CN101598027A - The tunnel connection channel construction method in a kind of shield structure interval - Google Patents

The tunnel connection channel construction method in a kind of shield structure interval Download PDF

Info

Publication number
CN101598027A
CN101598027A CNA2009100410289A CN200910041028A CN101598027A CN 101598027 A CN101598027 A CN 101598027A CN A2009100410289 A CNA2009100410289 A CN A2009100410289A CN 200910041028 A CN200910041028 A CN 200910041028A CN 101598027 A CN101598027 A CN 101598027A
Authority
CN
China
Prior art keywords
service channel
construction
vertical shaft
perform
portal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100410289A
Other languages
Chinese (zh)
Other versions
CN101598027B (en
Inventor
易觉
方启超
赵晖
赖伟文
王小军
董维奇
黎湛荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hua Qiao construction group Limited by Share Ltd
Original Assignee
CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG filed Critical CHINA TUNNEL CONSTRUCTION Co Ltd GUANGDONG
Priority to CN2009100410289A priority Critical patent/CN101598027B/en
Publication of CN101598027A publication Critical patent/CN101598027A/en
Application granted granted Critical
Publication of CN101598027B publication Critical patent/CN101598027B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses the tunnel connection channel construction method in a kind of shield structure interval, it may further comprise the steps: 1. pair service channel zone periphery is established the plain concrete diaphragm wall that a trap closes and is made water-stop curtain; 2. adopt the agitation pile or the grouting and reinforcing soil body at the service channel intra-zone; 3. in the reinforcing area scope, carry out the shaft excavation construction; 4. adopt hidden construction process to carry out the excavation and the lining construction of service channel to both sides from vertical shaft; 5. treat the service channel interval perform finish and shield machine fully by after adding solid, cut off the section of jurisdiction of service channel portal position, perform portal waterstop, the portal structure of service channel, and the service channel liner structure and the backfill vertical shaft that perform the vertical shaft position, last service channel connects to be finished, the stratum consolidation job practices of this service channel is efficient, safety, can be popularized and applied to shield machine and change in the construction of cutter stratum consolidation, the construction of changing cutter for shield machine provides one to ensure reliably.

Description

The tunnel connection channel construction method in a kind of shield structure interval
Technical field
The present invention relates to the realm of building construction, the connection channel construction method in particularly a kind of shield tunnel project.
Background technology
In engineering in the past, the service channel stratum consolidation method in the shield tunnel project all is to adopt one or more combinations in agitation pile reinforcing, rotary churning pile reinforcing, grouting and reinforcing or the freezing process reinforcement means to reinforce.But need be in rich groundwater, when the mobile soft formation strong, that void content is big of water is reinforced, if adopting the cement grout material reinforces, cement grout tends to scurry situations such as slurry, segregation because slurries take place, and make that soil mass consolidation intensity is low, porosity is big, lack of homogeneity, can not be strong from surely reaching permeability, finally cause reinforcing and lost efficacy; If adopt freezing process to reinforce, also exist long in time limit, construction cost is higher, the adverse effect of frost heave, underflow be to deficiencies such as fast Freezing stratum as rapid effect are undesirable.Accident takes place frequently during the service channel excavation, and has had a strong impact on the construction speed in tunnel, becomes the difficult problem in the shield tunnel project construction always.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of efficient, safety, the service channel form of construction work of saving duration, risk when also greatly reducing simultaneously the service channel construction, for controlling the stable reinforced construction method that effective guarantee is provided of soil mass consolidation preferably, and guarantee that shield machine passes through strengthening stratum quickly and safely.
The present invention solves the problems of the technologies described above the technical scheme that is adopted:
The tunnel connection channel construction method in a kind of shield structure interval is characterized in that: may further comprise the steps:
(1) service channel zone periphery is established the plain concrete diaphragm wall that a trap closes and make water-stop curtain, diaphragm wall is performed to impervious stratum by ground, has formed an airtight tubular outsourcing water-stopping structure jointly with impervious layer;
(2) adopt the agitation pile or the grouting and reinforcing soil body at the service channel intra-zone, improvement geology, and between plain concrete diaphragm wall and soil mass consolidation, set up row's rotary churning pile to strengthen waterproof and soil mass consolidation;
(3) in the reinforcing area scope, carry out the shaft excavation construction;
(4) adopt hidden construction process to carry out the excavation and the lining construction of service channel to both sides from vertical shaft;
(5) treat the service channel interval perform finish and shield machine fully by after adding solid, cut off the section of jurisdiction of service channel portal position, perform portal waterstop, the portal structure of service channel, and the service channel liner structure and the backfill vertical shaft that perform the vertical shaft position, last service channel connects to be finished.
The invention has the beneficial effects as follows: adopt this worker's method to carry out the service channel construction, the barrier properties of reinforcing area is good, and the consolidation effect of soil mass consolidation is good; The risk that performs service channel can not brought the tunneling shield construction during service channel excavation construction; The service channel construction can be carried out simultaneously with the tunneling shield construction, does not influence total duration of construction of tunnel; During the service channel construction, saved the level transportation in the tunnel, it is more convenient to construct.The stratum consolidation job practices of this service channel is efficient, safety, can be popularized and applied to shield machine and change in the construction of cutter stratum consolidation, and the construction of changing cutter for shield machine provides one to ensure reliably.
The specific embodiment
The tunnel connection channel construction method in a kind of shield structure interval may further comprise the steps:
(1) sets up the plain concrete diaphragm wall that a trap closes in the reinforcing area periphery and make water-stop curtain, the plain concrete diaphragm wall is that 800mm is thick, the strength grade of concrete that adopts is C20, wherein the diaphragm wall in the tunnel scope then adopts the C20+ mortar to be mixed into the plain concrete that is equivalent to C5 intensity, so that shield machine cutter directly cuts it, the assurance shield machine tunnels to pass smoothly and adds solid.The stagnant water effect of diaphragm wall is reliable, diaphragm wall is performed to impervious stratum by ground, formed an airtight tubular externally-packed structure jointly with impervious layer, soil mass consolidation in the reinforcing scope is played the effect that cuts off current, prevents water erosion and seepage failure, guaranteed that the soil mass consolidation in the reinforcing area has good consolidation effect.
(2) at the inner agitation pile or the grouting and reinforcing soil body of adopting of reinforcing area, improvement geology, and between plain concrete diaphragm wall and soil mass consolidation, set up row's rotary churning pile to strengthen waterproof and soil mass consolidation.The soil body through agitation pile, rotary churning pile or grouting and reinforcing should have good self-support performance, homogenieity, and unconfined compression strength reaches more than the 0.2Mpa, thereby has guaranteed that country rock soil body self-stability is good when vertical shaft and service channel excavation construction, ensures construction safety.
(3) in the reinforcing area scope, vertically perform the vertical shaft that a diameter is 1600mm from ground to service channel, vertical shaft adopts reverse construction, and what liner adopted is trapezoidal guard wall structure.
(4) after vertical shaft performs design elevation, it is underground to adopt terrestrial net that the geographical coordinates setting-out at control point is arrived, and makes the axis of service channel, adopts hidden construction process to carry out the excavation and the lining construction of service channel to both sides from vertical shaft again.The turnover of construction material, personnel, native slag is finished by the vertical shaft vertical transport.
(5) treat the service channel interval perform finish and shield machine fully by after adding solid, cut off the section of jurisdiction of service channel portal position, perform portal waterstop, the portal structure of service channel, and the service channel liner structure and the backfill vertical shaft that perform the vertical shaft position, last service channel connects to be finished.
By above-mentioned construction as can be seen, adopt this worker's method to carry out the service channel construction, the barrier properties of reinforcing area is good, and the consolidation effect of soil mass consolidation is good; The risk that performs service channel can not brought the tunneling shield construction during service channel excavation construction; The service channel construction can be carried out simultaneously with the tunneling shield construction, does not influence total duration of construction of tunnel; During the service channel construction, saved the level transportation in the tunnel, it is more convenient to construct.
The stratum consolidation job practices of this service channel is efficient, safety, can be popularized and applied to shield machine and change in the construction of cutter stratum consolidation, and the construction of changing cutter for shield machine provides one to ensure reliably.

Claims (3)

1. the tunnel connection channel construction method in a shield structure interval is characterized in that: may further comprise the steps:
(1) service channel zone periphery is established the plain concrete diaphragm wall that a trap closes and make water-stop curtain, diaphragm wall is performed to impervious stratum by ground, has formed an airtight tubular outsourcing water-stopping structure jointly with impervious layer;
(2) adopt the agitation pile or the grouting and reinforcing soil body at the service channel intra-zone, improvement geology, and between plain concrete diaphragm wall and soil mass consolidation, set up row's rotary churning pile to strengthen waterproof and soil mass consolidation;
(3) in the reinforcing area scope, carry out the shaft excavation construction;
(4) adopt hidden construction process to carry out the excavation and the lining construction of service channel to both sides from vertical shaft;
(5) treat the service channel interval perform finish and shield machine fully by after adding solid, cut off the section of jurisdiction of service channel portal position, perform portal waterstop, the portal structure of service channel, and the service channel liner structure and the backfill vertical shaft that perform the vertical shaft position, last service channel connects to be finished.
2. the tunnel connection channel construction method in a kind of shield structure according to claim 1 interval is characterized in that: the continuous wall thickness of plain concrete of described step (1) is 800mm, and the strength grade of concrete of employing is C20.
3. the tunnel connection channel construction method in a kind of shield structure according to claim 1 interval, it is characterized in that: the vertical shaft of described step (3) adopts reverse construction, vertically perform the vertical shaft that a diameter is 1600mm from ground to service channel, what its liner adopted is trapezoidal guard wall structure.
CN2009100410289A 2009-07-10 2009-07-10 Tunnel connection channel construction method of shield interval Active CN101598027B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100410289A CN101598027B (en) 2009-07-10 2009-07-10 Tunnel connection channel construction method of shield interval

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100410289A CN101598027B (en) 2009-07-10 2009-07-10 Tunnel connection channel construction method of shield interval

Publications (2)

Publication Number Publication Date
CN101598027A true CN101598027A (en) 2009-12-09
CN101598027B CN101598027B (en) 2011-08-17

Family

ID=41419608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100410289A Active CN101598027B (en) 2009-07-10 2009-07-10 Tunnel connection channel construction method of shield interval

Country Status (1)

Country Link
CN (1) CN101598027B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101749026A (en) * 2010-02-10 2010-06-23 中铁三局集团有限公司 Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN102287198A (en) * 2011-07-23 2011-12-21 中铁十二局集团有限公司 Construction method for river-crossing shield tunnel crushed stratum communication channel
CN101967978B (en) * 2010-02-04 2012-10-03 上海隧道工程股份有限公司 Construction method for improving shield soil in composite sand gravel stratum
CN103114857A (en) * 2013-02-26 2013-05-22 中铁十九局集团第二工程有限公司 Shield tunnel construction method
CN101781889B (en) * 2010-01-29 2014-10-08 中铁四局集团第五工程有限公司 H-shaped waterproof curtain construction process
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN104963693A (en) * 2015-06-18 2015-10-07 河海大学 Construction method for rectangular parallel top pipe connection channel
CN105545313A (en) * 2016-02-02 2016-05-04 中铁十九局集团轨道交通工程有限公司 T-shaped concealed excavated tunnel shield tunneling machine backup trolley lowering translation system and method thereof
CN106050266A (en) * 2016-07-22 2016-10-26 中铁建大桥工程局集团第五工程有限公司 Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN106437735A (en) * 2016-11-07 2017-02-22 中铁工程装备集团有限公司 Shield tunneling machine for tunnel connecting passageway and connecting passageway tunneling method of shield tunneling machine
CN108019211A (en) * 2018-01-23 2018-05-11 中国铁路设计集团有限公司 Waterproof of man and its construction method in a kind of pilot tunnel of rich water sand-pebble layer
CN108425682A (en) * 2018-03-13 2018-08-21 中铁建大桥工程局集团第二工程有限公司 A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method
CN110820803A (en) * 2019-11-11 2020-02-21 北京市市政工程设计研究总院有限公司 Open excavation construction method for transverse connection channel of shield tunnel
CN111236980A (en) * 2020-03-24 2020-06-05 石家庄铁源工程咨询有限公司 Contact channel construction method for water-rich pebble stratum
CN111502674A (en) * 2020-04-24 2020-08-07 中国十九冶集团有限公司 Advanced support structure and construction method for shallow-buried underground tunnel in water-rich and impurity-filled soil area
CN112066829A (en) * 2020-08-14 2020-12-11 首钢集团有限公司 Air shaft communication channel communicating method
CN112324474A (en) * 2020-10-23 2021-02-05 中铁十四局集团有限公司 Tunnel contact channel rapid construction method based on telescopic steel pipe sheet
CN112502734A (en) * 2020-11-30 2021-03-16 中铁二十局集团有限公司 Construction method of shield interval contact channel of water-rich sand layer
CN114934776A (en) * 2022-05-28 2022-08-23 中铁一局集团(广州)建设工程有限公司 Construction method for inhibiting frost heaving and thaw collapse of water-rich geology

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100501124C (en) * 2006-09-04 2009-06-17 上海隧道工程股份有限公司 Construction method for tunnel contact passage in shield section of underground railway

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101781889B (en) * 2010-01-29 2014-10-08 中铁四局集团第五工程有限公司 H-shaped waterproof curtain construction process
CN101967978B (en) * 2010-02-04 2012-10-03 上海隧道工程股份有限公司 Construction method for improving shield soil in composite sand gravel stratum
CN101749026B (en) * 2010-02-10 2012-10-03 中铁三局集团有限公司 Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN101749026A (en) * 2010-02-10 2010-06-23 中铁三局集团有限公司 Grid reinforcing method of shield receiving or starting end head and shield receiving method
CN102287198B (en) * 2011-07-23 2013-07-03 中铁十二局集团有限公司 Construction method for river-crossing shield tunnel crushed stratum communication channel
CN102287198A (en) * 2011-07-23 2011-12-21 中铁十二局集团有限公司 Construction method for river-crossing shield tunnel crushed stratum communication channel
CN103114857A (en) * 2013-02-26 2013-05-22 中铁十九局集团第二工程有限公司 Shield tunnel construction method
CN104846829A (en) * 2014-02-18 2015-08-19 宏润建设集团股份有限公司 Shield-reserved penetration composite type foundation pit support wall and construction method thereof
CN104963693A (en) * 2015-06-18 2015-10-07 河海大学 Construction method for rectangular parallel top pipe connection channel
CN104963693B (en) * 2015-06-18 2017-03-08 河海大学 Rectangular parallel push pipe connection channel construction method
CN105545313A (en) * 2016-02-02 2016-05-04 中铁十九局集团轨道交通工程有限公司 T-shaped concealed excavated tunnel shield tunneling machine backup trolley lowering translation system and method thereof
CN106050266A (en) * 2016-07-22 2016-10-26 中铁建大桥工程局集团第五工程有限公司 Construction method for undermining connected channel between shield sections in water-rich sand cobble stratum tunnel
CN106050266B (en) * 2016-07-22 2018-01-02 中铁建大桥工程局集团第五工程有限公司 The construction method of shield section service channel tunneling in rich water sand-pebble layer tunnel
CN106437735A (en) * 2016-11-07 2017-02-22 中铁工程装备集团有限公司 Shield tunneling machine for tunnel connecting passageway and connecting passageway tunneling method of shield tunneling machine
CN106437735B (en) * 2016-11-07 2018-06-01 中铁工程装备集团有限公司 Tunnel connection channel shield machine and its service channel driving method
CN108019211A (en) * 2018-01-23 2018-05-11 中国铁路设计集团有限公司 Waterproof of man and its construction method in a kind of pilot tunnel of rich water sand-pebble layer
CN108019211B (en) * 2018-01-23 2023-09-12 中国铁路设计集团有限公司 Water-intercepting curtain in pilot tunnel of water-rich sandy pebble stratum and construction method thereof
CN108425682A (en) * 2018-03-13 2018-08-21 中铁建大桥工程局集团第二工程有限公司 A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method
CN110820803A (en) * 2019-11-11 2020-02-21 北京市市政工程设计研究总院有限公司 Open excavation construction method for transverse connection channel of shield tunnel
CN110820803B (en) * 2019-11-11 2021-06-22 北京市市政工程设计研究总院有限公司 Open excavation construction method for transverse connection channel of shield tunnel
CN111236980A (en) * 2020-03-24 2020-06-05 石家庄铁源工程咨询有限公司 Contact channel construction method for water-rich pebble stratum
CN111502674A (en) * 2020-04-24 2020-08-07 中国十九冶集团有限公司 Advanced support structure and construction method for shallow-buried underground tunnel in water-rich and impurity-filled soil area
CN112066829A (en) * 2020-08-14 2020-12-11 首钢集团有限公司 Air shaft communication channel communicating method
CN112066829B (en) * 2020-08-14 2022-03-18 首钢集团有限公司 Air shaft communication channel communicating method
CN112324474A (en) * 2020-10-23 2021-02-05 中铁十四局集团有限公司 Tunnel contact channel rapid construction method based on telescopic steel pipe sheet
CN112324474B (en) * 2020-10-23 2021-10-22 中铁十四局集团有限公司 Tunnel contact channel rapid construction method based on telescopic steel pipe sheet
CN112502734A (en) * 2020-11-30 2021-03-16 中铁二十局集团有限公司 Construction method of shield interval contact channel of water-rich sand layer
CN114934776A (en) * 2022-05-28 2022-08-23 中铁一局集团(广州)建设工程有限公司 Construction method for inhibiting frost heaving and thaw collapse of water-rich geology

Also Published As

Publication number Publication date
CN101598027B (en) 2011-08-17

Similar Documents

Publication Publication Date Title
CN101598027B (en) Tunnel connection channel construction method of shield interval
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN101985882B (en) Construction method of rigid primary support of mould-building concrete of plateau permafrost tunnel
CN202866826U (en) Shield tunnel working well outer end socket stratum reinforced structure
CN105041325A (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN207377565U (en) Constructing metro tunnel structure containing complicated geological and without shield launching place
CN103306684A (en) Process for grouting on back of shield segment
CN202117686U (en) Surrounding rock advanced support structure for railway tunnel at deep-buried watery and weak stratums
CN101781993A (en) Shield driving construction method for bearing water-rich soil layer
CN105351001B (en) A kind of method based on gob side entry retaining region reinforcement gas pumping
CN106522989A (en) Air shaft structure and shield excavation parallel construction method
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN105464685A (en) Cave-pile method bored tunnel waterproof curtain and construction method thereof
CN104612696A (en) Construction method for large-section underground excavation subway station to pass through viaduct in fine sand layer by using column hole method
CN111810176A (en) Subway station end reinforcement construction method for water-rich sand layer shield construction
CN103572764A (en) Ultra-deep manual hole digging pile dado water stop structure and construction method thereof
CN110130909B (en) Construction method for shield to penetrate existing station in silt stratum
CN216342131U (en) Shield tunnel invades limit stake and handles reinforced structure
CN103573280B (en) Method for supporting porous ooze invasion compound roof roadway
CN102330436A (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN104863613B (en) Rocky stratum tunneling underground structure flash joist anchor draws just branch structure and construction method
CN104453915B (en) Big cross section vertical shaft pre-pouring grout reinforces Rapid Excavation method
CN108868796A (en) For wearing skyscraper group construction method under the shield sharp radius curve and heavy grade under water-rich sand layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 510220 Guangdong city of Guangzhou province Haizhuqu District Yue Xuan Street No. 81 (G-3) 1501-1512, 1604-1607 room

Patentee after: Guangdong Hua Qiao construction group Limited by Share Ltd

Address before: 510000, building 18, Pacific Insurance Mansion, 559 Tianhe North Road, 1802, Guangdong, Guangzhou

Patentee before: China Tunnel Construction Co., Ltd. Guangdong

CP03 Change of name, title or address