CN101560872A - Integral combined cable-passing packer for deep well - Google Patents

Integral combined cable-passing packer for deep well Download PDF

Info

Publication number
CN101560872A
CN101560872A CNA2009100520946A CN200910052094A CN101560872A CN 101560872 A CN101560872 A CN 101560872A CN A2009100520946 A CNA2009100520946 A CN A2009100520946A CN 200910052094 A CN200910052094 A CN 200910052094A CN 101560872 A CN101560872 A CN 101560872A
Authority
CN
China
Prior art keywords
packer
cable
deep well
combined cable
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100520946A
Other languages
Chinese (zh)
Inventor
陈学虎
徐元富
桑春
陆从明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANCHENG CAIYANG ELECTRICAL VALVE CO Ltd
Original Assignee
YANCHENG CAIYANG ELECTRICAL VALVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YANCHENG CAIYANG ELECTRICAL VALVE CO Ltd filed Critical YANCHENG CAIYANG ELECTRICAL VALVE CO Ltd
Priority to CNA2009100520946A priority Critical patent/CN101560872A/en
Publication of CN101560872A publication Critical patent/CN101560872A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a packer for underground mining in the field of oil extraction in the oil field, in particular to an integral combined cable-passing packer for a deep well, which is characterized in that a main shaft is integral; 2 to 5 channels which are not communicated with each other are arranged in the vertical direction of the main shaft; and both ends of each channel are provided with a connecting and sealing device respectively. Compared with the prior art, the integral combined cable-passing packer has the advantages that the main shaft in the middle of the integral combined cable-passing packer for the deep well adopts an integral structure, so that the packer has improved strength, firm structure, stable performance and reliable sealing and the defects generated in the connecting process are reduced; oil channels and cables pass through the channels respectively and do not interfere with each other, namely no relative motion exits between the oil channels and the cables, so that the cable strain is eliminated. Moreover, a plurality of channels can be arranged for passing in the vertical direction of the main shaft as required, so that the integral combined cable-passing packer has a compact structure and is favorable for popularization and application.

Description

Integral combined cable-passing packer for deep well
Technical field:
The present invention relates to the packer that adopt the down-hole in the oil recovery field, oil field, especially a kind of integral combined cable-passing packer for deep well.
Background technology:
At present, take out deeply in the process greater than 4000 meters petroleum drilling and mining mining site crude oil at well depth, the actual lifting lift of existing oil pumper and submersible electric pump is not more than 3500 meters, can not disposablely finish lifting, and need carry out the lifting of combined type secondary.Therefore, in order to satisfy the needs that different oil reservoirs in the producing well are extracted, isolate, monitor, requirement is following cable in well, and because of prior art packer (as shown in Figure 1), it has only an interior latus rectum central bore passage of crossing liquid medium, and form with being threaded by upper and lower a few part central tubes, make that packer intensity is low, structure is insecure, unstable properties, it is unreliable to seal, and this type of packer can not be used for the oil field deep well oil recovery and pass through cable.
Summary of the invention
The objective of the invention is to solve the problem that background technology exists, provide a kind of intensity big, sound construction, asphalt channel and cable passage lanes are taken their own roads, non-interfering integral combined cable-passing packer for deep well.
For achieving the above object, the technical solution adopted in the present invention is: a kind of integral combined cable-passing packer for deep well, be included in the body shaft periphery and be furnished with packing element sealing mechanism, slips anchoring mechanism, centralizer body supporting mechanism, track pin, the track changement, it is characterized in that: body shaft is all-in-one-piece, vertically be provided with 2-5 passage that is not connected mutually in body shaft, the two ends of each passage are respectively equipped with and connect and sealing device.
Described a kind of integral combined cable-passing packer for deep well is characterized in that: vertically be provided with 2 passages that are not connected mutually in body shaft, wherein: one is the oil pipe passage; Another is a cable passage.
Described a kind of integral combined cable-passing packer for deep well is characterized in that: be furnished with lower contact attitude reference device in the lower end of body shaft, the connection of each passage lower contact and sealing device fit in the lower contact attitude reference device.
The present invention's beneficial effect compared with prior art:
Body shaft in the middle of this integral combined cable-passing packer for deep well because employing is an overall structure, therefore, makes packer intensity increase, sound construction, and stable performance, sealing is reliable, has reduced the drawback that produces in the connecting link.Asphalt channel and cable passage lanes are taken their own roads, and do not disturb mutually, promptly do not have relative motion between oil pipe and the cable, have eliminated cable strain.And, on body shaft, vertically can be provided with a plurality of passages as required and pass through, compact conformation helps applying.
Description of drawings:
Fig. 1 is the prior art constructions schematic diagram;
Fig. 2 is a structural representation of the present invention.
Among the figure:
1. lock nut, 2. cable passes through device, 3. oil connection, 4. body shaft, 5. packing element sealing mechanism, 6. slips anchoring mechanism, 7. centralizer body supporting mechanism, 8. track pin, 9. track changement, 10. lower contact attitude reference device, 11. tubing interface, 12. cable passage, 15. oil pipe passages, 16. cable connectors.
The specific embodiment:
Describe the present invention in detail below in conjunction with accompanying drawing:
As shown in Figure 2, a kind of integral combined cable-passing packer for deep well, body shaft 4 is all-in-one-piece, top connection connection and the sealing device of being furnished with each passage in the upper end of body shaft 4, be furnished with lower contact attitude reference device 10 in the lower end of body shaft 4, the connection of each passage lower contact and sealing device fit in the lower contact attitude reference device 10.Be furnished with packing element sealing mechanism 5, slips anchoring mechanism 6, centralizer body supporting mechanism 7, track pin 8, track changement 9 in body shaft 4 peripheries.All outside each component are packed into successively from an end, and the structure of outside each component sets with the principle of deblocking according to handling body shaft 4 and designs.In body shaft 4, according to actual needs, vertically can be provided with the passage that 2-5 is not connected mutually, except that being used for oil pipe passage 15, but building-out cable passage 12, test channel, exhaust passage, chemical injection channel.At present deep-well need most be in body shaft 4, vertically to be provided with 2 passages that are not connected mutually, wherein: one is oil pipe passage 15, the upper port of oil pipe passage 15 is connected with oil connection 3, the lower end is provided with tubing interface 11; Another is a cable passage 12, and the upper port of cable passage 12 is provided with cable and passes through device 2, lock nut 1, is provided with cable connector 16 and sealing device in the lower port of cable passage 12.
Operating principle
Two end cables that cable passes through device 2 connect the cable of electric submersible pump and aboveground control system respectively, after cable connects and fixes, packer is gone into the well, when going into the well in the centralizer body supporting mechanism 7 track pin 8 of lower end be in the anti-top dead-centre that sets track (short groove track), on the body shaft 4 in the middle of slips is locked in the slips anchoring mechanism 6, guarantee to go into the well smoothly, when body shaft 4 during down to design attitude, on put forward body shaft 4 certain height, track pin slides to the track bottom dead centre for 8 times (because centralizer body supporting mechanism 7 is supported in the down-hole casing inwall, 4 body shaft of handling body shaft, 4 periphery accessories and intermediate host axle 4 are done relative motion), transfer body shaft 4 again, track pin 8 goes to compression track (elongated slot track) by track changement 9, the frictional resistance of down-hole casing and centralizer body supporting mechanism 7 forces intermediate host axle 4 to move down, thereby make slips produce relative motion with cone, slips opens, and is anchored to the down-hole casing inwall; Body shaft 4 continues to move down, and slips anchoring then compresses packing element sealing mechanism 5, to the packing element seal radial is swollen and sealed well setting of casing annular space, this moment packer be in the state of setting can operate as normal, if want deblocking, only need to put forward body shaft 4 and get final product.

Claims (3)

1, a kind of integral combined cable-passing packer for deep well, be included in body shaft (4) periphery and be furnished with packing element sealing mechanism (5), slips anchoring mechanism (6), centralizer body supporting mechanism (7), track pin (8), track changement (9), it is characterized in that: body shaft (4) is for all-in-one-piece, vertically be provided with 2-5 passage that is not connected mutually in body shaft (4), the two ends of each passage are respectively equipped with and connect and sealing device.
2, a kind of integral combined cable-passing packer for deep well according to claim 1 is characterized in that: vertically be provided with 2 passages that are not connected mutually in body shaft (4), wherein: one is oil pipe passage (15); Another is cable passage (12).
3, a kind of integral combined cable-passing packer for deep well according to claim 1, it is characterized in that: be furnished with lower contact attitude reference device (10) in the lower end of body shaft (4), the connection of each passage lower contact and sealing device fit in the lower contact attitude reference device (10).
CNA2009100520946A 2009-05-26 2009-05-26 Integral combined cable-passing packer for deep well Pending CN101560872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100520946A CN101560872A (en) 2009-05-26 2009-05-26 Integral combined cable-passing packer for deep well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100520946A CN101560872A (en) 2009-05-26 2009-05-26 Integral combined cable-passing packer for deep well

Publications (1)

Publication Number Publication Date
CN101560872A true CN101560872A (en) 2009-10-21

Family

ID=41219827

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100520946A Pending CN101560872A (en) 2009-05-26 2009-05-26 Integral combined cable-passing packer for deep well

Country Status (1)

Country Link
CN (1) CN101560872A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845943A (en) * 2010-06-09 2010-09-29 中国石油天然气集团公司 Universal packer for through cable
CN102162357A (en) * 2011-03-31 2011-08-24 中国矿业大学 Method for testing in-situ internal stress of vertical shaft wall
CN114320860A (en) * 2021-12-31 2022-04-12 百斯迈奇能源技术服务(深圳)有限公司 Canning system and two electric submersible pump equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845943A (en) * 2010-06-09 2010-09-29 中国石油天然气集团公司 Universal packer for through cable
CN101845943B (en) * 2010-06-09 2013-07-31 中国石油天然气集团公司 Universal packer for through cable
CN102162357A (en) * 2011-03-31 2011-08-24 中国矿业大学 Method for testing in-situ internal stress of vertical shaft wall
CN102162357B (en) * 2011-03-31 2013-05-22 中国矿业大学 Method for testing in-situ internal stress of vertical shaft wall
CN114320860A (en) * 2021-12-31 2022-04-12 百斯迈奇能源技术服务(深圳)有限公司 Canning system and two electric submersible pump equipment

Similar Documents

Publication Publication Date Title
CN201416414Y (en) Integral combination type electric cable-passing through packer for deep well
CN202596684U (en) Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN110529073B (en) Soluble full-bore sliding sleeve based on intelligent control
CN102747967A (en) Multi-stage segmented release water exploration pipe column and method for casing well completion multi-stage fractured horizontal well
CN105822253A (en) Bushing sliding sleeve and hydraulic bridge plug combined type completion pipe string and rapid fracturing method
CN201620853U (en) Constant-pressure gasproof pipe column of multilayer mining single pump
CN205918361U (en) Perpendicular drilling tool of machinery
CN103184850A (en) Bidirectional seat seal hook-wall packer, preparation method thereof and shaft circumferential packing method
CN204532234U (en) Sliding sleeve of bushing and waterpower bridging plug combined type completion tubular column
CN201915931U (en) Special setting ball seat for fracture of horizontal well
CN205000943U (en) But anchor tile modus ponens casing packer
CN107288580B (en) Remote control sleeve sliding sleeve based on potential difference communication
CN202882846U (en) Downhole isolating valve
CN102454381A (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN101560872A (en) Integral combined cable-passing packer for deep well
CN202596652U (en) Recoverable hydraulic packer
CN201843571U (en) Oil drainage type packer
CN205349284U (en) Sidetracked hole for sand control washable well give up and fill device
CN202152670U (en) Sectioned construction pipe column of horizontal well
CN201620785U (en) Pressure-controlled hydraulic pushing tool
CN201924839U (en) Primary production string
CN205532455U (en) Parallel double -barrelled packer of deep water oil well
CN204804819U (en) Dynamic logging technology pole tubular column is carried to horizontal well pole
CN204941345U (en) A kind of radial well transfer with packing function
CN202023557U (en) Cable inlet device for power and signal transmission drill rod

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20091021