CN101413275B - Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading - Google Patents

Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading Download PDF

Info

Publication number
CN101413275B
CN101413275B CN2008101580757A CN200810158075A CN101413275B CN 101413275 B CN101413275 B CN 101413275B CN 2008101580757 A CN2008101580757 A CN 2008101580757A CN 200810158075 A CN200810158075 A CN 200810158075A CN 101413275 B CN101413275 B CN 101413275B
Authority
CN
China
Prior art keywords
ground
test
pore water
cylinder
water pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101580757A
Other languages
Chinese (zh)
Other versions
CN101413275A (en
Inventor
崔新壮
金青
董琳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN2008101580757A priority Critical patent/CN101413275B/en
Publication of CN101413275A publication Critical patent/CN101413275A/en
Application granted granted Critical
Publication of CN101413275B publication Critical patent/CN101413275B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The invention discloses a field simulator for simulating accumulative settlement of a foundation under the action of traffic load and a method for simulating the same. The invention solves the problems that the prior art lacks effective and normative simulation devices so that the accumulative settlement discipline cannot be studied scientifically, and achieves the automatic simulation of the traffic load with adjustable parameters and convenient operation. The structure of the field simulator comprises a bracket, wherein a loading plate and a displacement detecting device are arranged in the bracket; a guiding device is arranged on the upper part of the bracket and is connected with a cylinder which is connected with the displacement sensor; the displacement sensor is connected with a control device; the control device is further connected with an air circuit switching device; and one end of the air circuit switch device is connected with the cylinder, while the other end is connected with an air pump.

Description

Ground cumulative settling in-site modeling device and analogy method under the action of traffic loading
Technical field:
The present invention relates to ground cumulative settling in-site modeling device and analogy method under a kind of action of traffic loading, belong to the Communication and Transportation Engineering field.
Background technology:
To low roadbed, vehicle-mounted repeatedly effect can cause the ground cumulative settling at present.But at the scene, the consolidation settlement that this cumulative settling and roadbed deadweight cause takes place simultaneously, causes the vehicle-mounted cumulative settling that causes to be difficult to separate from total settlement, and this feasible research to the cumulative settling rule becomes difficult.So be badly in need of at present a kind of on ground the vehicle-mounted method that causes cumulative settling of direct modeling.
Summary of the invention:
Purpose of the present invention lacks effective standard analogue means at present in order to solve exactly, can't carry out the problem of scientific research to the cumulative settling rule, ground cumulative settling in-site modeling device and analogy method under a kind of action of traffic loading are provided, provide a kind of effective hardware facility and test method for studying the vehicle-mounted ground cumulative settling rule that causes.
For achieving the above object, the present invention adopts following technical scheme:
Ground cumulative settling in-site modeling device under a kind of action of traffic loading, it comprises support, is provided with load plate and displacement detector in support; Support top installation and guide device, guide piece is connected with cylinder, and cylinder is connected with displacement transducer, and displacement transducer is connected with control device; Control device also is connected with the air circuit breaker device, and air circuit breaker device one end is connected with cylinder, and the other end is connected with air pump.
Described displacement detector is a laser displacement gauge.
Be provided with lifting rope in the described guide piece, the connection of lifting rope end is dropped hammer, and the bottom of dropping hammer cooperates with air spring, and air spring cooperates with load plate; The simultaneous displacement sensor cooperates with lifting rope.
Described air circuit breaker device is the two-bit triplet solenoid valve.
Be equipped with sound suppressor on described cylinder and the two-bit triplet solenoid valve.
Described control device is a single-chip microcomputer, and it is connected with computer.
Described cylinder is connected with air pump through two-bit triplet solenoid valve, throttling valve, pressurizer tank.
A kind of analogy method that adopts ground cumulative settling in-site modeling device under the action of traffic loading, its step is:
The confirmed test loading parameters
1. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; At the position installation soil pressure sensor of intending laying load plate, traffic loading in-site modeling device is installed;
2. known roadbed height h, wheel load p can be calculated as follows the vertical dynamic stress peak value that obtains on the vehicle-mounted ground that causes:
Vertical dynamic stress peak value σ = 0.5 p h 2
Draft the loading of dropping hammer for the first time of height of the fall and air spring parameter then, the output valve of testing each pressure transducer under the load plate simultaneously; According to the comparison of Stress Calculation result and test findings, revise height of the fall and air spring parameter, and carry out single load once more, till peak stress test findings and numerical result differ less than 5%;
Official test and test
3. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; In the ground central punch, lay soil pressure case and pore water pressure sensor, lay traffic loading in-site modeling device, and laser displacement gauge is installed on support, ground settlement is tested; Pore water pressure sensor must be placed in below the water level;
4. according to the height of the fall and the air spring parameter of top definite certain operating mode correspondence, under the load time at intermittence of 1s-10s, test; With soil pressure sensor and pore water pressure sensor break ground pressure and dynamic pore water pressure in the ground are tested simultaneously;
5. after load test finishes, continue to gather excess pore water pressure data in ground settlement and the ground, with the dissipation situation of analyzing excess pore water pressure in the ground and the ground consolidation sedimentation that causes thus.
The present invention is made up of three parts, automatic control system, pneumatic system, loading system.Automatic control system is made up of single-chip microcomputer, displacement transducer and computer.In single-chip microcomputer, write control height of the fall and the program of quiescent interval by computer.When beginning to move under the instruction of cylinder at single-chip microcomputer, be connected the sling height that the displacement transducer record on the air cylinder connecting rod drops hammer, and constantly data are fed back to single-chip microcomputer, thus the switch of control two-bit triplet solenoid valve, further control cylinder is by pressing the system acting that is provided with in advance.The sling height of dropping hammer, quiescent interval and loading number of times etc. are presented on the computer screen in real time.
Pneumatic system is made up of cylinder, two-bit triplet solenoid valve, sound suppressor, pressurizer tank, air pump etc.The circulation of air is by the switch control of solenoid valve in the cylinder, air pump pressurized air enters cylinder, thereby promotes the certain height of dropping hammer, two-bit triplet solenoid valve transposition then, air is extruded in the cylinder, drops hammer to do the movement of falling object and hit air spring on the load plate.Sound suppressor is all passed through in the discharging of air simultaneously, thereby reduces noise.
Loading system is made up of load plate, air spring and support.Air spring can change the rigidity of air, simulates embankment to the different buffering of carload with subdue effect.
The invention has the beneficial effects as follows: this instrument can be realized the automatic simulation of carload, and parameter is adjustable, and is easy to operate.
Description of drawings
Fig. 1 is a traffic loading in-site modeling structure drawing of device;
Fig. 2 arranges sketch for the load plate lower pressure sensor;
Fig. 3 is that soil pressure case and hydraulic pressure sensor are arranged sketch.
Wherein, 1. displacement transducer; 2. cylinder; 3. guide piece; 4. computer; 5. single-chip microcomputer; 6. two-bit triplet solenoid valve; 7. sound suppressor; 8. throttling valve; 9. pressurizer tank; 10. support; 11. lifting rope; 12. drop hammer; 13. air spring; 14. laser displacement gauge; 15. air pump; 16. load plate, 17. soil pressure cases, 18. hydraulic pressure sensors.
Embodiment
The present invention will be further described below in conjunction with accompanying drawing and embodiment.
Among Fig. 1, it comprises support 10, is provided with load plate 16 and displacement detector in support 10; Support 10 top installation and guide devices 3, guide piece is connected with cylinder 2, and cylinder 2 is connected with displacement transducer 1, and displacement transducer 1 is connected with control device; Control device also is connected with the air circuit breaker device, and air circuit breaker device one end is connected with cylinder 2, and the other end is connected with air pump 15.
Displacement detector is a laser displacement gauge 14.
Be provided with lifting rope 11 in the guide piece 3, lifting rope 11 lower ends connect drops hammer 12, and 12 bottoms of dropping hammer cooperate with air spring 13, and air spring 13 cooperates with load plate 16; Simultaneous displacement sensor 1 cooperates with lifting rope 11.
The air circuit breaker device is a two-bit triplet solenoid valve 6.
Be equipped with sound suppressor 7 on cylinder 2 and the two-bit triplet solenoid valve 6.
Control device is a single-chip microcomputer 5, and it is connected with computer 4.
Cylinder 2 is connected with air pump 15 through two-bit triplet solenoid valve 6, throttling valve 8, pressurizer tank 9.
The performing step of on-the-spot ground cumulative settling analogy method of the present invention:
A. confirmed test loading parameters
1. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; Intending laying the position setting pressure sensor of load plate, as shown in Figure 2; Traffic loading in-site modeling device is installed.
2. known roadbed height h, wheel load p can be calculated as follows the vertical dynamic stress peak value that obtains on the vehicle-mounted ground that causes:
σ = 0.5 p h 2
Draft the loading of dropping hammer for the first time of height of the fall and air spring parameter then, the output valve of testing each pressure transducer under the load plate simultaneously.According to the comparison of Stress Calculation result and test findings, revise height of the fall and air spring parameter, and carry out single load once more, till peak stress test findings and numerical result differ less than 5%.
B. official test and test
3. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; In the ground central punch, lay soil pressure case 17 and pore water pressure sensor 18 (it is following that pore water pressure sensor must be placed in water level), as shown in Figure 3; Lay traffic loading in-site modeling device, and on support, laser displacement gauge 14 is installed, ground settlement is tested.
4. according to the height of the fall and the air spring parameter of above-mentioned definite certain operating mode correspondence, under the load time, test at certain pause; Simultaneously break ground pressure and dynamic pore water pressure in the ground are tested.
5. after load test finishes, continue to gather excess pore water pressure data in ground settlement and the ground, with the dissipation situation of analyzing excess pore water pressure in the ground and the ground consolidation sedimentation that causes thus.

Claims (1)

1. analogy method that adopts ground cumulative settling in-site modeling device under the action of traffic loading, this device comprises support (10), is provided with load plate (16) and laser displacement gauge (14) in support (10); Support (10) top installation and guide device (3), guide piece is connected with cylinder (2), and cylinder (2) is connected with displacement transducer (1), and displacement transducer (1) is connected with control device; Control device also is connected with the air circuit breaker device, and air circuit breaker device one end is connected with cylinder (2), and the other end is connected with air pump (15); Be provided with lifting rope (11) in the guide piece (3), lifting rope (11) lower end connects drops hammer (12), and (12) bottom of dropping hammer cooperates with air spring (13), and air spring (13) cooperates with load plate (16); Simultaneous displacement sensor (1) cooperates with lifting rope (11); Its simulation steps is:
The confirmed test loading parameters
1. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; At the position installation soil pressure sensor of intending laying load plate, traffic loading in-site modeling device is installed;
2. known roadbed height h, wheel load p can be calculated as follows the vertical dynamic stress peak value that obtains on the vehicle-mounted ground that causes:
Vertical dynamic stress peak value σ = 0.5 p h 2
Draft the loading of dropping hammer for the first time of height of the fall and air spring parameter then, the output valve of testing each pressure transducer under the load plate simultaneously; According to the comparison of Stress Calculation result and test findings, revise height of the fall and air spring parameter,
And carry out single load once more, till peak stress test findings and numerical result differ less than 5%;
Official test and test
3. remove ground top layer foreign material, expose the former face of land, excavation is tested pits; In the ground central punch, lay soil pressure case and pore water pressure sensor, wherein pore water pressure sensor is placed in below the water level, lays traffic loading in-site modeling device, and laser displacement gauge is installed on support, and ground settlement is tested;
4. according to the height of the fall and the air spring parameter of top definite certain operating mode correspondence, under the load time at intermittence of 1s-10s, test; With soil pressure sensor and pore water pressure sensor break ground pressure and dynamic pore water pressure in the ground are tested simultaneously;
5. after load test finishes, continue to gather excess pore water pressure data in ground settlement and the ground, with the dissipation situation of analyzing excess pore water pressure in the ground and the ground consolidation sedimentation that causes thus.
CN2008101580757A 2008-10-29 2008-10-29 Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading Expired - Fee Related CN101413275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101580757A CN101413275B (en) 2008-10-29 2008-10-29 Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101580757A CN101413275B (en) 2008-10-29 2008-10-29 Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading

Publications (2)

Publication Number Publication Date
CN101413275A CN101413275A (en) 2009-04-22
CN101413275B true CN101413275B (en) 2010-08-11

Family

ID=40593993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101580757A Expired - Fee Related CN101413275B (en) 2008-10-29 2008-10-29 Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading

Country Status (1)

Country Link
CN (1) CN101413275B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU211294U1 (en) * 2021-11-23 2022-05-30 Федеральное Автономное Учреждение "Российский Дорожный Научно-Исследовательский Институт" WHEEL LOAD SIMULATOR (CYCLOS)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102021918B (en) * 2009-09-18 2012-09-05 中国海洋石油总公司 Detection method of bearing capacity of big tonnage full sized foundation in simulated conditions
CN102561411A (en) * 2010-12-20 2012-07-11 上海市电力公司 Method for preventing settlement of underground structure
CN102539313B (en) * 2012-02-06 2013-10-30 同济大学 Test system for simulating action of rapid traffic moving load
CN102854073B (en) * 2012-09-10 2014-09-10 湖北工业大学 Embankment deformation monitoring model experiment device based on displacement tracing technology, and method thereof
CN103245770B (en) * 2013-04-19 2015-03-25 河海大学 Electroosmosis-vacuum-loading combined consolidometer
CN103344208B (en) * 2013-05-30 2016-08-24 三一重工股份有限公司 Cylinder type dynamic compaction machinery tamping depth measuring method, device and dynamic compaction machinery
WO2014198102A1 (en) * 2013-06-14 2014-12-18 湖南三一智能控制设备有限公司 Dynamic compactor, and method and device for measuring compaction depth of oil cylinder type dynamic compactor
CN103940672B (en) * 2014-02-23 2016-07-06 中国水利水电科学研究院 Test system for centrifuge test platform
CN104019793B (en) * 2014-06-06 2016-06-01 山东大学 Measure the device of Highway Foundation sedimentation
CN104614226B (en) * 2015-01-05 2017-07-11 温州大学 A kind of towed reciprocation cycle aircraft loads simulation test device and application process
CN104568568B (en) * 2015-01-05 2018-04-24 温州大学 A kind of multi-point exciting formula aircraft loads model test apparatus and its application process
CN107059833A (en) * 2017-04-12 2017-08-18 西南交通大学 Site foundation dynamic compression modulus tester
CN108508044B (en) * 2018-03-16 2019-11-26 西南交通大学 Water and soil indicatrix measuring device and method under a kind of drying and watering cycle
CN109520613B (en) * 2018-11-29 2020-12-01 安徽江淮汽车集团股份有限公司 Method for detecting bombing sound in pure electric van-type commercial vehicle
CN109540437B (en) * 2018-11-30 2020-07-28 辽宁工程技术大学 Experimental device for simulating convenient connection in coal mining and use method thereof
CN111829911B (en) * 2020-07-14 2021-11-26 北京建筑材料科学研究总院有限公司 Performance measuring device for filling leveling layer on floating ground
CN111829910B (en) * 2020-07-14 2021-11-23 北京建筑材料科学研究总院有限公司 Quality evaluation method for filling leveling layer on floating ground

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU211294U1 (en) * 2021-11-23 2022-05-30 Федеральное Автономное Учреждение "Российский Дорожный Научно-Исследовательский Институт" WHEEL LOAD SIMULATOR (CYCLOS)
RU222005U1 (en) * 2023-09-15 2023-12-05 Федеральное Автономное Учреждение "Российский Дорожный Научно-Исследовательский Институт" WHEEL LOAD SIMULATOR WITH LINEAR MOTION

Also Published As

Publication number Publication date
CN101413275A (en) 2009-04-22

Similar Documents

Publication Publication Date Title
CN101413275B (en) Foundation accumulating and sedimentation in-situ simulating apparatus and method under action of traffic loading
KR100901083B1 (en) A pre-consolidation testing apparatus equipped with shear wave generators and receivers for measuring shear wave velocity distribution of soils
CN103953074B (en) A kind of open-end pipe pile hammering injection analogue experiment installation and experimental technique
CN108007800B (en) Model test device and test method for circular dynamic load soil body settlement
CN101787716B (en) Model test apparatus for studying dynamic response and long-term settlement law of high-speed railway
CN202975004U (en) Multifunctional cuboid geotechnical model test system for simulating seepage of artesian aquifer
CN101832993B (en) Semi-module test box for dynamic compaction reinforced foundation model test
CN103969012A (en) Shake table test real-time loading device for simulating different burial depths of rock tunnel
CN101532930B (en) Pile model power-cycle test system
CN105181498A (en) Simple instrument method for test of internal stress of soil mass under cyclic loading
CN106988352B (en) Testing method for horizontal bearing capacity of single pile under consideration of soil body pre-consolidation and cyclic load
CN105401954B (en) Tunnel anti-expansion support design method
CN109916719A (en) The immersion of loess subway tunnel surrounding and dynamic load simulation system and test method
CN106198266A (en) A kind of overlength bar is heavy, superduty circular cone dynamic sounding blow counts modification method
CN106769547A (en) One kind impact liquefaction test equipment and test method
CN101629896A (en) Method for researching friction anchoring property between forest root system and soil and device therefor
CN110426458A (en) A kind of new method and monitoring system using Elastic Wave Velocity prediction landslide
CN109115632A (en) The comprehensive shearing experiment device of anchoring body and its experimental method
CN201314054Y (en) On-site simulation device used for simulating groundsill accumulated settlement under traffic loads
CN101692014A (en) Method for reverse pull detection of prestressing force under anchor of anchor cable
CN105155597A (en) Monitoring and adjusting system for underground structure and construction method for monitoring and adjusting system
CN108267370A (en) A kind of one-dimensional cylinder test device and method for simulating the kinetic head boundary effect soil body
CN108387710A (en) A kind of experimental rig and method for simulating the rectangle head boundary effect soil body
CN104458064A (en) Analog simulation pneumatic support system for mine ground pressure and control method
CN214614219U (en) Full life cycle geotechnical centrifuge test device for driven pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100811

Termination date: 20111029