CN101413294A - 分灾剪切滑移基础减震结构的施工方法 - Google Patents

分灾剪切滑移基础减震结构的施工方法 Download PDF

Info

Publication number
CN101413294A
CN101413294A CNA2008101564523A CN200810156452A CN101413294A CN 101413294 A CN101413294 A CN 101413294A CN A2008101564523 A CNA2008101564523 A CN A2008101564523A CN 200810156452 A CN200810156452 A CN 200810156452A CN 101413294 A CN101413294 A CN 101413294A
Authority
CN
China
Prior art keywords
calamity
branch
damage
damping structure
disaster
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101564523A
Other languages
English (en)
Inventor
刘平
万泽青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou University
Original Assignee
Yangzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou University filed Critical Yangzhou University
Priority to CNA2008101564523A priority Critical patent/CN101413294A/zh
Publication of CN101413294A publication Critical patent/CN101413294A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Vibration Prevention Devices (AREA)

Abstract

本发明涉及一种分灾剪切滑移基础减震结构的施工方法。本发明的方法是在地基上浇注下层基础底板,在下层基础底板上设置洞孔,将分灾元件一端放置在洞孔中,在下层基础底板上铺设分灾层,分灾元件的另一端放入上层基础底板上的洞孔中,下层基础底板和上层基础底板夹着中间的分灾层紧固。本发明解决了采用橡胶隔震垫的橡胶老化、维护和成本高问题。本发明具有成本低廉,7度设防的造价可达到10度设防的效果,设计施工简便,可抵御特大地震,真正做到大震不倒,有利于提高结构在遭遇重大地震时的安全性等效果。

Description

分灾剪切滑移基础减震结构的施工方法
技术领域
本发明涉及一种基础减震结构,特别涉及一种分灾剪切滑移基础减震结构的施工方法。
背景技术
在本发明之前,传统钢筋混凝土结构的一个重要抗震设计理论及原则是“强柱弱梁”。该理论要求钢筋混凝土结构在地震作用下在梁端出现塑性铰,以结构局部破坏为代价,使钢筋混凝土结构在不倒塌的情况下消耗地震能量。但由此带来的问题是震后结构需要修复,同时由于塑性铰的发生位置、区域长度等都有不确定性,设计期望以非承重构件的局部破坏为代价消耗地震能量无法准确并完美实现。另外,由于混凝土属于脆性材料,极限应变较小,而钢筋的塑性变形能力较强,当钢筋混凝土结构节点进入屈服阶段以后,钢筋、混凝土二者之间的协调性将受到严重影响。采用橡胶隔震垫也是一种比较成熟的隔震技术,在实际工程中已有大量应用实例。但隔震元件的橡胶老化问题、使用过程中的维护问题、以及成本问题一直都是困扰该技术的重要因素,使其在应用过程中受到极大的限制,无法推广。
发明内容
本发明的目的就在于克服上述缺陷,设计、研制一种分灾剪切滑移基础减震结构的施工方法。
本发明的技术方案是:
分灾剪切滑移基础减震结构的施工方法,其步骤在于:
(1)在地基上浇注下层基础底板;
(2)在下层基础底板上设置洞孔,将分灾元件一端放置在洞孔中;
(3)在下层基础底板上铺设分灾层;
(4)分灾元件的另一端放入上层基础底板上的洞孔中;
(5)下层基础底板和上层基础底板夹着中间的分灾层紧固。
本发明的优点和效果在于分灾剪切滑移基础减震结构可抵御特大地震,真正做到大震不倒,有利于提高结构在遭遇重大地震时的安全性,减少人民生命财产的损失,同时成本低廉,施工方便。
本发明具体的有益效果是:
(1)可抵御特大地震,真正做到大震不倒;
(2)成本低廉,7度设防的造价,可达到10度设防的效果;
(3)设计施工简便。
附图说明
图1——本发明的结构示意图。
图2——图1的纵向剖面图。
具体实施方式
本发明的基本原理是:
利用薄弱层分灾原理,在两层基础底板之间设置分灾层和分灾元件,地震来临时,分灾元件承受水平地震的剪切作用,产生裂纹扩展耗能;根据摩擦减震原理,两层基础底板产生相对水平位移时,在分灾层产生摩擦阻尼实现减震;另外,依据调谐减震原理,由于分灾层是整体结构的薄弱层,其水平刚度远低于上部结构的水平刚度,使得整体结构的自振周期避开场地的卓越周期和地震波的特征周期,降低地震能量向上部结构的传递。
下面通过附图对本发明作进一步详述:
如图1、图2所示,基础部分由下层基础底板1、分灾层2、分灾元件3、上层基础底板4构成。
施工时按常规方法进行基坑开挖,降水后浇筑下层基础底板1,在下层基础底板1上预留洞孔用于放置分灾元件3,分灾元件3的横截面可以是圆形或方形或其它形状,只要与下层基础底板1上预留洞孔的大小、形状匹配即可,分灾元件3是混凝土块体构件,分灾元件3主要是受剪切作用的混凝土块体构件,分灾元件3的高度应等于下层基础底板1、分灾层2和上层基础底板4的厚度的总和;分灾元件3的大小和数量应根据建筑物所处地区的抗震设防烈度和结构的重要性程度来设计;分灾元件3在预制时四周抹低标号砂浆,以取代后期施工模板;然后在下层基础底板1上铺设分灾层2,分灾层2可以是砂子或钢珠或沥青中的任何一种或一种以上;接着浇筑上层基础底板4,最后在上层基础底板4上进行结构基础施工和上部结构施工(图中省略)。此外,上层基础底板4、下基础底板1之间可以另用钢筋连接,以加强强度。
在正常使用情况下,本发明的减震结构与传统混凝土结构没有区别;当发生地震时,在水平地震力作用下,由于分灾层2的存在,使下层基础底板1、上层基础底板4可以发生相对滑移,分灾层2首先由于挤压产生摩擦阻尼减震,与此同时,分灾元件3在剪切作用下裂纹扩展耗能。在整个过程中,由于分灾元件3的设计总体水平剪切刚度应小于上部结构底层柱总体剪切刚度,从而使上部结构相当于只产生了刚体平移,主体结构一般不进入塑性变形阶段,从而保证上部主体结构在地震作用下的安全性。

Claims (5)

1.分灾剪切滑移基础减震结构的施工方法,其步骤在于:
(1)在地基上浇注下层基础底板;
(2)在下层基础底板上设置洞孔,将分灾元件一端放置在洞孔中;
(3)在下层基础底板上铺设分灾层;
(4)分灾元件的另一端放入上层基础底板上的洞孔中;
(5)下层基础底板和上层基础底板夹着中间的分灾层紧固。
2.根据权利要求1所述的分灾剪切滑移基础减震结构的施工方法,其特征在于分灾元件是混凝土块体构件。
3.根据权利要求2所述的分灾剪切滑移基础减震结构的施工方法,其特征在于分灾元件的横截面是圆形或方形。
4.根据权利要求1所述的分灾剪切滑移基础减震结构的施工方法,其特征在于分灾层是砂子或钢珠或沥青中的任何一种或一种以上。
5.根据权利要求1所述的分灾剪切滑移基础减震结构的施工方法,其特征在于上层基础底板、下基础底板之间用钢筋连接。
CNA2008101564523A 2008-10-10 2008-10-10 分灾剪切滑移基础减震结构的施工方法 Pending CN101413294A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101564523A CN101413294A (zh) 2008-10-10 2008-10-10 分灾剪切滑移基础减震结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101564523A CN101413294A (zh) 2008-10-10 2008-10-10 分灾剪切滑移基础减震结构的施工方法

Publications (1)

Publication Number Publication Date
CN101413294A true CN101413294A (zh) 2009-04-22

Family

ID=40594011

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101564523A Pending CN101413294A (zh) 2008-10-10 2008-10-10 分灾剪切滑移基础减震结构的施工方法

Country Status (1)

Country Link
CN (1) CN101413294A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736750B (zh) * 2009-12-30 2011-03-16 北京工业大学 一种钢筋复位型砌体房屋基础隔震-耗能双控型装置
CN102518231A (zh) * 2011-12-26 2012-06-27 北京工业大学 防锈薄板槽内装玻璃珠与细砂的基础隔震房屋及作法
CN103015463A (zh) * 2011-03-18 2013-04-03 张继红 一种已建建筑物基础隔离施工方法及其所用的隔离结构
CN109577381A (zh) * 2018-12-17 2019-04-05 济南市市政工程设计研究院(集团)有限责任公司 一种地下结构的隔震方法及隔震的地下结构
CN111535355A (zh) * 2020-05-22 2020-08-14 浙江金誉工程咨询有限公司 工业建筑减震基础

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101736750B (zh) * 2009-12-30 2011-03-16 北京工业大学 一种钢筋复位型砌体房屋基础隔震-耗能双控型装置
CN103015463A (zh) * 2011-03-18 2013-04-03 张继红 一种已建建筑物基础隔离施工方法及其所用的隔离结构
CN102518231A (zh) * 2011-12-26 2012-06-27 北京工业大学 防锈薄板槽内装玻璃珠与细砂的基础隔震房屋及作法
CN109577381A (zh) * 2018-12-17 2019-04-05 济南市市政工程设计研究院(集团)有限责任公司 一种地下结构的隔震方法及隔震的地下结构
CN111535355A (zh) * 2020-05-22 2020-08-14 浙江金誉工程咨询有限公司 工业建筑减震基础

Similar Documents

Publication Publication Date Title
Nie et al. Technological development and engineering applications of novel steel-concrete composite structures
CN101476360B (zh) 一种用于框架结构的新型耗能减震填充墙板
Silva et al. Seismic structural assessment of the Christchurch catholic basilica, New Zealand
Clemente et al. Seismically isolated buildings in Italy: State-of-the-art review and applications
CN108374431B (zh) 一种新型半装配式抗震消能挡土墙及其施工方法
CN103938749A (zh) 一种具有双屈服点的十字型耗能内芯防屈曲支撑构件
CN105756217A (zh) 一种具有震后自复位功能的钢木混合抗震墙
CN110468691B (zh) 一种灾后可更换装配式混凝土防摇摆桥墩体系
CN105239726B (zh) 预制型钢混凝土组合异形耗能柱
CN101413294A (zh) 分灾剪切滑移基础减震结构的施工方法
CN206256622U (zh) 具有自复位功能的损伤可修复装配式组合柱
CN103290993A (zh) 跨中自复位软钢耗能混凝土梁
CN103938748A (zh) 一种具有双屈服点的一字型耗能内芯防屈曲支撑构件
CN101936074B (zh) 快捷房屋抗震加固方法及装置
CN115045181A (zh) 一种中高烈度区预制墩柱-承台承插式节点连接方法与构造
CN103061451A (zh) 带洞口混凝土墙体的水平分层复合连梁及其施工方法
CN106759948A (zh) 一种预应力装配式高性能钢筋混凝土梁柱节点及其施工方法
CN107938884B (zh) 一种加固震损框架的自复位框架-剪力墙结构及施工方法
CN207003673U (zh) 一种梁与墙板的连接节点
CN203403558U (zh) 剪力墙
CN203097012U (zh) 一种拼装互锁预应力剪力墙体系
CN210288683U (zh) 一种提高pc框架节点抗震性能的连接结构
CN104775544A (zh) 一种配筋灌孔砌块复合连梁消能型联肢抗震墙及制作方法
CN103790230B (zh) 一种震后自复位混凝土框架结构体系
CN107859354B (zh) 一种加固既有框架的自复位框架-剪力墙结构及施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090422