CN101363220A - Construction waste squeezing silt backfill method - Google Patents

Construction waste squeezing silt backfill method Download PDF

Info

Publication number
CN101363220A
CN101363220A CNA2008101958050A CN200810195805A CN101363220A CN 101363220 A CN101363220 A CN 101363220A CN A2008101958050 A CNA2008101958050 A CN A2008101958050A CN 200810195805 A CN200810195805 A CN 200810195805A CN 101363220 A CN101363220 A CN 101363220A
Authority
CN
China
Prior art keywords
building waste
mud
building garbage
building
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101958050A
Other languages
Chinese (zh)
Other versions
CN100595390C (en
Inventor
宋功业
张哲华
曹建兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Dahan Construction Industrial Group Co., Ltd.
Original Assignee
XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY filed Critical XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY
Priority to CN200810195805A priority Critical patent/CN100595390C/en
Publication of CN101363220A publication Critical patent/CN101363220A/en
Application granted granted Critical
Publication of CN100595390C publication Critical patent/CN100595390C/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)

Abstract

The invention relates to disposal of the building garbage left behind by removal of buildings in the construction industry and the silt caused by backfilling of ponds, in particular to the method of backfilling ponds of silt squeezing out by building garbage. The invention uses the building garbage to backfill ponds, under the repeated squeezing of a backhoe shovel and due to the good hydroscopic property of the building garbage, the moisture of the slit is absorbed by the building garbage when the slit is scattered into the gap of the building garbage by appropriate proportion, and the silt, with the good filling and adhesion properties, can completely fill the gaps of the construction garbage under external force and can adhere to the building garbage. The method can solve the problems of emission of the building garbage and slit disposal, and also can solve the foundation problem at the soft soil area such as ponds.

Description

Construction waste squeezing silt backfill method
Technical field
The processing of mud is a kind of construction waste squeezing silt backfill method specifically under the processing of the building waste that stays when the present invention relates to the removal of building trade building and the river embankment backfill situation.
Background technology
At present, domesticly carry out large-scale economic construction (particularly new countryside construction), often carrying out housing demolition and building construction.During housing demolition, produce a large amount of building waste (remaining brick, watt bits, block concrete and consequent particle, dust etc. behind the demolishing buildings), the processing of these building wastes will cause the pollution of environment.Meanwhile, when carrying out building construction in weak native zones such as river embankments, need handle soft soil foundation, difficulty is bigger.The method of handling has two kinds at present, a kind of is cushion, be about to the mud of filling out to be changed and all dig out, change with clay or other constructional materials and fill out, mud digs out discharging need discharge the place, because mud is mobile big, during discharging in the open, every cubic metre mud needs 5 square metres discharging place, and lasting needs above ability drying half a year, and the mud foul smell is very heavy, causes surrounding enviroment to pollute.The expenses such as construction cost that the made ground base handles, cost of materials of changing are also very high, increased building costs.Another kind is an inorganization backfill method, promptly under inorganization, river embankment having been carried out backfill, is directly to be poured into building waste or household garbage in the river embankment, inorganization backfill method, to cause the face of land harder, the inside weakness is changed and is filled out with digging out mud as natural ground, workload is very big, fracture accident often taking place when adopting pile foundation piling, bring potential safety hazard for construction site and operator, does not have good solution so far.
Summary of the invention
The objective of the invention is for overcoming above-mentioned the deficiencies in the prior art part, a kind of construction waste squeezing silt backfill method is provided, utilize building waste to be backfilling into river embankment, push down repeatedly through backacter, building waste has goodish water imbibition, when being dispersed in mud in the space of building waste by proper proportion, after moisture in the mud can be absorbed by building waste, mud has fillibility and cementability preferably, under external force, the space of building waste can be filled up, and, can play bonding effect to building waste, this method both can solve the building waste emission problem, the sludge treatment problem also can solve weak native regional Measures for Making Ground and Foundation such as river embankment.
The present invention realizes with following technical scheme: a kind of construction waste squeezing silt backfill method is characterized in that: carry out as follows:
(1) water of river embankment is drained;
(2) building waste is transported to the zone for the treatment of backfill, with backacter building waste has been dug, among rendering to river embankment mud along the river embankment edge, after building waste is rendered to muck surface, with firmly extruding downwards of backacter, because mud is mobile big, and mud is extruded by building waste, part mud is packed in the space of building waste (this earth-filling method is called " squeeze and become silted up ");
(3) backacter compacting back and forth in the intact zone of backfill makes most of mud enter the building waste space, and building waste is played filling effect, has reduced the intergranular relative slip of building waste.
The present invention compares with above-mentioned other earth-filling method, have the following advantages and effect: well solved dirty, the random problem of building waste, also preferably resolve weak native regional Measures for Making Ground and Foundation such as river embankment, foundation strength after treatment, stability are all relatively good, building is carried out piling construction, pile breaking phenomenon can not take place, both saved the building waste discharge fee, also save the sludge treatment expense, had remarkable economic efficiency and social benefit.
The specific embodiment
Below in conjunction with embodiment the present invention is described in further detail:
Embodiment,
The composition that is used for the building waste of foundation backfill mainly is brick, watt bits, concrete block, mortar piece and the mixture be made up of their chip dust etc., its particle diameter general requirements is not more than 200mm, the building waste of bulk must use through broken back, must not contain impurity such as organic substance, plastics.
Construction equipment: backacter and building waste carrying facility.
Job practices:
(1) water of river embankment is drained;
(2) building waste is transported to the zone for the treatment of backfill, with backacter building waste has been dug, among rendering to river embankment mud along the river embankment edge, after building waste is rendered to muck surface, with firmly extruding downwards of backacter, because mud is mobile big, and mud is extruded by building waste, part mud is packed in the space of building waste (this earth-filling method is called " squeeze and become silted up ");
(3) backacter compacting back and forth in the intact zone of backfill makes most of mud enter the building waste space, and building waste is played filling effect, has reduced the intergranular relative slip of building waste.
Through actual measurement, the bearing capacity of foundation soil after above-mentioned construction waste squeezing silt backfill method construction can reach (the natural ground supporting capacity that is equivalent to five floor rooms) more than the 13kPa.
Instantiation:
Floor space 40000m forms a team in certain residential district three 2, the river embankment 2000m of inorganization backfill wherein 2(by the building waste institute landfill after household garbage before removing and the removal) can only adopt cushion to handle during construction, change with clay and fill out, and cost lasts half a year and just disposes with 260,000 yuan altogether; The contiguous project nine floor space 60000m that forms a team 2, river embankment water surface area 50000m wherein 2, utilize the building waste of removing to make backfill, squeezing becomes silted up handles, and has satisfied designing requirement, and only 530,000 yuan of full payments are lasted also only six months; Another contiguous project is not handled the inorganization backfill, adopts C70 level high-strength Prestressed Pipe Pile basis, because the surface is hard, carries out integrity detection after middle soft beaten in the piling construction, finds that whole foundation piles fracture.
Construction waste squeezing silt backfill method provided by the invention is used for building waste the regional foundation backfills of weak soil such as river embankment exactly, both can solve the building waste emission problem, also can solve weak native regional ground processing such as river embankment.

Claims (1)

1, a kind of construction waste squeezing silt backfill method is characterized in that: carry out as follows:
(1) water of river embankment is drained;
(2) building waste is transported to the zone for the treatment of backfill, with backacter building waste has been dug, among rendering to river embankment mud along the river embankment edge, after building waste is rendered to muck surface, with firmly extruding downwards of backacter, because mud is mobile big, and mud is extruded by building waste, part mud is packed in the space of building waste (this earth-filling method is called " squeeze and become silted up ");
(3) backacter compacting back and forth in the intact zone of backfill makes most of mud enter the building waste space, and building waste is played filling effect, has reduced the intergranular relative slip of building waste.
CN200810195805A 2008-09-02 2008-09-02 River and pool back filling method by piling builders rubbish Active CN100595390C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810195805A CN100595390C (en) 2008-09-02 2008-09-02 River and pool back filling method by piling builders rubbish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810195805A CN100595390C (en) 2008-09-02 2008-09-02 River and pool back filling method by piling builders rubbish

Publications (2)

Publication Number Publication Date
CN101363220A true CN101363220A (en) 2009-02-11
CN100595390C CN100595390C (en) 2010-03-24

Family

ID=40389804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810195805A Active CN100595390C (en) 2008-09-02 2008-09-02 River and pool back filling method by piling builders rubbish

Country Status (1)

Country Link
CN (1) CN100595390C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556604A (en) * 2013-10-10 2014-02-05 江苏建筑职业技术学院 Method for achieving Yellow River closure through construction waste
CN105297700A (en) * 2015-10-15 2016-02-03 中国建筑第八工程局有限公司 Method for treating sludge or quicksand foundation
CN110080233A (en) * 2019-04-08 2019-08-02 上海宝冶集团有限公司 The processing method of soft foundation
CN112262635A (en) * 2020-07-28 2021-01-26 天津泰达盐碱地绿化研究中心有限公司 Ecological restoration method for coastal heavy saline-alkali soil by comprehensively utilizing municipal refuse

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103556604A (en) * 2013-10-10 2014-02-05 江苏建筑职业技术学院 Method for achieving Yellow River closure through construction waste
CN103556604B (en) * 2013-10-10 2015-11-18 江苏建筑职业技术学院 The method of damming the Yellow River is carried out with building waste
CN105297700A (en) * 2015-10-15 2016-02-03 中国建筑第八工程局有限公司 Method for treating sludge or quicksand foundation
CN105297700B (en) * 2015-10-15 2018-06-29 中国建筑第八工程局有限公司 A kind of mud, drift sand ground processing method
CN110080233A (en) * 2019-04-08 2019-08-02 上海宝冶集团有限公司 The processing method of soft foundation
CN112262635A (en) * 2020-07-28 2021-01-26 天津泰达盐碱地绿化研究中心有限公司 Ecological restoration method for coastal heavy saline-alkali soil by comprehensively utilizing municipal refuse

Also Published As

Publication number Publication date
CN100595390C (en) 2010-03-24

Similar Documents

Publication Publication Date Title
CN1193141C (en) Combined grouting construction process of reinforcing foundation
Zhou et al. Engineering issues on karst
CN103233473B (en) Many ribs of high polymer stake grouting method
CN108914912A (en) A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
RU2541009C2 (en) Improved road-building soil
Chu et al. Methods for improvement of clay slurry or sewage sludge
CN102888864B (en) Method for centralizing and strengthening obliquely damaged pontoon raft shallow-buried foundation building
CN104746505A (en) Method for treating miscellaneous fill foundation combing dynamic consolidation and compaction grouting
CN100595390C (en) River and pool back filling method by piling builders rubbish
RU2551564C2 (en) Processing method of drilling wastes on territory of cluster site
CN101008178B (en) Soft base processing construction process using excavating and stirring method
CN106638579A (en) Construction method of coral sand foundation expanding cement mortar injection pile
RU2551560C2 (en) Road-building composite material
CN202220341U (en) Support structure for foundation pit in sludge
CN104108919A (en) Environment-friendly water-stop curtain
CN103603355A (en) Empty pile processing method for cast-in-situ bored pile
Spagnoli et al. Trench cutter case histories and their possible application for offshore piles as relieve drilling
CN102409668A (en) Cast-in-situ bored pile and expansion and compaction construction method thereof
CN201268857Y (en) Soil shovel
CN114031256B (en) Mud-water separation system for sludge landfill and construction method thereof
CN215332643U (en) Percussion drilling tool for earth filling exploration
Sobhee-Beetul Ground improvement using PET bottle waste as a potential reinforcement material for granular columns: an experimental approach
CN202247864U (en) Bored pile
CN109083098B (en) Plugging structure for comprehensively treating damaged part of old flood drainage system of tailing pond
CN1673165A (en) Bagged cement soil and its engineering application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU DAHAN CONSTRUCTION INDUSTRIAL GROUP CO., L

Free format text: FORMER OWNER: XUZHOU INSTITUTE OF ARCHITECTURAL TECHNOLOGY

Effective date: 20111104

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 221000 XUZHOU, JIANGSU PROVINCE TO: 221600 XUZHOU, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20111104

Address after: 221600 No. 6, Song Feng Road, Peixian City, Jiangsu, Xuzhou

Patentee after: Jiangsu Dahan Construction Industrial Group Co., Ltd.

Address before: 221000 Jiangsu province Xuzhou city Copper Mt. District School Road No. 26

Patentee before: Xuzhou Institute of Architectural Technology