CN101280887B - Pipe gas pressure stabilizing regulation system - Google Patents
Pipe gas pressure stabilizing regulation system Download PDFInfo
- Publication number
- CN101280887B CN101280887B CN2007101002610A CN200710100261A CN101280887B CN 101280887 B CN101280887 B CN 101280887B CN 2007101002610 A CN2007101002610 A CN 2007101002610A CN 200710100261 A CN200710100261 A CN 200710100261A CN 101280887 B CN101280887 B CN 101280887B
- Authority
- CN
- China
- Prior art keywords
- pressure
- gas pressure
- gas
- knock out
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Feeding And Controlling Fuel (AREA)
Abstract
The invention provides a pipeline gas pressure stabilization regulating system including a pressure monitoring system and a pressure regulating system, the pressure regulating system includes a fuel tank, a first pressure release valve and solenoid switch connected in turn, the solenoid switch connects to a first buffer vessel set, the other end of the first buffer vessel set connects to a regulating valve set by a second buffer vessel set, then connected to a combustor on the one hand; on the other hand the other end of the first buffer vessel set separately connects a secure boot flame and an igniter by a general pressure reducer; a gas pressure sensor in the pressure monitoring system is arranged on the top of the first buffer vessel set and the second buffer vessel set. The inventive system can reduce gas pressure wave motion for maintaining stabilization of the pipeline gas pressure.
Description
Technical field
The present invention relates to a kind of pipe gas pressure stabilizing regulation system, refer to laboratory usefulness especially, have the highi degree of accuracy pipeline gas pressure stable regulation system of real-time monitoring and control.
Background technique
At present; Be used for the stable regulating system of pipeline pressure, as Chinese patent number be 95223675.3 disclosed, mainly be pressure control to fluid pipeline; Method through increasing the loop is regulated water output and pressure, and the application target of this scheme and applicable object are liquid.And pipeline gas pressure is regulated, and particularly the correlation technique for pressure stability in short-term and regulating system also is not reported.
In view of above situation, the present invention is directed in the market the blank of pipe gas pressure stabilizing system and study.
Summary of the invention
The purpose of this invention is to provide a kind of pipe gas pressure stabilizing regulation system, this system is a kind of meticulous regulating system that is used for stablizing the gas pipeline air pressure.
Above-mentioned purpose of the present invention realizes through following technological scheme:
A kind of pipe gas pressure stabilizing regulation system, this system comprises pressure monitor system and pressure regulating system two-part;
Said pressure regulating system comprises: fuel pot, and first reduction valve and the magnetic switch that connect successively, said magnetic switch is connected with the first knock out drum group; The said first knock out drum group the other end is connected with the modulating valve group through the second knock out drum group on the one hand, is connected with burner then; Then be connected with igniter with safe guidance flame respectively on the other hand through general decompressor;
Said pressure monitor system comprises gas pressure sensor, and this gas pressure sensor is located at the first knock out drum group and the top of the second knock out drum group in the said pressure regulating system.
A kind of optimal technical scheme is characterized in that: the said second knock out drum group is connected with the postcombustion jar with second reduction valve through magnetic switch.
According to nominal operating pressure and pipe fitter's delivered pressure of gas cylinder, it is identical with pipe fitter's delivered pressure to set blowing mouth pressure through first reduction valve.
Adopt the design of many knock out drums group, gas arrives the first knock out drum group through first reduction valve, and pipeline gas is carried out the voltage stabilizing first time; As required, the corresponding second knock out drum group of design was carried out the adjusting of voltage stabilizing once more before pipeline gas got into burner, kept the duration of work constant pressure.
Electromagnetic switch valve is all installed in each surge flask air outlet in the said first buffering gas tank group, and the actual pressure (air pressure tabular value) according to pipeline gas during burning is controlled each electromagnetic switch valve, and real-time regulated gets into the gas pressure of pipeline.
The said second knock out drum group is provided with the postcombustion jar through the electromagnetic switch valve and second reduction valve, when the pipeline gas drops is too fast, opens electromagnetic switch valve through second reduction valve, and gas make-up fast is provided, and guarantees that pipeline pressure is stable.
Gas in the said postcombustion jar is transported to the second knock out drum group through second reduction valve, converges with the main pipe combustion gas, gets into fuel device through the modulating valve group.
Said gas pressure sensor is monitored ducted gas pressure in real time.
Described pipe gas pressure stabilizing regulation system is regulated buffer gas conveyance conduit flow mainly according to the output signal of pipeline gas pressure transducer.
In combustion experiment, the heat flow that burning is produced is stable to be the key that system realizes, for guaranteeing the precision and the repeatability of burning, needs the gas pressure in the gas pipeline to keep constant.
The invention has the beneficial effects as follows: when carrying out combustion experiment, the variation in pressure that can guarantee combustion process intermediate conduit gas to produce stable burning, provides the ignition heat flow of standard less than 10%, realizes repeatably combustion experiment.
Through pipeline configuration design, monitor the constant of gas pressure in both realization combining pipelines in real time.Be applied to especially in quick, the accurate combustion system, when gas in the pipeline changed at short notice fast, system can reduce the fluctuation of gas pressure, was used to keep the stable of pipeline gas pressure.
Below in conjunction with accompanying drawing and embodiment the present invention is described further, but this and do not mean that restriction to protection scope of the present invention.
Description of drawings
Fig. 1 is a pipeline pressure stable system block diagram of the present invention.
Fig. 2 is a pipe gas pressure stabilizing system architecture schematic representation of the present invention.
Embodiment
As illustrated in fig. 1 and 2, Fig. 1 is a pipeline pressure stable system block diagram of the present invention.Fig. 2 is a pipe gas pressure stabilizing system architecture schematic representation of the present invention.
Among Fig. 1,101,102 is fuel pot, and 103 is the first buffering gas tank group; 104 is the second buffering gas tank group, and 105 is first reduction valve, and 106 is second reduction valve; 107 is modulating valve, and 108 is general decompressor, and 109 is safe guidance flame; 110 is sets of burners, and 111 is the igniter group, all connects through pipeline between above-mentioned each parts.
With propane is example, designs two buffering gas tank groups.Aero operating pressure is 3 absolute atmospheres (0.3Mpa) in the pipeline, and domestic demand guaranteed that pipeline pressure falls and was no more than 10% 4 second period of combustion, and implementation is following:
As shown in Figure 2, the nominal operating pressure in the liquefied propane gas tank 201 is 2.1Mpa, and pipe fitter's delivered pressure is 0.3Mpa, and propane is 0.3Mpa through reduction valve 208 setting air outlet pressure, guarantees that gas cylinder outlet air pressure is consistent with pipeline pressure.Part propane gas arrives buffering gas tank group 203 through reduction valve 208, and pipeline gas is carried out the voltage stabilizing first time; Pipeline gas part after the voltage stabilizing gets into knock out drum groups 204 through electromagnetic switch valve 218 and carries out the voltage stabilizing second time, through the gas of voltage stabilizing once more, is transported to modulating valve group 211 through electromagnetic switch valve 219 and 220, gets into burner 221 then.Then be transported to safe guidance flame 223 and igniter systems 222 through another part gas after the voltage stabilizing for the first time through general decompressor 210.The top of said buffering gas tank group 203 is provided with barometer 205.The top of said buffering gas tank group 204 is provided with barometer 206.
Being provided with of electromagnetic switch valve is as shown in Figure 2, and electromagnetic switch valve 213,214,215 are all installed in each surge flask air outlet in fuel pot and the buffering gas tank group; 216,217,218,219; 220, during burning according to the actual pressure of pipeline gas (utilizing barometer 205,206 to measure); Each electromagnetic switch valve is controlled, and real-time regulated gets into the gas pressure of pipeline, keeps the gas pressure in the gas pipeline constant.
Claims (2)
1. pipe gas pressure stabilizing regulation system; This system comprises pressure monitor system and pressure regulating system two-part; Said pressure regulating system comprises: fuel pot; With first reduction valve and first magnetic switch that fuel pot is connected successively, said first magnetic switch is connected with the first knock out drum group; The said first knock out drum group is connected with the modulating valve group through the second knock out drum group on the one hand, is connected with burner then, then is connected with igniter with safe guidance flame respectively through general decompressor on the other hand; Said pressure monitor system comprises gas pressure sensor, and this gas pressure sensor is located at the first knock out drum group and the top of the second knock out drum group in the said pressure regulating system.
2. according to the said pipe gas pressure stabilizing regulation system of claim 1, it is characterized in that: the said second knock out drum group is connected with the postcombustion jar with second reduction valve through second magnetic switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101002610A CN101280887B (en) | 2007-06-06 | 2007-06-06 | Pipe gas pressure stabilizing regulation system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007101002610A CN101280887B (en) | 2007-06-06 | 2007-06-06 | Pipe gas pressure stabilizing regulation system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101280887A CN101280887A (en) | 2008-10-08 |
CN101280887B true CN101280887B (en) | 2012-01-11 |
Family
ID=40013486
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007101002610A Expired - Fee Related CN101280887B (en) | 2007-06-06 | 2007-06-06 | Pipe gas pressure stabilizing regulation system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101280887B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109238625A (en) * | 2018-09-27 | 2019-01-18 | 北京航天长征飞行器研究所 | Big-flow high-pressure oxygen long-time supply system |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101539486B (en) * | 2009-04-24 | 2010-09-08 | 北京航空航天大学 | Gas pressure control adjusting device |
CN102092540A (en) * | 2010-12-08 | 2011-06-15 | 北京七星华创电子股份有限公司 | Chemical liquid storage equipment and chemical liquid storage and distribution control method |
CN102654242A (en) * | 2012-03-30 | 2012-09-05 | 蚌埠高科能源装备有限公司 | Natural gas pressure regulating device |
CN103574290A (en) * | 2012-07-30 | 2014-02-12 | 重庆大众机械有限公司 | Regenerated pressure self-stabilization balancing process pipeline system |
CN104848035A (en) * | 2015-04-27 | 2015-08-19 | 张彦忠 | Gas supply device for fuel gas heater |
CN104819467B (en) * | 2015-04-29 | 2017-06-06 | 哈尔滨飞机工业集团有限责任公司 | A kind of aircraft fire protection test burn device air supply system |
CN105864639B (en) * | 2016-04-05 | 2018-07-06 | 中国石油工程建设有限公司 | A kind of pipeline pressure-stabilizing system and method after liquefied petroleum gas multi-purpose station pipeline stopping transportation |
CN106969265A (en) * | 2017-04-15 | 2017-07-21 | 广东蓝新氢能源科技有限公司 | A kind of explosion-proof metering device of voltage stabilizing |
CN109032199B (en) * | 2018-06-26 | 2021-12-21 | 常州大学 | Pressure control system and pressure control method of low-pressure phase balance experimental device |
CN114427660B (en) * | 2022-01-05 | 2024-06-04 | 国家石油天然气管网集团有限公司 | Integrated automatic leveling and automatic emptying system and method for station yard |
CN114607717B (en) * | 2022-03-09 | 2024-01-02 | 一汽解放汽车有限公司 | Hydrodynamic retarder and automobile |
CN115184815A (en) * | 2022-06-22 | 2022-10-14 | 中汽创智科技有限公司 | Fuel cell monocell test system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2108847U (en) * | 1991-05-21 | 1992-07-01 | 鞍山钢铁公司 | Automatic pressure-stabilizing and igniting device of gas calorific value apparatus |
US6129778A (en) * | 1997-03-04 | 2000-10-10 | L'air Liquide | Process for supplying a consumption unit with gas at several pressures |
DE102004018057A1 (en) * | 2004-04-08 | 2005-11-10 | Karl Dungs Gmbh & Co. Kg | Gas valve arrangement with delayed gas release |
-
2007
- 2007-06-06 CN CN2007101002610A patent/CN101280887B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2108847U (en) * | 1991-05-21 | 1992-07-01 | 鞍山钢铁公司 | Automatic pressure-stabilizing and igniting device of gas calorific value apparatus |
US6129778A (en) * | 1997-03-04 | 2000-10-10 | L'air Liquide | Process for supplying a consumption unit with gas at several pressures |
DE102004018057A1 (en) * | 2004-04-08 | 2005-11-10 | Karl Dungs Gmbh & Co. Kg | Gas valve arrangement with delayed gas release |
Non-Patent Citations (1)
Title |
---|
JP特开2002-013698A 2002.01.18 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109238625A (en) * | 2018-09-27 | 2019-01-18 | 北京航天长征飞行器研究所 | Big-flow high-pressure oxygen long-time supply system |
Also Published As
Publication number | Publication date |
---|---|
CN101280887A (en) | 2008-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101280887B (en) | Pipe gas pressure stabilizing regulation system | |
CN202082951U (en) | Air/fuel ratio full ratio adjustable burner | |
EP2258984B1 (en) | System for controlling the calorie content of a fuel | |
CN105627356A (en) | Combustion optimization control system of metallurgical gas boiler | |
RU2007146461A (en) | METHOD AND DEVICE FOR REGULATING A LINE OF OPERATION OF A GAS TURBINE COMBUSTION CHAMBER | |
CN203162944U (en) | Hydrogen burner system | |
US10378764B2 (en) | System for boiler control | |
CN201376921Y (en) | Multi-channel paratactic combination feed-water automatic oxygenation device for power plant boiler | |
RU149566U1 (en) | DEVICE FOR GAS-DYNAMIC TESTS | |
EP3362740B1 (en) | Adjustable burner control valve | |
CN103148504A (en) | Self-adaptive economic combustion control system | |
CN214309492U (en) | Fuel system of tester of engine combustion chamber | |
CN203744293U (en) | Numerical controlled gas combustion device | |
SE1850477A1 (en) | Optimisation of control of rotary kiln | |
CN210237553U (en) | Facility system for effectively adjusting heat value of natural gas | |
CN202598130U (en) | Self-gas-supplying system controlled by pressure adjusting device of compressed natural gas | |
CN105402454B (en) | Gas supply adjusting device based on pressure reducer | |
CN207815380U (en) | A kind of novel gas flow is precisely controlled combustion system | |
CN105928003B (en) | A kind of control method on adjusting SCV burner fuel quantity delivereds | |
CN208759877U (en) | A kind of frostproof froth n machine is with applying steam heating device | |
CN102588648A (en) | Method for adjusting gas pressure by adopting stop valve | |
CN109469920A (en) | A kind of fiery temperature control system of boiler heating | |
CN104864268A (en) | Method for controlling medium flow by adopting big pipe and small pipe | |
CN205003126U (en) | Big board burning test device of veneer type fireproof paint | |
CN204437718U (en) | A kind of main steam header road voltage stabilizing leak detection system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120111 Termination date: 20150606 |
|
EXPY | Termination of patent right or utility model |