CN101514556A - Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof - Google Patents

Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof Download PDF

Info

Publication number
CN101514556A
CN101514556A CNA2009100740289A CN200910074028A CN101514556A CN 101514556 A CN101514556 A CN 101514556A CN A2009100740289 A CNA2009100740289 A CN A2009100740289A CN 200910074028 A CN200910074028 A CN 200910074028A CN 101514556 A CN101514556 A CN 101514556A
Authority
CN
China
Prior art keywords
tower crane
crane foundation
piling machine
prefabricated tower
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100740289A
Other languages
Chinese (zh)
Other versions
CN101514556B (en
Inventor
黄忠坤
黄忠乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiang Wengang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2009100740289A priority Critical patent/CN101514556B/en
Publication of CN101514556A publication Critical patent/CN101514556A/en
Application granted granted Critical
Publication of CN101514556B publication Critical patent/CN101514556B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Wind Motors (AREA)

Abstract

The invention belongs to tower crane foundations and installation equipment thereof, and particularly relates to a prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof. The invention solves the problem of low stability caused by directly placing the prefabricated tower crane foundation on a foundation. The prefabricated tower crane foundation comprises a center part, a transitional part and an end part, wherein, a pile cap is arranged at the free end of the end part and tubular pile holes are formed on the pile cap. The dedicated hydraulic installation piling machine of the prefabricated tower crane foundation comprises a hydraulic oil cylinder and a support-fastening hook sleeved on the tower footing beam, wherein, a portal-type support is arranged at the top of the support-fastening hook; a piston rod of the hydraulic oil cylinder can pass through the top part of the portal-type support; and tubular pile via holes are formed on the positions which correspond to the piston rod of the hydraulic oil cylinder in a vertical direction, on the support-fastening hook. The invention has the following beneficial effects: the prefabricated tower crane foundation improves the wind and shock resistance and the stability after the on-site installation and greatly increases the construction safety index of personnel without increasing the construction cost; and the hydraulic installation piling machine improves the efficiencies of installation and construction and has compact structure, thereby facilitating transportation, installation and application.

Description

A kind of prefabricated tower crane foundation and dedicated hydraulic installation piling machine thereof
Technical field
The invention belongs to tower crane and erection equipment thereof, be specifically related to a kind of prefabricated tower crane foundation and dedicated hydraulic installation piling machine thereof.
Background technology
Concrete prefabricated assembly unit tower crane foundation with the concrete precast element reasonable combination, closely links to each other with pillar crane and co-operation, can be used for the prefabricated assembled basis of multiple model pillar crane, is called for short prefabricated tower crane foundation.
Concrete precast element comprises central part, transition piece, extremity piece.Central part is the cross prefabricated component.Transition piece is the prefabricated component of expansion prefabricated tower crane foundation length.Extremity piece is the prefabricated component of prefabricated tower crane foundation end.After each prefabricated component assembling combination, the level connection is formed by prestress wire stretch-draw.The bolt link position that the tower machine is pressed tower machine underframe by stone bolt is connected with prefabricated tower crane foundation.And prefabricated tower crane foundation directly is placed on the ground, though ground need pass through certain processing method, its stability still remains to be improved.
Summary of the invention
The present invention provides a kind of prefabricated tower crane foundation and dedicated hydraulic installation piling machine thereof in order to solve the problem that prefabricated tower crane foundation directly is placed on ground upward stability deficiency.
The present invention adopts following technical scheme to realize: prefabricated tower crane foundation, comprise central part, transition piece and extremity piece, and it is characterized in that the free end of extremity piece is provided with heavy stand, have hole of post on the heavy stand.Mutually perpendicular two transition pieces connect by some arc junction plates, and mutually perpendicular two end pieces also connects by some arc junction plates.
Be exclusively used in the hydraulic installation piling machine of prefabricated tower crane foundation, comprise hydraulic jack, it is characterized in that also comprising the support fastening hook that can be sleeved on the column foot beam, support fastening hook top is provided with portal trestle, the piston rod of hydraulic jack can pass the top of portal trestle and be provided with, and the position of the piston rod of vertical corresponding hydraulic jack has the pile tube via hole on the support fastening hook.The bottom of piston rod is threaded with the upper end of pile tube.The support fastening hook comprises the platform at top, and the platform two ends are the coupler body of hinged L type respectively.
The present invention has following beneficial effect: the heavy stand of described prefabricated tower crane foundation by setting up, firmly be connected with ground through pile tube, the setting of some junction plates in addition, wind resistance, shock resistance are strengthened, its wind loading rating can reach more than 10 grades, on-the-spot installation rear stability and personnel's construction safety index improve greatly, and construction cost also improves.
Prefabricated tower crane foundation dedicated hydraulic installation piling machine of the present invention is depressed pile tube fast or is extracted by hydraulic power supply Continuous Drive hydraulic jack, replaces existing manually swinging to beat the inaccessiable degree of depth of stake, has improved installation and efficiency of construction; And the controllable pressure size, thereby but the adjustable pipe stake is pressed into the underground degree of depth; In addition owing to used and to produce very big pressure and Hydraulic Power Transmission System movably, make that the entire equipment profile is less, weight is light, compact conformation is convenient to transportation, installs and is used.
Description of drawings
Fig. 1 is the structural representation of prefabricated tower crane foundation of the present invention
Fig. 2 is the A-A sectional drawing of Fig. 1
Fig. 3 is the structural representation of hydraulic installation piling machine of the present invention
Fig. 4 is the hydraulic schematic diagram of hydraulic installation piling machine of the present invention
Fig. 5 is the Hydraulic Station schematic diagram of hydraulic installation piling machine
Fig. 6 is the vertical view of Fig. 5
Among the figure: 1-central part, 2-transition piece, 3-extremity piece, 4-heavy stand, 5-hole of post, 6-arc junction plate; The fan-shaped junction plate of 7-, 8-support fastening hook, 9-portal trestle, 10-hydraulic jack, 11-pile tube, 12-column foot beam, 13-Hydraulic Station, 14-locomotive;
15-oil tank liquid level machine, the empty filter of 16-, the 17-stop valve of draining the oil, 18-pressure duct oil filter, 19-oil pump, the 20-shaft coupling, 21-motor, 22-overflow valve, 23-hand-operated direction valve, 24-pressure meter switch, the 25-pressure meter, 26-one way valve, 27-heater, 28-snap joint, 29-fuel tank.
The specific embodiment
In conjunction with the accompanying drawings the specific embodiment of the present invention is described further.
As shown in Figure 1 and Figure 2, prefabricated tower crane foundation comprises central part 1, transition piece 2 and extremity piece 3, it is characterized in that the free end of extremity piece 3 is provided with heavy stand 4, has hole of post 5 on the heavy stand 4.Mutually perpendicular two transition pieces 2 connect by some arc junction plates 6, and mutually perpendicular two end pieces 3 connects by some fan-shaped junction plates 7.
As shown in Figure 3, be exclusively used in the hydraulic installation piling machine of prefabricated tower crane foundation, comprise hydraulic jack 10, it is characterized in that it comprises the support fastening hook 8 that can be sleeved on the column foot beam 12, support fastening hook 8 tops are provided with portal trestle 9, the piston rod of hydraulic jack 10 can pass the top of portal trestle 9 and be provided with, and the position of the piston rod of vertical corresponding hydraulic jack has the pile tube via hole on the support fastening hook 8.The bottom of piston rod 10 is threaded with the upper end of pile tube 11.Support fastening hook 8 comprises the platform at top, and the platform two ends are the coupler body of hinged L type respectively.As Fig. 5, shown in Figure 6, the Hydraulic Station that drives hydraulic jack can be installed on the locomotive, is convenient to operation.
After the prefabricated tower crane foundation combination is finished, pile tube is squeezed into underground by hydraulic installation piling machine.After construction was finished, hydraulic installation piling machine can trip out pile tube, realized recycling, further reduced construction cost.Every 1100mm of pile tube commonly used, between many by being threaded, can dismounting.
The hydraulic principle of hydraulic installation piling machine as shown in Figure 4, during hydraulic installation piling machine work, motor 21 drives oil pump 19 with hydraulic oil sucking-off from fuel tank 29, pile tube is pressed into underground by pressure duct oil filter 18, one way valve 26 by manual operation reversal valve 23 control hydraulic jacks 10.

Claims (5)

1, a kind of prefabricated tower crane foundation comprises central part (1), transition piece (2) and extremity piece (3), it is characterized in that the free end of extremity piece (3) is provided with heavy stand (4), has hole of post (5) on the heavy stand (4).
2, prefabricated tower crane foundation according to claim 1 is characterized in that mutually perpendicular two transition pieces (2) connect by some arc junction plates (6), and mutually perpendicular two end pieces (3) connects by some fan-shaped junction plates (7).
3, a kind of hydraulic installation piling machine that is exclusively used in prefabricated tower crane foundation as claimed in claim 1 or 2, comprise hydraulic jack (10), it is characterized in that it also comprises the support fastening hook (8) that can be sleeved on the column foot beam (12), support fastening hook (8) top is provided with portal trestle (9), the piston rod of hydraulic jack (10) can pass the top of portal trestle (9) and be provided with, and the position that support fastening hook (8) is gone up the piston rod of vertical corresponding hydraulic jack has the pile tube via hole.
4, hydraulic installation piling machine according to claim 3 is characterized in that the bottom of the piston rod of described hydraulic jack (10) is threaded with the upper end of pile tube (11).
5, hydraulic installation piling machine according to claim 4 is characterized in that described support fastening hook (8) comprises the platform at top, and the platform two ends are the coupler body of hinged L type respectively.
CN2009100740289A 2009-03-24 2009-03-24 Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof Expired - Fee Related CN101514556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100740289A CN101514556B (en) 2009-03-24 2009-03-24 Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100740289A CN101514556B (en) 2009-03-24 2009-03-24 Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof

Publications (2)

Publication Number Publication Date
CN101514556A true CN101514556A (en) 2009-08-26
CN101514556B CN101514556B (en) 2012-04-18

Family

ID=41039164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100740289A Expired - Fee Related CN101514556B (en) 2009-03-24 2009-03-24 Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof

Country Status (1)

Country Link
CN (1) CN101514556B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102296626A (en) * 2011-05-18 2011-12-28 从卫民 Multi-combination foundation bolt hole of concrete prefabricating and assembling crane base
CN102041815B (en) * 2009-10-19 2012-10-17 单希佳 Tower crane
CN103343546A (en) * 2013-07-12 2013-10-09 张家港保税区利中国际贸易有限公司 Universal tower crane concrete foundation
CN114561938A (en) * 2021-12-20 2022-05-31 陕西建工新能源有限公司 Novel photovoltaic concrete prestressed pipe pile

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102041815B (en) * 2009-10-19 2012-10-17 单希佳 Tower crane
CN102296626A (en) * 2011-05-18 2011-12-28 从卫民 Multi-combination foundation bolt hole of concrete prefabricating and assembling crane base
CN103343546A (en) * 2013-07-12 2013-10-09 张家港保税区利中国际贸易有限公司 Universal tower crane concrete foundation
CN103343546B (en) * 2013-07-12 2016-01-13 张家港保税区利中国际贸易有限公司 Universal tower crane concrete foundation
CN114561938A (en) * 2021-12-20 2022-05-31 陕西建工新能源有限公司 Novel photovoltaic concrete prestressed pipe pile

Also Published As

Publication number Publication date
CN101514556B (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN101514556B (en) Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof
CN104477788A (en) Spanning self-climbing type translational crane of wind power generation tower
CN110552507A (en) Well is from automatic cloth system of concrete that climbs
CN207048345U (en) Construction discharge platform device
CN207498832U (en) Hydraulic climbing die block system climbing device
CN209686254U (en) A kind of folding retractable support leg device
CN208605135U (en) A kind of cross sliding type hydraulic lifting compression type jumbolter
CN201381515Y (en) Prefabricated tower crane foundation and hydraulic pile mounting machine special for same
CN208650561U (en) Reinforced concrete structure inversely removes vertical conversion support construction
CN217975378U (en) Cast-in-place board template strutting arrangement of simple beam assembled
CN211777820U (en) Steel pipe concrete tower
CN202000268U (en) Foldable front outrigger for bridge girder erection machine
CN204281116U (en) Wind power generation stepped leap self-crawling type translation loop wheel machine
CN112359888B (en) Static pile reaction frame jacking system for carbon filter tank body deviation rectifying and reinforcing construction and construction method
CN201400892Y (en) Hydraulic pile head crushing device
CN212612506U (en) Quick strutting arrangement of foundation ditch
CN210975570U (en) Operation platform for construction of large-section steel-concrete composite beam
CN208716716U (en) Wind-power electricity generation installs loop wheel machine
CN112664235A (en) Walking type pipe gallery formwork supporting device
CN202509490U (en) Steel-concrete combined pile capable of being disassembled under load by segments and being repeatedly used
CN201738563U (en) Hydraulic climbing scaffold for building construction
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN2218221Y (en) Hydraulic propulsion lifting scaffold
CN205012339U (en) Pile driver
CN205012337U (en) Pour formula pile driver

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANG WENGANG

Free format text: FORMER OWNER: HUANG ZHONGKUN

Effective date: 20130308

Free format text: FORMER OWNER: HUANG ZHONGQIAN

Effective date: 20130308

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jiang Wengang

Inventor before: Huang Zhongkun

Inventor before: Huang Zhongqian

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: HUANG ZHONGKUN HUANG ZHONGQIAN TO: JIANG WENGANG

Free format text: CORRECT: ADDRESS; FROM: 224011 YANCHENG, JIANGSU PROVINCE TO: 276000 LINYI, SHANDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130308

Address after: 276000 Shandong city of Linyi province Lanshan Nanfang Subdistrict Office Community of Tsinghua Yuan Industrial Park

Patentee after: Jiang Wengang

Address before: 224011. 62 Fenghuang Road North, Long Gang Town, Yancheng City, Jiangsu

Patentee before: Huang Zhongkun

Patentee before: Huang Zhongqian

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20180324

CF01 Termination of patent right due to non-payment of annual fee