CN101550703B - 钢筋混凝土基础或桩承台的设计方法 - Google Patents

钢筋混凝土基础或桩承台的设计方法 Download PDF

Info

Publication number
CN101550703B
CN101550703B CN2009100223634A CN200910022363A CN101550703B CN 101550703 B CN101550703 B CN 101550703B CN 2009100223634 A CN2009100223634 A CN 2009100223634A CN 200910022363 A CN200910022363 A CN 200910022363A CN 101550703 B CN101550703 B CN 101550703B
Authority
CN
China
Prior art keywords
reinforced concrete
foundation
concrete foundation
pile
pile cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009100223634A
Other languages
English (en)
Other versions
CN101550703A (zh
Inventor
石波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
PowerChina Northwest Engineering Corp Ltd
Original Assignee
NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NORTHWEST HYDRO CONSULTING ENGINEERS CHECC filed Critical NORTHWEST HYDRO CONSULTING ENGINEERS CHECC
Priority to CN2009100223634A priority Critical patent/CN101550703B/zh
Publication of CN101550703A publication Critical patent/CN101550703A/zh
Application granted granted Critical
Publication of CN101550703B publication Critical patent/CN101550703B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明涉及高耸建筑物的领域,特别是钢筋混凝土基础或桩承台的设计方法,该方法所采用的装置包括上部结构及天然基础或桩基础,其特征是:在上部结构(4)下连接的钢筋混凝土基础(1)或钢筋混凝土桩承台(5)内镶嵌有预应力钢筋(2)。该方法将钢筋混凝土基础或桩承台在垂直方向采用预应力结构,基础或桩承台受力更加合理,基础或桩承台的抗裂和稳定性更好。

Description

钢筋混凝土基础或桩承台的设计方法
技术领域
本发明涉及高耸建筑物构造领域,特别是一种钢筋混凝土基础或桩承台的设计方法。
背景技术
近年来,我国新建的风电塔架基础,一般为天然基础和桩基础两种形式,但也存在以下主要问题:1、基础或桩承台承受较大的垂直拉力,基础或桩承台为抵抗该力一般采用较多的普通钢筋;2、由于基础或桩承台承受较大的垂直拉力在拉力作用下计算裂缝较大。如何解决以上这些矛盾,达到克服上述存在的问题,同时又不影响施工速度,是本发明所要解决的问题。
发明内容
本发明的目的是提供一种新型基础或桩承台、在不影响施工速度的同时,克服已知技术存在的不足使经济效益更加明显的钢筋混凝土基础或桩承台的设计方法在垂直方向采用预应力。
本发明的技术方案是,设计一种钢筋混凝土基础或桩承台的设计方法,该方法所采用的装置包括上部结构及天然基础或桩基础,其特征是:在上部结构下连接的钢筋混凝土基础或钢筋混凝土桩承台内镶嵌有竖向预应力钢筋。
所述的钢筋混凝土基础上端为圆台中空结构,竖向预应力钢筋均匀垂直分布在中空结构的内圆柱上。
所述的钢筋混凝土桩承台为中空的圆柱形结构,中空的圆柱形底端为封闭平面,在封闭平面下连接有若干个桩;竖向预应力钢筋均匀垂直分布在中空的内圆柱上。
所述的镶嵌预应力钢筋的数量是普通钢筋数量的1/3~1/5。
所述的镶嵌预应力钢筋采用高强度材料为现有国标采用的无粘接钢棒或钢绞线。
本结构采用预应力钢筋代替普通钢筋,预应力钢筋的强度是普通钢筋的3~5倍,用钢量相对减少,另外裂缝开展宽度相应减少或不产生裂缝。
本发明的特点是:为了避免钢筋混凝土基础或桩承台的裂缝过早出现,充分利用高强度钢筋及高强度混凝土,设法在混凝土结构或构件承受使用荷载前,预先对受拉区的混凝土施以预压应力。
本发明采用预压应力来减小或抵消荷载所引起的混凝土拉应力,从而将结构构件的拉应力控制在较小范围,甚至处于受压状态,以推迟混凝土裂缝的出现和开展,从而提高构件的抗裂性能和刚度。
本发明的特点是:不需要预留孔道,也不必灌浆、施工简便、快速、造价较低、易于推广应用。
其优点是:1、抗裂性好,刚度大。由于对构件施加预应力,大大推迟了裂缝的出现,在使用荷载作用下,构件可不出现裂缝,或裂缝在控制范围之内,所以提高了构件的刚度,增加了结构的耐久性。
2、节省材料,减小自重。其结构由于必须采用高强度材料,因此可减少钢筋用量,节省钢材,同时对结构安全度有较明显的优越性。
3、提高构件的抗剪能力。试验表明,纵向预应力钢筋起着锚栓的作用,阻碍着构件斜裂缝的出现与开展。
4、提高受压构件的稳定性。当受压构件长细比较大时,在受到一定的压力后便容易被压弯,以致丧失稳定而破坏。如果对钢筋混凝土柱施加预应力,使纵向受力钢筋张拉得很紧,不但预应力钢筋本身不容易压弯,而且可以帮助周围的混凝土提高抵抗压弯的能力。
5、提高构件的耐疲劳性能。因为具有强大预应力的钢筋,在使用阶段因加荷或卸荷所引起的应力变化幅度相对较小,故此可提高抗疲劳强度,这对承受动荷载的结构来说是很有利的。
钢筋混凝土基础或桩承台的设计方法在垂直方向采用预应力,充分利用预应力钢筋的特性,而且基础或桩承台在不增用钢量或减少用钢量的情况下增加了基础或桩承台抗裂和抗倾性,同时使得上部结构的稳定性更好。
附图说明
下面结合实施例附图对本发明做进一步说明。
图1是实施例1天然基础在垂直方向采用预应力平面示意图;
图2是图1的A-A剖视图;
图3是实施例2桩基础在垂直方向采用预应力平面示意图;
图4是图3的B-B剖视图。
图中:1、钢筋混凝土基础;2、预应力钢筋;3、地面;4、上部结构;5、钢筋混凝土桩承台;6、桩。
具体实施方式
实施例1结构如图1、图2所示,是钢筋混凝土基础1在垂直方向采用的预应力结构示意图,它包括上部结构4及钢筋混凝土基础1,在上部结构4下连接的钢筋混凝土基础1内镶嵌有预应力钢筋2。钢筋混凝土基础1自下而上其外径为依次递减并呈叠加圆台状,圆台上端为中空结构,预应力钢筋2均匀垂直分布在中空结构的内圆柱上。镶嵌竖向预应力钢筋2的数量是普通钢筋1/3~1/5。普通钢筋的数量是本领域的公知技术。预应力钢筋的强度是普通钢筋的3~5倍,因此用钢量相对普通钢筋要少,另外裂缝开展宽度相应减少或不产生裂缝。其结构由于采用高强度材料,及现有国标采用的无粘接钢棒或钢绞线,因此可减少钢筋用量,镶嵌竖向预应力钢筋2的截面尺寸为现有国标采用的无粘接钢棒或钢绞线的规格。这样既节省钢材又提高钢筋混凝土基础或桩承台的安全性。
实施例2结构如图3、图4所示,是钢筋混凝土桩承台5在垂直方向采用的预应力结构示意图,其它包括上部结构4及钢筋混凝土桩承台5,在上部结构4下连接的钢筋混凝土桩承台5内镶嵌有预应力钢筋2。钢筋混凝土桩承台5为中空的圆柱形结构,中空的圆柱形底端为封闭平面,在封闭平面下连接有若干个桩6;预应力钢筋2均匀垂直分布在中空的内圆柱上。实施例2所采用的数量、高强度材料及截面尺寸规格同实施例1。
在使用时按图所示施工基础,钢筋混凝土基础1或钢筋混凝土桩承台5在受力垂直方向力与常规基础或桩承台不同,由于在在上部结构4下连接的钢筋混凝土基础1或钢筋混凝土桩承台5内镶嵌有预应力钢筋2,所以使高耸结构的基础受力更加合理,其抗裂性好,刚度大。构件的抗剪能力提高、受压构件的稳定性更高、构件的耐疲劳性能更好。

Claims (3)

1.钢筋混凝土基础或桩承台的设计方法,该方法所采用的装置包括上部结构及天然基础或桩基础,其特征是:在上部结构(4)下连接的钢筋混凝土基础(1)或钢筋混凝土桩承台(5)内镶嵌有预应力钢筋(2);所述的钢筋混凝土基础(1)上端圆台为中空结构,预应力钢筋(2)均匀垂直分布在中空结构的内圆柱上;所述的钢筋混凝土桩承台(5)上端为中空的圆柱形结构,中空的圆柱形底端为封闭平面,在封闭平面下连接有若干个桩(6);预应力钢筋(2)均匀垂直分布在中空的内圆柱上。
2.按照权利要求1所述的钢筋混凝土基础或桩承台的设计方法,其特征是:所述的镶嵌竖向预应力钢筋(2)的数量是普通钢筋数量的1/3~1/5。
3.按照权利要求1所述的钢筋混凝土基础或桩承台的设计方法,其特征是:所述的镶嵌竖向预应力钢筋(2)采用高强度材料无粘接钢棒或钢绞线。
CN2009100223634A 2009-05-06 2009-05-06 钢筋混凝土基础或桩承台的设计方法 Active CN101550703B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100223634A CN101550703B (zh) 2009-05-06 2009-05-06 钢筋混凝土基础或桩承台的设计方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100223634A CN101550703B (zh) 2009-05-06 2009-05-06 钢筋混凝土基础或桩承台的设计方法

Publications (2)

Publication Number Publication Date
CN101550703A CN101550703A (zh) 2009-10-07
CN101550703B true CN101550703B (zh) 2011-03-30

Family

ID=41155174

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100223634A Active CN101550703B (zh) 2009-05-06 2009-05-06 钢筋混凝土基础或桩承台的设计方法

Country Status (1)

Country Link
CN (1) CN101550703B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102371612A (zh) * 2010-08-13 2012-03-14 何达伟 基座制造方法
CN102561521A (zh) * 2010-12-14 2012-07-11 贵阳铝镁设计研究院有限公司 螺栓偏差纠偏方法
CN102345407A (zh) * 2011-07-21 2012-02-08 从卫民 一种高压线铁塔底座
CN102345296A (zh) * 2011-07-21 2012-02-08 从卫民 一种高压输变线、通讯塔底座
CN102720206A (zh) * 2012-07-16 2012-10-10 南京工业大学 一种新型预应力混凝土桩与承台的连接结构

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4163621A (en) * 1978-02-08 1979-08-07 Tadayasu Higuchi Method for forming a continuous footing with prefabricated footing blocks
CN2809021Y (zh) * 2005-07-29 2006-08-23 交通部公路科学研究所 大吨位基桩抗压静载试验中的预应力反力***装置
CN101230579A (zh) * 2008-02-21 2008-07-30 同济大学 环形承压底板井格梁式风力发电塔基础
CN201148613Y (zh) * 2008-01-07 2008-11-12 中交水运规划设计院有限公司 抗冰墩

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4163621A (en) * 1978-02-08 1979-08-07 Tadayasu Higuchi Method for forming a continuous footing with prefabricated footing blocks
CN2809021Y (zh) * 2005-07-29 2006-08-23 交通部公路科学研究所 大吨位基桩抗压静载试验中的预应力反力***装置
CN201148613Y (zh) * 2008-01-07 2008-11-12 中交水运规划设计院有限公司 抗冰墩
CN101230579A (zh) * 2008-02-21 2008-07-30 同济大学 环形承压底板井格梁式风力发电塔基础

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP昭60-92518A 1985.05.24
栾维功等.水工建筑物中井桩承台设计的探讨.《甘肃水利水电技术》.1994,(第3期),第28-32页. *

Also Published As

Publication number Publication date
CN101550703A (zh) 2009-10-07

Similar Documents

Publication Publication Date Title
CN101550703B (zh) 钢筋混凝土基础或桩承台的设计方法
CN101761089B (zh) 纤维筋混凝土抗拔桩
CN201254768Y (zh) 网状竹筋加强夯土墙
CN102345291A (zh) 一种部分预应力支护悬臂桩
CN201265157Y (zh) 后张无粘结预应力混凝土抗浮桩
CN102363957B (zh) 一种后张预应力复合抗拔桩
CN106930436B (zh) 一种内置预应力钢斜撑的钢筋混凝土剪力墙
CN201411704Y (zh) 钢筋混凝土基础或桩承台
CN201358468Y (zh) 井格式承台风力发电塔桩基础
CN205557512U (zh) 可回收预应力抗拔桩
CN102345292A (zh) 一种带有扩大头的复合预应力抗拔桩
CN2809021Y (zh) 大吨位基桩抗压静载试验中的预应力反力***装置
CN202194131U (zh) 一种部分预应力支护悬臂桩
CN2701914Y (zh) 砼预制拼装多用塔机基础
CN202936804U (zh) 后张法预应力桩
CN206190458U (zh) 全向预应力抗疲劳组合钢结构风塔
CN202194130U (zh) 一种带有扩大头的复合预应力抗拔桩
CN104264659A (zh) 一种预制空心抗拔桩及其制备方法
CN203741830U (zh) 一种混凝土综合作用桩
CN201679001U (zh) 纤维筋混凝土抗拔桩
CN212223643U (zh) 一种独柱墩拉压组合抗倾覆结构
CN201794215U (zh) 一种先张法预应力钢筋砼预制梁
CN204940273U (zh) 一种压力分散型预应力锚索施工装置
CN203361184U (zh) 一种架空输电线路杆塔基础型式
CN208088106U (zh) 一种后张预应力预制空心式桥墩柱结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HYDROCHINA XIBEI ENGINEERING CORPORATION

Free format text: FORMER NAME: NORTHWEST HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER ENGINEERING CONSULTING

Owner name: CHINA ELECTRIC POWER CONSTRUCTION GROUP NORTHWEST

Free format text: FORMER NAME: HYDROCHINA XIBEI ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: POWERCHINA NORTHWEST ENGINEERING Co.,Ltd.

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee before: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

CP03 Change of name, title or address

Address after: 710065 Shaanxi Province, Xi'an City Road eight No. 18

Patentee after: NORTHWEST HYDRO CONSULTING ENGINEERS, CHECC

Address before: 710065 Shaanxi Province, Xi'an City Road eight No. 18 general survey and Design Institute of the Northwest Office

Patentee before: Northwest Hydro Consulting Engineers, CHECC