CN101463607A - Method for applying even force on reinforced concrete foundation top board of steel tank - Google Patents

Method for applying even force on reinforced concrete foundation top board of steel tank Download PDF

Info

Publication number
CN101463607A
CN101463607A CNA200710203124XA CN200710203124A CN101463607A CN 101463607 A CN101463607 A CN 101463607A CN A200710203124X A CNA200710203124X A CN A200710203124XA CN 200710203124 A CN200710203124 A CN 200710203124A CN 101463607 A CN101463607 A CN 101463607A
Authority
CN
China
Prior art keywords
reinforced concrete
concrete foundation
top board
steel tank
mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200710203124XA
Other languages
Chinese (zh)
Other versions
CN101463607B (en
Inventor
李鸿全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN200710203124XA priority Critical patent/CN101463607B/en
Publication of CN101463607A publication Critical patent/CN101463607A/en
Application granted granted Critical
Publication of CN101463607B publication Critical patent/CN101463607B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a method for leading to a reinforced concrete foundation top slab of a steel tank to receive stress evenly. After the reinforced concrete foundation top slab undergoes casting, screeding and drying, a layer of asphaltic base oil is coated on the slab and then a layer of thin asphalt grout is coated, and finally asphalt mortar is paved, and then the coated top slab is compressed with a flat-plate vibrator to form a soft cushion. Compared with the prior art, the method has the advantages of naturally regulating and balancing, transforming the zigzag type partial concentration stress into the evenly distributed load and passing the load to the lower foundation, greatly increasing the degree of safety of the foundation structure, effectively preventing caustic corrosion and prolonging the service life of the equipment, etc.

Description

A kind of even stressed method of reinforced concrete foundation top board that makes the steel tank jar
Technical field:
The present invention relates to evenly stressed method of a kind of reinforced concrete foundation top board, especially for the even stressed method of the steel tank tank base top board in the alumina producing.
Background technology:
Alumina producing belongs to alkaline leaching technology, and numerous steel tank jars are arranged, and volume is big, and quality is heavy.For example, 14 meters of decomposer diameters, more than 30 meter of height, its steel tank base plate adopt the welding of overlapping batten, reach more than 6000 ton material gross weight is passed to the bottom by the base plate of this indention basis.And prior art is to adopt pea gravel concreten rigidity bed course, and it is difficult for levelling, is difficult for fixing levelness and makes reinforced concrete foundation top board discontinuity, and stress raisers have caused certain potential safety hazard.
Summary of the invention:
The technical problem to be solved in the present invention is:
Provide a kind of even stressed method of reinforced concrete foundation top board that makes the steel tank jar, to solve reinforced concrete foundation top board discontinuity in the prior art, the technical problem of stress raisers.
The present invention is by the following technical solutions:
After the reinforced concrete foundation top board waters and smashes floating drying, brush one bituminous primer thereon earlier, be coated with the rare clay of one deck pitch again, water the black top mortar at last, and use the plate vibrator compacting, form cushion course.
Asphalt mortar, bituminous mortar is made up of pitch, powder, asbestos, sand, and the weight ratio of each component is: pitch 10~18%, powder 10~18%, asbestos 0.7~1.3%, sand 63.6~71%.
The asphalt mortar, bituminous mortar thickness that waters the shop is 45~55mm.
Asphalt mortar, bituminous mortar divides secondary to water the shop, and every layer of empty shop 30~40mm is thick, and after the plate vibrator compacting, thickness 22.5~27.5mm adds glass grid cloth drawknot between two-layer.
The making of watering the asphalt mortar, bituminous mortar of shop is to mix giving heat to 135~145 ℃ powder and sand, adds gradually with the pitch that is about to endure to 200~230 ℃, constantly turn covered by pitch to whole powders and sand till, mix to temperature be 180~210 ℃.
Pitch adopts 10 #Building petroleum asphalt, 90 ℃ of softening points.
Powder and sand adopt alkaline-resisting building stones such as limestone, dolomite, and the solidity index of sand is not less than 93%-98%.
The present invention compared with prior art has following advantage:
1, the asphalt mortar, bituminous mortar that cushion course adopted is a flexible material, when top rough zigzag steel tank base plate is located on it, it can balance correction naturally, zigzag concentration of local stress is turned to evenly distributed load be passed to the basis, bottom, improved the degree of safety of foundation structure greatly, overcome and adopted pea gravel concreten rigidity bed course to be difficult for levelling in the past, be difficult for fixing the disadvantage of levelness and discontinuity.
What 2, adorn in the alumina steel tank jar is the high-concentration sodium hydroxide alkaline material, and concrete foundation is had bigger corrosiveness, and asphalt mortar, bituminous mortar is anti-alkaline material, can effectively prevent caustic corrosion, prolongs the application life of equipment.
The specific embodiment:
Embodiments of the invention:
After the reinforced concrete foundation top board watered and smashes floating drying, one bituminous primer of first thereon brushing was coated with the rare clay of one deck pitch again, treated to begin to water the black top mortar bed behind dried the consolidating.
Asphalt mortar, bituminous mortar is made up of pitch, powder, asbestos, sand, and the weight ratio of each component is: pitch 14.5%, powder 14.5%, asbestos 0.9%, sand 70.1%.
Pitch adopts 10 #Building petroleum asphalt, 90 ℃ of softening points.
Powder and sand adopt alkaline-resisting building stones such as limestone, dolomite, and the solidity index of sand is not less than 93%-98%.
The making of watering the asphalt mortar, bituminous mortar of shop is to mix giving heat to 140 ℃ powder and sand, adds gradually with the pitch that is about to endure to 210 ℃, constantly turn covered by pitch to whole powders and sand till, mix to temperature be 200 ℃.
Asphalt mortar, bituminous mortar divides secondary to water the shop, and every layer of empty shop 35mm is thick, after the plate vibrator compacting, forms cushion course.Its thickness in monolayer is 25mm, adds glass grid cloth drawknot between two-layer, and two layers of thickness is 50mm altogether.

Claims (7)

  1. [claim 1] a kind of even stressed method of reinforced concrete foundation top board that makes the steel tank jar, it is characterized in that: the reinforced concrete foundation top board water smash floating drying after, brush one bituminous primer on it earlier, be coated with the rare clay of one deck pitch again, water the black top mortar at last, and use the plate vibrator compacting, form cushion course.
  2. [claim 2] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 1, it is characterized in that: asphalt mortar, bituminous mortar is made up of pitch, powder, asbestos, sand, the weight ratio of each component is: pitch 10~15%, powder 10~15%, asbestos 0.7~1.3%, sand 63.6~70.6%.
  3. [claim 3] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 1 and 2, it is characterized in that: the asphalt mortar, bituminous mortar thickness that waters the shop is 45~55mm.
  4. [claim 4] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 3, it is characterized in that: asphalt mortar, bituminous mortar divides secondary to water the shop, every layer of empty shop 30~40mm is thick, after the plate vibrator compacting, thickness 22.5~27.5mm adds glass grid cloth drawknot between two-layer.
  5. [claim 5] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 1 and 2, it is characterized in that: the making of watering the asphalt mortar, bituminous mortar of shop is to mix giving the powder and the sand of heat to 135~145 ℃, add gradually with the pitch that is about to endure to 200~230 ℃, constantly turn covered by pitch to whole powders and sand till, mix to temperature be 180~210 ℃.
  6. [claim 6] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 1 and 2, it is characterized in that: pitch adopts 10# building petroleum asphalt, 90 ℃ of softening points.
  7. [claim 7] even stressed method of reinforced concrete foundation top board that makes the steel tank jar according to claim 1 and 2, it is characterized in that: powder and sand adopt alkaline-resisting building stones such as limestone, dolomite, and the solidity index of sand is not less than 93%-98%.
CN200710203124XA 2007-12-17 2007-12-17 Method for applying even force on reinforced concrete foundation top board of steel tank Expired - Fee Related CN101463607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200710203124XA CN101463607B (en) 2007-12-17 2007-12-17 Method for applying even force on reinforced concrete foundation top board of steel tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200710203124XA CN101463607B (en) 2007-12-17 2007-12-17 Method for applying even force on reinforced concrete foundation top board of steel tank

Publications (2)

Publication Number Publication Date
CN101463607A true CN101463607A (en) 2009-06-24
CN101463607B CN101463607B (en) 2010-10-13

Family

ID=40804381

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200710203124XA Expired - Fee Related CN101463607B (en) 2007-12-17 2007-12-17 Method for applying even force on reinforced concrete foundation top board of steel tank

Country Status (1)

Country Link
CN (1) CN101463607B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845910A (en) * 2010-05-21 2010-09-29 重庆大学 Bitumen sand cushion energy-dissipating and shock-absorbing building

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1309921C (en) * 2005-08-23 2007-04-11 贵阳铝镁设计研究院 Insulated floor laying method in aluminium electrolysis shop and its structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101845910A (en) * 2010-05-21 2010-09-29 重庆大学 Bitumen sand cushion energy-dissipating and shock-absorbing building

Also Published As

Publication number Publication date
CN101463607B (en) 2010-10-13

Similar Documents

Publication Publication Date Title
CN1948622B (en) Polymer modified cement hole concrete road surface structure and construction method
CN103726444B (en) A kind of multiple field super thick lightweight bridge deck pavement structure and paving method
CN101619557B (en) Pavement base course material prepared from brick mixed building rubbish regenerated aggregate and preparation method thereof
CN102392413B (en) Pavement structure of combined steel bridge deck and pavement method thereof
CN103741599B (en) A kind of lightweight cold mixing resin steel bridge deck pavement material
CN112726321B (en) Full-thickness ultrathin long-life pavement structure and construction method thereof
CN1920176B (en) Deck installation structure of big-span steel bridge
CN111074715A (en) Anti-crack roadbed and pavement structure and construction method thereof
CN110029576A (en) A kind of no steel seamless bridge expansion gap device and its construction technology
CN107217597A (en) A kind of prestressed concrete bridge face is seamlessly connected the construction method of plate
CN104594151A (en) Water drainage anti-cracking type cold-recycling pavement structure
CN102505641A (en) Repair reinforcing structure of steel bridge deck and repair reinforcing method of repair reinforcing structure
CN103306439B (en) Roof construction layer pouring technology implanted by a kind of high impervious cracking resistance topping
CN101463607B (en) Method for applying even force on reinforced concrete foundation top board of steel tank
CN202492858U (en) Concrete wear-resistant cover plate
CN201495466U (en) Roadbed constructed by utilizing recycled aggregate from brick and concrete construction waste
WO2020258631A1 (en) Cement concrete bridge deck double-layer ac asphalt mixture paving structure and paving method
CN110056117B (en) Corrugated surface hollow FRP profile sea sand concrete slab structure
CN209703223U (en) Road structure based on construction refuse regenerated cement stabilizing inorganic mixture
CN204589746U (en) A kind of composite road surface structure being applicable to saturated dredger soft soil area Heavy Traffic condition
CN209082285U (en) A kind of pavement structure having fiber mixture
CN102561143A (en) Pavement structure of concrete highway in alpine region
CN207878272U (en) Drainage asphalt pavement structure suitable for paving steel bridge deck
CN202718021U (en) Heat insulation assembly type prestressed concrete pavement
CN210916849U (en) Noctilucent brick with interlocking function

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101013

Termination date: 20141217

EXPY Termination of patent right or utility model