CN101586337A - Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof - Google Patents

Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof Download PDF

Info

Publication number
CN101586337A
CN101586337A CNA2009101195720A CN200910119572A CN101586337A CN 101586337 A CN101586337 A CN 101586337A CN A2009101195720 A CNA2009101195720 A CN A2009101195720A CN 200910119572 A CN200910119572 A CN 200910119572A CN 101586337 A CN101586337 A CN 101586337A
Authority
CN
China
Prior art keywords
pile
pipe
place
pressing
major diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009101195720A
Other languages
Chinese (zh)
Inventor
洪子云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2009101195720A priority Critical patent/CN101586337A/en
Publication of CN101586337A publication Critical patent/CN101586337A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a holding type major diameter static pressure sinking pipe cast-in-place pile construction method, which comprises the steps of: A, measuring and positioning; B, moving the pile-pressing machine in situ; C, moving the pile shoe in situ; D, lifting the steel sleeved pile pipe; E, checking the centering of the steel sleeved pile pipe; F, pressing the pipe; G, jointing the pipe; H, pressing the pipe again; I, stopping pressing the pipe; J, placing a steel bar cage; K, placing concrete; L, drawing the pipe out. The invention further provides a pile-pressing machine, which has a body composed of a walking mechanism, a crane, a counterweight structure and a frame. The pile-pressing machine is characterized in that: a pile-pressing bench is disposed on the frame; the pile-pressing bench comprises a pile-pressing upright column, a main pile-pressing cylinder, an accessory pile-pressing cylinder, a hydraulic gyrator, and a pile clamping box; pile clamping cylinders are transversely disposed on the pile clamping box; and a driving sleeve is disposed on the vertical through hole of the hydraulic gyrator. The invention utilizes the advantages of low noise and high frequency vibration of static pile-pressing construction process, and fully plays the advantages of high bearing capacity and stable construction quality of major diameter sinking pipe cast-in-place pile.

Description

Holding type major diameter static pressure sinking pipe cast-in-place pile job practices and pile press
Technical field:
The present invention relates to a kind of building foundation pile foundation piling method.
Background technology:
The major diameter hammer hidden pipe caisson pile has reliably obtained extensive use because of its bearing capacity of single pile height, pile quality.But shortcomings such as it exists, and noise is big, the high easy lodging of pile frame, work high above the ground influence safety.
Advantages such as prestressed high-strength concrete pile (PHC pile tube) is higher because of its bearing capacity of single pile, speed of application is fast also are used widely, and develop into the static pressure pile-sinking of low noise from initial hammer piling.But static pressure PHC pile tube because of the restriction of tubular pile body intensity also exist folder stake place easily folder broken, meet in the foundation soil relatively that hard formation easily fractures, shortcoming such as quick-fried, corrosivity soil property (as seawater influence zone, offshore area) pile joint are perishable.
Summary of the invention
The invention provides a kind of holding type major diameter static pressure sinking pipe cast-in-place pile job practices, its purpose is to overcome the prior art shortcoming, a kind of bearing capacity of single pile height is provided, noiselessness, pollution-free, pile driving pressure is big, and waste of material was few when geology changed, the building foundation pile foundation piling method anticorrosive, that speed of application is fast.
For achieving the above object, the present invention takes following scheme:
The holding type major diameter static pressure sinking pipe cast-in-place pile job practices is characterized in that: the steps include:
A: measurement and positioning;
B: pile press is in place;
C: shoe is in place;
D: lifting steel bushing pile tube pipe;
E: steel bushing pile tube pipe centering investigation;
F: pressure pipe;
G: take over;
H: pressure pipe again;
I: stop pressure pipe;
J: place reinforcing cage;
K: placing of concrete;
L: tube drawing.
After above-mentioned steps D finishes, before step e begins, has step D1: steel bushing pile tube pipe and shoe gap are taked the sealing seal approach.
Above-mentioned steps F and the described pressure pipe of step H are the static pressure, immersed tube construction technology.
Above-mentioned static pressure, immersed tube construction technology is for being pressed into steel bushing pile tube pipe in the foundation soil by counterweight and pile press pressure-driven on static pile press deadweight and the pile frame.
The described adapter of above-mentioned steps G is to connect threadably between two adjacent steel case pile pipes.
Has step K 1 after the described step K: after concrete spouting is finished, more than concrete, add the perfusion rubble to the face of land.To guarantee the steel pipe internal pressure.
Among the described step L, can comprise step: L1: tube drawing; L2: anti-inserting; L3: after whenever extracting a steel bushing pile tube pipe, carry out the uncoupling operation.
Above-mentioned anti-inserting soon will be pressed in the foundation soil with the static pressure, immersed tube construction technology once more with the steel bushing pile tube pipe of extracting.
The steel bushing pile tube pipe that above-mentioned uncoupling operation is about to be screwed onto together breaks away from.
Can also have step L4: when only a surplus joint steel bushing pile tube Guan Wei extracts, increase dither machine limit and pull out the vibration of cover tube edge.
Among the step L, has step L4: when only a surplus joint steel bushing pile tube Guan Wei extracts, interior block stamp hung in to increase the weight of to be pressed in above the pipe inner concrete in the steel bushing pile tube pipe or increase rubble be pressed on the top of concrete, guarantee pile quality.
Being invented also provides above-mentioned holding type major diameter static pressure sinking pipe cast-in-place pile job practices employed pile press, has walking mechanism, crane, the body that counter weight construction and frame constitute, it is characterized in that: also be provided with the piling platform on the frame, the piling platform is by pressure pile standard, main piling cylinder, secondary piling cylinder, the hydraulic gyration device, pile clamping box constitutes, a pair of pressure pile standard is fixedly arranged on frame with respect to the pile clamping box symmetry, main piling cylinder, secondary piling cylinder is fixedly arranged on the pressure pile standard respectively, main piling cylinder, the cylinder bar lower end of secondary piling cylinder is arranged in pile clamping box, the pile clamping box middle part is provided with vertical through holes, vertical through holes both sides on the pile clamping box are installed with the folder stake cylinder of horizontally set, folder stake cylinder bar end is provided with jaw, piling case top is provided with the hydraulic gyration device, the hydraulic gyration device is provided with and the corresponding vertical through holes of above-mentioned vertical through holes, and the vertical through holes place of hydraulic gyration device is provided with anchor clamps.
Be respectively equipped with anti-top oil cylinder on the above-mentioned a pair of pressure pile standard, end is arranged in pile clamping box on the lever of anti-top oil cylinder.
Usefulness of the present invention is: also given full play to Large-diameter Sinking Pipe castinplace pile, the reliable and stable advantage of construction quality when having utilized silent piling construction technology low noise, being provided with the high-frequency vibration advantage.
Description of drawings
Fig. 1 is a pile press overall structure schematic diagram;
Fig. 2 is a piling platform structural representation.
The specific embodiment
The pile press of the embodiment of the invention is as shown in Figure 1 and Figure 2: have the body that walking mechanism, crane 5, counter weight construction and the frame of composition constitute, walking mechanism comprises elevating mechanism 6, traversing slew gear 7, vertical shift mechanism 8, counter weight construction comprises counterweight beam 9, auxiliary counterweight beam 10 and counterweight, pile press also has skirt piles device 1, structures such as main driver's cabin 2.Also be provided with piling platform 3 on the frame, piling platform 3 is by pressure pile standard 4 ', main piling cylinder 6 ', secondary piling cylinder 8 ', hydraulic gyration device 7 ', pile clamping box 4 constitutes, a pair of pressure pile standard 4 ' is fixedly arranged on frame with respect to pile clamping box 4 symmetries, main piling cylinder 6 ', secondary piling cylinder 8 ' is fixedly arranged on the pressure pile standard 4 ' respectively, main piling cylinder 6 ', the cylinder bar lower end of secondary piling cylinder 8 ' is arranged in pile clamping box 4, pile clamping box 4 middle parts are provided with vertical through holes, vertical through holes both sides on the pile clamping box 4 are installed with the folder stake cylinder of horizontally set, folder stake cylinder bar end is provided with jaw, pile clamping box 4 tops are provided with hydraulic gyration device 7 ', the hydraulic gyration device is provided with and the corresponding vertical through holes of above-mentioned vertical through holes, and the vertical through holes place of hydraulic gyration device 7 ' is provided with actuating sleeve 70 '.Be respectively equipped with anti-top oil cylinder 1 ' on the above-mentioned a pair of pressure pile standard 4 ', end is arranged in pile clamping box 4 on the cylinder bar of anti-top oil cylinder 1 '.
Above-mentioned pile press is exclusively used in holding type major diameter static pressure sinking pipe cast-in-place pile job practices of the present invention.
The holding type major diameter static pressure sinking pipe cast-in-place pile job practices, the embodiment step is as follows:
A: measurement and positioning;
B: pile press is in place;
C: shoe is in place;
D: lifting steel bushing pile tube pipe;
Above-mentioned steps D is for being that steel bushing pile tube pipe that the long end of 10m-20m has a screw thread lifts in the vertical through holes of pile clamping box 4 and places the top of shoe with the crane 5 of pile press with the single-unit length of diameter 600mm-800mm.
D1: steel bushing pile tube pipe and shoe gap are taked the sealing seal approach;
E: steel bushing pile tube pipe centering investigation;
Above-mentioned steps E checks the verticality of two mutually orthogonal directions of steel bushing pile tube pipe for using transit, and the perpendicularity deviation when first segment steel bushing pile tube pipe inserts should just can not carry out next step step after meeting the requirements greater than 0.5%.
F: pressure pipe;
Pressure pipe promptly starts with the folder stake cylinder of horizontally set on the pile clamping box 4, folder stake cylinder bar end is provided with jaw, jaw is clamped steel bushing pile tube pipe, according to required pressure-activated main piling cylinder 6 ' or start main piling cylinder 6 ', secondary piling cylinder 8 ' simultaneously, pile clamping box 4 is moved downward, thereby steel bushing pile tube pipe is pressed in the soil with the static pressure, immersed tube construction technology.
G: take over;
After being pressed into steel bushing pile tube pipe, if do not reach set depth, then need to connect second joint, the 3rd joint ... connect threadably successively behind the steel sleeve, at this moment pile clamping box 4 will be gone up a joint steel bushing pile tube pipe clamp firmly, with crane 5 next joint steel bushing pile tube pipe is sling in the actuating sleeve 70 ' that the vertical vertical through holes place that imports hydraulic gyration device 7 ', back is provided with, hydraulic gyration device 7 ' starts, and actuating sleeve 70 ' produces gyration and the nipple of next joint steel bushing pile tube pipe is screwed in last one saves the nipple of steel bushing pile tube pipe and be spirally connected.
H: pressure pipe again;
Unclamp a joint steel bushing pile tube pipe, start main piling cylinder 6 ' or start main piling cylinder 6 ', secondary piling cylinder 8 ' simultaneously, pile clamping box 4 is moved upward, reclamp next joint steel bushing pile tube pipe, steel bushing pile tube pipe is pressed in the soil with the static pressure, immersed tube construction technology.
I: stop pressure pipe;
After end pressure and stake reach the final pressure control criterion, stop pressure pipe.
J: place reinforcing cage;
The elongated configuration of the general employing of reinforcing cage, after reinforcing cage was put into the position, the top hung tight fixing with wire rope, prevented reinforcing cage bottom bend by pressure, and concrete is irritated to certain altitude, unclamps wire rope.
K: placing of concrete;
K1: after concrete spouting is finished, more than concrete, add the perfusion rubble, guarantee the steel pipe internal pressure to the face of land.
L1: tube drawing;
Tube drawing starts main piling cylinder 6 ', secondary piling cylinder 8 ', anti-top oil cylinder 1 ' after promptly clamping steel bushing pile tube pipe with pile clamping box 4 individually or simultaneously, and pile clamping box 4 is risen, and extracts steel bushing pile tube pipe from soil.
L2: anti-inserting;
Anti-insert be about to steel bushing pile tube pipe and extract certain-length after, utilize main piling cylinder 6 ', secondary piling cylinder 8 ' once more, steel bushing pile tube pipe inserted in the soil, to guarantee the concrete density of stake end concrete density and concrete pile.In 1 meter length of when tube drawing, extracting at first, should repeatedly instead insert, in the tube drawing process, not have the oil cylinder stroke of two main piling cylinders 6 ' instead to insert once.
L3: after whenever extracting a steel bushing pile tube pipe, carry out the uncoupling operation;
Uncoupling promptly utilizes hydraulic gyration device 7 ' to start, and actuating sleeve 70 ' produces the nipple that gyration screws out the nipple of next joint steel bushing pile tube pipe a last joint steel bushing pile tube pipe.
L4:, when only a surplus joint steel bushing pile tube Guan Wei extracts, interior block stamp is hung in steel bushing pile tube pipe be pressed on the rubble end face that is positioned at the pipe inner concrete if when subterranean layer is arranged.With the roof pressure power of increase pipe inner concrete, thereby increase the top concrete compactness, and reduce the undergauge that causes because of the soil layer side pressure.
In construction, also can adopt the high-frequency type bobbing machine with further raising concrete density.
In normal construction, body upper is provided with fixedly that shelf plays fixation, does not then need the uncoupling operation not disconnect head, and steel bushing pile tube pipe can up promote always and be up to 60 meters, reduces the time that disconnects.
This construction method advantage is as follows:
1, bearing capacity of single pile height. Holding type major diameter static pressure sinking pipe cast-in-place pile is by the carrying shape Belong to end and hold friction pile. Because adopting, this construction method embraces compressed steel sleeve pipe pile sinking, Static pressure pile driver can adopt higher pile driving pressure pile sinking and needn't worry to occur as quiet Press the phenomenon of PHC pile tube clip pile position pile body breakage. Higher pile driving pressure can Steel sleeve is run through or enter sandy soils, residual soil, severely-weathered rock stratum, effectively Guaranteed that pile pipe arrives the design supporting course. When constructing simultaneously all soil of stake and stake are held Local products are given birth to obvious compacted effect, thereby have obviously improved pile side resistance and stake end Resistance.
2, bearing capacity is directly perceived. Pile driving pressure is the concentrated expression of pile side resistance and end resistance, because of There are certain correlation in this pile driving pressure and static loading experiment result, and it is perpendicular that end pressure can be estimated single pile To bearing capacity.
3, meet environmental requirement. Static pressure pile-sinking has avoided employing diesel hammer or hydraulic hammer hammering to sink The noise that pipe produces, the construction site does not have the situations such as mud contamination yet.
4, anticorrosive. The concrete layer protection is arranged around the steel reinforcement cage behind the pile, avoided underground water Corrosion to reinforcing bar.
5, speed of application is fast. Adopt between the steel sleeve pile pipe to be threaded, execute-in-place is convenient, Short construction period, speed is fast.
6, pile quality is reliable. By taking to prevent in anti-plug, the pipe that the measures such as interior block stamp from guaranteeing Concrete density, thus pile quality guaranteed.

Claims (9)

1, holding type major diameter static pressure sinking pipe cast-in-place pile job practices is characterized in that: the steps include:
A: measurement and positioning;
B: pile press is in place;
C: shoe is in place;
D: lifting steel bushing pile tube pipe;
E: steel bushing pile tube pipe centering investigation;
F: pressure pipe;
G: take over;
H: pressure pipe again;
I: stop pressure pipe;
J: place reinforcing cage;
K: placing of concrete;
L: tube drawing.
2, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1 is characterized in that: step F and the described pressure pipe of step H are the static pressure, immersed tube construction technology.
3, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1 is characterized in that: the described adapter of step G is to connect threadably between two adjacent steel case pile pipes.
4, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1 is characterized in that: have step K 1 after the described step K: add the perfusion rubble to the face of land more than concrete.
5, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1 is characterized in that: among the described step L, comprise step: L1: tube drawing; L2: anti-inserting; L3: after whenever extracting a steel bushing pile tube pipe, carry out the uncoupling operation.
6, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1 is characterized in that: among the step L, have step L4: when only a surplus joint steel bushing pile tube Guan Wei extracts, increase dither machine limit and pull out the vibration of cover tube edge.
7, holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 4, it is characterized in that: among the step L, has step L4: when only a surplus joint steel bushing pile tube Guan Wei extracts, interior block stamp hung in to be pressed in the steel bushing pile tube pipe on the concrete that is positioned at pipe add on the end face of rubble.
8, the employed pile press of holding type major diameter static pressure sinking pipe cast-in-place pile job practices as claimed in claim 1, has walking mechanism, crane, the body that counter weight construction and frame constitute, it is characterized in that: also be provided with the piling platform on the frame, the piling platform is by pressure pile standard, main piling cylinder, secondary piling cylinder, the hydraulic gyration device, pile clamping box constitutes, a pair of pressure pile standard is fixedly arranged on frame with respect to the pile clamping box symmetry, main piling cylinder, secondary piling cylinder is fixedly arranged on the pressure pile standard respectively, main piling cylinder, the cylinder bar lower end of secondary piling cylinder is arranged in pile clamping box, the pile clamping box middle part is provided with vertical through holes, vertical through holes both sides on the pile clamping box are installed with the folder stake cylinder of horizontally set, folder stake cylinder bar end is provided with jaw, the pile clamping box top is provided with the hydraulic gyration device, the hydraulic gyration device is provided with and the corresponding vertical through holes of above-mentioned vertical through holes, and the vertical through holes place of hydraulic gyration device is provided with actuating sleeve.
9, pile press as claimed in claim 8 is characterized in that: be respectively equipped with anti-top oil cylinder on a pair of pressure pile standard, end is arranged in pile clamping box on the cylinder bar of anti-top oil cylinder.
CNA2009101195720A 2009-03-17 2009-03-17 Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof Pending CN101586337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009101195720A CN101586337A (en) 2009-03-17 2009-03-17 Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009101195720A CN101586337A (en) 2009-03-17 2009-03-17 Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof

Publications (1)

Publication Number Publication Date
CN101586337A true CN101586337A (en) 2009-11-25

Family

ID=41370746

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009101195720A Pending CN101586337A (en) 2009-03-17 2009-03-17 Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof

Country Status (1)

Country Link
CN (1) CN101586337A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831908A (en) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 Large-diameter ultra-deep static-pressure single tube immersing ramming grouting pile construction process and device
WO2013110096A1 (en) * 2012-01-19 2013-07-25 Vo Thanh Minh Piling apparatus and process for installation of pile assembly
CN103243733A (en) * 2013-05-09 2013-08-14 中铁六局集团天津铁路建设有限公司 Pile foundation construction method for working mountainous areas foundation with multilayer distributing hard rock strata
CN104452760A (en) * 2013-09-23 2015-03-25 湖北毅力机械有限公司 Noiseless steel sheet pile pressing equipment and construction method thereof
CN110629781A (en) * 2019-09-28 2019-12-31 广州地铁设计研究院股份有限公司 Concrete-filled steel tube pile group suitable for narrow space and construction method thereof

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101831908A (en) * 2010-05-11 2010-09-15 武汉华威建筑桩工机械有限责任公司 Large-diameter ultra-deep static-pressure single tube immersing ramming grouting pile construction process and device
WO2013110096A1 (en) * 2012-01-19 2013-07-25 Vo Thanh Minh Piling apparatus and process for installation of pile assembly
CN104093909A (en) * 2012-01-19 2014-10-08 武青明 Piling apparatus and process for installation of pile assembly
EP2804990A1 (en) * 2012-01-19 2014-11-26 Vo, Thanh Minh Piling apparatus and process for installation of pile assembly
EP2804990A4 (en) * 2012-01-19 2015-10-21 Thanh Minh Vo Piling apparatus and process for installation of pile assembly
US9399851B2 (en) 2012-01-19 2016-07-26 Thanh Minh Vo Piling apparatus and process for installation of pile assembly
CN104093909B (en) * 2012-01-19 2016-12-14 武青明 For installing the piling equipment of an assembly
CN103243733A (en) * 2013-05-09 2013-08-14 中铁六局集团天津铁路建设有限公司 Pile foundation construction method for working mountainous areas foundation with multilayer distributing hard rock strata
CN104452760A (en) * 2013-09-23 2015-03-25 湖北毅力机械有限公司 Noiseless steel sheet pile pressing equipment and construction method thereof
CN110629781A (en) * 2019-09-28 2019-12-31 广州地铁设计研究院股份有限公司 Concrete-filled steel tube pile group suitable for narrow space and construction method thereof

Similar Documents

Publication Publication Date Title
CN104846810B (en) Self-circulating posterior grouting bored pile construction method
CN108797587A (en) A kind of novel sinking construction technology of static pressed pile
CN203846485U (en) Long pile percussion drill hole forming construction device
CN101429768B (en) Pre-stress high-strength concrete pipe pile static-pressure construction method
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN102535529A (en) Construction method of self-balancing method pile foundation bearing capacity test device
CN105178861A (en) Drilling hole enlarging mechanism
CN101586337A (en) Holding type major diameter static pressure sinking pipe cast-in-place pile construction method and pile-pressing machine thereof
CN105040715A (en) Method for building bridge construction cofferdam through steel sheet piles
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN101761081A (en) Construction method and equipment of holding and pressing type static-pressure driven cast-in-place pile
CN102021901B (en) Method for putting up steel pipe pile platform of abrupt slope bare rock
CN102134854A (en) Slipway underwater pile foundation and construction method thereof
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN201272970Y (en) Pressing type large-diameter statically pressed encased cast-in-place pile pressing machine
CN203654309U (en) Pile-caisson hydraulic structure
CN109898569A (en) The detection construction method of composite cement soil stake
CN104947664A (en) Thick stone sea-filling layer prestressing force high-strength concrete square pile construction method
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN102134861B (en) Method for testing precast pile in soil body
CN2804178Y (en) Hydraulic static force pilot hole and squeezing pile appts
CN115075249B (en) Pile foundation cleaning device and pile foundation cleaning process
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091125