CN101418561A - Installation process of water guide mechanism of super-huge bulb tubular water turbine generator set - Google Patents

Installation process of water guide mechanism of super-huge bulb tubular water turbine generator set Download PDF

Info

Publication number
CN101418561A
CN101418561A CNA2008102430901A CN200810243090A CN101418561A CN 101418561 A CN101418561 A CN 101418561A CN A2008102430901 A CNA2008102430901 A CN A2008102430901A CN 200810243090 A CN200810243090 A CN 200810243090A CN 101418561 A CN101418561 A CN 101418561A
Authority
CN
China
Prior art keywords
water distributor
distributor
installation
stator
guide vane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008102430901A
Other languages
Chinese (zh)
Other versions
CN101418561B (en
Inventor
赵显忠
程云山
潘勇
吴文桑
韩强
顾建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources And Hydropower Seventh Engineering Bureau Co ltd Electromechanical Installation Branch
Hohai University HHU
Original Assignee
China Water Resources And Hydropower Seventh Engineering Bureau Co ltd Electromechanical Installation Branch
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources And Hydropower Seventh Engineering Bureau Co ltd Electromechanical Installation Branch, Hohai University HHU filed Critical China Water Resources And Hydropower Seventh Engineering Bureau Co ltd Electromechanical Installation Branch
Priority to CN2008102430901A priority Critical patent/CN101418561B/en
Publication of CN101418561A publication Critical patent/CN101418561A/en
Application granted granted Critical
Publication of CN101418561B publication Critical patent/CN101418561B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

The installation process of the water distributor of the oversize bulb tubular turbine generator set comprises the following steps: preassembling a water distributor; when in formal installation, the guide vane of the water distributor is arranged at a full-closed position; the guide vane shaft is pulled to the outer ring direction of the water distributor along the axial direction of the guide vane shaft, so that the outer end of the guide vane props against the inner wall of the outer ring of the water distributor; a wedge plate is inserted between the inner end surface of the guide vane and the gap of the inner ring wall of the water distributor and is welded and fixed; welding adjacent guide vanes by using a butt strap; the water distributor is integrally hung in the installation position and is fixedly connected with the tubular seat; and after the water distributor is installed in place, the access board is cut off, and the wedge board is detached. The installation process skillfully uses the guide vanes of the water distributor as the supporting pieces to fix the inner ring and the outer ring, so that the inner ring and the outer ring are not deformed, and the installation precision is ensured; in addition, the installation process firstly assembles the water distributor and then hoists the whole water distributor in place, so that the two steps of assembling and field installation of the water distributor are separated, the time consumption of field installation is reduced, and the installation efficiency is greatly improved.

Description

Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism
Technical field
The present invention relates to a kind of mounting process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism, belong to the scaled bulb tubular hydraulic generator technical group field.
Background technology
From world's hydroelectric development trend as can be seen, the importance of low-head hydroelectric plant construction grows stronger day by day, the size of generating set is also developing to large-scale, super-huge direction, and China water power market also from high water head to low-head development, thereby make that the scaled bulb tubular hydraulic generator group has been subjected to academia and industrial circle is paid close attention to widely.
The scaled bulb tubular hydraulic generator group mainly comprises the hydraulic turbine and the generator of a shared main shaft, and generator, parts of bearings are arranged in the light bulb head, and whole unit places runner according to tubular seat and supplemental support level; The hydraulic turbine is formed by imbedding mechanism, distributor, rotation and auxiliary deployment mechanism, and the distributor composition includes interior ring, outer shroud, is installed on the stator between the inner and outer ring.
It is the Bulb Turbine Units of the present single-machine capacity maximum of China that the Guangxi bridge consolidates the power station, belong to the super large type light bulb through-flow type hydro-turbo generating set, the size of its distributor is huge, the inner and outer rings diameter reaches 5276mm, 10790mm respectively, the quality of whole distributor is huge, the inner and outer rings of distributor very easily produces plastic deformation in hoisting process, has reduced installation accuracy, even causes installing failure.
Summary of the invention
Technical problem to be solved by this invention is, overcomes existing distributor mounting method and very easily produces the deficiency of plastic deformation, provides a kind of installation accuracy high installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism.
The technical solution adopted for the present invention to solve the technical problems is as follows: installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism, and its step is as follows:
1), the prepackage distributor, interior ring, outer shroud, stator are assembled into one, and debug;
2), when formally installing, the stator of distributor is placed the complete shut-down position;
3), guide vane teunnion is axially drawn to the outer gate barrel direction along it, make the stator outer end withstand the outer gate barrel inwall;
4), between the gap of stator inner face and distributor internal ring wall, insert wedge, and its welding is fixing;
5), with the adjacent stator of attachment strap welding;
6), distributor integral body is hung in the installation site, the upstream side inner and outer rings of distributor is connected with the inner and outer rings of tubular seat respectively;
7), distributor is in place after, prescind attachment strap, unload wedge.
Beneficial effect of the present invention is as follows: this installation technology dexterously with the stator of distributor as support member, in order to fixing inner and outer ring, make inner and outer ring that deformation not take place, guaranteed installation accuracy; And this installation technology is the assembling distributor earlier, and then whole distributor lifting is put in place, makes the assembling of distributor with the scene two steps are installed and separates, and has reduced field erected consuming timely, has improved installation effectiveness greatly; This installation reliability of technology is high and be easy to realize, good solution the installation question of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism.
Description of drawings
Fig. 1 is a super large type light bulb through-flow type hydro-turbo generator set water guide mechanism master TV structure schematic diagram.
Fig. 2 is a super large type light bulb through-flow type hydro-turbo generator set water guide mechanism side-looking structural representation.
The specific embodiment
With reference to the accompanying drawings and in conjunction with example the present invention is described in further detail.But the invention is not restricted to given example.
As Fig. 1, Fig. 2 is the super large type light bulb through-flow type hydro-turbo generator set water guide mechanism structural representation, and among the figure, 1 is that interior ring, 2 is that outer shroud, 3 is that stator, 4 is that wedge, 5 is attachment strap.
Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism of the present invention, its step is as follows:
1), the prepackage distributor, interior ring 1, outer shroud 2, stator 3 are assembled into one, and debug;
2), when formally installing, the stator 3 of distributor is placed the complete shut-down position, stator places the complete shut-down position among Fig. 2, and the stator among Fig. 1 is in fully open position;
3), guide vane teunnion is axially drawn to the outer gate barrel direction along it, make the stator outer end withstand the outer gate barrel inwall, like this, in the present embodiment, draw guide vane teunnion outward by special tool between having stayed and having encircled in stator and the distributor in the gap of stator end, the method of specific implementation has a lot, such as drawing guide vane teunnion outward with suspender, this is common mechanical technique, is not described in detail among the embodiment;
4), between the gap of stator 3 inner faces and distributor internal ring wall, insert wedge 4, and with its welding fixing (wedge 4 and stator 3 welding, wedge 4 and the welding of distributor internal ring wall), guarantee that stator is in the complete shut-down position, and can not become flexible, guaranteed the structural strength of distributor integral body;
5), with the adjacent stator of attachment strap 5 welding, further increase the overall construction intensity of distributor;
6), distributor integral body is hung in the installation site, the upstream side inner and outer rings of distributor is connected with the inner and outer rings of tubular seat respectively;
7), distributor is in place after, prescind attachment strap 5, unload wedge 4, finish to the installation of this distributor.
As shown in Figure 2, in the step 5) of present embodiment, 2 blocks of attachment straps of welding between the adjacent guide vane, welding manner adopts spot welding to get final product, in order to strengthen firmness.

Claims (2)

1, installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism, its step is as follows:
1), the prepackage distributor, interior ring, outer shroud, stator are assembled into one, and debug;
2), when formally installing, the stator of distributor is placed the complete shut-down position;
3), guide vane teunnion is axially drawn to the outer gate barrel direction along it, make the stator outer end withstand the outer gate barrel inwall;
4), between the gap of stator inner face and distributor internal ring wall, insert wedge, and its welding is fixing;
5), with the adjacent stator of attachment strap welding;
6), distributor integral body is hung in the installation site, the upstream side inner and outer rings of distributor is connected with the inner and outer rings of tubular seat respectively;
7), distributor is in place after, prescind attachment strap, unload wedge.
2, to remove 1 described installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism according to right, it is characterized in that in the step 5), 2 blocks of attachment straps of welding between the adjacent guide vane.
CN2008102430901A 2008-12-08 2008-12-08 Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism Active CN101418561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102430901A CN101418561B (en) 2008-12-08 2008-12-08 Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102430901A CN101418561B (en) 2008-12-08 2008-12-08 Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism

Publications (2)

Publication Number Publication Date
CN101418561A true CN101418561A (en) 2009-04-29
CN101418561B CN101418561B (en) 2010-06-02

Family

ID=40629548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102430901A Active CN101418561B (en) 2008-12-08 2008-12-08 Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism

Country Status (1)

Country Link
CN (1) CN101418561B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562418A (en) * 2012-01-14 2012-07-11 广东省源天工程公司 Stage axis adjusting method for shaft tubular-turbine generating unit
CN107257886A (en) * 2015-03-02 2017-10-17 福伊特专利有限公司 Method for assembling air deflector

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102562418A (en) * 2012-01-14 2012-07-11 广东省源天工程公司 Stage axis adjusting method for shaft tubular-turbine generating unit
CN102562418B (en) * 2012-01-14 2013-12-25 广东省源天工程公司 Stage axis adjusting method for shaft tubular-turbine generating unit
CN107257886A (en) * 2015-03-02 2017-10-17 福伊特专利有限公司 Method for assembling air deflector
CN107257886B (en) * 2015-03-02 2019-02-12 福伊特专利有限公司 Method for assembling air deflector
US10487793B2 (en) 2015-03-02 2019-11-26 Voith Patent Gmbh Method for mounting a guide apparatus

Also Published As

Publication number Publication date
CN101418561B (en) 2010-06-02

Similar Documents

Publication Publication Date Title
CA2763303C (en) Runner for direct-connected low-speed small mixed flow type water turbine applied in hydrodynamic energy-saving cooling tower
CN107013399B (en) Fixed-blade tubular turbine adopting gear transmission
CN204283729U (en) A kind of wind generator set blade blade pitch device
CN101418561B (en) Installation process of super large type light bulb through-flow type hydro-turbo generator set water guide mechanism
CN201714677U (en) Residual heat removal pump of nucleus secondary pump for pressurized water reactor nuclear power plant
CN104595107A (en) Blade variable-pitch mechanism of wind generating set
CN103603763A (en) Bulb tubular turbine for micro-head power generation of water plant
CN201925075U (en) Water turbine with front cover in rear-detachment structure
CN212775567U (en) Bearing sealing device for wind turbine generator
WO2013051113A1 (en) Francis turbine for hydropower generation
CN211082119U (en) Cell type generator based on honeycomb type power station
CN103388548A (en) Direct hydraulic turbine generator
CN101440615B (en) Super large water guide mechanism downstream inner and external rings installation locating rack of bulb tubular turbine-generator
CN219412767U (en) Integral residual pressure recovery generator set with rear movable guide vanes
CN203243181U (en) Dual-stator permanent magnetism direct-driven wind turbine generator
CN203257596U (en) Monoblock shaft extension tubular water-turbine generator set
KR101862469B1 (en) hydraulic turbine structure for power generation
CN102312787A (en) Annular wind power permanent magnetic direct-driven generator
CN106014826A (en) Integrated forward adjustable-pitch tubular hydraulic generator
CA2438429C (en) Method of re-building francis turbine runners
CN221195412U (en) End suction centrifugal pump structure convenient to overhaul
CN201090352Y (en) Interior ring assembly of hydraulic turbine taper water distributor
CN201314041Y (en) Mounting and positioning frame for inner and outer rings at downstream side of water guide mechanism of extra-large bulb tubular turbine generator set
CN209786967U (en) Protection device of permanent magnet synchronous motor
CN203035436U (en) Water turbine suitable for cooling tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant