CN101342763B - Concrete curing cystosepiment with connecting structure - Google Patents

Concrete curing cystosepiment with connecting structure Download PDF

Info

Publication number
CN101342763B
CN101342763B CN2007101360358A CN200710136035A CN101342763B CN 101342763 B CN101342763 B CN 101342763B CN 2007101360358 A CN2007101360358 A CN 2007101360358A CN 200710136035 A CN200710136035 A CN 200710136035A CN 101342763 B CN101342763 B CN 101342763B
Authority
CN
China
Prior art keywords
cystosepiment
connector
film
main body
connecting portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101360358A
Other languages
Chinese (zh)
Other versions
CN101342763A (en
Inventor
韩千求
吴璇教
申东岸
全忠根
金锺
金锺伯
金玟镐
孔维星
金基喆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WAN ARCHITECT OFFICE
ARCH ENGINEERING COMPLEX BUILDING OFFICE
Original Assignee
WAN ARCHITECT OFFICE
ARCH ENGINEERING COMPLEX BUILDING OFFICE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WAN ARCHITECT OFFICE, ARCH ENGINEERING COMPLEX BUILDING OFFICE filed Critical WAN ARCHITECT OFFICE
Priority to CN2007101360358A priority Critical patent/CN101342763B/en
Publication of CN101342763A publication Critical patent/CN101342763A/en
Application granted granted Critical
Publication of CN101342763B publication Critical patent/CN101342763B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention relates to a concrete curing foam sheet with a connecting structure. The foam sheet comprises a foam sheet body formed by superposing a first PE film, a second PE film and a finishing board; a first transparent connecting piece connected to one side end of the foam sheet body; a fixture fixed on the inner side of the connector slot of the first connecting piece; a connector which is elastically connected with the fixture through a spring and is provided with a pair of rods arranged in the center and elastically supported by spring; a second transparent connecting piece which is fixedly connected with the connector of another foam sheet through the rods inserted in the connector. The foam sheet comprises a connecting unit which is used for tightly connecting the foam board to another foam sheet on the surface of the concrete to be cured, thus preventing the gaps between the connected foams from causing concrete to be improperly cured locally. In addition, as the connecting pieces are made of transparent flexible synthetic resin, workers are allowed to see the curing of the concrete easily even when the foam sheet is installed on the surface of the concrete to be cured.

Description

Concrete curing cystosepiment with syndeton
Technical field
The present invention relates to a kind of concrete curing cystosepiment; Relate more specifically to a kind of concrete curing cystosepiment with syndeton; This concrete curing cystosepiment comprise be formed on the cystosepiment main body, be used for this concrete curing cystosepiment closely is connected to the linkage unit at lip-deep another concrete curing cystosepiment of concrete maintenance, thereby prevent the bad maintenance in concrete part that causes owing to the space between the plate.
Background technology
Concrete maintenance is meant the processing that the low temperature, drying and the temperature that are used for protecting after concrete does not receive casting concrete change suddenly and vibration, impact and the load of course of hardening influence.In concrete maintenance processes, it is very important continuing to keep initial moisture condition.When concrete is dry in the maintenance starting stage, can not carry out the aquation reaction fully, in this case, can not look to concrete strength to increase.
Therefore, the consideration in xoncrete structure and the concrete stirring scheme requires have measure to prevent the rapid evaporation of moisture and the rising of concrete temperature, and after concrete casting, keeps moisture condition.For this reason, various concrete curing plates been have have been researched and developed.The Korean Patent Registration No.10-0667103 that inventor of the present invention submits to discloses a kind of concrete curing plate.
Disclosed concrete curing plate comprises hardening through the 2nd PE that will be provided with the pore that forms to specify Spacing and is incorporated into the air plates that a PE film with flat surfaces obtains in above-mentioned patent, and the finishing board of being processed and being combined with the pore of air plates by PE.Air plates and finishing board are bonded to each other through heat fused, and the edge sealing of the plate that will combine through heat treatment.Compare with traditional concrete maintenance plate, this concrete curing plate has the intensity and the improved heat-insulating efficiency of increase, therefore can keep suitable concrete curing temperature and humidity state effectively and control quality of concrete.
Yet, above-mentioned concrete curing plate is being configured under the lip-deep situation of concrete curing, a plurality of plates with conventional criteria by with the pitch arrangement of appointment on said surface.Thereby, producing the space between the plate, said surface partly is exposed to the outside through the space.The expose portion on maintenance surface can not keep moisture condition fully, thereby maintenance is bad.Therefore, bad in order to prevent concrete curing, need research and development to assign to prevent that through the connecting portion between the plate concrete maintenance surface is exposed to outside syndeton.
Summary of the invention
Therefore; Consider that the problems referred to above have made the present invention; The purpose of this invention is to provide a kind of concrete curing cystosepiment with syndeton; This concrete curing cystosepiment comprise be formed on the cystosepiment main body, be used for said concrete curing cystosepiment closely is connected to the linkage unit at lip-deep another concrete curing cystosepiment of concrete maintenance, thereby prevent the local bad maintenance of concrete that the space owing to the coupling part between the said plate causes.
Another object of the present invention provides a kind of concrete curing cystosepiment with syndeton; Wherein connector is processed by transparent and flexible synthetic resin, thereby even allows the workman also can with the naked eye easily see concrete maintenance degree said cystosepiment being installed under the lip-deep situation of concrete maintenance.
According to an aspect of the present invention; Can realize above-mentioned purpose with other through a kind of concrete curing cystosepiment with syndeton is provided; Said concrete curing cystosepiment comprises: the cystosepiment main body; This cystosepiment main body comprises the PE film that contacts with concrete maintenance surface, be provided with a plurality of pores and be stacked in the 2nd PE film on the said PE film and be stacked in the finishing board on said the 2nd PE film, and this cystosepiment main body is provided with through compressing said first and second films and said finishing board and is respectively formed at the insertion section at said cystosepiment main body side place to have reduced cross section; The first transparent connector; This first connector is provided with the board slot that is formed in the one of which side surface; And be formed on the connection tank in its another side surface, and be inserted under the situation in the said board slot of said first connector in said insertion section and use a plurality of attachment screws said first connector to be fixed to a side of said cystosepiment main body said cystosepiment main body; Bar shaped fixture, this fixture are provided with a plurality of rings that are installed in a longitudinal direction on the one of which side surface, and use a plurality of screws to be fixed to the inboard of said connection tank; Connector, this connector is provided with: be formed on the both sides place of an one of which side surface a pair of lateral process, be formed on central protrusion between the said lateral process, be formed on receiving slit in the upper surface of said central protrusion, be inserted into said receiving slit and a pair of bar that supports by the spring ground that inserts therebetween, be provided with slotted hole that the vertical component effect that runs through the said bar of confession that forms passes through movably and use hold-down screw and be fixed to the fixed head of said central protrusion, be installed in the lip-deep a plurality of rings of opposite side of said connector and the said ring of the said ring of said connector and said fixture is connected and under the situation that said connector flexibly is connected to said fixture, is inserted into a plurality of springs in the said connection tank in a longitudinal direction; And the second transparent connector; This second connector is provided with: be formed on board slot in the one of which side surface, be formed in the both sides on its opposite side surface and supply said lateral process to be inserted into wherein side insertion groove, to be formed between the said side insertion groove and to supply said central protrusion to be inserted into bar hole and elongated hole that wherein central insertion groove, the top through said central insertion groove form; Said elongated hole is respectively formed at the place, both sides in said bar hole; Thereby after said bar being inserted in the said bar hole; Said vertical component effect can flexibly be supported by said elongated hole, and said second connector is inserted in the said insertion section with said cystosepiment main body and uses a plurality of attachment screws to be fixed to another side of said cystosepiment main body under the situation in the said board slot of said second connector.
According to a further aspect in the invention; A kind of concrete curing cystosepiment with syndeton is provided; This concrete curing cystosepiment comprises: cystosepiment main body, this cystosepiment main body comprise the PE film that contacts with concrete maintenance surface, be provided with a plurality of pores and be stacked in the 2nd PE film on the said PE film and be stacked in the finishing board on said the 2nd PE film; First connecting portion, this first connecting portion be through compressing the side place that said first film, said second film and said finishing board are formed on said cystosepiment main body, and be provided with staircase areas at place, its underpart; Second connecting portion, this second connecting portion be through compressing another side place that said first film, said second film and said finishing board are formed on said cystosepiment main body, and locate to be provided with staircase areas at an upper portion thereof; And combining unit; Said combining unit is installed in respectively on the contact surface of said first connecting portion and said second connecting portion, thereby said first connecting portion of said cystosepiment and said second connecting portion are attached to said second connecting portion and said first connecting portion of another cystosepiment.
Preferably, said combining unit can comprise from the group that is made up of a pair of cloudy Velcro band and positive Velcro band, a pair of rubber magnet and at least one pair of protruding snap fastener and recessed snap fastener, select a kind of.
Description of drawings
Can more be expressly understood above and other objects of the present invention, characteristic and other advantage from the detailed description of carrying out below in conjunction with accompanying drawing, in the accompanying drawing:
Fig. 1 is the stereogram according to the concrete curing cystosepiment with syndeton of an embodiment of the invention;
Fig. 2 is the cutaway view according to the concrete curing cystosepiment of an embodiment of the invention;
Fig. 3 is the exploded perspective view according to the concrete curing cystosepiment of an embodiment of the invention;
Fig. 4 is the exploded perspective view according to the connector of the concrete curing cystosepiment of an embodiment of the invention and second connector;
Fig. 5 is the stereogram of the concrete curing cystosepiment with syndeton according to another implementation of the invention;
Fig. 6 is the cutaway view of concrete curing cystosepiment according to another implementation of the invention;
Fig. 7 is the exploded perspective view of concrete curing cystosepiment according to another implementation of the invention;
Fig. 8 is the partial enlarged drawing of coupling part, and it is used to explain the syndeton of concrete curing cystosepiment according to another implementation of the invention;
Fig. 9 is the stereogram of the concrete curing cystosepiment with syndeton according to another implementation of the invention; And
Figure 10 is the stereogram according to the concrete curing cystosepiment with syndeton of another embodiment of the present invention.
The specific embodiment
Describe preferred implementation of the present invention below with reference to accompanying drawings in detail.
Fig. 1 and Fig. 2 are stereogram and the cutaway views according to the concrete curing cystosepiment with syndeton of an embodiment of the invention; Fig. 3 is the exploded perspective view according to the concrete curing cystosepiment of an embodiment of the invention, and Fig. 4 is the exploded perspective view according to the connector of the concrete curing cystosepiment of an embodiment of the invention and second connector.
Referring to figs. 1 through Fig. 4, comprise: the cystosepiment main body 10 that forms through a stacked PE film 12, the 2nd PE film 13 and finishing board 15 according to the concrete curing cystosepiment with syndeton of an embodiment of the invention; Be connected to transparent first connector 20 of a side of cystosepiment main body 10; Be fixed to the fixture 30 of inboard of the connection tank 22 of first connector 20; Connector 40, this connector flexibly is connected to fixture 30 through spring 49, and is provided with and a pair ofly is installed in its middle body and by the bar 44 of spring 45 resiliency supported; And the second transparent connector 50, this connector is inserted into the connector 40 that wherein is fixedly connected to contiguous concrete curing cystosepiment through the bar 44 with connector 40.
Thereby cystosepiment main body 10 comprise as the bottom contact concrete maintenance surface a PE film 12, be provided with a plurality of pores 14 and be stacked in the 2nd PE film 13 on the PE film 12 and be stacked in the finishing board 15 on the 2nd PE film 13.
Cystosepiment main body 10 is provided with the insertion section 16 that is respectively formed at its side.Through compressing stacked first film 12, second film 13 and finishing board 15 acquisition insertion sections 16.The insertion section 16 that is formed on a side place of cystosepiment main body 10 is inserted in the board slot 21 in the side surface that is formed on first connector 20.
First connector 20 is transparent member of the rod that is connected tank 22 in being provided with the board slot 21 that is formed in the one of which side surface and being formed on its opposite side surface.As stated, be inserted into board slot 21 be connected to each other the cystosepiment main body 10 and first connector 20, use a plurality of attachment screws 17 that insertion section 16 is fixed to board slot 21 then through insertion section 16 with cystosepiment main body 10.
Fixture 30 is inserted into connector 40 and is connected in the tank 22.Fixture 30 is a strip piece, and it is provided with through a plurality of screws and is fixed to a side surface on the inner surface that connects tank 22.A plurality of rings 31 are installed on another side surface of fixture 30 in a longitudinal direction.Spring 49 is connected respectively to ring 31.
Connector 40 is under connector 40 flexibly is connected to the situation of fixture 30, to be inserted into the member that connects tank 22.Lateral process 41 is two side-prominent from a side surface of connector 40 respectively, and central protrusion 42 is outstanding from the central authorities between lateral process 41 of connector 40 side surfaces.
Receiving slit 43 is formed in the upper surface of central protrusion 42, and in a pair of bar 44 insertion receiving slits 43, said bar is flexibly supported by the spring 45 that inserts therebetween.Each bar 44 is provided with the axis of guide 442 that is inserted into the back shaft 441 in the spring 45 and is formed on the moving direction of the limit rod 44 on its other end that is formed on the one of which end.Thereby said a pair of bar 44 is supported from mediad two-side elastic ground by spring 45.
In addition, each bar 44 all is provided with vertical component effect 440, and this vertical component effect projects upwards from the upper surface of bar.The slotted hole 460 that the vertical component effect 440 of bar 44 passes fixed head 46 projects upwards, and therefore allows to come action bars 44 through outside grip.
Fixed head 46 is installed on the central protrusion 42.As stated, slotted hole 460 passes fixed head 46 and forms, thereby passes movably at the vertical component effect 440 of bar 44 under the situation of slotted hole 46 and use a plurality of hold-down screws 47 that fixed head 46 is fixed to central protrusion 42.
In a longitudinal direction a plurality of rings 48 are installed on another side surface of connector 40.The ring 48 of connector 40 is connected respectively through spring 49 with the ring 31 of fixture 30, as stated, thereby flexibly connects connector 40 and fixture 30.
Second connector 50 is rod transparent member, and this second connector is provided with and is formed in the one of which side surface and supplies board slot 51 that the insertion section 16 of cystosepiment main body 10 inserts and the connection tank that is formed in its opposite side surface and supplies connector 40 to insert.With connect in the both sides that tank is divided into the side surface that is formed on second connector 50 and supply the side insertion groove 52 that lateral process 41 inserts and the central authorities between side insertion groove 52 of the side surface that is formed on second connector 50 in and supply the central insertion groove 53 of central protrusion 42 insertions.Be inserted in the board slot 51 through insertion section 16, use a plurality of attachment screws 17 that insertion section 16 is fixed to board slot 51 then and the connection cystosepiment main body 10 and second connector 50 cystosepiment main body 10.
Bar hole 54 forms the top of passing central insertion groove 53, and elongated hole 55 is respectively formed on the both sides in bar hole 54.Therefore, when at vertical component effect 440 under the situation of central bend during with bar 44 insertion rod holes 54, just the elastic force through spring 45 is inserted into vertical component effect 440 respectively in the elongated hole 55.
By means of above-mentioned syndeton; Concrete curing cystosepiment of the present invention can closely be connected at lip-deep another concrete curing cystosepiment of concrete curing, thereby has prevented the bad maintenance in concrete part that causes owing to the space that exists in the coupling part between the plate.
In addition; Because first connector 20 and second connector 50 are made up of transparent and flexible synthetic resin; Even so concrete curing cystosepiment of the present invention is being installed under the lip-deep situation of concrete maintenance, the staff also can with the naked eye see concrete maintenance degree.
Fig. 5 and Fig. 6 are the stereogram and the cutaway views of the concrete curing cystosepiment with syndeton according to another implementation of the invention; Fig. 7 is the exploded perspective view of concrete curing cystosepiment according to another implementation of the invention; Fig. 8 is the coupling part partial enlarged drawing, and it is used to explain the syndeton of concrete curing cystosepiment according to another implementation of the invention.
In addition, Fig. 9 is the stereogram of the concrete curing cystosepiment with syndeton according to another implementation of the invention, and Figure 10 is the stereogram according to the concrete curing cystosepiment with syndeton of another embodiment of the present invention.
To Figure 10, the concrete curing cystosepiment with syndeton according to another implementation of the invention comprises with reference to Fig. 5: the cystosepiment main body 10 that forms through a stacked PE film 12, the 2nd PE film 13 and finishing board 15; Be formed on first connecting portion 60 at a side place of cystosepiment main body 10; Be formed on second connecting portion 70 at another side place of cystosepiment main body 10; And be installed in the combining unit 80 on the contact surface of first connecting portion 60 and second connecting portion 70 respectively.
Thereby cystosepiment main body 10 comprise as the bottom contact concrete maintenance surface a PE film 12, be provided with a plurality of pores 14 and be stacked in the 2nd PE film 13 on the PE film 12 and be stacked in the finishing board 15 on the 2nd PE film 13.
Through compressing first connecting portion 60 that stacked first film 12, second film 13 and finishing board 15 obtain to be formed on a side place of cystosepiment main body 10.First connecting portion 60 is provided with staircase areas 61 at place, its underpart.
Through compressing second connecting portion 70 that stacked first film 12, second film 13 and finishing board 15 obtain to be formed on another side place of cystosepiment main body 10.Second connecting portion 70 locates to be provided with staircase areas 71 at an upper portion thereof.
Combining unit 80 is installed on each the contact surface of first connecting portion 60 and second connecting portion 70, thereby first connecting portion 60 of cystosepiment and second connecting portion 70 are attached to second connecting portion 70 and first connecting portion 60 of another concrete curing cystosepiment respectively.
In Fig. 8, combining unit 80 comprises that cloudy Velcro (Velcro) on the contact surface that is attached to first connecting portion 60 is with 81 and be attached to the positive Velcro band 82 on the contact surface of second connecting portion 70.
In Fig. 9, combining unit 80 comprises the rubber magnet 83 on the contact surface that is installed in first connecting portion 60 and second connecting portion 70 respectively.In Figure 10, combining unit 80 comprises the protruding snap fastener 84 on the contact surface that is attached to first connecting portion 60 and is attached to the recessed snap fastener 85 on the contact surface of second connecting portion 70.
That is to say that combining unit 80 comprises from the group that is made up of a pair of cloudy Velcro band 81 and positive Velcro band 82, a pair of rubber magnet 83 and at least one pair of protruding snap fastener 84 and recessed snap fastener 85, select a kind of.
By means of above-mentioned syndeton; Concrete curing cystosepiment of the present invention can closely be connected at lip-deep another concrete curing cystosepiment of concrete curing, thereby can prevent the bad maintenance in concrete part that causes owing to the space that exists in the coupling part between the plate.
Can obviously find out from top description; The invention provides a kind of concrete curing cystosepiment with syndeton; This concrete curing cystosepiment comprises linkage unit; This linkage unit is formed on the cystosepiment main body, is used for this concrete curing cystosepiment closely is connected to lip-deep another concrete curing cystosepiment of concrete maintenance, thereby has prevented the bad maintenance in concrete part that the space owing to the coupling part between the plate causes.
In addition, connector is processed by transparent and flexible synthetic resin, even thereby cystosepiment is being installed under the lip-deep situation of concrete maintenance, the staff also can with the naked eye easily see concrete maintenance degree.
Although disclose preferred implementation of the present invention for illustration purpose; But it will be appreciated by those skilled in the art that; Under the situation that does not deviate from disclosed scope of the present invention and spirit in the accompanying claims, can carry out various modifications, increase and substitute.

Claims (3)

1. concrete curing cystosepiment with syndeton, this concrete curing cystosepiment comprises:
The cystosepiment main body; This cystosepiment main body comprises the PE film that contacts with concrete maintenance surface, be provided with a plurality of pores and be stacked in the 2nd PE film on the said PE film and be stacked in the finishing board on said the 2nd PE film, thereby and this cystosepiment main body be provided with through compressing said first and second PE films and said finishing board and be respectively formed at the insertion section at said cystosepiment main body side place to have reduced cross section;
The first transparent connector; This first connector is provided with and is formed on the board slot in the one of which side surface and is formed on the connection tank in its another side surface, and is inserted in the said insertion section with said cystosepiment main body and uses a plurality of attachment screws said first connector to be fixed to a side of said cystosepiment main body under the situation in the said board slot of said first connector;
Bar shaped fixture, this fixture are provided with a plurality of rings that are installed in a longitudinal direction on the one of which side surface, and use a plurality of screws said bar shaped fixture to be fixed to the inboard of said connection tank;
Connector, this connector is provided with: be formed on the both sides place of an one of which side surface a pair of lateral process, be formed on central protrusion between the said lateral process, be formed on receiving slit in the upper surface of said central protrusion, be inserted into said receiving slit and a pair of bar that supports by the spring ground that inserts therebetween, be provided with slotted hole that the vertical component effect that runs through the said bar of confession that forms passes through movably and use hold-down screw and be fixed to the fixed head of said central protrusion, be installed in the lip-deep a plurality of rings of opposite side of said connector and for said connector flexibly is connected to said fixture the said ring of the said ring of said connector and said fixture is connected and is inserted into a plurality of springs in the said connection tank in a longitudinal direction; And
The second transparent connector; This second connector is provided with: be formed on board slot in the one of which side surface, be formed in the both sides on its opposite side surface and supply said lateral process to be inserted into wherein side insertion groove, to be formed between the said side insertion groove and to supply said central protrusion to be inserted into bar hole and elongated hole that wherein central insertion groove, the top through said central insertion groove form; Said elongated hole is respectively formed at the place, both sides in said bar hole; Thereby after said bar being inserted in the said bar hole; Said vertical component effect can flexibly be supported by said elongated hole, and said second connector is inserted in the said insertion section with said cystosepiment main body and uses a plurality of attachment screws to be fixed to another side of said cystosepiment main body under the situation in the said board slot of said second connector.
2. concrete curing cystosepiment with syndeton, this concrete curing cystosepiment comprises:
Cystosepiment main body, this cystosepiment main body comprise the PE film that contacts with concrete maintenance surface, be provided with a plurality of pores and be stacked in the 2nd PE film on the said PE film and be stacked in the finishing board on said the 2nd PE film;
First connecting portion, this first connecting portion be through compressing the side place that a said PE film, said the 2nd PE film and said finishing board are formed on said cystosepiment main body, and be provided with staircase areas at the place, bottom of said first connecting portion;
Second connecting portion, this second connecting portion be through compressing another side place that a said PE film, said the 2nd PE film and said finishing board are formed on said cystosepiment main body, and be provided with staircase areas at the place, top of said second connecting portion; And
Combining unit; Said combining unit is installed in respectively on the contact surface of said first connecting portion and said second connecting portion; Thereby said first connecting portion of said cystosepiment is attached to said second connecting portion of another cystosepiment, and said second connecting portion of said cystosepiment is attached to said first connecting portion of another cystosepiment.
3. concrete curing cystosepiment according to claim 2 is characterized in that, said combining unit comprises from the group that is made up of a pair of protruding Velcro band and recessed Velcro band, a pair of rubber magnet and at least one pair of protruding snap fastener and recessed snap fastener, select a kind of.
CN2007101360358A 2007-07-13 2007-07-13 Concrete curing cystosepiment with connecting structure Expired - Fee Related CN101342763B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101360358A CN101342763B (en) 2007-07-13 2007-07-13 Concrete curing cystosepiment with connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101360358A CN101342763B (en) 2007-07-13 2007-07-13 Concrete curing cystosepiment with connecting structure

Publications (2)

Publication Number Publication Date
CN101342763A CN101342763A (en) 2009-01-14
CN101342763B true CN101342763B (en) 2012-11-07

Family

ID=40244939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101360358A Expired - Fee Related CN101342763B (en) 2007-07-13 2007-07-13 Concrete curing cystosepiment with connecting structure

Country Status (1)

Country Link
CN (1) CN101342763B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101863072B (en) * 2010-06-11 2012-06-27 东南大学 Internal curing process for improving performance of high strength and slight expansion concrete
KR102294317B1 (en) * 2015-01-30 2021-08-26 엘지이노텍 주식회사 Light emitting apparatus

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248726Y (en) * 1996-03-28 1997-03-05 谢勇成 Pad for curing and protecting of concrete road surface
CN2433065Y (en) * 2000-08-09 2001-06-06 北方交通大学 Concrete curing cover
CN2670425Y (en) * 2003-11-11 2005-01-12 长沙圣华科技发展有限公司 Concrete water-saving moist keeping maintenance film
KR100667103B1 (en) * 2006-05-03 2007-01-12 (주) 선엔지니어링종합건축사사무소 Bubble seat for concreat curing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2248726Y (en) * 1996-03-28 1997-03-05 谢勇成 Pad for curing and protecting of concrete road surface
CN2433065Y (en) * 2000-08-09 2001-06-06 北方交通大学 Concrete curing cover
CN2670425Y (en) * 2003-11-11 2005-01-12 长沙圣华科技发展有限公司 Concrete water-saving moist keeping maintenance film
KR100667103B1 (en) * 2006-05-03 2007-01-12 (주) 선엔지니어링종합건축사사무소 Bubble seat for concreat curing

Also Published As

Publication number Publication date
CN101342763A (en) 2009-01-14

Similar Documents

Publication Publication Date Title
CN100455176C (en) Heat radiating apparatus in electronic device and heat radiating method
CN101288352B (en) Fixing system for printed circuit boards
CN101752735B (en) Circuit board fixing device
CN101342763B (en) Concrete curing cystosepiment with connecting structure
JP2007513820A5 (en)
US7731544B2 (en) U-shaped electrical connector spring devices and methods
CN101959386A (en) Fastener
CN204155923U (en) Heat radiator fixing device combination
CN203420401U (en) Keel connecting piece
CN202936068U (en) Spliced suspended ceiling on car roof
CN204526429U (en) A kind of consumable chip and consumable chip fixed structure
KR200487906Y1 (en) Cushion frame of a billiard table
CN202135443U (en) Shield assembly
JPS608440Y2 (en) wiring board
CN202134528U (en) Fin assembling structure and radiator comprising same
CN201511425U (en) Anti-explosion bearing plate of hot-press used for producing compressed wood floor
CN219204834U (en) Rotary fixing type PCB positioning jig
CN218548643U (en) Blue membrane damage structure is prevented to quick fixed inserted block
CN201383572Y (en) Electric connector combination and backboard
CN110803370B (en) High-strength moisture-proof corrosion-proof corrugated paper box
CN215834877U (en) Female seat terminal production fixed knot of TYPE-C constructs
CN104300159A (en) Spraying preparation jig for fuel-cell catalyst coatings
CN216741182U (en) Easy-to-dismount structure of section bar
CN212767468U (en) General rubber box for cleaning and material transferring
CN212648343U (en) Power battery substrate assembly structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20130713