CN101418571A - 宽大基坑逆作法施工的中板施工方法 - Google Patents

宽大基坑逆作法施工的中板施工方法 Download PDF

Info

Publication number
CN101418571A
CN101418571A CNA2008102012120A CN200810201212A CN101418571A CN 101418571 A CN101418571 A CN 101418571A CN A2008102012120 A CNA2008102012120 A CN A2008102012120A CN 200810201212 A CN200810201212 A CN 200810201212A CN 101418571 A CN101418571 A CN 101418571A
Authority
CN
China
Prior art keywords
plate
construction
end bay
enclosing structure
space enclosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102012120A
Other languages
English (en)
Other versions
CN101418571B (zh
Inventor
陈立生
李波
王洪新
梁怀柱
朱云兴
曹恒钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Municipal Engineering Co Ltd filed Critical Shanghai No2 Municipal Engineering Co Ltd
Priority to CN 200810201212 priority Critical patent/CN101418571B/zh
Publication of CN101418571A publication Critical patent/CN101418571A/zh
Application granted granted Critical
Publication of CN101418571B publication Critical patent/CN101418571B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及地下施工类,具体涉及一种宽大基坑逆作法施工的中板施工方法,该方法先开挖中部的土方,靠近围护结构处预留土台控制围护结构变形。浇筑混凝土板时,先施工中间部分的钢筋混凝土板,等中部钢筋混凝土板达到强度后,再分小块开挖两侧土台,然后,分小块、对称地施工两侧靠近围护结构的混凝土板,这种开挖、浇筑顺序合理,有利于控制基坑变形,节省工期,方便施工。

Description

宽大基坑逆作法施工的中板施工方法
技术领域
本发明涉及地下工程施工类,具体涉及一种宽大基坑逆作法施工的中板施工方法。
背景技术
基坑工程采用逆作法施工可以使上部结构施工时间提前,可以节省总工期。由于各层板的支撑作用优于钢支撑或钢筋混凝土支撑体系,所以,逆作法施工对基坑的稳定更有利。因此,逆作法施工被广泛应用于地下工程的施工中。
以往逆作法施工中板时模板多单独采用土模或支架方法。土模施工时,为保证板的浇筑质量,仍然要用木模板。由于不便于拆除,模板损耗大,而且开挖下一层时垫层容易附着于中板的下面,造成极大的安全隐患;采用支架时多采用较短的木支架,这种支架也不利于拆除,而且施工时损耗较大。另外,也有工程采用长度略长的钢管支架的,这种支架方便模板的拆除,对施工进度有利,而且能节约成本,但容易造成基坑超挖,对控制围护结构变形不利。
另外,目前中板施工时中板往往根据施工方便进行分块,分块大小和顺序较为随意,有时对控制基坑变形非常不利。所以,目前宽大基坑的挖土和分块还没有形成统一的科学的顺序,各工程施工时,是不利于基坑工程安全的。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种宽大基坑逆作法施工的中板施工方法,该方法先开挖中部的土方,靠近围护结构处预留土台控制围护结构变形。浇筑混凝土板时,先施工中间部分的钢筋混凝土板,等中部钢筋混凝土板达到强度后,再分小块开挖两侧土台。然后,分小块、对称地施工两侧靠近围护结构的混凝土板。这种开挖、浇筑顺序合理,有利于控制基坑变形,节省工期,方便施工。
本发明目的实现由以下技术方案完成:
一种宽大基坑逆作法施工的中板施工方法,其特征在于该方法采用如下的步骤:首先开挖基坑中间部分土体,在围护结构处预留边跨部分土台,且中间部分土体标高适当超挖,超挖的高度与钢管长度匹配,采用长度不大于2.0m的钢管支架方法支模,然后浇筑中板中间部分的钢筋混凝土板;待中间部分中板浇筑施工完成后,再按边跨中板浇筑顺序分块挖除边跨部分的土台,开挖标高控制在中板板底位置,采用土模法施工靠近围护结构处中板,施工过程中,边开挖土台,边及时完成相应位置处中板的浇筑。
所述钢管的长度的最佳值为1.8~2.0m。
在围护结构处预留边跨部分土台的宽度为8~10m。
在完成边跨部分施工时,先施工边跨跨中部分中板,然后由跨中向两侧顺序施工靠近围护结构处中板,直至整个中板完成。
边跨部分中板分块沿围护结构方向的宽度是10~20m。
边跨中板的施工时,对称基坑中部的两侧同时开挖土台,并同时浇筑相应位置处的中板。
本发明的优点是,加快宽大基坑中间部分的施工进度,节约施工成本。由于基坑中间部分分块较大,开挖、绑扎钢筋及浇筑混凝土速度较快;另外,由于高1.8~2.0m的施工空间使拆除支架非常方便,也加快了施工速度。由于方便拆除基坑中间的大部分模板,模板损耗小,节约了施工成本。因为基坑中间的大部分土方开挖、中板浇筑施工不影响围护结构,有利于控制围护结构变形。由于是在中间部分中板施工结束后才开挖靠近围护结构处土方,并施工钢筋混凝土结构;并且,施工靠近围护结构处混凝土板时,采用土模法施工。这些做法有效避免了基坑围护结构处的土体超挖,减小了围护结构的无支撑暴露时间,利用时空效应原理有效地控制了逆作法施工时围护结构的变形。
附图说明
图1为本发明土方开挖平面布置示意图;
图2为本发明土方开挖立面布置示意图;
图3为本发明围护结构处预留土台,并采用支架法施工基坑中间部分中板的示意图;
图4为本发明挖除围护结构处土台形成土模示意图;
图5为本发明采用土模分块、对称地施工边跨处中板示意图;
图6为本发明边跨处中板土方开挖及板块浇筑的顺序示意图。
具体实施方式
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1~6所示,其中标号分别表示:位于基坑中心部分的土体1、位于基坑边跨部分的土体2、位于中间部分的中板I、位于边跨部分的中板II,板II-1~板II-5分别表示边跨中板的施工顺序。
本实施例先开挖基坑中间部分的土体1,靠近围护结构处即边跨部分预留宽8~10m土台2,中间部分土体标高根据支架长度适当超挖,超挖的高度与钢管长度匹配,之后浇筑基坑中间部分垫层,采用长1.8~2.0m钢管支架支模,铺设木模板,施工中间部分的中板I,最后浇筑完成基坑中间部分中板I。
等中间部分中板I施工完成后,再顺序开挖边跨部分的土体2,并浇筑相应的中板。边跨开挖标高控制在板底,采用土模法施工靠近围护结构处中板。施工顺序是:开挖边跨跨中部分土台→浇筑垫层→铺设木模板→浇筑边跨跨中间部分中板→从跨中向两侧顺序挖除土台→浇筑垫层→铺设木模板→浇筑边跨跨中两侧中板→直至整个中板浇筑完成。
边跨开挖时,沿围护结构方向分成宽度为10~20m左右的小块,边开挖边浇筑中板,以形成流水加快施工速度,并减小基坑无支撑暴露时间。开挖土体并浇筑边跨处中板时,先施工跨中部分,使大尺寸基坑变成小尺寸基坑,以控制围护结构变形。施工时,有条件的尽量对称于基坑中间部分施工两侧对应的中板,以形成有效地对围护结构的支撑,减少基坑变形。如施工边跨处中板时,先施工位于跨中处的II-1板,然后向两侧以II-2、II-3、II-4、……顺序边开挖土台,边施工中板,并尽量同时施工图6中所示编号相同的板块。

Claims (6)

1.一种宽大基坑逆作法施工的中板施工方法,其特征在于该方法采用如下的步骤:首先开挖基坑中间部分土体,在围护结构处预留边跨部分土台,且中间部分土体标高适当超挖,超挖的高度与钢管长度匹配,采用长度不大于2.0m的钢管支架方法支模,然后浇筑中板中间部分的钢筋混凝土板;待中间部分中板浇筑施工完成后,再按边跨中板浇筑顺序分块挖除边跨部分的土台,开挖标高控制在中板板底位置,采用土模法施工靠近围护结构处中板,施工过程中,边开挖土台,边及时完成相应位置处中板的浇筑。
2.根据权利要求1所述的一种宽大基坑逆作法施工的中板施工方法,其特征在于所述钢管的长度的最佳值为1.8~2.0m。
3.根据权利要求1所述的一种宽大基坑逆作法施工的中板施工方法,其特征在于在围护结构处预留边跨部分土台的宽度为8~10m。
4.根据权利要求1所述的一种宽大基坑逆作法施工的中板施工方法,其特征在于在完成边跨部分施工时,先施工边跨跨中部分中板,然后由跨中向两侧顺序施工靠近围护结构处中板,直至整个中板完成。
5.根据权利要求4所述的一种宽大基坑逆作法施工的中板施工方法,其特征在于边跨部分中板分块沿围护结构方向的宽度是10~20m。
6.根据权利要求4所述的一种宽大基坑逆作法施工的中板施工方法,其特征在于边跨中板的施工时,对称基坑中部的两侧同时开挖土台,并同时浇筑相应位置处的中板。
CN 200810201212 2008-10-15 2008-10-15 宽大基坑逆作法施工的中板施工方法 Active CN101418571B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200810201212 CN101418571B (zh) 2008-10-15 2008-10-15 宽大基坑逆作法施工的中板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810201212 CN101418571B (zh) 2008-10-15 2008-10-15 宽大基坑逆作法施工的中板施工方法

Publications (2)

Publication Number Publication Date
CN101418571A true CN101418571A (zh) 2009-04-29
CN101418571B CN101418571B (zh) 2010-09-01

Family

ID=40629558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810201212 Active CN101418571B (zh) 2008-10-15 2008-10-15 宽大基坑逆作法施工的中板施工方法

Country Status (1)

Country Link
CN (1) CN101418571B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956395A (zh) * 2010-10-29 2011-01-26 浙江宝业建设集团有限公司 减少基坑周边变形的底板及其施工方法
CN101979779A (zh) * 2010-10-29 2011-02-23 浙江宝业建设集团有限公司 对临近偏斜建筑控倾防沉的基坑施工方法
CN102094656A (zh) * 2010-12-01 2011-06-15 中国水电顾问集团华东勘测设计研究院 一种避免钢衬开孔的灌浆方法
CN103017620A (zh) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 一种岩石基坑控制***施工方法
CN104762974A (zh) * 2015-03-18 2015-07-08 中天建设集团有限公司 一种旨在提高逆作基坑土方工程明挖出土方量的挖土方法
CN105569048A (zh) * 2014-10-20 2016-05-11 中建四局第一建筑工程有限公司 一种加快基坑施工进度的方法
CN106223612A (zh) * 2016-07-21 2016-12-14 刘洋 土模法的施工方法
CN109235493A (zh) * 2018-09-04 2019-01-18 中建八局第三建设有限公司 一种逆作法中地下室梁板超挖与短支模施工方法
CN113756314A (zh) * 2021-08-03 2021-12-07 中铁(上海)投资集团有限公司 一种适用于长三角地区软土地基深大地铁基坑开挖的施工方法
CN115094905A (zh) * 2022-08-01 2022-09-23 上海建工一建集团有限公司 一种大型基坑地下工程中心向四周预制装配结构施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09143999A (ja) * 1995-11-21 1997-06-03 Kajima Corp 切ばり材および切ばり工法
JPH11131475A (ja) * 1997-10-30 1999-05-18 Taisei Corp 山留支保工の施工方法
JP2003293370A (ja) * 2002-03-29 2003-10-15 Toda Constr Co Ltd 仮設構台とその構築工法
CN1514072A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 控制基坑变形化整为零的方法
CN1948633A (zh) * 2005-10-14 2007-04-18 上海市第七建筑有限公司 盆式开挖逆作法施工方法
CN1982546A (zh) * 2005-12-12 2007-06-20 上海市第七建筑有限公司 中心岛顺作局部裙边逆作施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09143999A (ja) * 1995-11-21 1997-06-03 Kajima Corp 切ばり材および切ばり工法
JPH11131475A (ja) * 1997-10-30 1999-05-18 Taisei Corp 山留支保工の施工方法
JP2003293370A (ja) * 2002-03-29 2003-10-15 Toda Constr Co Ltd 仮設構台とその構築工法
CN1514072A (zh) * 2003-07-24 2004-07-21 上海隧道工程股份有限公司 控制基坑变形化整为零的方法
CN1948633A (zh) * 2005-10-14 2007-04-18 上海市第七建筑有限公司 盆式开挖逆作法施工方法
CN1982546A (zh) * 2005-12-12 2007-06-20 上海市第七建筑有限公司 中心岛顺作局部裙边逆作施工方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王美华,季方: "超大面积深基坑逆作法施工技术的探讨", 地下空间 *
贾坚: "逆作开挖深基坑控制卸载变形的方法与实践", 岩土工程学报 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956395A (zh) * 2010-10-29 2011-01-26 浙江宝业建设集团有限公司 减少基坑周边变形的底板及其施工方法
CN101979779A (zh) * 2010-10-29 2011-02-23 浙江宝业建设集团有限公司 对临近偏斜建筑控倾防沉的基坑施工方法
CN102094656A (zh) * 2010-12-01 2011-06-15 中国水电顾问集团华东勘测设计研究院 一种避免钢衬开孔的灌浆方法
CN102094656B (zh) * 2010-12-01 2012-10-31 中国水电顾问集团华东勘测设计研究院 一种避免钢衬开孔的灌浆方法
CN103017620A (zh) * 2012-11-28 2013-04-03 泰兴市第一建筑安装工程有限公司 一种岩石基坑控制***施工方法
CN105569048A (zh) * 2014-10-20 2016-05-11 中建四局第一建筑工程有限公司 一种加快基坑施工进度的方法
CN104762974A (zh) * 2015-03-18 2015-07-08 中天建设集团有限公司 一种旨在提高逆作基坑土方工程明挖出土方量的挖土方法
CN106223612A (zh) * 2016-07-21 2016-12-14 刘洋 土模法的施工方法
CN109235493A (zh) * 2018-09-04 2019-01-18 中建八局第三建设有限公司 一种逆作法中地下室梁板超挖与短支模施工方法
CN113756314A (zh) * 2021-08-03 2021-12-07 中铁(上海)投资集团有限公司 一种适用于长三角地区软土地基深大地铁基坑开挖的施工方法
CN115094905A (zh) * 2022-08-01 2022-09-23 上海建工一建集团有限公司 一种大型基坑地下工程中心向四周预制装配结构施工方法

Also Published As

Publication number Publication date
CN101418571B (zh) 2010-09-01

Similar Documents

Publication Publication Date Title
CN101418571B (zh) 宽大基坑逆作法施工的中板施工方法
CN101761092B (zh) 大跨度深基坑可移动整体大模板侧墙施工方法
CN107313431B (zh) 临近不等高基坑同步施工方法
CN104878766B (zh) 一种长边坡护坡混凝土连续快速浇筑拉模体系及施工方法
CN1948633A (zh) 盆式开挖逆作法施工方法
CN105256812B (zh) 基坑预制装配式混凝土支撑结构及其施工方法
CN105178244A (zh) 一种现浇防浪墙快速立模施工方法
CN102653945A (zh) 基础托换结构及其施工方法
CN103603359A (zh) 一种深基坑斜撑支护结构拆除方法
CN102031785A (zh) 永久结构板带代替临时围檩的基坑支护技术
CN103290849A (zh) 一种半逆作法坑中坑支护结构及其施工方法
CN105350559A (zh) 一种适用于大型厂房的金刚砂结构地面的施工方法
CN109208632A (zh) 一种预制空心模块积木式混凝土挡土墙
CN111794254A (zh) 一种铁路边坡预制拼装后浇式骨架护坡结构及其施工方法
CN103132465B (zh) 一种紧贴桩基承台的地下箱涵建造方法
CN204690763U (zh) 长边坡护坡混凝土连续快速浇筑拉模体系
CN106988319A (zh) 一种大型深基坑主体结构侧墙的快速施工方法
CN107191006A (zh) 一种导流槽耐火混凝土层拆除修复方法
CN102936953B (zh) “大”字型劲钢结构模板施工方法
CN102433894B (zh) 盖挖逆作法车站侧墙的施工方法
CN210636443U (zh) 隧道上方基坑加固结构
CN209066480U (zh) 一种预制空心模块积木式混凝土挡土墙
CN203066083U (zh) 相邻的两个基坑的支护结构
CN103615252B (zh) 地铁盾构井单层主体结构的施工工艺
CN101644055A (zh) 水工建筑物陡倾建基面固结灌浆方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING

Free format text: FORMER NAME: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Patentee after: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

Address before: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Patentee before: Shanghai No.2 Municipal Engineering Co., Ltd.