CN101603712A - Dehumidifier - Google Patents

Dehumidifier Download PDF

Info

Publication number
CN101603712A
CN101603712A CNA2009100401843A CN200910040184A CN101603712A CN 101603712 A CN101603712 A CN 101603712A CN A2009100401843 A CNA2009100401843 A CN A2009100401843A CN 200910040184 A CN200910040184 A CN 200910040184A CN 101603712 A CN101603712 A CN 101603712A
Authority
CN
China
Prior art keywords
water
tank
heat exchanger
cooled heat
evaporimeter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100401843A
Other languages
Chinese (zh)
Other versions
CN101603712B (en
Inventor
杨宝纲
周忠洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI TIANJI ENERGY TECHNOLOGY Co Ltd
Original Assignee
ZHUHAI TIANJI ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI TIANJI ENERGY TECHNOLOGY Co Ltd filed Critical ZHUHAI TIANJI ENERGY TECHNOLOGY Co Ltd
Priority to CN2009100401843A priority Critical patent/CN101603712B/en
Publication of CN101603712A publication Critical patent/CN101603712A/en
Application granted granted Critical
Publication of CN101603712B publication Critical patent/CN101603712B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Gases (AREA)

Abstract

The present invention relates to the air-treatment field, particularly a kind of steam compression type dehumidifying equipment that uses in the hot and humid environment operating mode.Dehumidifier comprises the compressor, condenser, throttling arrangement and the evaporimeter that connect and form the closed-loop path by pipeline in turn; Also comprise blower fan, blower fan is between the air inlet of the gas outlet of evaporimeter and condenser; In addition, also comprise a pre-cooler, this pre-cooler comprises at least one water-cooled heat exchanger, tank and water pump; Described water-cooled heat exchanger is positioned at the front end of described evaporimeter airintake direction, tank is positioned at the below of described evaporimeter, water pump is positioned at tank, and the delivery port of water pump connects the water inlet of water-cooled heat exchanger, and the delivery port of water-cooled heat exchanger inserts tank by pipeline.Above-mentioned dehumidifier can be used in hot and humid environment normally and efficiently.

Description

Dehumidifier
Technical field
The present invention relates to the air-treatment field, particularly a kind of steam compression type dehumidifying equipment that uses in the hot and humid environment operating mode.
Background technology
As shown in Figure 1, the operation principle of general dehumidifier is as follows:
One, the interior circulation of dehumidifier: the operation by compressor 1 → exhaust outlet is discharged the gas of HTHP → enter condenser 11 and is cooled off → become normal temperature high voltage gas → by throttling arrangement 10 dam → the become liquid of low-temp low-pressure → become the gas of low-temp low-pressure by the evaporimeter 3 evaporations compressor 1 that absorbs heat → get back to.So move in circles.
Two, the outer circulation of dehumidifier: under the situation of normal boot-strap → operation → malaria by blower fan 9 from air inlet suction → process evaporimeter 3 → evaporimeter 3 airborne moisture content is adsorbed on the aluminium flake → become dry air → process condenser 11 dispel the heat → to blow out from air outlet.
At present, in the air-treatment field, the small-sized dehumidifier of making according to the steam compression type refrigeration principle particularly, because of noise is low, in light weight, efficient is high, occupation rate of market is a lot, the application of small-sized unit accounts for more than 90% of whole air dewetting unit output, applied environment roughly is divided into below 38 ℃, below 35 ℃, below 32 ℃.Have only seldom the producer of counting, according to the standard design of air-conditioning unit below 43 ℃.But all can not long-play, this is the operating condition critical line of dehumidifier just.The dehumidifier of using in the operating mode of high temperature (above 43 ℃) high humiditys (relative humidity 〉=90%) does not also have at present, particularly the small-sized unit of steam compression type.At industry, commercial field, can only adopt the dehumidification mode of bleeding of a large amount of heat energy of loss at present, very serious to the waste of fuel, produce CO simultaneously 2, SO 2Deng discharging, quite serious to atmospheric pollution.
Summary of the invention
The object of the invention provides a kind of steam compression type dehumidifying machine to dehumidify after the first precooling, and this dehumidifier can be used in hot and humid environment normally and efficiently.
For achieving the above object, the invention provides following technical scheme:
Dehumidifier comprises the compressor, condenser, throttling arrangement and the evaporimeter that connect and form the closed-loop path by pipeline in turn; Also comprise blower fan, blower fan is between the air inlet of the gas outlet of evaporimeter and condenser;
In addition, also comprise a pre-cooler, this pre-cooler comprises at least one water-cooled heat exchanger, tank and water pump; Described water-cooled heat exchanger is positioned at the front end of described evaporimeter airintake direction, tank is positioned at the below of described evaporimeter, water pump is positioned at tank, and the delivery port of water pump connects the water inlet of water-cooled heat exchanger, and the delivery port of water-cooled heat exchanger inserts tank by pipeline.
Above-mentioned dehumidifier has been set up pre-cooler on the basis of original dehumidifier, malaria is tentatively lowered the temperature through the water-cooled heat exchanger in the pre-cooler earlier, carry out drying, cooling entering evaporimeter then, and can be assembled in the screw clamp by the condensed water that the evaporimeter surface condensation becomes, these condensed waters are in that water pump suction water-cooled heat exchanger is arranged, as the low-temperature receiver of precooling.Certainly, also cold water can be added in advance in tank, as the low-temperature receiver of water-cooled heat exchanger.Owing to increased pre-cooler, this dehumidifier can be used in hot and humid environment normally and efficiently.
Further technical scheme is,
Described throttling arrangement is a heating power expansion valve.
Compare with capillary, the pressure adjustable range of heating power expansion valve is bigger, and can also regulate the liquid supply rate of evaporimeter automatically, and the thermic load of liquid supply rate and evaporimeter is complementary.
Description of drawings
Fig. 1 is the structure chart of existing dehumidifier;
Fig. 2 is the structure chart of dehumidifier of the present invention.
The invention will be further described below in conjunction with drawings and Examples.
The specific embodiment
Referring to Fig. 2, dehumidifier comprises compressor 1, condenser 11, fluid reservoir 8, throttling arrangement 10, evaporimeter 3 and the gas-liquid separator 2 that connects and form the closed-loop path by pipeline in turn.Also comprise blower fan 9, blower fan 9 quickens flowing of air between the air inlet of the gas outlet of evaporimeter 3 and condenser 11.Dehumidifier also comprises a pre-cooler, and this pre-cooler comprises a water-cooled heat exchanger 4, tank 6 and water pump 5.Water-cooled heat exchanger 4 is positioned at the front end of evaporimeter 3 airintake directions.Tank 6 is positioned at the below of evaporimeter 3.Water pump 5 is positioned at tank 6, and the delivery port of water pump connects the water inlet of water-cooled heat exchanger 4.The delivery port of water-cooled heat exchanger 4 inserts tank 6 by pipeline.The top of tank 6 is provided with overfall, and overfall is connected with drainpipe 7.Also be provided with the water level switch 12 of control water level in the tank 6, this water level switch 12 can be float-type or electric pole type.Throttling arrangement can be selected heating power expansion valve or capillary herein, preferred heating power expansion valve.
When above-mentioned dehumidifier is worked, three working medium circulations, i.e. cold-producing medium, empty G﹠Ws are arranged.The cyclic process of cold-producing medium is, elder generation enters condenser 11 by the gas that compressor 1 is compressed into HTHP, in condenser 11, liquefy, liquid after the liquefaction enters fluid reservoir 8, enter evaporimeter 3 heat absorptions through throttling arrangement 10 again and flash to gas, get back to gas-liquid separator 2, enter compressor 1 at last and move in circles.The cyclic process of extraneous air is, hot and humid air through water-cooled heat exchanger 4, dehumidifies into dry Cryogenic air on evaporimeter 3 surfaces earlier again, through condenser 11 heating after blower fan is blown in the air or in the air channel.The cyclic process of water is, the condensed water that becomes in evaporimeter 3 surface condensations gathers in the tank 6, and when condensed water reached a certain amount of, water level switch 12 actions were flowed out through drainpipe 7 by overfall.When intake air temperature reached setting value, water pump 5 was transported to water in the water-cooled heat exchanger 4 by the road, and the water outlet of water-cooled heat exchanger 4 returns tank 6, formed circulation.This situation progressively realizes in the elevation process in environment temperature.
When hot and humid operating mode is dehumidified, can in tank 6, inject cold water earlier, simultaneously the operating temperature of water pump 5 is set to Current Temperatures and gets final product.
More than implement to be considered to limiting the scope of the invention, the present invention also has some other distortion.Can whether adopt according to compressor size or concrete condition decision as gas-liquid separator and fluid reservoir; And water-cooled heat exchanger quantity can be more than one, or the like.If those skilled in the art is subjected to inspiration of the present invention, the distortion that does not need creative work to make all should be implemented in protection domain of the present invention.

Claims (5)

1, dehumidifier comprises the compressor, condenser, throttling arrangement and the evaporimeter that connect and form the closed-loop path by pipeline in turn; Also comprise blower fan, blower fan is between the air inlet of the gas outlet of evaporimeter and condenser;
It is characterized in that also comprise a pre-cooler, this pre-cooler comprises at least one water-cooled heat exchanger, tank and water pump; Described water-cooled heat exchanger is positioned at the front end of described evaporimeter airintake direction, tank is positioned at the below of described evaporimeter, water pump is positioned at tank, and the delivery port of water pump connects the water inlet of water-cooled heat exchanger, and the delivery port of water-cooled heat exchanger inserts tank by pipeline.
2, dehumidifier according to claim 1,
It is characterized in that:
Described throttling arrangement is a heating power expansion valve.
3, dehumidifier according to claim 2,
It is characterized in that:
The top of described tank is provided with overfall, and overfall is connected with drainpipe.
4, dehumidifier according to claim 3,
It is characterized in that:
Also be provided with the water level switch of control water level in the described tank.
5, dehumidifier according to claim 4,
It is characterized in that:
Described water-cooled heat exchanger is one.
CN2009100401843A 2009-06-11 2009-06-11 Dehumidifier Expired - Fee Related CN101603712B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100401843A CN101603712B (en) 2009-06-11 2009-06-11 Dehumidifier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100401843A CN101603712B (en) 2009-06-11 2009-06-11 Dehumidifier

Publications (2)

Publication Number Publication Date
CN101603712A true CN101603712A (en) 2009-12-16
CN101603712B CN101603712B (en) 2012-07-04

Family

ID=41469545

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100401843A Expired - Fee Related CN101603712B (en) 2009-06-11 2009-06-11 Dehumidifier

Country Status (1)

Country Link
CN (1) CN101603712B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106765710A (en) * 2017-03-07 2017-05-31 广东美的制冷设备有限公司 Dehumidification system and dehumidifier
CN108167952A (en) * 2017-12-21 2018-06-15 中国石油大学(华东) A kind of dehumidifier that environment Wen Sheng is reduced using condensed water
CN108626786A (en) * 2017-03-23 2018-10-09 青岛海尔空调器有限总公司 Total heat recovery type dehumidifier
CN109340936A (en) * 2018-12-06 2019-02-15 珠海格力电器股份有限公司 Dehumidification equipment
CN112268321A (en) * 2020-10-26 2021-01-26 珠海格力电器股份有限公司 Mixed working medium refrigerating system and dehumidifier
CN114484630A (en) * 2021-12-22 2022-05-13 深圳市华图测控***有限公司 Dehumidification device and constant humidity machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2725762Y (en) * 2004-09-07 2005-09-14 熊晓强 Integrated dehumidifier
CN100359250C (en) * 2005-06-07 2008-01-02 威海际高制冷空调设备有限公司 One-unit double system household ventilating dehumidifier
CN200943969Y (en) * 2006-08-22 2007-09-05 东南大学 Constant temperature dehumidification apparatus
CN201448954U (en) * 2009-06-11 2010-05-05 珠海天济能源科技有限公司 dehumidifier

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106765710A (en) * 2017-03-07 2017-05-31 广东美的制冷设备有限公司 Dehumidification system and dehumidifier
CN108626786A (en) * 2017-03-23 2018-10-09 青岛海尔空调器有限总公司 Total heat recovery type dehumidifier
CN108167952A (en) * 2017-12-21 2018-06-15 中国石油大学(华东) A kind of dehumidifier that environment Wen Sheng is reduced using condensed water
CN109340936A (en) * 2018-12-06 2019-02-15 珠海格力电器股份有限公司 Dehumidification equipment
CN112268321A (en) * 2020-10-26 2021-01-26 珠海格力电器股份有限公司 Mixed working medium refrigerating system and dehumidifier
CN114484630A (en) * 2021-12-22 2022-05-13 深圳市华图测控***有限公司 Dehumidification device and constant humidity machine
CN114484630B (en) * 2021-12-22 2024-01-26 深圳市华图测控***有限公司 Dehumidifying device and constant humidity machine

Also Published As

Publication number Publication date
CN101603712B (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN201448954U (en) dehumidifier
US20200164301A1 (en) Compressor installation with drying device for compressed gas and method for drying compressed gas
CN101603712B (en) Dehumidifier
CN203323274U (en) Large-small environment evaporative cooling, mechanical cooling and mixed ventilation composite air conditioning system
CN102095231A (en) Ultra-low humidity compound dehumidifier and control method thereof
CN102901193A (en) Stepless temperature regulating type condensation heat recovery air conditioning unit
CN201740170U (en) High-efficiency air dehumidifier
CN205048602U (en) Dehumidification runner and indirect evaporation cooling heat recovery fresh air conditioning of heat pump manifold type
CN104061630B (en) Modular fresh air processor
CN102620477B (en) Double-cold-source full fresh air heat pump dehumidification unit
CN102288016A (en) Energy-saving and environment-friendly drying box
CN105352307A (en) Dehumidification type heat pump drying system provided with bypass air duct
CN100359250C (en) One-unit double system household ventilating dehumidifier
CN106546090A (en) Hot and cold stream hybrid vortex pipe drying system
CN102721133B (en) Self-cooling type solid desiccant cooling dehumidification air-conditioning system
CN201368544Y (en) Moisture removal heating segment for combined type air-conditioning unit
CN202709344U (en) Ice storage heat pump coupling multistage total heat recovery fresh air processor
CN201476397U (en) Temperature-adjusting dehumidifier of water source heat pump
CN203949470U (en) Dehumidifying drying heat hot pump assembly
CN105115069A (en) Dehumidification turning wheel and heat pump coupling type indirect evaporative cooling heat recovery fresh air conditioner
CN201578977U (en) Efficient compact energy-saving combined low dew point dryer
CN100554796C (en) Solar energy driving compaction type two-stage parallel connection liquid dehumidifying air conditioner
CN202835916U (en) Evaporative heat pump dehumidifying temperature-regulating unit
CN202562131U (en) Dehumidifier set with novel air heat pump of double cold sources
CN105091094A (en) Constant-humidity air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20140611

EXPY Termination of patent right or utility model