CN101592719A - Current transformer method of testing and system thereof - Google Patents

Current transformer method of testing and system thereof Download PDF

Info

Publication number
CN101592719A
CN101592719A CNA2009101084357A CN200910108435A CN101592719A CN 101592719 A CN101592719 A CN 101592719A CN A2009101084357 A CNA2009101084357 A CN A2009101084357A CN 200910108435 A CN200910108435 A CN 200910108435A CN 101592719 A CN101592719 A CN 101592719A
Authority
CN
China
Prior art keywords
current transformer
test
mutual inductor
polarity
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009101084357A
Other languages
Chinese (zh)
Other versions
CN101592719B (en
Inventor
李鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Clou Electronics Co Ltd
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN2009101084357A priority Critical patent/CN101592719B/en
Publication of CN101592719A publication Critical patent/CN101592719A/en
Application granted granted Critical
Publication of CN101592719B publication Critical patent/CN101592719B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The method and the system thereof of current transformer test provided by the present invention, this system comprise transducer check device, PC and calibrating table top; The calibrating table top is provided with current transformer to be measured and test monitor screen, after finishing current transformer wiring to be measured on the calibrating table top, PC is provided with the calibrating scheme of current transformer, PC was downloaded the information of current transformer from marketing system after setting was finished, and the parameter of being examined and determine is resolved; Use PC control verification device to current transformer automatic Verification to be checked then; Obtain the verification result of the current transformer of PC control verification device automatic Verification then; Verification result with current transformer is uploaded to marketing system at last, thereby finishes the test of current transformer.The invention solves the existing inefficient technical matters of measuring current ct calibrating method, have advantages such as calibrating speed is fast, safe and reliable.

Description

Current transformer method of testing and system thereof
[technical field]
The present invention relates to the transformer test field, a kind of current transformer method of testing and system thereof are provided.
[background technology]
Current transformer is a widely used metering outfit in electric system, and the quality of current transformer performance is directly connected to the reliability of metering system, and underproof current transformer also can influence the safe operation of electric system, therefore must examine and determine it.Traditional calibration method is to rely on the manual source that rises, and again with the method test mutual inductor of mutual inductor comparator than contrast differences value and angular difference value, and this method of testing once can only be examined and determine a mutual inductor, and calibrating efficient is also lower.
[summary of the invention]
In order to solve the existing inefficient technical matters of measuring current ct calibrating method, the invention provides a kind of current transformer method of testing and system.
To achieve these goals, technical scheme proposed by the invention is: a kind of method of current transformer test is provided, and this method of testing may further comprise the steps: the first step: current transformer to be measured is placed the calibrating table top; Second step:, finish primary connection and secondary connection by the no-load voltage ratio that indicates on the current transformer nameplate; The 3rd step: PC is provided with the calibrating scheme of current transformer; The 4th step: PC is downloaded the information of current transformer from marketing system, and the parameter of being examined and determine is resolved; The 5th step: PC control verification device is to current transformer automatic Verification to be checked; The 6th step: the verification result that obtains the current transformer of PC control verification device automatic Verification; The 7th step: the verification result of current transformer is uploaded to marketing system, thereby finishes the test of current transformer.
According to an optimal technical scheme of the present invention: in described the 5th step current transformer automatic Verification to be checked is comprised: the current transformer polarity check; The demagnetization test; Power frequency withstand test; The fundamental error test; And impedance experiments.
According to an optimal technical scheme of the present invention: described current transformer polarity check may further comprise the steps: one,, suppose that the polarity of mutual inductor is acquiescence polarity, acquiescence polarity is general identical with the polarity of standard mutual inductor, is " subtracting " polarity; Two,, add the primary current of 1%-20% for tested mutual inductor by the output of PC power controlling source; Three, ratio difference and the angular difference value that reads on the mutual-inductor tester changes, if ratio, thinks then that the polarity of tested mutual inductor is identical with the polarity of standard mutual inductor less than 40, is " subtracting " polarity, and the mutual inductor polarity inspection finishes; Otherwise, continue to carry out next step; Four, primary current is reduced to 0, Controlling Source output then adds an inverse current, and the amplitude of electric current is the 1%-20% of primary current; Five, read the variation of the ratio difference and the angular difference value of mutual-inductor tester once more, if ratio, thinks then that the polarity of tested mutual inductor is opposite with the polarity of standard mutual inductor less than 40%, be " additive polarity ", polarity check finishes; If ratio, is then thought the incorrect polarity of mutual inductor still greater than 40%.
According to an optimal technical scheme of the present invention: the demagnetization mode of described demagnetization test to current transformer is closed circuit demagnetization or open circuit demagnetization.
According to an optimal technical scheme of the present invention: described power frequency withstand test can carry out mutual inductor once over the ground, secondary over the ground, once to the withstand voltage test of secondary.At the trial, the high pressure of PC may command power source output 0-2000V, the lasting time is provided with by the calibrating scheme, can read leakage current by the dielectric voltage withstand instrument, and draw the withstand voltage test conclusion.
According to an optimal technical scheme of the present invention: described fundamental error test may further comprise the steps: step, by PC step-up error calibrating scheme, the scheme content comprises: the error testing point, and 1%-120% can be provided with arbitrarily; Station is provided with, and can select station 1-10; Power factor is provided with, and the power factor that can select is 1.0 and 0.8, and the payload of fully loaded and underloading is set, and the payload of native system support is 0VA-100VA; Before two steps, the beginning error test, system for the underproof mutual inductor of polarity check, will stop to examine and determine other project to the self-verifying of current transformer polarity; Before three steps, the beginning error test, system is according to the scheme setting test of demagnetizing alternatively; The demagnetization experiment can reduce because the adverse effect that remanent magnetism produces transformer error in the mutual inductor; Four steps, finish after above-mentioned-three steps an of step, system can current transformer be fully loaded with earlier, after carry out light duty test.
According to an optimal technical scheme of the present invention: whether described impedance and admittance test satisfy the requirement that connects impedance in the JJG 314-99 Verification of Measuring Current Transformer vertification regulation about secondary by the secondary connection impedance magnitude of each epi-position of individual inspiration with the line impedance of judging stage body.
According to an optimal technical scheme of the present invention: described demagnetization demagnetization mode under the situation that does not connect load, adds an inverse current for tested mutual inductor during for open circuit demagnetization experiment, and size of current is that the 1%-20% of primary current can be provided with arbitrarily.
According to an optimal technical scheme of the present invention: when described demagnetization mode is closed circuit demagnetization magnetic experiment, the mutual inductor verifying attachment is according to the nominal load of mutual inductor to be checked, the automatic switchover demagnetizing resistance is the fixedly multiple of rated resistance, add the inverse current of 1%-100% then for tested mutual inductor, electric current slowly reduces to 0 then, thereby finishes the demagnetization test.
According to an optimal technical scheme of the present invention: in described four steps current transformer is fully loaded with earlier, the concrete steps of carrying out light duty test then are as follows:
Step 1, the no-load voltage ratio of switching standards current transformer is consistent with the no-load voltage ratio of tested current transformer on transformer calibrating device;
Step 2, gating will be examined the station relay of current transformer automatically, disconnects the mutual inductor of other station;
Step 3 makes transformer calibrating device power controlling source output primary current, and electric current slowly increases, and outputs to 1%, 5%, 20%, 100% and 120% of rated primary current successively;
Step 4 writes down the ratio difference and the angular difference value of each test point by mutual-inductor tester;
Step 5 reads the ratio difference and the angular difference value of each test point with PC from mutual-inductor tester, and draws the error test conclusion according to the accuracy class of tested mutual inductor;
Step 6, when calibrating underloading error, system's automatic switchover load box is to underloading load, the process of repeating step one-step 5 then.
Another kind of technical scheme of the present invention is: a kind of current transformer test macro is provided, this system comprises PC, receives the transducer check device of PC, described system comprises that also being used to control transformer calibrating device realizes tested mutual inductor is finished polarity check, demagnetization test, error testing, power frequency withstand test, and draws the PC of experimental result; Be used to realize the primary connection of tested mutual inductor and the calibrating table top of secondary connection; Described calibrating table top is provided with current transformer to be measured.
According to an optimal technical scheme of the present invention: also be provided with the test monitor screen on the described calibrating table top.
According to an optimal technical scheme of the present invention: the no-load voltage ratio scope of described current transformer is 4-000A/5A.
According to an optimal technical scheme of the present invention: described current transformer is one or more.
Beneficial effect of the present invention is: only need primary connection, can finish 10 current transformers with no-load voltage ratio of the same type; By gear of automatic switchover standard mutual inductor, switch the calibration power factor, and after the automatic switchover load box payload, thereby realize full-automatic calibrating.System is furnished with the big screen LED monitor screen, and the testing person can be isolated with the transducer check device, can the protection test personal security at the calibrating current mutual inductor with high transforming ratio.System is furnished with acoustooptic alarm system, when mutual inductor is carried out power frequency withstand test, has sound and light alarm, with the alert operation of taking care.Can automatically examine and determine current transformer, primary connection can be examined and determine 10 mutual inductors simultaneously, can examine and determine all the calibrating projects in " JJG 313-94 Verification of Measuring Current Transformer vertification regulation ", and it is many to have the calibrating project, examines and determine fireballing characteristics.These method and system have improved the efficient of current transformer production test, have alleviated the work load of electric-power metering department.
[description of drawings]
Fig. 1 is current transformer method of testing process flow diagram in current transformer method of testing of the present invention and the system thereof;
Fig. 2 is a kind of current transformer test system structure synoptic diagram in current transformer method of testing of the present invention and the system thereof.
[embodiment]
Below in conjunction with accompanying drawing technical solutions of the utility model are described further:
See also shown in Figure 1ly, in step S101, current transformer to be measured placed on the calibrating table top; In step S102,, finish mutual inductor primary connection and secondary connection according to indicating on the current transformer nameplate; PC is provided with the ct calibrating scheme in step S103; PC is downloaded mutual inductor information from marketing system in step S104, resolves verification parameters; PC control verification device is to current transformer automatic Verification to be checked in step S105; In step S106, obtain test findings; In step S107, verification result is uploaded to marketing system.
Wherein, calibrating specifically comprises following substep to current transformer among the step S105: substep S105-1, carry out polarity check to current transformer; Substep S105-2 is to the current transformer test of demagnetizing; Substep S105-3 is to the current transformer power frequency withstand test; Substep S105-4 carries out the fundamental error test to current transformer; Substep S105-5 carries out impedance experiments to current transformer; Substep S105-1 and step S105-5 be in no particular order the order.
In substep S105-1, the current transformer polarity check may further comprise the steps:
A supposes that the polarity of mutual inductor is acquiescence polarity, and acquiescence polarity is general identical with the polarity of standard mutual inductor, is " subtracting " polarity;
B:, add the primary current of 1%-20% for tested mutual inductor by the output of PC power controlling source;
C: the ratio difference and the angular difference value that read on the mutual-inductor tester change, if ratio, thinks then that the polarity of tested mutual inductor is identical with the polarity of standard mutual inductor less than 40, are " subtracting " polarity, and the mutual inductor polarity inspection finishes; Otherwise, continue to carry out next step;
D: primary current is reduced to 0, and Controlling Source output then adds an inverse current, and the amplitude of electric current is the 1%-20% of primary current;
E: read the variation of the ratio difference and the angular difference value of mutual-inductor tester once more, if ratio, thinks then that the polarity of tested mutual inductor is opposite with the polarity of standard mutual inductor less than 40%, be " additive polarity ", polarity check finishes; If ratio, is then thought the incorrect polarity of mutual inductor still greater than 40%.
Connect anti-mutual inductor for polarity, the embodiment of the invention can normally be examined and determine mutual inductor according to " reversed polarity ", and need not manually to exchange secondary connection; For the mutual inductor of incorrect polarity, the embodiment of the invention will stop to examine and determine other project.
In substep S105-2, the demagnetization mode that the demagnetization of current transformer is tested is divided into closed circuit demagnetization and open circuit demagnetization; When the demagnetization mode is tested for the open circuit demagnetization, under the situation that does not connect load, add an inverse current for tested mutual inductor, size of current is that the 1%-20% of primary current can be provided with arbitrarily.When the demagnetization mode is closed circuit demagnetization experiment, the mutual inductor verifying attachment is according to the nominal load of mutual inductor to be checked, and the automatic switchover demagnetizing resistance is the fixedly multiple of rated resistance, adds the inverse current of 1%-100% then for tested mutual inductor, electric current slowly reduces to 0 then, thereby finishes the demagnetization test.Wherein, the demagnetization experiment can reduce owing to the influence of the remanent magnetism in the current transformer to mutual inductor ratio and angular difference, and to improve the reliability of test, this test event can be done by user's choosing.
In substep S105-3, the current transformer power frequency withstand test can carry out mutual inductor once over the ground, secondary over the ground, once to the withstand voltage test of secondary.At the trial, the high pressure of PC may command power source output 0-2000V, the lasting time is provided with by the calibrating scheme, can read leakage current by the dielectric voltage withstand instrument, and draw the withstand voltage test conclusion.In the withstand voltage test process; system also can be furnished with acoustooptic alarm system; when withstand voltage test is carried out; HT pilot can light, and alert is taken care, simultaneously; also is furnished with scram button; when abnormal conditions appear in withstand voltage test, can press scram button fast and finish withstand voltage test, to protect this test macro safety.
In substep S105-4, the test of current transformer fundamental error may further comprise the steps:
The mutual inductor ratio scope that the fundamental error test can be examined and determine is: 4.0A ~ 3000A, can examine and determine the current transformer that secondary current is 5A or 1A, the power factor that can test is 1.0 or 0.8, can test the error under fully loaded and underloading condition, the load range that can test is: 0VA ~ 100VA, the percentage range that can test is 1% ~ 120%, and test point and test parameter can be adjusted by the plan of establishment in the PC software.Wherein the basic procedure of fundamental error experiment is as follows:
A, by PC step-up error calibrating scheme, the scheme content comprises: the error testing point, 1%-120% can be provided with arbitrarily; Station is provided with, and can select station 1-10; Power factor is provided with, and the power factor that can select is 1.0 and 0.8, and the payload of fully loaded and underloading is set, and the payload of native system support is 0VA-100VA;
B, before the beginning error test, system for the underproof mutual inductor of polarity check, will stop to examine and determine other project to the self-verifying of current transformer polarity;
C, before the beginning error test, system is according to the scheme setting test of demagnetizing alternatively; The demagnetization experiment can reduce because the adverse effect that remanent magnetism produces transformer error in the mutual inductor;
D finishes after the above-mentioned steps 1-step 3, and system can current transformer be fully loaded with earlier, after carry out light duty test.
Test detailed process in the steps d is as follows:
Steps d .1, the no-load voltage ratio of switching standards current transformer is consistent with the no-load voltage ratio of tested current transformer on transformer calibrating device;
Steps d .2, gating will be examined the station relay of current transformer automatically, disconnects the mutual inductor of other station;
Steps d .3 makes transformer calibrating device power controlling source output primary current, and electric current slowly increases, and outputs to 1%, 5%, 20%, 100% and 120% of rated primary current successively;
Steps d .4 writes down the ratio difference and the angular difference value of each test point by mutual-inductor tester;
Steps d .5 reads the ratio difference and the angular difference value of each test point with PC from mutual-inductor tester, and draws the error test conclusion according to the accuracy class of tested mutual inductor;
Steps d .6, when calibrating underloading error, system's automatic switchover load box is to the underloading load, then the repeating step process of steps d .5 d.1-.
When calibrating underloading error, system can automatically switch load box to the underloading load, repeats then d.1 ~ d.5 process;
The process of this transformer error experiment is automatically carried out; And be furnished with monitor screen, the percent value in the time of can the far-end observation experiment, than difference and angular difference value makes the operator protect operating personnel's safety to greatest extent away from the check table top.
Whether the current transformer impedance experiments satisfies the requirement that connects impedance in " JJG 314-99 Verification of Measuring Current Transformer vertification regulation " about secondary by the secondary connection impedance magnitude of each epi-position of individual inspiration with the line impedance of judging stage body.
After finishing calibrating, finally obtain the verification result of the current transformer of PC control verification device automatic Verification; The software kit of system is preserved the test result to mutual inductor automatically, diversified query manipulation interface is provided, can carry out combined queries according to a plurality of conditions such as calibrating date, mutual inductor type, model, manufacturing firms, also can print verification result and generate form.
At last the current transformer verification result that obtains is uploaded to marketing system, thereby finishes the test of current transformer.PC software is furnished with and power marketing system interface software, the verification result of mutual inductor can be uploaded to the power marketing system, shares the calibrating data with marketing system.
PC is provided with current transformer calibrating scheme, and 1-10 current transformer only of the same type is tested according to the testing program that is provided with, and draw test findings, also can carry out transformer test automatically, and only need primary connection can finish all calibrating projects, greatly improved the work efficiency of power department.
Referring to Fig. 2,
In the current transformer test macro provided by the invention, comprise transducer check device 1, be used to control transformer calibrating device 1 and realize tested mutual inductor is finished polarity check, demagnetization test, error testing, power frequency withstand test, and draw the PC 2 of experimental result; Be used to realize the primary connection of tested mutual inductor and the calibrating table top 3 of secondary connection; Calibrating table top 3 is provided with 1-10 current transformer 4 to be measured and a test monitor screen 5.By primary connection, can finish the test of the current transformer 4 of 10 same types, greatly improved the work efficiency of power department.This system can have power frequency withstand test, current transformer demagnetization test, mutual inductor polarity to judge, detect test, the test of current transformer fundamental error to the project of transformer test, and current transformer impedance experiments, the current transformer 4 no-load voltage ratio scopes of calibrating are 4 ~ 3000A/5A, also can examine and determine the current transformer that secondary is 1A; The embodiment of the invention can the calibration power factor be 0.8 and 1.0 current transformer, and the loading range that can examine and determine is: 0.00VA ~ 100VA, therefore, this system can detect the current transformer that the domestic overwhelming majority uses always, has very strong adaptability.PC 2 is provided with the calibrating experiment parameter and the calibrating scheme of mutual inductor to be checked, automatically finishes the ct calibrating project by control mutual inductor verifying attachment, draws conclusion (of pressure testing) at last; After PC 2 is finished analysis to experimental result, set up the interface with the power marketing system, experimental result is uploaded to marketing system, realize data sharing with this test macro.PC 2 also is provided with the interface routine with the power marketing system, and by the parameter information of this interface routine from power marketing system downloads to-be-tested transformer, obtains the verification parameters of to-be-tested transformer.Multiple management information system (the Management Information System of configuration, MIS) interface protocol is supported domestic most of power marketing system software, can download mutual inductor information from marketing system, upload the calibrating data, thereby make this system have very strong adaptability.
This system can also manage scheme, can be provided with whether to carry out the mutual inductor visual examination; Be provided with and whether carry out power frequency withstand test, and the withstand voltage test value can be made as 0-2000V, the withstand voltage test time can be made as 0-99 second; Be provided with and whether carry out insulation resistance test and admittance test; Be provided with and whether carry out the test of mutual inductor fundamental error, and step-up error calibrating point.The verification parameters of these test events can be combined into different transformer test schemes, when testing, only gets final product with accessing the testing scheme that pre-sets at every turn, thereby has simplified the parameter setting up procedure before the calibrating greatly.
In the foregoing description, only the present invention has been carried out exemplary description, but those skilled in the art can design various embodiments according to different actual needs under the situation of the scope and spirit that do not break away from the present invention and protected.

Claims (10)

1. current transformer method of testing is characterized in that: the method for described current transformer test may further comprise the steps:
A: current transformer to be measured is placed the calibrating table top;
B: finish primary connection and secondary connection by the no-load voltage ratio that indicates on the current transformer nameplate;
The C:PC machine is provided with the calibrating scheme of current transformer;
The D:PC machine is downloaded the information of current transformer from marketing system, and the parameter of being examined and determine is resolved;
E:PC machine control verification device is to current transformer automatic Verification to be checked;
F: the verification result that obtains the current transformer of PC control verification device automatic Verification;
H: the verification result of current transformer is uploaded to marketing system, thereby finishes the test of current transformer.
2. current transformer method of testing according to claim 1 is characterized in that: in the described step e current transformer automatic Verification to be checked is comprised: the current transformer polarity check; The demagnetization test; Power frequency withstand test; The fundamental error test; And impedance experiments.
3. current transformer method of testing according to claim 2 is characterized in that: described current transformer polarity check may further comprise the steps:
E11: the polarity of supposing mutual inductor is acquiescence polarity, and acquiescence polarity is general identical with the polarity of standard mutual inductor, is " subtracting " polarity;
E12:, add the primary current of 1%-20% for tested mutual inductor by the output of PC power controlling source;
E13: the ratio difference and the angular difference value that read on the mutual-inductor tester change, if ratio, thinks then that the polarity of tested mutual inductor is identical with the polarity of standard mutual inductor less than 40, are " subtracting " polarity, and the mutual inductor polarity inspection finishes; Otherwise, continue to carry out next step;
E14: primary current is reduced to 0, and Controlling Source output then adds an inverse current, and the amplitude of electric current is the 1%-20% of primary current;
E15:, the variation of reading the ratio difference and the angular difference value of mutual-inductor tester once more, if ratio less than 40% then think that the polarity of tested mutual inductor is opposite with the polarity of standard mutual inductor, is " additive polarity ", polarity check finishes; If ratio, is then thought the incorrect polarity of mutual inductor still greater than 40%.
4. current transformer method of testing according to claim 2 is characterized in that:
The described demagnetization mode that the demagnetization of current transformer is tested is closed circuit demagnetization or open circuit demagnetization;
When described demagnetization mode is tested for the open circuit demagnetization, under the situation that does not connect load, add an inverse current for tested mutual inductor, size of current is that the 1%-20% of primary current can be provided with arbitrarily;
When described demagnetization mode is closed circuit demagnetization experiment, the mutual inductor verifying attachment is according to the nominal load of mutual inductor to be checked, and the automatic switchover demagnetizing resistance is the fixedly multiple of rated resistance, adds the inverse current of 1%-100% then for tested mutual inductor, electric current slowly reduces to 0 then, thereby finishes the demagnetization test.
5. current transformer method of testing according to claim 2 is characterized in that:
Described power frequency withstand test can carry out mutual inductor once over the ground, secondary over the ground, once to the withstand voltage test of secondary, at the trial, the high pressure of PC may command power source output 0-2000V, the time that continues is provided with by the calibrating scheme, can read leakage current by the dielectric voltage withstand instrument, and draw the withstand voltage test conclusion.
6. current transformer method of testing according to claim 2 is characterized in that:
Described fundamental error test may further comprise the steps:
E21: by PC step-up error calibrating scheme, the scheme content comprises: the error testing point, and 1%-120% can be provided with arbitrarily; Station is provided with, and can select station 1-10; Power factor is provided with, and the power factor that can select is 1.0 and 0.8, and the payload of fully loaded and underloading is set, and the payload of native system support is 0VA-100VA:
E22: before the beginning error test, system for the underproof mutual inductor of polarity check, will stop to examine and determine other project to the self-verifying of current transformer polarity;
E23: before the beginning error test, system is according to the scheme setting test of demagnetizing alternatively; The demagnetization experiment can reduce because the adverse effect that remanent magnetism produces transformer error in the mutual inductor;
E24: carry out after the test of step e 21-E23, system can be fully loaded with earlier current transformer, after carry out light duty test.
7. current transformer method of testing according to claim 2 is characterized in that:
Whether described impedance experiments satisfies the requirement that connects impedance in the JJG 314-99 Verification of Measuring Current Transformer vertification regulation about secondary by the secondary connection impedance magnitude of each epi-position of individual inspiration with the line impedance of judging stage body.
8. current transformer method of testing according to claim 6 is characterized in that:
In the described step e 24 current transformer is fully loaded with earlier, the concrete steps of carrying out light duty test then are as follows:
E241, the no-load voltage ratio of switching standards current transformer is consistent with the no-load voltage ratio of tested current transformer on transformer calibrating device;
E242, gating will be examined the station relay of current transformer automatically, disconnects the mutual inductor of other station;
E243 makes transformer calibrating device power controlling source output primary current, and electric current slowly increases, and outputs to 1%, 5%, 20%, 100% and 120% of rated primary current successively;
E244 writes down the ratio difference and the angular difference value of each test point by mutual-inductor tester;
E245 reads the ratio difference and the angular difference value of each test point with PC from mutual-inductor tester, and draws the error test conclusion according to the accuracy class of tested mutual inductor;
E246, when calibrating underloading error, system's automatic switchover load box is to underloading load, the process of repeating step E241-step e 245 then.
9. current transformer test macro, described current transformer test macro comprises transducer check device (1), it is characterized in that: described current transformer test macro comprises that also being used to control transformer calibrating device realizes tested mutual inductor is finished polarity check, demagnetization test, error testing, power frequency withstand test, and draws the PC (2) of experimental result; Be used to realize the primary connection of tested mutual inductor and the calibrating table top (3) of secondary connection; Described calibrating table top (3) is provided with current transformer to be measured (4) and test monitor screen (5).
10. according to the described current transformer test macro of claim 9, it is characterized in that:
The no-load voltage ratio scope of described current transformer (4) is 4-3000A/5A or 4-3000A/1A; Described current transformer (4) is one or more.
CN2009101084357A 2009-06-30 2009-06-30 Method and system for testing current transformer Expired - Fee Related CN101592719B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101084357A CN101592719B (en) 2009-06-30 2009-06-30 Method and system for testing current transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101084357A CN101592719B (en) 2009-06-30 2009-06-30 Method and system for testing current transformer

Publications (2)

Publication Number Publication Date
CN101592719A true CN101592719A (en) 2009-12-02
CN101592719B CN101592719B (en) 2011-09-14

Family

ID=41407483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101084357A Expired - Fee Related CN101592719B (en) 2009-06-30 2009-06-30 Method and system for testing current transformer

Country Status (1)

Country Link
CN (1) CN101592719B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101900783A (en) * 2010-07-21 2010-12-01 宁波英格塑料制品有限公司 High-voltage testing equipment
CN102411097A (en) * 2010-09-20 2012-04-11 河南平高东芝高压开关有限公司 Test control device for current transformer
CN102654571A (en) * 2011-03-02 2012-09-05 深圳市凯弦电气自动化有限公司 Comprehensive tester of current transformer
WO2012163064A1 (en) * 2011-06-01 2012-12-06 浙江省电力公司 Full-automatic detecting system and method for transformer
CN103105594A (en) * 2013-01-24 2013-05-15 江苏省电力公司电力科学研究院 Current mutual inductor residual magnetism detection method based on small-signal gradient mapping
CN103293504A (en) * 2013-06-04 2013-09-11 国家电网公司 On-site current transformer comprehensive detector and testing method thereof
CN104459589A (en) * 2013-09-17 2015-03-25 比亚迪股份有限公司 Automatic test system of current sensor
CN104820161A (en) * 2015-05-21 2015-08-05 国家电网公司 Multi-tap current transformer secondary wiring detection device
CN104950277A (en) * 2015-06-25 2015-09-30 国家电网公司 Semi-automatic comprehensive detection device for low-voltage current transformer
CN106093696A (en) * 2016-06-13 2016-11-09 贵州电网有限责任公司贵阳供电局 Outside transformer substation current transformer polarity indication device
CN107255791A (en) * 2017-06-09 2017-10-17 国网四川省电力公司电力科学研究院 A kind of full-automatic verification system of program control type current transformer
CN109342988A (en) * 2018-12-20 2019-02-15 广东电网有限责任公司 A kind of remanence of current transformer influence test method, apparatus and system
CN109407036A (en) * 2018-12-29 2019-03-01 太原山互科技有限公司 A kind of full-automatic calibrating installation of batch current transformer based on PLC control
CN110308415A (en) * 2019-07-05 2019-10-08 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 The error compensating method and device of electric energy metered system
CN110687492A (en) * 2019-08-21 2020-01-14 国网湖北省电力有限公司计量中心 Method and system for monitoring detection quality of automatic verification system of low-voltage current transformer on line
CN111812576A (en) * 2020-07-22 2020-10-23 积成电子股份有限公司 System and method for adjusting transformer board of relay protection device
CN113030832A (en) * 2021-03-22 2021-06-25 苏州电器科学研究院股份有限公司 Device and method for detecting composite error of current transformer
CN114814658A (en) * 2022-05-07 2022-07-29 山东送变电工程有限公司 Timing polarity-limiting tester

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101900783A (en) * 2010-07-21 2010-12-01 宁波英格塑料制品有限公司 High-voltage testing equipment
CN102411097A (en) * 2010-09-20 2012-04-11 河南平高东芝高压开关有限公司 Test control device for current transformer
CN102411097B (en) * 2010-09-20 2014-06-25 河南平高东芝高压开关有限公司 Test control device for current transformer
CN102654571A (en) * 2011-03-02 2012-09-05 深圳市凯弦电气自动化有限公司 Comprehensive tester of current transformer
CN102654571B (en) * 2011-03-02 2014-11-05 深圳市凯弦电气自动化有限公司 Comprehensive tester of current transformer
WO2012163064A1 (en) * 2011-06-01 2012-12-06 浙江省电力公司 Full-automatic detecting system and method for transformer
US9562916B2 (en) 2011-06-01 2017-02-07 Zhejiang Electric Power Corporation Full-automatic detecting system and method for transformer
WO2014114141A1 (en) * 2013-01-24 2014-07-31 国家电网公司 Method for detecting residual magnetism of current transformer based on small-signal slope mapping
CN103105594A (en) * 2013-01-24 2013-05-15 江苏省电力公司电力科学研究院 Current mutual inductor residual magnetism detection method based on small-signal gradient mapping
CN103293504B (en) * 2013-06-04 2016-01-20 国家电网公司 The method of testing of on-site current transformer comprehensive detector
CN103293504A (en) * 2013-06-04 2013-09-11 国家电网公司 On-site current transformer comprehensive detector and testing method thereof
CN104459589A (en) * 2013-09-17 2015-03-25 比亚迪股份有限公司 Automatic test system of current sensor
CN104820161B (en) * 2015-05-21 2017-11-07 国家电网公司 A kind of multi-tap secondary wiring of current mutual inductor detection means
CN104820161A (en) * 2015-05-21 2015-08-05 国家电网公司 Multi-tap current transformer secondary wiring detection device
CN104950277A (en) * 2015-06-25 2015-09-30 国家电网公司 Semi-automatic comprehensive detection device for low-voltage current transformer
CN104950277B (en) * 2015-06-25 2018-02-13 国家电网公司 A kind of low-voltage current mutual inductor semi-automation comprehensive detection device
CN106093696B (en) * 2016-06-13 2018-07-17 贵州电网有限责任公司贵阳供电局 Outside transformer substation current transformer polarity indication device
CN106093696A (en) * 2016-06-13 2016-11-09 贵州电网有限责任公司贵阳供电局 Outside transformer substation current transformer polarity indication device
CN107255791A (en) * 2017-06-09 2017-10-17 国网四川省电力公司电力科学研究院 A kind of full-automatic verification system of program control type current transformer
CN109342988A (en) * 2018-12-20 2019-02-15 广东电网有限责任公司 A kind of remanence of current transformer influence test method, apparatus and system
CN109407036A (en) * 2018-12-29 2019-03-01 太原山互科技有限公司 A kind of full-automatic calibrating installation of batch current transformer based on PLC control
CN109407036B (en) * 2018-12-29 2023-12-15 太原山互科技有限公司 Full-automatic calibrating device of batch current transformer based on PLC control
CN110308415A (en) * 2019-07-05 2019-10-08 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 The error compensating method and device of electric energy metered system
CN110687492A (en) * 2019-08-21 2020-01-14 国网湖北省电力有限公司计量中心 Method and system for monitoring detection quality of automatic verification system of low-voltage current transformer on line
CN111812576A (en) * 2020-07-22 2020-10-23 积成电子股份有限公司 System and method for adjusting transformer board of relay protection device
CN113030832A (en) * 2021-03-22 2021-06-25 苏州电器科学研究院股份有限公司 Device and method for detecting composite error of current transformer
CN114814658A (en) * 2022-05-07 2022-07-29 山东送变电工程有限公司 Timing polarity-limiting tester
CN114814658B (en) * 2022-05-07 2024-02-06 山东送变电工程有限公司 Timing polarity tester

Also Published As

Publication number Publication date
CN101592719B (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN101592719B (en) Method and system for testing current transformer
CN108037450A (en) A kind of high-voltage circuitbreaker automatic detection device and detection method
CN105974348B (en) Low-voltage current mutual inductor comprehensive detection system and its method
CN101592716B (en) Method and system for testing potential transformer
CN102707173A (en) Tester
CN211043532U (en) Transformer test system
CN102305919A (en) Calibration device and method capable of synchronously measuring multiple voltage transformers at one time
WO2023116650A1 (en) Intelligent testing system and method for safety parameters of mine explosion-proof electrical apparatus
CN101782638A (en) Calibration device and method capable of measuring multiple current transformers once
CN106772188B (en) Mutual inductor operation characteristic evaluation method based on environmental influence factors and assessment platform
CN206161810U (en) Intelligent control box relay test appearance
CN103698730A (en) Current transformer checking system of alternating current-direct current double power supplies
CN203204081U (en) Tester
CN106569108B (en) A kind of the resistance test system and detection method of interchanger
CN110703177A (en) Integrated test device and method for electrical performance test of voltage transformer for distribution network
CN104407240A (en) Loss online detecting system for three-winding transformer and loss calculating method
CN207965077U (en) The test device of the external breaker of electric energy meter
CN103592552B (en) A kind of overvoltage protection device characteristic tester and method of testing
CN202351421U (en) Error detection device for current transformer
CN208432669U (en) A kind of test macro
CN203870240U (en) Voltage transformer on-site detector
CN115575778A (en) Calibration system and calibration method of direct-current insulation monitoring device
CN115356674A (en) Intelligent testing method for mutual inductor
CN104849532A (en) Precise current sensor
Balraj et al. Investigations on the Physical Parameters and Real Time Protection of Distributed Transformers using Internet of Things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914

Termination date: 20210630