CN101335482B - 风力发电机变频器的冷却***及工作方式 - Google Patents

风力发电机变频器的冷却***及工作方式 Download PDF

Info

Publication number
CN101335482B
CN101335482B CN2007100426663A CN200710042666A CN101335482B CN 101335482 B CN101335482 B CN 101335482B CN 2007100426663 A CN2007100426663 A CN 2007100426663A CN 200710042666 A CN200710042666 A CN 200710042666A CN 101335482 B CN101335482 B CN 101335482B
Authority
CN
China
Prior art keywords
temperature
cooling system
frequency converter
wind power
power generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100426663A
Other languages
English (en)
Other versions
CN101335482A (zh
Inventor
李惠昌
李滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Wind Power Group Co Ltd
Original Assignee
SHANGHAI SEWIND CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SEWIND CO Ltd filed Critical SHANGHAI SEWIND CO Ltd
Priority to CN2007100426663A priority Critical patent/CN101335482B/zh
Publication of CN101335482A publication Critical patent/CN101335482A/zh
Application granted granted Critical
Publication of CN101335482B publication Critical patent/CN101335482B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Motor Or Generator Cooling System (AREA)

Abstract

本发明涉及风力发电领域,特别涉及风力发电机变频器的冷却***。本发明的风力发电机变频器的冷却***的压力表、压力传感器、安全阀、补水接口、集水箱和测温元件集成在辅助阀块中,测温元件、加热器和温控阀集成在主控阀块中,用软管将所述变频器、主控阀块、冷却循环泵和辅助阀块依次连接构成旁路,冷却器连接在所述变频器和所述温控阀之间形成主回路。本发明还提供上述风力发电机变频器冷却***的工作方式。由于采用了上述的技术解决方案,节省了空间、降低了成本、缩短了零部件采购周期、减少了车间安装工时,使变频器的冷却***能适应低温环境的工作。

Description

风力发电机变频器的冷却***及工作方式
技术领域
本发明涉及风力发电领域,特别涉及风力发电机变频器的冷却***。
背景技术
目前的风力发电机变频器原冷却***存在以下问题:泵站布置过于分散,占用的空间比较多;泵站接管工作量大;泵站零件采购工作量大;泵站成本高;泵站不适用低温环境,工作温度范围仅为-20℃到+40℃;冷却器风扇电机为单速电机,不适用低温环境,工作温度范围仅为-20℃到+40℃。
发明内容
本发明的目的在于提供一种能克服上述风力发电机变频器冷却***缺点的能在更宽温度范围工作的风力发电机变频器冷却***。
本发明的另一目的在于提供上述风力发电机变频器冷却***的工作方式。
实现本发明目的技术方案是:一种风力发电机变频器的冷却***,包括依次通过软管连接的变频器、冷却器、温控阀和冷却循环泵形成的冷却主回路,还包括连接在上述变频器和上述温控阀之间的测温元件和加热器构成的旁路,还包括分别与上述变频器和上述冷却循环泵之间的软管相连的压力表、压力传感器、安全阀、补水接口、集水箱、膨胀箱和测温元件,其中,上述的压力表、压力传感器、安全阀、补水接口、集水箱和测温元件集成在辅助阀块中,上述测温元件、加热器和温控阀集成在主控阀块中,用软管将上述变频器、主控阀块、冷却循环泵和辅助阀块依次连接构成旁路,上述冷却器连接在上述变频器和上述温控阀之间形成主回路。
上述的风力发电机变频器的冷却***中上述冷却循环泵采用可承受-40℃到+120℃的介质温度的低温泵。上述冷却器风扇采用双速电机。上述冷却器风扇电机增装使之能适应低温环境的加热带。上述辅助阀块安装在上述膨胀箱上面。上述膨胀箱用支架固定在冷却循环泵上。
一种风力发电机变频器的冷却***的工作方式,包括如下方式:
旁路循环:当变频器出水管水温度低于20℃时,温控阀不开通,热水直接通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环;
主回路循环:当变频器出水管水温度高于20℃时温控阀开通,热水先经过冷却器被冷却后再经过主控阀块的主回路口到达冷却循环泵,被冷却循环泵送回变频器,完成主回路循环。
上述的风力发电机变频器的冷却***的工作方式,上述旁路循环方式中,当环境温度低于10℃时,温控阀不开通,管道中的水经过加热器加热后通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环。
由于采用了上述的技术解决方案,节省了空间、降低了成本、缩短了零部件采购周期、减少了车间安装工时,使变频器的冷却***能适应低温环境的工作。
附图说明
图1为本发明风力发电机变频器的冷却***的示意图。
具体实施方式
下面结合附图和实施方式对本发明作进一步的详细说明:
参考图1,一种风力发电机变频器的冷却***,包括依次通过软管连接的变频器1、冷却器5、温控阀21和冷却循环泵4形成的冷却主回路,还包括连接在上述变频器1和上述温控阀21之间的第一测温元件23和加热器22构成的旁路,还包括分别与上述变频器1和上述冷却循环泵4之间的软管相连的压力表31、压力传感器32、安全阀33、补水接口34、集水箱35、膨胀箱6和第二测温元件36,其中,上述的压力表31、压力传感器32、安全阀33、补水接口34、集水箱35和第二测温元件36集成在辅助阀块3中,上述第一测温元件23、加热器22和温控阀21集成在主控阀块2中,用软管将上述变频器1、主控阀块2、冷却循环泵4和辅助阀块3依次连接构成旁路,上述冷却器5连接在上述变频器1和上述温控阀21之间形成主回路。
上述的风力发电机变频器的冷却***中上述冷却循环泵4采用可承受-40℃到+120℃的介质温度的低温泵,如采用GRUNDFOS CR系列低温泵。上述冷却器风扇采用双速电机,如690V50Hz1.1KW980r/min和690V50Hz1.8KW1450r/min的电机,可以视不同温度条件采取相应的连接方式。上述冷却器风扇电机增装使之能适应低温环境的加热带,如该加热带的功率可为20W。上述辅助阀块3安装在上述膨胀箱6上面。上述膨胀箱6用支架固定在冷却循环泵4上。
一种风力发电机变频器的冷却***的工作方式,包括如下方式:
旁路循环:当变频器出水管水温度低于20℃时,温控阀不开通,热水直接通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环;
主回路循环:当变频器出水管水温度高于20℃时温控阀开通,热水先经过冷却器被冷却后再经过主控阀块的主回路口到达冷却循环泵,被冷却循环泵送回变频器,完成主回路循环。
上述的风力发电机变频器的冷却***的工作方式,上述旁路循环方式中,当环境温度低于10℃时,温控阀不开通,管道中的水经过加热器加热后通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环。
本发明的特点在于:
1)采用整体式泵站设计:将加热器、接头、温控阀集成在一个控制阀中。采用GRUNDFOS CR系列低温泵,可承受-40℃到+120℃的介质温度。
2)冷却器风扇采用双速电机:690V50Hz1.1KW980r/min和690V50Hz1.8KW1450r/min可以视不同温度条件采取相应的连接方式。
3)冷却器风扇电机增加加热带(20W)以适应低温环境。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。

Claims (7)

1.一种风力发电机变频器的冷却***,包括依次通过软管连接的变频器、冷却器、温控阀和冷却循环泵形成的冷却主回路,还包括连接在所述变频器和所述温控阀之间的第一测温元件和加热器构成的旁路,还包括分别与所述变频器和所述冷却循环泵之间的软管相连的压力表、压力传感器、安全阀、补水接口、集水箱、膨胀箱和第二测温元件,其特征在于,所述的压力表、压力传感器、安全阀、补水接口、集水箱和第二测温元件集成在辅助阀块中,所述第一测温元件、加热器和温控阀集成在主控阀块中,用软管将所述变频器、主控阀块、冷却循环泵和辅助阀块依次连接构成旁路,所述冷却器连接在所述变频器和所述温控阀之间形成主回路。
2.根据权利要求1所述的风力发电机变频器的冷却***,其特征在于,所述冷却循环泵采用可承受-40℃到+120℃的介质温度的低温泵。
3.根据权利要求1所述的风力发电机变频器的冷却***,其特征在于,所述冷却器风扇采用双速电机。
4.根据权利要求1所述的风力发电机变频器的冷却***,其特征在于,所述冷却器风扇电机增装使之能适应低温环境的加热带。
5.根据权利要求1所述的风力发电机变频器的冷却***,其特征在于,所述辅助阀块安装在所述膨胀箱上面。
6.根据权利要求1所述的风力发电机变频器的冷却***,其特征在于,所述膨胀箱用支架固定在冷却循环泵上。
7.一种风力发电机变频器的冷却***的工作方式,其特征在于,包括如下方式:
旁路循环:当环境温度低于10℃时,温控阀不开通,管道中的水经过加热器加热后通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环;当变频器出水管水温低于20℃时,温控阀不开通,热水直接通过主控阀块的旁路口到达冷却循环泵,再被冷却循环泵送回变频器,完成旁路循环;
主回路循环:当变频器出水管水温度高于20℃时温控阀开通,热水先经过冷却器被冷却后再经过主控阀块的主回路口到达冷却循环泵,被冷却循环泵送回变频器,完成主回路循环。
CN2007100426663A 2007-06-26 2007-06-26 风力发电机变频器的冷却***及工作方式 Expired - Fee Related CN101335482B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100426663A CN101335482B (zh) 2007-06-26 2007-06-26 风力发电机变频器的冷却***及工作方式

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100426663A CN101335482B (zh) 2007-06-26 2007-06-26 风力发电机变频器的冷却***及工作方式

Publications (2)

Publication Number Publication Date
CN101335482A CN101335482A (zh) 2008-12-31
CN101335482B true CN101335482B (zh) 2011-12-28

Family

ID=40197854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100426663A Expired - Fee Related CN101335482B (zh) 2007-06-26 2007-06-26 风力发电机变频器的冷却***及工作方式

Country Status (1)

Country Link
CN (1) CN101335482B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101982716B (zh) * 2010-11-03 2012-08-08 上海致远绿色能源有限公司 风力发电压缩机制冷制热***
CN102967100A (zh) * 2012-11-26 2013-03-13 无锡马山永红换热器有限公司 风电冷却***
CN103079384B (zh) * 2012-12-14 2015-03-25 上海冠带通风节能设备有限公司 风力发电自启动硅堆冷却***
CN104638880B (zh) * 2013-11-08 2019-09-20 珠海格力电器股份有限公司 变流器冷却***及具有该变流器冷却***的空调机组
CN104578817B (zh) * 2014-12-30 2017-06-16 徐州中矿大传动与自动化有限公司 一种交‑直‑交变频器专用的复合型冷却***
CN105864412A (zh) * 2016-06-16 2016-08-17 南京讯联智能科技有限公司 一种新型风力发电齿轮箱润滑冷却***
CN107044391B (zh) * 2017-06-15 2023-08-04 国电联合动力技术有限公司 一种风电机组冷却***
WO2020244196A1 (zh) * 2019-06-03 2020-12-10 广州高澜节能技术股份有限公司 一种集成阀块冷却泵组

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1834454A (zh) * 2006-04-19 2006-09-20 南京航空航天大学 采用蒸发循环冷却的风力发电机
EP1707752A1 (en) * 2004-12-23 2006-10-04 Nuovo Pignone S.P.A. Turbogenerator
CN1963193A (zh) * 2006-11-10 2007-05-16 南京航空航天大学 集中冷却式风力发电机***
CN201063525Y (zh) * 2007-06-26 2008-05-21 上海电气风电设备有限公司 风力发电机变频器的冷却***

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1707752A1 (en) * 2004-12-23 2006-10-04 Nuovo Pignone S.P.A. Turbogenerator
CN1834454A (zh) * 2006-04-19 2006-09-20 南京航空航天大学 采用蒸发循环冷却的风力发电机
CN1963193A (zh) * 2006-11-10 2007-05-16 南京航空航天大学 集中冷却式风力发电机***
CN201063525Y (zh) * 2007-06-26 2008-05-21 上海电气风电设备有限公司 风力发电机变频器的冷却***

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2007-74894A 2007.03.22
JP特开平7-240589A 1995.09.12

Also Published As

Publication number Publication date
CN101335482A (zh) 2008-12-31

Similar Documents

Publication Publication Date Title
CN101335482B (zh) 风力发电机变频器的冷却***及工作方式
CN102272936B (zh) 太阳能转换器,包括温度受控的太阳能转换器,以及相关的***和方法
KR101880316B1 (ko) 통합 냉각시스템
CN201063525Y (zh) 风力发电机变频器的冷却***
SE0502676L (sv) Kylsystem
CN103277263A (zh) 超大型风力发电机组冷却***
CN109812932A (zh) 一种变频空调功率模块温升控制方法及装置
CN113363532A (zh) 一种燃料电池冷却***的控制方法
CN207740140U (zh) 天然气长输管道增压站压缩机的双效冷却装置
CN113844615A (zh) 一种船舶变频节能控制***
JP6175164B1 (ja) 併用システム
CN211116425U (zh) 集中冷却***
CN107044391B (zh) 一种风电机组冷却***
CN206602008U (zh) 一种利用日夜温差对变压器强迫油循环冷却的***
CN213807870U (zh) 一种利用制冷站冷量余量的燃气轮机进气单回路冷却***
CN201526362U (zh) 一种柴油机冷却水集中循环装置
CN203837518U (zh) 设有补偿式水能风机的冷却塔
CN108678936B (zh) 泵运行管控方法
CN210602088U (zh) 一种地源热泵多联机地下能量补偿器
CN209197509U (zh) 一种避免冷却塔盘管冻裂的余热再利用***
CN208101688U (zh) 一种混合动力工程机械用散热装置
CN203025326U (zh) 一种水冷电机测试平台
CN106766221B (zh) 配合供热水的控制方法及其装置
CN203452980U (zh) 集中式风力发电机组液冷***
CN204100562U (zh) 储水箱及其应用的卫浴水***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SIEMENS WIND POWER EQUIPMENT (SHANGHAI) CO., LTD.

Free format text: FORMER OWNER: SHANGHAI SEWIND CO., LTD.

Effective date: 20130411

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200241 MINHANG, SHANGHAI TO: 201306 PUDONG NEW AREA, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130411

Address after: 201306 room D608, No. 168 Tonghui Road, Shanghai, Pudong New Area

Patentee after: SIEMENS WIND POWER EQUIPMENT (SHANGHAI) CO.,LTD.

Address before: 200241 No. 555, Dongchuan Road, Shanghai, Minhang District

Patentee before: Shanghai Electric Wind Power Group Co.,Ltd

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 201306 room D608, No. 168 Tonghui Road, Shanghai, Pudong New Area

Patentee after: Shanghai Electric Wind Power Equipment Co.,Ltd.

Address before: 201306 room D608, No. 168 Tonghui Road, Shanghai, Pudong New Area

Patentee before: SIEMENS WIND POWER EQUIPMENT (SHANGHAI) CO.,LTD.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161124

Address after: 200241 Dongchuan Road, Minhang District, building No. 4, building 555, building 4

Patentee after: SHANGHAI ELECTRIC WIND POWER GROUP Co.,Ltd.

Address before: 201306 room D608, No. 168 Tonghui Road, Shanghai, Pudong New Area

Patentee before: Shanghai Electric Wind Power Equipment Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 200241 Dongchuan Road, Shanghai, No. 555, building No. 8, floor, floor, No.

Patentee after: Shanghai Electric Wind Power Group Co.,Ltd.

Address before: 200241, building 4, building 555, No. 4, Dongchuan Road, Shanghai, Minhang District

Patentee before: SHANGHAI ELECTRIC WIND POWER GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228