein, be to utilize binder to cohere mutually between this water pipe and the joint connector.
12. according to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: wherein, binder is to utilize chlorinated polyvinyl chloride (the Chlorinated polyvinyl chloride that is same as water pipe and joint connector material; CPVC) be the material person.
13. according to 1 of claim the described be embedded in method for constructing fire-fighting sprinkling pipeline in the floor, it is characterized in that: it behind stripping, can carry out mud to floor and do construction and japanning operator in the step of removing blocking.
CN200810146996A 2008-08-29 2008-08-29 Method for constructing fire-fighting sprinkling pipeline embedded in floor slab Pending CN101660344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810146996A CN101660344A (en) 2008-08-29 2008-08-29 Method for constructing fire-fighting sprinkling pipeline embedded in floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810146996A CN101660344A (en) 2008-08-29 2008-08-29 Method for constructing fire-fighting sprinkling pipeline embedded in floor slab

Publications (1)

Publication Number Publication Date
CN101660344A true CN101660344A (en) 2010-03-03

Family

ID=41788586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810146996A Pending CN101660344A (en) 2008-08-29 2008-08-29 Method for constructing fire-fighting sprinkling pipeline embedded in floor slab

Country Status (1)

Country Link
CN (1) CN101660344A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106178365A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 A kind of intellectual communityintellectualized village extinction by automatic sprinkling system installation method
CN106178323A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 Library fire system construction method of installation
CN106215357A (en) * 2016-07-29 2016-12-14 广西安讯科技投资有限公司 Community automatic fire extinguishing system construction method of installation
CN106237573A (en) * 2016-07-29 2016-12-21 广西安讯科技投资有限公司 Metro fire-fighting system construction method of installation

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106178365A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 A kind of intellectual communityintellectualized village extinction by automatic sprinkling system installation method
CN106178323A (en) * 2016-07-29 2016-12-07 广西安讯科技投资有限公司 Library fire system construction method of installation
CN106215357A (en) * 2016-07-29 2016-12-14 广西安讯科技投资有限公司 Community automatic fire extinguishing system construction method of installation
CN106237573A (en) * 2016-07-29 2016-12-21 广西安讯科技投资有限公司 Metro fire-fighting system construction method of installation

Similar Documents

Publication Publication Date Title
CN101660344A (en) Method for constructing fire-fighting sprinkling pipeline embedded in floor slab
CN104652618A (en) Space gridding steel structure assembly type node and assembling method thereof
CN201598833U (en) Fully-assembled steel construction platform with adjustable size
Asam Recycling prefabricated concrete components–a contribution to sustainable construction
JP2006104909A (en) Foundation construction method of independent steel mat
DE102008031025A1 (en) Method for embedding sprinkler pipe network in concrete road surface, involves assembling components of sprinkler, and fastening block
CN202466861U (en) Three-directional polyvinyl chloride (PVC) assembly angle bead
CN202509724U (en) Rachel structure of natural stone fake-mortarless decoration wall
CN205206088U (en) Installation connection structure of prefabricated constructional column and wallboard
TWM590207U (en) Pipe joint with inner faucet locking thread
US20090277112A1 (en) Anchor Bolt Sock
JPH0768513B2 (en) Floating asbestos dust removal method
CN205476547U (en) Prefabricated wall body stop device
JPH0658227U (en) Anchor cap
CN104372922A (en) Scaffold
CN205000665U (en) Support arrangement for be used for integral translation of outer hanging tower machine
RU2108924C1 (en) Method of restoration
CN203846611U (en) Steel structure building
TWI270599B (en) Hoop bar and reinforcing bar connecting device
CN210857977U (en) Stable connection structure is consolidated to building
JP7051143B1 (en) Fence construction method
CN209040542U (en) Die worker's tool is hung in a kind of concrete construction
CN201214871Y (en) Inside/Outside corner section bar for buildings
CN211775778U (en) Concrete formwork structure for floor-penetrating pipeline
JPS62141259A (en) Safety net apparatus for construction of balcony

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100303