CN101450809B - Arrangement mode of material storage yard - Google Patents
Arrangement mode of material storage yard Download PDFInfo
- Publication number
- CN101450809B CN101450809B CN2007102027812A CN200710202781A CN101450809B CN 101450809 B CN101450809 B CN 101450809B CN 2007102027812 A CN2007102027812 A CN 2007102027812A CN 200710202781 A CN200710202781 A CN 200710202781A CN 101450809 B CN101450809 B CN 101450809B
- Authority
- CN
- China
- Prior art keywords
- ore
- transfer point
- yard
- material storage
- storage yard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention discloses an arrangement mode for a raw material yard. An ore unloading system (1) and an ore crushing system (2) are connected and arranged at one side of an open ore yard (4), and an ore homogenization silo (5) is arranged at the other side of the open ore yard (4); the ore crushing system (2) is connected with a transfer station (31), the open ore yard (4) is connected with a transfer station (32), the ore homogenization silo (5) is connected with a transfer station (33), and the three transfer stations are connected with each other. The arrangement mode for the raw material yard is more reasonable, can save factory sites, reduce the paving area of roads and the laying lengths of pipelines, and reduce the capital construction investment of the engineering and the production operation cost.
Description
Technical field
The present invention relates to a kind of material storage yard, particularly a kind of decoration form of material storage yard.
Background technology
In ore processing industry (as the production of aluminum oxide), ore is transported to factory by transportation equipment from the mine, generally can be deposited in the material storage yard, and blocky ore carried out fragmentation, reach the granularity that the time in grinding production facility is allowed, the ore that satisfies production requirement also will be deposited in the homogenizing warehouse and mix homogenizing, the ore deposit grade that contains of the ore of certain hour section is fluctuateed in certain allowed band, thereby guarantee normally carrying out of production.In common material storage yard is arranged, ore unload ore deposit system 1, ore reduction system 2, ore open storage 4 and ore homogenizing storehouse 5 by dispersed placement at plant area's different positions, be connected in turn by belt conveyor and transfer point again, this method for arranging makes plant area's land area strengthen, road is paved the corresponding increase with pipe laying length of area, factory's initial cost and production and operation cost rise.
Summary of the invention
Technical problem to be solved by this invention is, the decoration form in a kind of more reasonable raw material stockyard is provided, can save factory site, reduce road and pave area and pipe laying length, reduce engineering initial cost and production and operation cost, to overcome deficiency of the prior art.
Technical scheme of the present invention: material storage yard comprises that ore unloads ore deposit system 1, ore reduction system 2, ore open storage 4 and ore homogenizing storehouse 5, ore unloads ore deposit system 1 and ore reduction system 2 and couples together a side that is arranged on ore open storage 4, and ore homogenizing storehouse 5 is arranged on the opposite side of ore open storage 4; Ore reduction system 2 is connected with first transfer point 31, and ore open storage 4 is connected with second transfer point 32, and ore homogenizing storehouse 5 is connected with the 3rd transfer point 33, the first transfer points 31, second transfer point 32 and the 3rd transfer point 33 and interconnects.
The decoration form of above-mentioned material storage yard, ore unload ore deposit system 1, ore open storage 4 and ore homogenizing storehouse 5 layout that is parallel to each other.
The decoration form of aforesaid material storage yard, first transfer point 31, second transfer point 32 and the 3rd transfer point 33 are carried by belt conveyor.
Compared with prior art, compact in design of the present invention makes land area, road pave area, pipe network laying length and will save more than 10% than layout separately, can significantly reduce the engineering initial cost.The present invention in use, ore is unloaded 1 unloading of ore deposit system at ore, be transferred to ore reduction system 2 by belt again and carry out fragmentation, reach and directly enter ore homogenizing storehouse 5 by first transfer point 31, the 3rd transfer point 33 after the granularity that the time in grinding production facility allows and stack or homogenizing, need not be via 4 transfers of ore open storage as conventional material storage yard, thus production and operation cost reduced.When the storage capacity of ore homogenizing storehouse 5 has been expired, the ore after the fragmentation afterwards will be transported to ore open storage 4 by second transfer point 32 and stack; When production needs, by second transfer point 32, the 3rd transfer point 33 ore is transported to again and carries out homogenizing in the ore homogenizing storehouse 5.
Description of drawings
Accompanying drawing 1 is a layout synoptic diagram of the present invention.
Embodiment
Embodiments of the invention: material storage yard comprises that ore unloads ore deposit system 1, ore reduction system 2, ore open storage 4 and ore homogenizing storehouse 5.Ore is unloaded ore deposit system 1, ore open storage 4 and ore homogenizing storehouse 5 to be parallel to each other and to be arranged in the material storage yard, ore is unloaded ore deposit system 1 and ore reduction system 2 to be coupled together by belt conveyor, the ore reduction system 2 and first transfer point 31 are coupled together by belt conveyor, the ore open storage 4 and second transfer point 32 are coupled together by belt conveyor, ore homogenizing storehouse 5 and the 3rd transfer point 33 are coupled together by belt conveyor, again first transfer point 31, second transfer point 32 and the 3rd transfer point 33 are connected with each other.
Claims (3)
1. the decoration form of a material storage yard is characterized in that: ore unloads ore deposit system (1) and ore reduction system (2) and couples together a side that is arranged on ore open storage (4), and ore homogenizing storehouse (5) is arranged on the opposite side of ore open storage (4); Ore reduction system (2) is connected with first transfer point (31), ore open storage (4) is connected with second transfer point (32), ore homogenizing storehouse (5) is connected with the 3rd transfer point (33), and first transfer point (31), second transfer point (32) and the 3rd transfer point (33) interconnect.
2. the decoration form of material storage yard according to claim 1 is characterized in that: ore unloads ore deposit system (1), ore open storage (4) and ore homogenizing storehouse (5) layout that is parallel to each other.
3. the decoration form of material storage yard according to claim 1, it is characterized in that: first transfer point (31), second transfer point (32) and the 3rd transfer point (33) link together by belt conveyor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007102027812A CN101450809B (en) | 2007-11-29 | 2007-11-29 | Arrangement mode of material storage yard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007102027812A CN101450809B (en) | 2007-11-29 | 2007-11-29 | Arrangement mode of material storage yard |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101450809A CN101450809A (en) | 2009-06-10 |
CN101450809B true CN101450809B (en) | 2011-06-29 |
Family
ID=40733318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007102027812A Expired - Fee Related CN101450809B (en) | 2007-11-29 | 2007-11-29 | Arrangement mode of material storage yard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101450809B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102556683A (en) * | 2010-12-26 | 2012-07-11 | 贵阳铝镁设计研究院有限公司 | Comprehensive arrangement method of bauxite raw storage pile |
-
2007
- 2007-11-29 CN CN2007102027812A patent/CN101450809B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101450809A (en) | 2009-06-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201058302Y (en) | Vehicle mounted mobile crusher | |
CN103625936B (en) | A kind of heap material extracting operation line arrangement structure of bulk cargo stockyard and piling and taking technique | |
CN104493967A (en) | System for preparing ceramsite from sludge | |
CN101450809B (en) | Arrangement mode of material storage yard | |
Mohammadi et al. | Review of in-pit crushing and conveying (IPCC) system and its case study in Copper Industry | |
CN106429487B (en) | Optimal path conveying system and raw material storage and mixing parallel production process thereof | |
CN201419932Y (en) | Storage bin penetration-type discharge device | |
CN211762592U (en) | Concrete mixing plant | |
CN104608248A (en) | Method for recycling fine aggregate smaller than 5 mm in concrete production | |
CN102556683A (en) | Comprehensive arrangement method of bauxite raw storage pile | |
CN108820940B (en) | Building type intelligent environment-friendly crushing, screening and loading system | |
CN102826391A (en) | Material piling system for uniformly mixed material piles in iron and steel plant | |
CN201603597U (en) | Moveable crushing station | |
CN103612332B (en) | Mixing plant | |
CN102518943A (en) | Pipeline transportation process for raw ore pulp | |
CN206395489U (en) | Optimal path conveying system | |
CN101757970A (en) | Mobile crushing station | |
CN204728283U (en) | Mix sand gravel truck | |
CN210084037U (en) | Hopper arrangement structure with discharging and feeding functions | |
CN205132568U (en) | Bulk material yard | |
CN111878160A (en) | System and method for treating waste rock in mine | |
CN202985790U (en) | Material adding system and building material preparation equipment comprising same | |
CN104947629A (en) | Mixing gravel stone truck | |
CN221140320U (en) | Raw coal washing arrangement structure of coal blending system | |
JP6720583B2 (en) | Method and apparatus for manufacturing building material using tunnel excavation shear |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110629 Termination date: 20151129 |
|
CF01 | Termination of patent right due to non-payment of annual fee |