CN101514551A CNA2009100251704A CN200910025170A CN101514551A CN 101514551 A CN101514551 A CN 101514551A CN A2009100251704 A CNA2009100251704 A CN A2009100251704A CN 200910025170 A CN200910025170 A CN 200910025170A CN 101514551 A CN101514551 A CN 101514551A
Authority
CN
China
Prior art keywords
reinforcing cage
stirrup
main muscle
cross
well head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100251704A
Other languages
Chinese (zh)
Other versions
CN101514551B (en
Inventor
宋功业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dahan Construction Industrial Group Co., Ltd.
Original Assignee
XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY filed Critical XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY
Priority to CN2009100251704A priority Critical patent/CN101514551B/en
Publication of CN101514551A publication Critical patent/CN101514551A/en
Application granted granted Critical
Publication of CN101514551B publication Critical patent/CN101514551B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pile foundation construction technology of construction trade, in particular to a colligation and installation construction method of the artificial excavating pile reinforcing cage on an orifice of a caisson. The pile foundation construction technology is the improvement of the colligation and installation construction method of the current artificial excavating pile reinforcing cage. The vertical reinforcing cage manufacturing and installation method is adopted at the orifice of the artificial excavating pile which is provided with artificially formed pores and inspected to be qualified. The reinforcing cage is being manufactured as well as being installed. The manufacturing in sections is adopted. One section is installed after being manufactured until the design requirement is achieved. The artificial excavating pile reinforcing cage vertical colligation and installation method has the beneficial effects that: no mechanical equipment is required for installing the reinforcing cage when the method is compared with a present method, and the engineering cost can be reduced; large manufacturing and piling field is not required, therefore, the method is especially applied to narrow construction field; when the time limit for a project is nervous, piles can be manufactured and installed simultaneously as long as adequate manpower is supplied.

Description

Artificial excavating pile reinforcing cage vertical colligation and mounting method
Technical field
The present invention relates to the construction technology of a kind of pile foundation of building trade.It specifically is the manually digging hole pile cages carries out vertical colligation and installs in the aperture job practices.Be to the colligation of existing manually digging hole pile cages and the improvement of construction method of installation.
Background technology
At present, existing manually digging hole pile cages is transported to on-the-spot the installation mostly after factory's colligation is good, promptly in the workshop or on-the-spot reinforcing cage is crouched putting colligation, be transported to the well head of hand excavated pile then, with crane gear reinforcing cage is hung vertical state again, arrive hand excavation's wellhole the inside down, make placement of cage of reinforcing bar.Perhaps install after the colligation moulding at the scene.Because (general 0.80m~3.00m), length is (general 5m~30m), when toward well is interior reinforcing cage being installed, need reinforcement cage hoisting be installed with lifting appliance also greatly greatly for the reinforcing cage diameter; Adopt crane gear that reinforcing cage is installed, increased engineering cost.Particularly crane gear can't be adopted in some job site, during as construction hand excavated pile in deep foundation ditch, just makes the installation reinforcing cage cause difficulty.
Summary of the invention
For addressing the above problem, the invention provides vertical making of a kind of manually digging hole pile cages and mounting method, reinforcing cage is carried out vertical colligation at well head, install on colligation limit, limit, does not need crane gear.
The present invention realizes with following technical scheme: vertical making of a kind of manually digging hole pile cages and mounting method is characterized in that; The manual pore-forming and through making reinforcing cage on one side on the hand excavated pile aperture of acceptance(check), simultaneously reinforcing cage to be installed, concrete grammar is:
1) at two cross-arm that keep at a certain distance away of hand excavated pile well head horizontal positioned of acceptance(check);
2) keep flat the reinforcing cage of making on cross-arm and strengthen stirrup, and carry out five equilibrium to strengthening stirrup, isodisperse is identical with reinforcing cage master muscle quantity, carries out mark;
3) first road is measured and marked to reinforcing cage master muscle and strengthen the stirrup position, with strengthen that 2 of the basic symmetry of stirrup intersect vertically with two main muscle and main muscle outside, strengthen stirrup inside, and firm welding;
4) upwards two meters are firm with reinforcement stirrup spot welding with main muscle with identical method at main muscle; According to the method main muscle is installed in by root and strengthens on the stirrup;
5) weld firmly according to designing requirement winding screw stirrup and with spiral stirrup and main muscle contact point in main muscle outside;
6) with the pad place of two respectively firm bolt knots of soft rope in two symmetries of reinforcing cage both sides and main muscle and reinforcement stirrup;
7) manually hold the rope made of hemp, take out the cross-arm that is placed on well head, loosen the rope made of hemp gently, the first segment reinforcing cage is slowly fallen, when the reinforcement stirrup suitable for reading of first segment reinforcing cage drops down onto well head, stop to fall;
Put two cross-arms at well head then, set by step 1 to next joint reinforcing cage of the method fabrication and installation of step 7, so carry out, till reaching the designing requirement degree of depth according to the front.
The invention has the beneficial effects as follows: can reinforcing cage be installed without plant equipment with existing method comparison, engineering cost is reduced; Do not need very big making to stack the place, this is especially suitable to narrow construction site; When the duration is nervous, if the staff abundance, the fabrication and installation simultaneously of each position;
Description of drawings
The present invention is further described below in conjunction with drawings and Examples.
Fig. 1 is a hand excavated pile wellhole schematic diagram;
Fig. 2 is that cross-arm is placed on schematic diagram on the wellhole;
Fig. 3 is that reinforcing cage is strengthened stirrup placement schematic diagram;
Fig. 3-the 1st, branches such as reinforcing cage reinforcement stirrup weld main muscle sectional drawing;
Fig. 4 installs the spiral stirrup schematic diagram on reinforcing cage;
Fig. 4-the 1st, the a-a sectional view of Fig. 4;
Fig. 5 is that first section reinforcing cage will making is installed to schematic diagram in the hand excavated pile wellhole;
Fig. 6 is the safety guard structural representation;
Fig. 6-the 1st, safety guard installation and removal method.
Among the figure: 1, well head retaining wall, 2, cross-arm, 3, reinforcing cage strengthens stirrup, 4, main muscle, 5, spiral stirrup, 6, safety guard, 7, rope.
The specific embodiment
Embodiment
Present embodiment is finished as shown in Figure 1 and the hand excavated pile wellbore depth h of process acceptance(check) is 30m, and well head retaining wall 1 is arranged.Design is that the good 2m of every colligation is once saving to whereabouts 2m, until colligation be in place.In order to guarantee construction safety, a safety guard 6 is laid at the place in the aperture.Concrete grammar is:
1) as shown in Figure 2, the steel pipe of two diameter 48mm of horizontal positioned is made cross-arm 2 on the hand excavated pile well head, and cross-arm 2 also can be with the reinforcing bar of diameter 〉=25mm and other wooden class, bamboo class club.Distance is about 1/3 of a well head diameter between two steel pipes.
2) as shown in Figure 3, keep flat the reinforcing cage of making and strengthen stirrup 3 on steel pipe, and carry out five equilibrium to strengthening stirrup shown in Fig. 3-1, isodisperse is identical with reinforcing cage master muscle quantity, and carries out mark;
3) first road is measured and marked to reinforcing cage master muscle and strengthen the stirrup position, with strengthen that 2 of basic symmetry on the stirrup intersect vertically with two main muscle and main muscle outside, strengthen stirrup inside, and firm welding;
4) as shown in Figure 3, main muscle 4 upwards two meters with identical method with main muscle and reinforcement stirrup firm welding; According to the method main muscle 4 is installed in by root and strengthens on the stirrup 3;
5) weld firmly according to designing requirement winding screw stirrup 5 and with spiral stirrup 5 and main muscle 4 contact points as shown in Figure 4, in main muscle outside;
6) with the pad place of two ropes, 7 respectively firm bolt knots in two symmetries of reinforcing cage both sides and main muscle and reinforcement stirrup;
7) manually hold rope, take out the steel pipe that is placed on well head, slowly loosen the rope made of hemp, first section reinforcing cage slowly fallen, when when the reinforcement stirrup of two meters eminences arrives well head, stopping to fall originally.
State during then by beginning is put two steel pipes at well head, according to foregoing next section of method fabrication and installation reinforcing cage, till reaching the projected depth requirement, sees Fig. 5.
About safety guard: job practices provided by the invention, maximum hidden danger is that well head falls, and is especially before reinforcing cage is not shaped, dangerous especially.For addressing this problem, the present invention has designed a cover safety guard 6, and safety guard 6 is made up of two semicircle grids that reinforcing bar is processed into.By field fabrication and installation.Why making two semicircles, mainly is to consider that installation and removal are convenient.Using method is to place it in above the cross-arm, now extracts safety guard 6 when extracting cross-arm out out.

Claims (5)

1, vertical making of a kind of manually digging hole pile cages and mounting method is characterized in that; The manual pore-forming and through making reinforcing cage on one side on the hand excavated pile aperture of acceptance(check), simultaneously reinforcing cage to be installed, concrete grammar is:
1) at two cross-arm that keep at a certain distance away of hand excavated pile well head horizontal positioned of acceptance(check);
2) keep flat the reinforcing cage of making on cross-arm and strengthen stirrup, and carry out five equilibrium to strengthening stirrup, isodisperse is identical with reinforcing cage master muscle quantity, carries out mark;
3) first road is measured and marked to reinforcing cage master muscle and strengthen the stirrup position, with strengthen that 2 of the basic symmetry of stirrup intersect vertically with two main muscle and main muscle outside, strengthen stirrup inside, and firm welding;
4) upwards two meters are firm with reinforcement stirrup spot welding with main muscle with identical method at main muscle; According to the method main muscle is installed in by root and strengthens on the stirrup;
5) weld firmly according to designing requirement winding screw stirrup and with spiral stirrup and main muscle contact point in main muscle outside;
6) with the pad place of two respectively firm bolt knots of soft rope in two symmetries of reinforcing cage both sides and main muscle and reinforcement stirrup;
7) manually hold soft rope, take out the cross-arm that is placed on well head, loosen soft rope gently, the first segment reinforcing cage is slowly fallen, when the reinforcement stirrup suitable for reading of first segment reinforcing cage drops down onto well head, stop to fall;
Put two cross-arms at well head then, according to the front set by step 1 to next joint reinforcing cage of the method fabrication and installation of step 7; So carry out, till reaching the designing requirement degree of depth.
2, vertical making of manually digging hole pile cages according to claim 1 and mounting method is characterized in that: also be placed with safety guard on be placed on the cross-arm of well head.
3, vertical making of manually digging hole pile cages according to claim 2 and mounting method is characterized in that; Safety guard is made up of two semicircle grids that reinforcing bar is processed into.
4, vertical making of manually digging hole pile cages according to claim 1 and mounting method is characterized in that: described cross-arm is the steel pipe of diameter 48mm or other rod class article that can be used as the steel pipe substitute.
5, vertical making of manually digging hole pile cages according to claim 1 and mounting method is characterized in that: the distance between two cross-arms is about 1/3 of a well head diameter.
CN2009100251704A 2009-02-20 2009-02-20 Artificial excavating pile reinforcing cage vertical colligation and installation method Active CN101514551B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100251704A CN101514551B (en) 2009-02-20 2009-02-20 Artificial excavating pile reinforcing cage vertical colligation and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100251704A CN101514551B (en) 2009-02-20 2009-02-20 Artificial excavating pile reinforcing cage vertical colligation and installation method

Publications (2)

Publication Number Publication Date
CN101514551A true CN101514551A (en) 2009-08-26
CN101514551B CN101514551B (en) 2011-01-12

Family

ID=41039159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100251704A Active CN101514551B (en) 2009-02-20 2009-02-20 Artificial excavating pile reinforcing cage vertical colligation and installation method

Country Status (1)

Country Link
CN (1) CN101514551B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561330A (en) * 2011-12-29 2012-07-11 中铁十六局集团北京轨道交通工程建设有限公司 Integrated construction method for artificial dug pile and steel pipe concrete column
CN103769781A (en) * 2013-12-31 2014-05-07 建科机械(天津)股份有限公司 Automatic grating steel reinforcement cage welding device
CN112012197A (en) * 2020-07-22 2020-12-01 重庆交通建设(集团)有限责任公司 Manual hole digging pile and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2700459Y (en) * 2004-05-21 2005-05-18 周春伯 Making apparatus for three-dimensional reinforcing steel bar building material

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102561330A (en) * 2011-12-29 2012-07-11 中铁十六局集团北京轨道交通工程建设有限公司 Integrated construction method for artificial dug pile and steel pipe concrete column
CN102561330B (en) * 2011-12-29 2014-06-18 中铁十六局集团北京轨道交通工程建设有限公司 Integrated construction method for artificial dug pile and steel pipe concrete column
CN103769781A (en) * 2013-12-31 2014-05-07 建科机械(天津)股份有限公司 Automatic grating steel reinforcement cage welding device
CN103769781B (en) * 2013-12-31 2015-11-18 建科机械(天津)股份有限公司 A kind of automatic welding device of grid steel reinforcement cage
CN112012197A (en) * 2020-07-22 2020-12-01 重庆交通建设(集团)有限责任公司 Manual hole digging pile and construction method thereof

Also Published As

Publication number Publication date
CN101514551B (en) 2011-01-12

Similar Documents

Publication Publication Date Title
CN114929969B (en) Modularized intelligent wall-protecting cast-in-place pile and construction process thereof
CN207017294U (en) Equipment anchor bolt buries the construction tool of reserving hole
CN104895092A (en) Method for using inner-support temporary latticed column as permanent structure column
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN205100225U (en) Assembled stake - board - anchor - roof beam combination formula batholith supporting construction
CN105274998A (en) Construction method of assembled pile-plate-anchor-beam combination type batholith support
CN105863042A (en) All-steel structure building and construction method thereof
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN106436576A (en) Constructing method of main tower of cable-stayed bridge through circumferential prestressing force
CN103741963A (en) Industrial plant foundation strengthening method
CN101514551B (en) Artificial excavating pile reinforcing cage vertical colligation and installation method
CN113417300B (en) Slope support system and construction method thereof
CN203821381U (en) Rectangular pre-stressed filling pile
CN209891202U (en) Anti-floating anchor rod
CN210031772U (en) Concrete bored concrete pile cuts a spacer
CN209339156U (en) The embedding rock foot pilework of anchor tube formula in a kind of Extra-Deep Foundation Pit
CN204401627U (en) To pull-type prestressed pipe pile pit supporting construction
CN109386009A (en) Equipment anchor bolt buries the construction tool and method of reserving hole
CN111962549B (en) Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile
CN210636402U (en) Fixing structure for water supply pipeline of outlet shaft well wall of deep-buried underground powerhouse of hydropower station
CN203924043U (en) A kind of bamboo concrete stake
CN204266111U (en) Deep foundation ditch steel trestle
CN208251135U (en) Sand gravel place photovoltaic bracket quick integral resistance to plucking miniature anchor rod composite pile
CN109778806B (en) Construction method for integrally sliding and lifting pier wall with connecting beam
CN208219667U (en) Foundation pit supporting construction based on campshed and inner support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU DAHAN CONSTRUCTION INDUSTRIAL GROUP CO., L

Free format text: FORMER OWNER: XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY

Effective date: 20111104

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 221116 XUZHOU, JIANGSU PROVINCE TO: 221600 XUZHOU, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111104

Address after: 221600 No. 6, Song Feng Road, Peixian City, Jiangsu, Xuzhou

Patentee after: Jiangsu Dahan Construction Industrial Group Co., Ltd.

Address before: 221116 Jiangsu province Xuzhou city Copper Mt. District School Road No. 26