CN101608457A - The method of processing wharf foundation by geotextile granular material pile - Google Patents

The method of processing wharf foundation by geotextile granular material pile Download PDF

Info

Publication number
CN101608457A
CN101608457A CNA2009100633198A CN200910063319A CN101608457A CN 101608457 A CN101608457 A CN 101608457A CN A2009100633198 A CNA2009100633198 A CN A2009100633198A CN 200910063319 A CN200910063319 A CN 200910063319A CN 101608457 A CN101608457 A CN 101608457A
Authority
CN
China
Prior art keywords
layer
geotextile
pile
lay
geogrids
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100633198A
Other languages
Chinese (zh)
Other versions
CN101608457B (en
Inventor
冯守中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUHAN GUANGYI TRAFFIC TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100633198A priority Critical patent/CN101608457B/en
Publication of CN101608457A publication Critical patent/CN101608457A/en
Application granted granted Critical
Publication of CN101608457B publication Critical patent/CN101608457B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Revetment (AREA)

Abstract

The invention belongs to the civil engineering construction field, be specifically related to a kind of method of handling the harbour basis.The method of processing wharf foundation by geotextile granular material pile is characterized in that it comprises the steps: 1) according to the wharf apron depth condition, basic engineering is not dredged or is carried out shallow slot and dredge; 2) in the scope that is not less than harbour basis length and width size, lay the geotextile granular pile; 3) level is laid the layer of geotextile layer on the mud face of geotextile granular pile top bit; 4) on the geotextile layer of having laid, lay basic mattress layer; 5) basic mattress layer employing tamping or quick-fried rammer are closely knit; 6) lay one deck second geogrids layer in closely knit basic mattress layer top, horizontal; 7) lay prefabricated reinforced concrete caisson or steel concrete square on second geogrids layer.This method can be saved construction investment, accelerating construction progress, and the minimizing people is the phenomenon of back-silting.

Description

The method of processing wharf foundation by geotextile granular material pile
Technical field
The invention belongs to the civil engineering construction field, be specifically related to a kind of method of handling the harbour basis.
Background technology
At present, port works gravity type quay or counterfort formula harbour Base Design processing method are that foundation trench dredging is carried out on the harbour basis, in foundation trench, change then and fill out medium coarse sand or piece (broken) stone, through ramming closely knit after, structures such as prefabricated reinforced concrete caisson or square are placed in to change fill out on the surface of base, to reach the requirement that reduces foundation settlement and guarantee base fixed.But because of harbour engineering soft base under water is often thicker, its basis digs that to change the engineering quantity of filling out often huge, thereby construction speed is slow, construction costs is high, and the mud after excavating inclines and often easily pours in basin once more with tide and stormy waves after throwing and cause the secondary phenomenon of back-silting.
Summary of the invention
The object of the present invention is to provide a kind of method of processing wharf foundation by geotextile granular material pile, this method can be saved construction investment, accelerating construction progress, and the minimizing people is the phenomenon of back-silting.
To achieve these goals, technical scheme of the present invention is: the method for processing wharf foundation by geotextile granular material pile is characterized in that it comprises the steps:
1) according to the wharf apron depth condition, basic engineering is not dredged or is carried out shallow slot and dredge, and the foundation trench dredging degree of depth is not more than 250cm;
2) in the scope that is not less than harbour basis length and width size, (grow up in the long 0~3m in harbour basis, be wider than in the scope of the wide 0~3m size in harbour basis) that (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile) to lay geotextile granular pile 1; The plane mode of laying out pile is quadrangle or triangle, the stake footpath parameter 40~200cm of geotextile granular pile, the spacing of geotextile granular pile is 0.4~5m, the stake of geotextile granular pile is long to be 1~30m, and the spacing of geotextile granular pile and stake are long can be calculated or test definite according to the stable of basis and distortion settlement request;
3) level is laid layer of geotextile layer 2 on the mud face of geotextile granular pile top bit, and geotextile layer 2 is the composite construction layer of one deck geotextiles or one deck geotextiles and geo-grid;
4) lay basic mattress layer 3 on the geotextile layer of having laid 2, the material of basic mattress layer 3 is coarse sand or piece (broken) stone, and the thickness of foundation pad is 50~250cm;
5) basic mattress layer employing tamping or quick-fried rammer are closely knit;
6) material of laying one deck second geogrids layer 5, the second geogrids layer in closely knit basic mattress layer top, horizontal is a geo-grid;
7) lay prefabricated reinforced concrete caisson or steel concrete square 6 on second geogrids layer 5.
In the described basic mattress layer, be geo-grid by the material of laying first geogrids layer, 4, the first geogrids layer 4 apart from level of per 50~100cm interlamellar spacing.Can establish 1~4 first geogrids layer in the mattress layer of basis.
The distance of described interlamellar spacing is meant: the distance between basecoat first geogrids layer and the geotextile layer 2, first adjacent geogrids layer and the distance between first geogrids layer, the distance between last layer first geogrids layer and second geogrids layer 5.
The maximum particle diameter of piece (broken) stone should not surpass 10cm.
The invention has the beneficial effects as follows: adopt processing wharf foundation by geotextile granular material pile, can accomplish not dredge or reduce the amount of dredging widely, this helps saving construction investment, accelerating construction progress, can guarantee workmanship simultaneously, and reduces the people and be the phenomenon of back-silting.
Description of drawings
Fig. 1 handles the harbour basis sectional schematic diagram that foundation trench is arranged for geotextile granular pile of the present invention;
Fig. 2 is the harbour basis sectional schematic diagram that geotextile granular pile of the present invention is handled no foundation trench;
Among the figure: 1-geotextile granular pile, 2-geotextile layer, 3-basis mattress layer, 4-first geogrids layer, 5-second geogrids layer, 6-reinforced concrete caisson or steel concrete square, 7-mud upper thread.
The specific embodiment
In order to understand the present invention better, further illustrate content of the present invention below in conjunction with example, but the present invention not only is confined to the following examples.
Embodiment 1 (processing has the harbour basis of foundation trench):
The method of processing wharf foundation by geotextile granular material pile, it comprises the steps:
1) according to the wharf apron depth condition, basic engineering is not dredged;
2) in the scope that is not less than harbour basis length and width size, (grow up in the long 0m in harbour basis, be wider than in the scope of the wide 0m size in harbour basis) that (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X to laying geotextile granular pile, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile); The plane mode of laying out pile is a quadrangle, the stake footpath parameter 60cm of geotextile granular pile, the spacing of geotextile granular pile is 1.8m, and the stake of geotextile granular pile is long to be 3m, and the spacing of geotextile granular pile and stake are long can be calculated or test definite according to the stable of basis and distortion settlement request;
3) level is laid the layer of geotextile layer on the mud face of geotextile granular pile top bit, and the geotextile layer is one deck geotextiles;
4) lay basic mattress layer on the geotextile layer of having laid, the material of basic mattress layer is a coarse sand, and the thickness of foundation pad is 50cm;
5) basic mattress layer adopts tamping;
6) lay one deck geogrids layer (for one deck geo-grid) in closely knit basic mattress layer top, horizontal, the material of geogrids layer is a geo-grid;
7) on geogrids layer, lay prefabricated reinforced concrete caisson.
Embodiment 2 (processing has the harbour basis of foundation trench):
As shown in Figure 1, the method for processing wharf foundation by geotextile granular material pile, it comprises the steps:
1) according to the wharf apron depth condition, basic engineering is carried out shallow slot and is dredged, and the foundation trench dredging degree of depth is 240cm;
2) in the scope that is not less than harbour basis length and width size, (grow up in the long 1m in harbour basis, be wider than in the scope of the wide 1m size in harbour basis) that (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X to laying geotextile granular pile 1, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile); The plane mode of laying out pile is a quadrangle, the stake footpath parameter 100cm of geotextile granular pile, the spacing of geotextile granular pile is 2m, and the stake of geotextile granular pile is long to be 10m, and the spacing of geotextile granular pile and stake are long can be calculated or test definite according to the stable of basis and distortion settlement request;
3) level is laid layer of geotextile layer 2 on the mud face of geotextile granular pile top bit, geotextile layer 2 is the composite construction layer (cover one deck geo-grid on one deck geotextiles, or cover one deck geotextiles on one deck geo-grid) of one deck geotextiles and one deck geo-grid;
4) on the geotextile layer of having laid 2, lay basic mattress layer 3, the material of basis mattress layer 3 is a coarse sand, the thickness of foundation pad is 150cm, in basic mattress layer thickness (as shown in Figure 1), by every 50cm interlamellar spacing lay first geogrids layer 4 (for one deck geo-grid) apart from level, the material of first geogrids layer 4 is a geo-grid;
5) basic mattress layer adopts tamping;
6) lay one deck second geogrids layer 5 (for one deck geo-grid) in closely knit basic mattress layer top, horizontal, the material of second geogrids layer is a geo-grid;
7) lay prefabricated reinforced concrete caisson 6 on second geogrids layer 5.
Embodiment 3 (processing has the harbour basis of foundation trench):
As shown in Figure 1, the method for processing wharf foundation by geotextile granular material pile, it comprises the steps:
1) according to the wharf apron depth condition, basic engineering is carried out shallow slot and is dredged, and the foundation trench dredging degree of depth is 50cm;
2) in the scope that is not less than harbour basis length and width size, (grow up in the long 3m in harbour basis, be wider than in the scope of the wide 3m size in harbour basis) that (job practices of geotextile granular pile is seen Chinese patent application 200810197321.X to laying geotextile granular pile 1, and denomination of invention is: the method for processing soft foundation by earthwork fabric granular pile); The plane mode of laying out pile is a triangle, the stake footpath parameter 120cm of geotextile granular pile, the spacing of geotextile granular pile is 3m, and the stake of geotextile granular pile is long to be 30m, and the spacing of geotextile granular pile and stake are long can be calculated or test definite according to the stable of basis and distortion settlement request;
3) level is laid layer of geotextile layer 2 on the mud face of geotextile granular pile top bit, geotextile layer 2 is the composite construction layer (cover one deck geo-grid on one deck geotextiles, or cover one deck geotextiles on one deck geo-grid) of one deck geotextiles and one deck geo-grid;
4) on the geotextile layer of having laid 2, lay basic mattress layer 3, the material of basis mattress layer 3 is piece (broken) stone, the thickness of foundation pad is 200cm, and in basic mattress layer thickness, (is one deck geo-grid by every 100cm interlamellar spacing apart from level laying one deck first geogrids layer 4; The basis mattress layer is divided into two-layer up and down by first geogrids layer, two-layer up and down each 100cm), the material of first geogrids layer 4 is a geo-grid;
5) it is closely knit that basic mattress layer adopts quick-fried rammer;
6) lay one deck second geogrids layer 5 (for one deck geo-grid) in closely knit basic mattress layer top, horizontal, the material of second geogrids layer is a geo-grid;
7) lay prefabricated steel concrete square 6 on second geogrids layer 5.
Embodiment 4:
Substantially the same manner as Example 3, difference is: the thickness of foundation pad is 250cm, and level is laid 4 first geogrids layer 4 (by laying apart from level of every 50cm interlamellar spacing) in basic mattress layer thickness.
Embodiment 5 (the geotextile granular pile is handled the harbour basis of no foundation trench):
As shown in Figure 2, the method for processing wharf foundation by geotextile granular material pile is substantially the same manner as Example 2, does not just have foundation trench.

Claims (2)

1. the method for processing wharf foundation by geotextile granular material pile is characterized in that it comprises the steps:
1) according to the wharf apron depth condition, basic engineering is not dredged or is carried out shallow slot and dredge, and the foundation trench dredging degree of depth is not more than 250cm;
2) in the scope that is not less than harbour basis length and width size, lay geotextile granular pile (1); The plane mode of laying out pile is quadrangle or triangle, the stake footpath parameter 40~200cm of geotextile granular pile, and the spacing of geotextile granular pile is 0.4~5m, the stake of geotextile granular pile is long to be 1~30m;
3) level is laid layer of geotextile layer (2) on the mud face of geotextile granular pile top bit, and geotextile layer (2) is the composite construction layer of one deck geotextiles or one deck geotextiles and geo-grid;
4) go up laying basic mattress layer (3) at the geotextile layer of having laid (2), the material of basic mattress layer (3) is coarse sand or piece stone, and the thickness of foundation pad is 50~250cm;
5) basic mattress layer employing tamping or quick-fried rammer are closely knit;
6) lay one deck second geogrids layer (5) in closely knit basic mattress layer top, horizontal, the material of second geogrids layer is a geo-grid;
7) lay prefabricated reinforced concrete caisson or steel concrete square (6) on second geogrids layer (5).
2. the method for processing wharf foundation by geotextile granular material pile according to claim 1, it is characterized in that: in the described basic mattress layer, by per 50~100cm interlamellar spacing lay first geogrids layer (4) apart from level, the material of first geogrids layer (4) is a geo-grid.
CN2009100633198A 2009-07-27 2009-07-27 Method for processing wharf foundation by geotextile granular material pile Active CN101608457B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100633198A CN101608457B (en) 2009-07-27 2009-07-27 Method for processing wharf foundation by geotextile granular material pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100633198A CN101608457B (en) 2009-07-27 2009-07-27 Method for processing wharf foundation by geotextile granular material pile

Publications (2)

Publication Number Publication Date
CN101608457A true CN101608457A (en) 2009-12-23
CN101608457B CN101608457B (en) 2012-06-06

Family

ID=41482355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100633198A Active CN101608457B (en) 2009-07-27 2009-07-27 Method for processing wharf foundation by geotextile granular material pile

Country Status (1)

Country Link
CN (1) CN101608457B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means
CN111663493A (en) * 2020-07-01 2020-09-15 交通运输部天津水运工程科学研究所 Repairing and reinforcing method suitable for block wharf after foundation damage

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200888A (en) * 2007-06-26 2008-06-18 王继忠 Construction method of composite foundation
CN101368383B (en) * 2008-09-11 2010-04-14 中国科学院武汉岩土力学研究所 Method for treating soft soil roadbed by artificial composite crust layer
CN101392527B (en) * 2008-10-21 2010-10-06 冯守中 Method for processing soft foundation by earthwork fabric granular pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537603A (en) * 2018-12-07 2019-03-29 天津大学 A kind of novel backfill reinforcement means
CN111663493A (en) * 2020-07-01 2020-09-15 交通运输部天津水运工程科学研究所 Repairing and reinforcing method suitable for block wharf after foundation damage

Also Published As

Publication number Publication date
CN101608457B (en) 2012-06-06

Similar Documents

Publication Publication Date Title
CN203603105U (en) Wall plate type ecological retaining wall bank protection structure
CN104153304B (en) A kind of corrugated steel culvert fills structure and dam filling construction thereof
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN103233444B (en) Underwater dumped rockfill bedding and side slope Anti-scouring structure and construction method thereof
CN103758113A (en) Liquefaction resistance foundation stabilization method by grate hooping
CN104452829A (en) Piled raft foundation anti-floating structure and construction method
CN106759133A (en) The mixing structure of dam type and construction method of a kind of homogeneous earth and rockfill dam and rock
CN202430681U (en) Bank protection structure
CN203808088U (en) Gabion gully detention structure for top of hydropower station slag yard
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN111472326A (en) Method and structure for building gravity dam on deep covering layer
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN101608457B (en) Method for processing wharf foundation by geotextile granular material pile
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN215976663U (en) Excavation area composite foundation treatment structure crossing under high-voltage line
CN215441846U (en) Foundation anti-settling structure
CN211228358U (en) Improved generation seawall dyke foot reinforced structure
CN212477620U (en) Structure for building gravity dam on deep and thick covering layer
CN103821106B (en) Small-sized fishing port and channel revetment structure
CN203188174U (en) Underwater riprap foundation bed and side-slope erosion prevention structure
CN209760216U (en) reinforcement system based on soft soil foundation drainage consolidation
CN108611941B (en) Method for processing saturated high-fill roadbed
CN202689032U (en) Retaining wall for supporting side slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN GUANGYI TRANSPORTATION SCIENCE AND TECHNOLOG

Free format text: FORMER OWNER: FENG SHOUZHONG

Effective date: 20120929

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200437 HONGKOU, SHANGHAI TO: 430074 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20120929

Address after: 430074 Hubei city of Wuhan province East Lake Dongxin Road Development Zone SBI Optics Valley Venture Street building 10 building A 2502-2503

Patentee after: Wuhan Guangyi Traffic Technology Co., Ltd.

Address before: 200437, room 1, building 992, Lane 1403, East Sports Union Road, Shanghai, Hongkou District