CN101555689B - Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation - Google Patents

Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation Download PDF

Info

Publication number
CN101555689B
CN101555689B CN2009100619190A CN200910061919A CN101555689B CN 101555689 B CN101555689 B CN 101555689B CN 2009100619190 A CN2009100619190 A CN 2009100619190A CN 200910061919 A CN200910061919 A CN 200910061919A CN 101555689 B CN101555689 B CN 101555689B
Authority
CN
China
Prior art keywords
drainage
collecting well
sand pocket
hydraulic reclamation
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009100619190A
Other languages
Chinese (zh)
Other versions
CN101555689A (en
Inventor
孟庆山
傅志斌
胡明鉴
汪稔
杨超
陈能远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Comprehensive Survey Research And Design Institute Co ltd
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Construction Comprehensive Survey Research And Design Institute Co ltd
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Comprehensive Survey Research And Design Institute Co ltd, Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Construction Comprehensive Survey Research And Design Institute Co ltd
Priority to CN2009100619190A priority Critical patent/CN101555689B/en
Publication of CN101555689A publication Critical patent/CN101555689A/en
Application granted granted Critical
Publication of CN101555689B publication Critical patent/CN101555689B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for pre-consolidating mixed hydraulically-filled soft soil foundation and a device thereof, relating to the field of pre-consolidation treatment technology of soft soil foundation. The method arranges a horizontal drainage passage in the mixed hydraulically-filled process, adopts a vacuum preloading and electroosmosis combined method for construction, carries out early intervention and consolidation of the ultra-soft soil actively during the hydraulically-filled process and the initial stage of the hydraulically-filled process, and creates a prophase condition for the subsequent foundation consolidation. The device arranges reinforcement cage sand bad collecting wells at the construction site and arranges a horizontally-communicated drainage sand bag between the reinforcement cage sand bag collecting wells; and a dual-pipe mixed hydraulically-filled equipment, the reinforcement cage sand bag collecting wells, a treatment equipment by the vacuum preloading and electroosmosis combined method and a collecting well pumping equipment are sequentially connected from left to right. The method and the device can cause the saturated soft soil to generate early consolidation and pre-settlement, leads the pre-treated foundation soil to meet the load metamorphism requirement better in the engineering usage stage and can greatly save engineering period and subsequent engineering treatment expense.

Description

The pre-reinforcing and processing method and the device thereof of mixed hydraulically-filled soft soil foundation
Technical field
The present invention relates to a kind of pre-consolidation process technical field of soft foundation, relate in particular to a kind of pre-reinforcing and processing method and device thereof of mixed hydraulically-filled soft soil foundation.Specifically, the present invention relates to the pre-consolidation process technology of ultra-soft foundation that regulation and project of reclamation by pumping filling are dredged in rivers navigation channel, lake etc., this technology both had been suitable for the exploitation in soils such as coastal tidal, depression, also was suitable for the comprehensive utilization of desilting barged-in fill.
Background technology
Barged-in fill is the sedimentary soil that the silt particle in regulation and mediation rivers navigation channel and reclamation by pumping filling process forms through the waterpower hydraulic reclamation, and the silt particle that dredging is come out is used for sea reclamation, has become coastal cities and has alleviated land resources effective way in short supply.At grounds such as dredger fill sandy soil, mud, flyash, the reinforcement means that often adopts in the engineering has: two ash stakes, deep-mixed pile, vacuum method, preloading, slotting plastic draining board is in conjunction with dynamic compaction etc. in advance.But, because all there is certain limitation in various technologies, for the consolidation process in most barged-in fills place, the pre-plastic draining board of inserting has appearred in conjunction with strong processing method, the High vacuum compacting method that rams, the several different methods such as impacting close method, electroosmotic drainage, low position vacuum preloading method, dry method vibration sinking tube compacted gravel stone mar and multi-point stress vibrating-punching combined compacting of shaking again.
Barged-in fill has very high moisture content as a kind of artificial perturbation's soil usually at the hydraulic reclamation initial stage.Therefore, have scholar and engineering circle personage to think, reinforcing soft foundation should not only limit to if can just take some to help fixed measure in the hydraulic reclamation process after barged-in fill fills, and then may obtain consolidation effect and economic effect better.The pre-reinforcing of barged-in fill ground is meant in dredge fill, utilize physics or chemical method (mainly being to add inorganic or organic Admixture), it is fixed that barged-in fill can be deposited as early as possible, and make the ground after fixed have more high-intensity a kind of barged-in fill method for processing foundation.
Though the pre-thought of reinforcing of barged-in fill ground just occurred as far back as the eighties in 20th century; But pre-research of reinforcing just just really began, and only be in the junior stage in recent years for the barged-in fill ground.People such as Wen Haijia are more conducive to obtain effective consolidation process from handling the angle proof saturated dredger soft soil of reinforcing; People such as Liu Zhenjie are to indoor mixed hydraulically-filled research of sludge fly ash, and its mechanical property index has had significant improvement behind the discovery mud fly ash, and has obtained better engineering properties; People such as Wang Huajing have provided the settling character of several typical barged-in fills.People such as Wang Qing, Xiao Shufang, Liu Pinghui, Liu Ying, Li Zhen and Xie Hailan have carried out in-house laboratory investigation to utilizing cement and quicklime to the pre-consolidation process of barged-in fill, have determined the optimum cement of barged-in fill and the ratio that mixes of lime.In addition, adopt cement and lime serous fluid of dredger fill to be carried out consolidation process, obtained certain effect as additive; Other has the scholar to utilize flyash and saponification slag as the additive of serous fluid of dredger fill serous fluid of dredger fill to be carried out consolidation process respectively, and engineering geological property, the microstructure of the hydraulic reclamation soil sample after the reinforcing have obtained obvious improvement.
Although these progress are outstanding, because the regional restriction of barged-in fill, and do not have the improvement imagination of proposition to hydraulic reclamation equipment, make this achievement in research can not in time be converted into actual production power.
Summary of the invention
Purpose of the present invention is exactly to provide a kind of pre-reinforcing and processing method and device thereof of mixed hydraulically-filled soft soil foundation in order to overcome shortcoming and defect such as the extremely low and consolidation settlement amount of ultra-soft hydraulic fill foundation initial stage bearing capacity is excessive.
The object of the present invention is achieved like this:
The present invention adopts and is different from the research thinking of handling natural weak soil, promptly form with mixed hydraulically-filled process and level is set to drainage channel, and in conjunction with adopting the construction of vacuum pre-pressed joint electroosmotic drainage, promptly initiatively carrying out the theory of the fixed early intervention of ultra-soft soil in the hydraulic reclamation process with the hydraulic reclamation initial stage, is that the condition in early stage of creating is handled in the ground stabilization in later stage.
One, the pre-reinforcing and processing method of mixed hydraulically-filled soft soil foundation
This method comprises the following steps:
1. be cured the laboratory test of agent at the hydraulic reclamation material than choosing, determine curing compound combination and and the hydraulic reclamation material between proportioning;
2. the removal of the obstacles, absolute altitude is measured in smooth place;
3. according to design pitch and hydraulic reclamation thickness, reinforcing cage sand pocket collecting well is installed in the place, the filling medium coarse sand is used for drainage in the double-deck sand pocket of collecting well;
4. with horizontal communicated drainage sand pocket reinforcing cage sand pocket collecting well is connected in twos, the reinforcing bar in the horizontal communicated drainage sand pocket is fixed on the outer reinforcement cage of collecting well;
5. the stirring hydraulic reclamation equipment that strand is inhaled ship hydraulic reclamation equipment and curing compound slurries is installed, determined hydraulic reclamation speed separately according to result of the test;
6. carry out two-tube mixed hydraulically-filledly, at default hydraulic reclamation height horizontal communicated drainage sand pocket is installed, treat the place hydraulic reclamation to design elevation, vacuum diaphragm is laid on the top layer;
7. jet pump is installed in the collecting well, is plugged the anode of round bar around the ponding in the vacuum preloading pump drainage collecting well, collecting well, and connect with lead as electroosmosis electrode;
8. constant-current supply is installed, and as anode, reinforcing cage is made negative electrode with round bar, carries out consolidation by electroosmosis, and collecting well pump drainage water is finished the vacuum pre-pressed joint electroosmotic drainage and handled soft base;
9. the test site absolute altitude is carried out test in situ and laboratory soil test, reach the construction in later period instructions for use after, extract reinforcing cage recycling, pay the place.
Two, the pre-consolidation process device of mixed hydraulically-filled soft soil foundation
This device comprises construction plant, reinforcing cage sand pocket collecting well, horizontal communicated drainage sand pocket, two-tube mixed hydraulically-filled material equipment, vacuum pre-pressed joint electroosmotic drainage treatment facility and collecting well pump drainage equipment;
Be provided with reinforcing cage sand pocket collecting well on construction ground, between reinforcing cage sand pocket collecting well, be provided with horizontal communicated drainage sand pocket;
From left to right, two-tube mixed hydraulically-filled material equipment, reinforcing cage sand pocket collecting well, vacuum pre-pressed joint electroosmotic drainage treatment facility and collecting well pump drainage equipment are connected successively.
Operating principle of the present invention:
The present invention is directed to land development and utilizations such as coastal tidal, depression, and hydraulic reclamation engineering such as waterway dredging, lake dredging up, before hydraulic reclamation, lay drainage network in advance; Utilize the curing compound characteristics of strongization early, in the hydraulic reclamation process, realize the abundant mixing of weak soil and curing compound slurries, reach the ultra-soft barged-in fill and early intervene purpose the early stage of strongization; Utilize the quick precipitation of vacuum preloading at the ground formation initial stage, then adopt vacuum pre-pressed joint electroosmotic drainage consolidation process blowing filling soft soil foundation, for later stage ground intensive treatment is got ready.
The present invention has the following advantages and good effect:
1. both be fit to land developments such as coastal tidal, depression, also be suitable for the comprehensive utilization of desilting barged-in fill; Facilitate the saturated soft soil body to produce precuring and pre-sedimentation, make foundation soil can satisfy the load metamorphism requirement of engineering operational phase after treatment better.
2. be a kind of compound consolidation process blowing filling soft soil foundation new technology, it is blended together the organic coupling of several different methods, replenishes mutually, mutually promotes, and the blowing filling soft soil foundation new technology is rapidly and efficiently handled in common formation.
3. can improve the barged-in fill ground, reduce its compressibilty, reduce settling amount, gain in strength; Make through the barged-in fill ground after further handling to have higher bearing capacity, reduce the subsequent treatment expense.
4. accelerate barged-in fill ground consolidation speed, shorten the barged-in fill ground treatment construction phase, have important social economy and environmental benefit; Technology is simple, and mechanism is clear and definite, energy-conserving and environment-protective.
In a word, the present invention can facilitate the saturated soft soil body to produce early strongization and pre-sedimentation, make foundation soil after preliminary treatment, can satisfy the load metamorphism requirement of engineering operational phase better, can significantly save duration and follow-up engineering disposal cost, have good social economy and environmental benefit.
Description of drawings
Fig. 1 is the structural representation of this device;
Fig. 2 is the structural representation of drainage network (reinforcing cage sand pocket collecting well and horizontal communicated drainage sand pocket);
Fig. 3 is that the electroosmosis electrode of vacuum pre-pressed joint electroosmotic drainage treatment facility is buried layout plan underground.
Wherein:
The 1-construction plant;
2-reinforcing cage sand pocket collecting well,
2.1-the outer reinforcement cage, 2.2-internal layer reinforcing cage, the double-deck sand pocket of 2.3-;
2.4-back-up sand;
The horizontal communicated drainage sand pocket of 3-,
3.1-horizontal drainage sand pocket, 3.2-conduct electricity reinforcing bar, the 3.3-back-up sand;
The two-tube mixed hydraulically-filled material equipment of 4-,
4.1-strand is inhaled ship, the 4.2-dredging tube, and the 4.3-dredge pump,
4.4-the hydraulic reclamation pipe, the 4.5-floating drum, the 4.6-agitator,
4.7-pulp-absorbing pipe 4.8-pulp absorbing pump 4.9-blows the slurry pipe;
5-vacuum pre-pressed joint electroosmotic drainage treatment facility,
5.1-the anode reinforcing bar, 5.2-anode connecting line, the 5.3-power line,
5.4-constant-current supply;
6-collecting well pump drainage equipment,
6.1-suction water pipe, the 6.2-jet pump, the 6.3-gutter,
6.4-vacuum diaphragm.
The specific embodiment
The present invention is further described below in conjunction with accompanying drawing:
One, the pre-consolidation process of mixed hydraulically-filled soft soil foundation
1, step 1., determine curing compound combination and and the hydraulic reclamation material between proportioning
At the characteristic of saturated dredger soft soil, carry out the sludge solidification effect indoor comparative test of quicklime, cement, gypsum, flyash, slag, screening, combination are suitable for blowing-filling sludge early the curing compound material and the proportioning thereof of strongization best results.
2,5. step determines hydraulic reclamation speed separately according to result of the test
The scene utilizes mixing plant to form the curing compound slurries, blurt out in hydraulic reclamation spray two-tube mixed hydraulically-filled material equipment 4 is set, hydraulic reclamation speed according to mud hydraulic reclamation speed and mixing ratio adjustment curing compound slurries is fully mixed saturated dredger soft soil and curing compound slurries in the hydraulic reclamation process.
Two, the pre-consolidation process device of mixed hydraulically-filled soft soil foundation
1, overall
As Fig. 1, this device comprises construction plant 1, reinforcing cage sand pocket collecting well 2, horizontal communicated drainage sand pocket 3, two-tube mixed hydraulically-filled material equipment 4, vacuum pre-pressed joint electroosmotic drainage treatment facility 5 and collecting well pump drainage equipment 6;
1 be provided with reinforcing cage sand pocket collecting well 2 on construction ground, between reinforcing cage sand pocket collecting well 2, be provided with horizontal communicated drainage sand pocket 3;
From left to right, two-tube mixed hydraulically-filled material equipment 4, reinforcing cage sand pocket collecting well 2, vacuum pre-pressed joint electroosmotic drainage treatment facility 5 and collecting well pump drainage equipment 6 are connected successively.
2, each functional block
(1) reinforcing cage sand pocket collecting well 2
As Fig. 2, described reinforcing cage sand pocket collecting well 2 comprises outer reinforcement cage 2.1, internal layer reinforcing cage 2.2, double-deck sand pocket 2.3 and back-up sand 2.4;
Outer reinforcement cage 2.1 and internal layer reinforcing cage 2.2 constitute collecting well, place double-deck sand pocket 2.3 in the middle of it, fill up back-up sand 2.4 in the double-deck sand pocket 2.3.
Reinforcing cage sand pocket collecting well 2 will around water in the weak soil come together in the well, again as the usefulness of the negative electrode of later stage electroosmotic drainage reinforcing flexible foundation, after ground stabilization is finished, can extract recycling simultaneously.
(2) horizontal communicated drainage sand pocket 3
As Fig. 2, described horizontal communicated drainage sand pocket 3 comprises horizontal drainage sand pocket 3.1, conduction reinforcing bar 3.2 and back-up sand 3.3;
In the back-up sand 3.3 load level draining sand pockets 3.1, horizontal drainage sand pocket 3.1 is connected with double-deck sand pocket 2.3, forms the drainage network that is communicated with; Conduction reinforcing bar 3.2 is positioned in the back-up sand 3.3, is connected with outer reinforcement cage 2.1, forms closed galvanic circle.
According to different initial substratum soil nature and construction condition, the level that select to be fit to is to drainage channel, mainly considers to blow in geosynthetics, large-scale sand wick, plastic draining board or the mud to add layer of sand and mix and use.
Horizontal drainage sand pocket 3.1 is a nylon braided bag, and back-up sand 3.3 is a medium coarse sand.
Being provided with of drainage network must be carried out before hydraulic reclamation and in the hydraulic reclamation process, and setting completed, and fixed promptly the beginning carries out, and the deadweight of having quickened hydraulic-filled soft clay is fixed.
(3) two-tube mixed hydraulically-filled material equipment 4
As Fig. 1, described two-tube mixed hydraulically-filled material equipment 4 comprises strand suction ship 4.1, dredging tube 4.2, dredge pump 4.3, hydraulic reclamation pipe 4.4, floating drum 4.5, agitator 4.6, pulp-absorbing pipe 4.7, pulp absorbing pump 4.8 and blows slurry pipe 4.9;
Dredge pump 4.3 is fixed in strand to be inhaled on the ship 4.1, and dredging tube 4.2, dredge pump 4.3, hydraulic reclamation pipe 4.4 and floating drum 4.5 are connected in turn, agitator 4.6, pulp-absorbing pipe 4.7, pulp absorbing pump 4.8 and blow slurry and manage 4.9 and be connected in turn.
(4) vacuum pre-pressed joint electroosmotic drainage treatment facility 5
As Fig. 3, vacuum pre-pressed joint electroosmotic drainage treatment facility 5 comprises anode reinforcing bar 5.1, anode connecting line 5.2, power line 5.3 and constant-current supply 5.4;
Anode reinforcing bar 5.1 is interconnected by anode connecting line 5.2 according to certain arrangement, connects constant-current supply 5.4 anodes by power line 5.3, and outer reinforcement cage 2.1 is connected with constant-current supply 5.4 negative electrodes by power line 5.3 as negative electrode.
Hydraulic reclamation is laid vacuum diaphragm 6.4 on the ground top layer after forming ground and table water drainage, carries out collecting well earlier and vacuumizes precipitation, then carries out vacuum pre-pressed joint electroosmotic drainage reinforcing flexible foundation.
1. electric osmose ratio juris
Insert metal electrode and pass to direct current in the saturated soft clay ground, because the DC electric field effect, the moisture in the soil flows to negative electrode from anode.Water is got rid of (adopt well-points dewatering as negative electrode usually, and drawn water by the well point) from negative electrode, and do not allow water near anode, replenish, can get rid of water in soil gradually by electroosmosis, thereby strengthen the fixed of ground, improve foundation strength.
2. electrode material
According to the character of soft subgrade soil, select electrode material.The optional reinforcing bar of electrode material, aluminium bar, iron staff etc.Anode adopts round bar, inserts saturated dredger soft soil around the collecting well certain distance, and negative electrode utilizes the reinforcing cage of collecting well, and collecting well is provided with suction water pipe, with jet pump pump drainage ponding outside the venue.
3. arrangement of electrodes
When electroosmotic drainage was used for reinforcing soft foundation usually, electrode was a vertical array, and electrode arrangement mode has three kinds substantially: hexagonal arrangement, the square arrangement that does not in the ranks stagger and the square arrangement that in the ranks staggers, suitably select according to the arrangement and the site condition of collecting well.
4. power supply
Adopt silicon controlled rectifier (SCR) as electrode supply, constant operating voltage is a low pressure between the anodic-cathodic, and every day, electric osmose was 8~12 hours, and while pump drainage water.
(5) collecting well pump drainage equipment 6
As Fig. 1, described collecting well pump drainage equipment 6 comprises suction water pipe 6.1, jet pump 6.2, gutter 6.3 and vacuum diaphragm 6.4.
Vacuum diaphragm 6.4 is covered on the blast-filled ground, and suction water pipe 6.1 is positioned in the internal layer reinforcing cage 2.2, and suction water pipe 6.1, jet pump 6.2 and gutter 6.3 are connected successively.

Claims (9)

1. the pre-reinforcing and processing method of a mixed hydraulically-filled soft soil foundation is characterized in that comprising the following steps:
1. be cured the laboratory test of agent at the hydraulic reclamation material than choosing, determine curing compound combination and and the hydraulic reclamation material between proportioning;
2. the removal of the obstacles, absolute altitude is measured in smooth place;
3. according to design pitch and hydraulic reclamation thickness, reinforcing cage sand pocket collecting well is installed in the place, the filling medium coarse sand is used for drainage in the double-deck sand pocket of collecting well;
4. with horizontal communicated drainage sand pocket reinforcing cage sand pocket collecting well is connected in twos, the reinforcing bar in the horizontal communicated drainage sand pocket is fixed on the outer reinforcement cage of collecting well;
5. the stirring hydraulic reclamation equipment that strand is inhaled ship hydraulic reclamation equipment and curing compound slurries is installed, determined hydraulic reclamation speed separately according to result of the test;
6. carry out two-tube mixed hydraulically-filledly, at default hydraulic reclamation height horizontal communicated drainage sand pocket is installed, treat the place hydraulic reclamation to design elevation, vacuum diaphragm is laid on the top layer;
7. jet pump is installed in the collecting well, is plugged the anode of round bar around the ponding in the vacuum preloading pump drainage collecting well, collecting well, and connect with lead as electroosmosis electrode;
8. constant-current supply is installed, and as anode, reinforcing cage is made negative electrode with round bar, carries out consolidation by electroosmosis, and collecting well pump drainage water is finished the vacuum pre-pressed joint electroosmotic drainage and handled soft base;
9. the test site absolute altitude is carried out test in situ and laboratory soil test, reach the construction in later period instructions for use after, extract reinforcing cage recycling, pay the place.
2. by the described method of claim 1, it is characterized in that step is 1.:
At the characteristic of saturated dredger soft soil, carry out the sludge solidification effect indoor comparative test of quicklime, cement, gypsum, flyash, slag, screening, combination are suitable for blowing-filling sludge early the curing compound material and the proportioning thereof of strongization best results.
3. by the described method of claim 1, it is characterized in that step is 5.:
The scene utilizes mixing plant to form the curing compound slurries, blurt out in hydraulic reclamation spray two-tube mixed hydraulically-filled material equipment (4) is set, hydraulic reclamation speed according to mud hydraulic reclamation speed and mixing ratio adjustment curing compound slurries is fully mixed saturated dredger soft soil and curing compound slurries in the hydraulic reclamation process.
4. implement the device of the described method of claim 1, it is characterized in that:
Comprise construction plant (1), reinforcing cage sand pocket collecting well (2), horizontal communicated drainage sand pocket (3), two-tube mixed hydraulically-filled material equipment (4), vacuum pre-pressed joint electroosmotic drainage treatment facility (5) and collecting well pump drainage equipment (6);
(1) is provided with reinforcing cage sand pocket collecting well (2) on construction ground, is provided with horizontal communicated drainage sand pocket (3) between reinforcing cage sand pocket collecting well (2);
From left to right, two-tube mixed hydraulically-filled material equipment (4), reinforcing cage sand pocket collecting well (2), vacuum pre-pressed joint electroosmotic drainage treatment facility (5) and collecting well pump drainage equipment (6) are connected successively.
5. by the described device of claim 4, it is characterized in that:
Described reinforcing cage sand pocket collecting well (2) comprises outer reinforcement cage (2.1), internal layer reinforcing cage (2.2), double-deck sand pocket (2.3) and back-up sand (2.4);
Outer reinforcement cage (2.1) and internal layer reinforcing cage (2.2) constitute collecting well, place double-deck sand pocket (2.3) in the middle of it, fill up back-up sand (2.4) in the double-deck sand pocket (2.3).
6. by the described device of claim 4, it is characterized in that:
Described horizontal communicated drainage sand pocket (3) comprises horizontal drainage sand pocket (3.1), conduction reinforcing bar (3.2) and back-up sand (3.3);
In back-up sand (3.3) the load level draining sand pocket (3.1), horizontal drainage sand pocket (3.1) is connected with double-deck sand pocket (2.3), forms the drainage network that is communicated with; Conduction reinforcing bar (3.2) is positioned in the back-up sand (3.3), is connected with outer reinforcement cage (2.1), forms closed galvanic circle.
7. by the described device of claim 4, it is characterized in that:
Described two-tube mixed hydraulically-filled material equipment (4) comprises strand suction ship (4.1), dredging tube (4.2), dredge pump (4.3), hydraulic reclamation pipe (4.4), floating drum (4.5), agitator (4.6), pulp-absorbing pipe (4.7), pulp absorbing pump (4.8) and blows slurry pipe (4.9);
Dredge pump (4.3) is fixed in strand to be inhaled on the ship (4.1), and dredging tube (4.2), dredge pump (4.3), hydraulic reclamation pipe (4.4) and floating drum (4.5) are connected in turn, and agitator (4.6), pulp-absorbing pipe (4.7), pulp absorbing pump (4.8) and blowing starched and managed (4.9) and be connected in turn.
8. by the described device of claim 4, it is characterized in that:
Vacuum pre-pressed joint electroosmotic drainage treatment facility (5) comprises anode reinforcing bar (5.1), anode connecting line (5.2), power line (5.3) and constant-current supply (5.4);
Anode reinforcing bar (5.1) is interconnected by anode connecting line (5.2) according to certain arrangement, connect constant-current supply (5.4) anode by power line (5.3), outer reinforcement cage (2.1) is connected with constant-current supply (5.4) negative electrode by power line (5.3) as negative electrode.
9. by the described device of claim 4, it is characterized in that:
Described collecting well pump drainage equipment (6) comprises suction water pipe (6.1), jet pump (6.2), gutter (6.3) and vacuum diaphragm (6.4);
Vacuum diaphragm (6.4) is covered on the blast-filled ground, and suction water pipe (6.1) is positioned in the internal layer reinforcing cage (2.2), and suction water pipe (6.1), jet pump (6.2) and gutter (6.3) are connected successively.
CN2009100619190A 2009-04-30 2009-04-30 Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation Expired - Fee Related CN101555689B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100619190A CN101555689B (en) 2009-04-30 2009-04-30 Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100619190A CN101555689B (en) 2009-04-30 2009-04-30 Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation

Publications (2)

Publication Number Publication Date
CN101555689A CN101555689A (en) 2009-10-14
CN101555689B true CN101555689B (en) 2011-02-09

Family

ID=41173952

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100619190A Expired - Fee Related CN101555689B (en) 2009-04-30 2009-04-30 Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation

Country Status (1)

Country Link
CN (1) CN101555689B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102162240B (en) * 2010-07-30 2015-02-25 江苏道达海上风电工程科技有限公司 System and method for realizing self-release of curing agent in cylinder foundation
CN103911931A (en) * 2014-04-23 2014-07-09 上海市基础工程集团有限公司 Sand-blowing filled bag construction road technology
CN105735075B (en) * 2016-02-02 2017-11-17 浙江大学 The temporary construction subgrade electric osmose solidification processing method of hydraulic reclamation soil site
CN105818268A (en) * 2016-05-25 2016-08-03 山推建友机械股份有限公司 Offshore soft base layer processing stirring device and reinforcement process thereof
CN107687118A (en) * 2017-08-31 2018-02-13 中建三局第建设工程有限责任公司 The forming method of hydraulic reclamation region saturated soft soil roadbed
CN108118684B (en) * 2017-11-28 2023-06-16 浙江大学城市学院 Beach reclamation dredger fill silt sand inclusion layer foundation reinforcing structure and construction method
CN109403401A (en) * 2018-09-25 2019-03-01 中交天航滨海环保浚航工程有限公司 A method of it twists and inhales ship excavation cobble sand
CN109264957A (en) * 2018-10-22 2019-01-25 吴慧明 A kind of municipal sludge hole decrement preprocess method based on vacuum method
US11619020B2 (en) 2020-12-03 2023-04-04 Zhejiang University Sludge three-dimensional electroosmosis drainage reinforcement method based on electric geotextile complex
CN112482346B (en) * 2020-12-03 2021-12-24 浙江大学 Sludge three-dimensional electroosmosis drainage reinforcing method based on electric geotextile complex

Also Published As

Publication number Publication date
CN101555689A (en) 2009-10-14

Similar Documents

Publication Publication Date Title
CN101555689B (en) Method and device for pre-consolidating mixed hydraulically-filled soft soil foundation
CN106836186B (en) A kind of construction technology of utilizing solidified earth from sludge
CN102162239B (en) Soft soil foundation treated by chemical-solution-combined injection electroosmosis method and construction method of soft soil foundation
CN104818707B (en) Application cotton stalk consolidation and solidification dredging silt, the method for new barged-in fill
CN110512589B (en) Vacuum drainage-reducing and magnesium oxide carbonization combined shallow ultra-soft foundation curing method
CN105970979A (en) Ecological slope protection method based on sludge solidification soil
CN204059332U (en) A kind of concrete precast pipe pile and piling prepressing Soft Ground device
CN105220681A (en) A kind of method of microorganism-electric field joint reinforcement Liquefaction Foundation
CN107572956A (en) A kind of premixing fluidised form solidified earth
CN103422497A (en) Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN105019425B (en) A kind of construction method of displacement hull and cured layer combined foundation structure
CN101761073A (en) Improved construction technology of CFG (cement fIying-ash gravel) pile
CN103015399A (en) Earthquake disaster reduction system for liquefiable foundation and foundation treatment method
CN103696416A (en) Novel foundation treatment method
CN201406681Y (en) Pre-reinforcement processing device of mixed hydraulic reclamation soft soil foundation
CN103437340A (en) Method for strengthening soft foundation through high-pressure jet grouting
CN104762937A (en) Pumped-storage hydroelectric plant applied to ecological reservoir and sewage treatment method
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN103215945B (en) The three-dimensional assembly power drain consolidation system of heterogeneous body place soft soil foundation and method
CN105155383A (en) Construction process of bubble light soil
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN203247575U (en) Stereoscopic combined type dynamic drainage consolidation system used for heterogeneous field soft foundation
CN103232149A (en) Environmental protection dredging stockyard sediment original position rapid dehydration system
CN113564977A (en) Construction method of soft soil foundation with high water content

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110209

Termination date: 20160430