CN101398303A - Forced centering plate and embedding method - Google Patents

Forced centering plate and embedding method Download PDF

Info

Publication number
CN101398303A
CN101398303A CNA2008101969784A CN200810196978A CN101398303A CN 101398303 A CN101398303 A CN 101398303A CN A2008101969784 A CNA2008101969784 A CN A2008101969784A CN 200810196978 A CN200810196978 A CN 200810196978A CN 101398303 A CN101398303 A CN 101398303A
Authority
CN
China
Prior art keywords
thoughts
returning home
plate
centering plate
forced centering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101969784A
Other languages
Chinese (zh)
Inventor
何丞杰
董昌济
邓克寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CNA2008101969784A priority Critical patent/CN101398303A/en
Publication of CN101398303A publication Critical patent/CN101398303A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The invention provides a forcing centering plate, comprising a centering plate (1). A central hole of the centering plate (1) is provided with a connecting bolt (2); the centering plate (1) is also provided with a bench mark (3); the bottom of the central hole of the centering plate (1) is provided with a connecting pipe (6) and a PVC pipe (4) which is connected with the connecting pipe (6); and the bottom surface of the centering plate (1) is also provided with at least two fixed reinforcing steel bars (5). The forcing centering plate has the advantages that a key part is made of a stainless steel material which is not easy to rust, can ensure the centering precision and has long service life; the top adopts an opening structure, thus eliminating the hidden trouble of damaging, rusting and the like; a rainwater guide hole ensures the centering hole not to be blocked; the embedding depth of the underground part of a centering observation pier is more than 1.5 times of the ground height, thus effectively preventing the inclination of the observation pier and reinforcing the stability of the observation pier.

Description

A kind of forced centering plate and method for embedding
Technical field
The present invention relates to field of measuring technique, a kind of specifically forced centering plate and method for embedding.
Background technology
In the high precision engineering survey, the error of centralization that requires instrument and observe board is less than 0.2mm, and conventional optics cultellation method and plumb bob can't arrive this requirement to point methods.Particularly some need carry out the measurement engineering project (installing and measuring etc. as deformation observation, precision equipment) of repeated measures repeatedly, guarantees that accuracy of alignment is better than 0.2mm and is even more important.
Summary of the invention
The objective of the invention is to develop a kind of total powerstation and accuracy of alignment of observing board of making and reach forced centering plate and the method for embedding that 0.2mm requires.
A kind of forced centering plate of the present invention, comprise: thoughts of returning home plate 1, the center pit of thoughts of returning home plate 1 is equipped with coupling bolt 2, leveling point 3 also is housed on the thoughts of returning home plate 1, the pvc pipe 4 (rainwater pod apertures) that connecting pipe 6 links to each other with connecting pipe 6 is equipped with in the center pit bottom of thoughts of returning home plate 1, and at least two fixedly reinforcing bars 5 also are equipped with in the bottom surface of thoughts of returning home plate 1.
The center-hole diameter mismachining tolerance of thoughts of returning home plate 1 should be greater than+0.1mm, and coupling bolt 2 links to each other the diameter mismachining tolerance of part with center pit should be greater than-0.1mm.
Thoughts of returning home plate 1, coupling bolt 2 and leveling point 3 should adopt stainless steel material.
The method for embedding of a kind of forced centering plate of the present invention, its step is as follows:
1. excavating the length of side is that 1~1.5m, the degree of depth are the square hole of 1.3~1.5m;
2. at the center in hole with the rig steel pipe 9 that to squeeze into a diameter be 400~600mm, its degree of depth is 3~5m overhead;
3. under surface level 1~1.2m, prick the foursquare reinforcing bar chassis circle 8 of a 1~1.2m;
4. prick the square column type steel ring 7 that height is 1.8~2.2m on chassis steel ring 8, its length of side is 250mm;
5. the fixedly reinforcing bar 5 with forced centering plate is welded in steel pipe 9 tops, must make the upper surface of the thoughts of returning home plate 1 of forced centering plate keep horizontality, loads onto template outside steel ring 7,8;
6. deposit concrete makes the surface of forced centering plate concordant with the surface level of thoughts of returning home observation pier 10, after concrete curing is good, removes mould;
7. backfill sand in the hole, compacting, on the sand face and the concrete thoughts of returning home that is exposed at surface level top observe the outside surface embedding marble slab of pier 10.
When observing repeatedly when measuring, as long as scope is installed on the screw thread, of coupling bolt 2 light is inserted in the center pit of thoughts of returning home plate 1 and can measure, so no matter when measure, always benchmark (accuracy of alignment is within 0.1mm) accurately.
The advantage of a kind of forced centering plate of the present invention and method for embedding is: critical component adopts stainless steel material, is difficult for corrosion, can guarantee accuracy of alignment, long service life; Open architecture is adopted at the top, has eliminated destroyed and hidden danger such as corrosion; The rainwater pod apertures guarantees that thoughts of returning home hole is not blocked; The thoughts of returning home observation pier under ground portion depth of burying should can effectively prevent to observe pier itself to tilt greater than 1.5 times of ground height, has strengthened the stability of self.
Description of drawings
Fig. 1 is the vertical view of thoughts of returning home plate.
Fig. 2 is the structural representation of forced centering plate.
Fig. 3 buries structural representation underground for thoughts of returning home observation pier.
Embodiment
Embodiment one
According to Fig. 1, shown in Figure 2, a kind of forced centering plate, comprise: thoughts of returning home plate 1, the center pit of thoughts of returning home plate 1 is equipped with coupling bolt 2, leveling point 3 also is housed on the thoughts of returning home plate 1, the pvc pipe 4 (rainwater pod apertures) that connecting pipe 6 links to each other with connecting pipe 6 is equipped with in the center pit bottom of thoughts of returning home plate 1, and at least two fixedly reinforcing bars 5 also are equipped with in the bottom surface of thoughts of returning home plate 1.
The center-hole diameter mismachining tolerance of thoughts of returning home plate 1 should be greater than+0.1mm, and coupling bolt 2 links to each other the diameter mismachining tolerance of part with center pit should be greater than-0.1mm.
Thoughts of returning home plate 1, coupling bolt 2 and leveling point 3 should adopt stainless steel material.
Embodiment two
According to shown in Figure 3, a kind of method for embedding of forced centering plate, its step is as follows:
1. excavating the length of side is that 1~1.5m, the degree of depth are the square hole of 1.3~1.5m;
2. at the center in hole with the rig steel pipe 9 that to squeeze into a diameter be 400~600mm, its degree of depth is 3~5m overhead;
3. under surface level 1~1.2m, prick the foursquare reinforcing bar chassis circle 8 of a 1~1.2m;
4. prick the square column type steel ring 7 that height is 1.8~2.2m on chassis steel ring 8, its length of side is 250mm;
5. the fixedly reinforcing bar 5 with forced centering plate is welded in steel pipe 9 tops, must make the upper surface of the thoughts of returning home plate 1 of forced centering plate keep horizontality, loads onto template outside steel ring 7,8;
6. deposit concrete makes the surface of forced centering plate concordant with the surface level of thoughts of returning home observation pier 10, after concrete curing is good, removes mould;
7. backfill sand in the hole, compacting, on the sand face and the concrete thoughts of returning home that is exposed at surface level top observe the outside surface embedding marble slab of pier 10.

Claims (4)

1, a kind of forced centering plate, comprise: thoughts of returning home plate (1), it is characterized in that: the center pit of thoughts of returning home plate (1) is equipped with coupling bolt (2), leveling point (3) also is housed on the thoughts of returning home plate (1), the pvc pipe (4) that connecting pipe (6) links to each other with connecting pipe (6) is equipped with in the center pit bottom of thoughts of returning home plate (1), and at least two fixedly reinforcing bars (5) also are equipped with in the bottom surface of thoughts of returning home plate (1).
2, a kind of method for embedding of forced centering plate is characterized in that: its step is as follows:
1. excavating the length of side is that 1~1.5m, the degree of depth are the square hole of 1.3~1.5m;
2. at the center in hole with the rig steel pipe (9) that to squeeze into a diameter be 400~600mm, its degree of depth is 3~5m overhead;
3. under surface level 1~1.2m, prick the foursquare reinforcing bar chassis circle (8) of a 1~1.2m;
4. go up at chassis steel ring (8) and prick the square column type steel ring (7) that height is 1.8~2.2m, its length of side is 250mm;
5. the fixedly reinforcing bar (5) with forced centering plate is welded in steel pipe (9) top, must make the upper surface of the thoughts of returning home plate (1) of forced centering plate keep horizontality, loads onto template outside steel ring (7), (8);
6. deposit concrete makes the surface of forced centering plate concordant with the surface level of thoughts of returning home observation pier (10), after concrete curing is good, removes mould;
7. backfill sand in the hole, compacting, on the sand face and the concrete thoughts of returning home that is exposed at surface level top observe the outside surface embedding marble slab of pier (10).
3, forced centering plate according to claim 1 is characterized in that: the center-hole diameter mismachining tolerance of thoughts of returning home plate (1) should be greater than+0.1mm, and coupling bolt (2) links to each other the diameter mismachining tolerance of part with center pit should be greater than-0.1mm.
4, forced centering plate according to claim 1 is characterized in that: thoughts of returning home plate (1), coupling bolt (2) and leveling point (3) should adopt stainless steel material.
CNA2008101969784A 2008-09-17 2008-09-17 Forced centering plate and embedding method Pending CN101398303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101969784A CN101398303A (en) 2008-09-17 2008-09-17 Forced centering plate and embedding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101969784A CN101398303A (en) 2008-09-17 2008-09-17 Forced centering plate and embedding method

Publications (1)

Publication Number Publication Date
CN101398303A true CN101398303A (en) 2009-04-01

Family

ID=40517018

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101969784A Pending CN101398303A (en) 2008-09-17 2008-09-17 Forced centering plate and embedding method

Country Status (1)

Country Link
CN (1) CN101398303A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101788292A (en) * 2010-01-25 2010-07-28 中铁十五局集团有限公司 Measuring and centering device
CN102696030A (en) * 2010-01-13 2012-09-26 高通股份有限公司 State driven mobile search
CN103076010A (en) * 2013-01-25 2013-05-01 天津二十冶建设有限公司 Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN103174144A (en) * 2013-03-21 2013-06-26 中冶集团武汉勘察研究院有限公司 On-site casting method for bottom peg burying in preformed grille under seaside levee
CN104897143A (en) * 2014-03-05 2015-09-09 中国葛洲坝集团股份有限公司 Cylinder forced centering observation pillar and embedment method thereof
CN116481505A (en) * 2023-04-25 2023-07-25 上海勘测设计研究院有限公司 Prism and Beidou double-positioning observation pier

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102696030A (en) * 2010-01-13 2012-09-26 高通股份有限公司 State driven mobile search
US9378223B2 (en) 2010-01-13 2016-06-28 Qualcomm Incorporation State driven mobile search
CN101788292A (en) * 2010-01-25 2010-07-28 中铁十五局集团有限公司 Measuring and centering device
CN103076010A (en) * 2013-01-25 2013-05-01 天津二十冶建设有限公司 Fabrication method of forced centering observation pillar for precision engineering measurement and observation pillar
CN103174144A (en) * 2013-03-21 2013-06-26 中冶集团武汉勘察研究院有限公司 On-site casting method for bottom peg burying in preformed grille under seaside levee
CN104897143A (en) * 2014-03-05 2015-09-09 中国葛洲坝集团股份有限公司 Cylinder forced centering observation pillar and embedment method thereof
CN104897143B (en) * 2014-03-05 2017-09-05 中国葛洲坝集团股份有限公司 A kind of cylinder forced centering observation pier and its method for embedding
CN116481505A (en) * 2023-04-25 2023-07-25 上海勘测设计研究院有限公司 Prism and Beidou double-positioning observation pier

Similar Documents

Publication Publication Date Title
CN101398303A (en) Forced centering plate and embedding method
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN104121895B (en) The stake bar at plane measurement of higher degree control point, soft clay area and method for embedding thereof
CN110258582B (en) Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method
JP2015212507A (en) Substructure of long object and construction method for substructure of long object
CN104988884A (en) Void deformation monitoring device for face rockfill dam and mounting method
CN112554217A (en) Construction method of concrete impervious wall
KR100673548B1 (en) Verticality measure apparatus of pier for bridge
CN111733853A (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN102587386A (en) Reverse HPE (hydraulic perpendicular embedding) construction method for steel pipe columns in basement
CN202925575U (en) Pre-buried structure for core-drilling detection of foundation pile
CN108797586A (en) A kind of construction method of anchor jacked pile
CN216483061U (en) Movable observation pier
CN113174991B (en) Pile periphery stratum collapse grouting reinforcement method for ocean deepwater inclined piles
CN113668620B (en) Single-pile static load test auxiliary device
CN114592505A (en) Low-clearance foundation pit reverse construction method steel pipe column first-inserting positioning construction method
CN212427155U (en) Tongue-and-groove type prefabricated underground continuous wall structure
CN109736296B (en) Method for setting factory building reference
CN210400674U (en) 45-degree right-angle strain flower
CN204662373U (en) A deformation monitoring devices that comes to nothing for panel rock-fill dam
JP2012167421A (en) Device for measuring amount of settlement of ground for concrete civil engineering structure and construction method for the same
JP2018168664A (en) Method for positioning core material
CN106759558B (en) A kind of control is buried in the earth the construction method of stand column pile direction and verticality
EP1884598A1 (en) Offshore foundation
CN220704506U (en) Precast pile protects barrel mouth location protection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20090401