CN101240718B - Down-hole mining space top board separation layer prealarming method - Google Patents

Down-hole mining space top board separation layer prealarming method Download PDF

Info

Publication number
CN101240718B
CN101240718B CN2008100143692A CN200810014369A CN101240718B CN 101240718 B CN101240718 B CN 101240718B CN 2008100143692 A CN2008100143692 A CN 2008100143692A CN 200810014369 A CN200810014369 A CN 200810014369A CN 101240718 B CN101240718 B CN 101240718B
Authority
CN
China
Prior art keywords
absciss layer
top board
warning
data
absciss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008100143692A
Other languages
Chinese (zh)
Other versions
CN101240718A (en
Inventor
谭云亮
赵同彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN2008100143692A priority Critical patent/CN101240718B/en
Publication of CN101240718A publication Critical patent/CN101240718A/en
Application granted granted Critical
Publication of CN101240718B publication Critical patent/CN101240718B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The present invention discloses a warning method for underground fossick space top board, relates to method of stope of coal mines working surface top board and alley way top board breakaway. Abscisslayer velocity ratio Lambada<SUB>n<SUB> is mainly used as warning index to warning by judging if one the time absciss layer velocity ratio exceed terminal absciss layer velocity ratio. Because abscisslayer velocity ratio Lambada<SUB>n</SUB> is unchangeable in same rock formation and different tunnel place, this can avoid affection to top board breakaway warning result caused by different abscisslayer sensor place in fossick space, and insure equivalence character of absciss layer monitoring warning at all place which is possible to generating absciss layer, and improving absciss layer prophesy accuracy.

Description

The method for early warning of down-hole mining space top board absciss layer
Technical field
The invention belongs to the coal mining technical field, especially the method for stope working surface of coal mines top board and back inbreak.
Background technology
In stope working surface of coal mines exploitation and tunnelling process, when top board hangs when revealing certain area, top board will inbreak, causes personnel's injures and deaths.Usually, the most dangerous top plate thickness is the top board of 3~5 meters scopes in bottom, generally will forecast the inbreak of this part top board.
At present, the forecast monitoring instrument of roof delamination is comprised mechanical type (artificial reading), electromagnetic conversion formula (self-timing reading and storage data, manually peek with extension set) and absciss layer telemetry observation system (self-timing reading and storage data, automatically be transferred to ground-based computer), and these monitoring meanss play positive role to preventing roof collapse.But, carrying out aspect the roof collapse early warning processing, all be based on specified place roof delamination value size and absciss layer velocity magnitude to monitoring the absciss layer data, carry out the roof collapse early warning by given threshold value.Because different location roof delamination amount and absciss layer speed are different, for example roof delamination amount that monitors in place, middle part, tunnel and absciss layer speed will be much larger than helping to locate roof delamination amount and absciss layer speed near two, therefore, for same tunnel, because the threshold value of roof delamination inbreak is a given constant, will occur like this causing deviation is appearred in the same area roof delamination inbreak forecast result because of the difference of absciss layer instrument installation site, bring very big influence still for the reliability of mining operation safety, cause in the tunnel that delamination monitoring is arranged still to have the phenomenon that roof fall accident takes place.Therefore, be sought after the pre existing alarm method is improved, eliminate the deviation of installing the roof collapse forecast result that the difference of position causes because of delamination monitoring.At present the research of this respect is not seen as yet the report of domestic and international similar research.
Summary of the invention
The objective of the invention is deficiency, propose a kind of forecast result method for early warning comparatively accurately at above-mentioned roof delamination inbreak forecast.
Technical scheme of the present invention is:
One, the absciss layer sensor of automatic reading and storage data is installed in the punching of monitoring place, in floor mounted absciss layer telemetry observation system, the absciss layer sensor is gathered the bed separation displacement data at regular intervals, and deposits transfer of data in associated data files to the absciss layer telemetry observation system.
Two, the bed separation displacement data are handled and roof delamination inbreak early warning
By the absciss layer telemetry observation system bed separation displacement data that collect are handled, concrete steps are:
1, the bed separation displacement data increment h to collecting nObtain absciss layer velocity amplitude v divided by data acquisition m blanking time n, i.e. v n=h n/ m.
Calculate a certain moment absciss layer velocity rate λ n, that is:
&lambda; n = v n 1 n &Sigma; i = 1 n v i
Limit absciss layer velocity rate λ when 2, monitoring place roof collapse being set ' n, i.e. absciss layer warning constant threshold.
3, judge a certain moment absciss layer velocity rate λ nWhether surpass the constant threshold values of setting,, judge that absciss layer is about to take place, make corresponding early warning as surpassing the constant threshold values.
Good effect of the present invention is:
Adopt absciss layer velocity rate λ nAs warning index, because absciss layer velocity rate λ nPositions, tunnel different in same rock stratum are constant, can avoid like this installing the difference of position and the result of roof collapse early warning is exerted an influence at digging space internal cause absciss layer sensor, guarantee the equivalence that carries out the delamination monitoring early warning in all positions that the absciss layer zone might take place, improve the absciss layer accuracy of the forecast.
Description of drawings
Fig. 1 is an absciss layer sensor fitting arrangement;
Fig. 2 is two sensor absciss layer hodographs that record;
Fig. 3 handles the absciss layer velocity rate figure that obtains through data;
Fig. 4 is the data handling procedure theory diagram.
The specific embodiment
Concrete enforcement according to certain ore deposit further specifies method of the present invention below.
Example: 2.8 meters of certain pit coal layer thicknesses, top board are 1.6 meters siltstone and 3.0 meters medium sandstone from bottom to top, 4 meters of span lengths, 2.8 meters of height.In order to carry out the accurate forecast of roof delamination,, adorn 1# absciss layer sensor, 2# absciss layer sensor (as shown in Figure 1) be installed from 0.2 meter of right side group at middle part, tunnel 2 meter amperes in floor mounted absciss layer telemetry observation system.Set per 10 minutes and gather a secondary data, the absciss layer telemetry observation system is received and is deposited data file in behind the displacement data and handle.During processing, carry out according to second step in the technical scheme, processing procedure is sent warning as shown in Figure 4 when the absciss layer velocity rate is 0.6.
In processing procedure, can obtain 1# and the hodograph of 2# absciss layer sensor and absciss layer velocity rate figure shown in Figure 3 as shown in Figure 2.As can be seen from Figure 2, top board middle part 1# absciss layer sensor absciss layer speed 19mm/h during roof collapse, and only be 6mm/h by helping 2# absciss layer sensor absciss layer speed; As can be seen from Figure 3, top board middle part 1# absciss layer sensor and almost equal by the 2# of group absciss layer sensor absciss layer velocity rate during roof collapse is all about 0.6.Result of the test shows, though absciss layer sensor installation site difference, but the absciss layer velocity rate that finally monitors is almost equal, avoided that different early warning exerts an influence to roof collapse because of the absciss layer sensor is installed the position, this has fully verified the reliability and the science of this method for early warning, can effectively avoid the defective because of monitoring place branch Different Effects early warning result.

Claims (1)

1. the method for early warning of a down-hole mining space top board absciss layer is characterized in that, it may further comprise the steps:
(1) automatic reading is installed and stores the absciss layer sensor of data in the punching of monitoring place, in floor mounted absciss layer telemetry observation system, the absciss layer sensor is gathered the bed separation displacement data at regular intervals, and deposits transfer of data in associated data files to the absciss layer telemetry observation system;
(2) the bed separation displacement data are handled and roof delamination inbreak early warning
By the absciss layer telemetry observation system bed separation displacement data that collect are handled, concrete steps are:
1. the bed separation displacement data increment h to collecting nObtain absciss layer velocity amplitude v divided by data acquisition m blanking time n, i.e. v n=h n/ m;
Calculate a certain moment absciss layer velocity rate λ n, that is:
&lambda; n = v n 1 n &Sigma; i = 1 n v i
Limit absciss layer velocity rate λ when 2. monitoring place roof collapse is set n 1, i.e. absciss layer warning constant threshold;
3. judge a certain moment absciss layer velocity rate λ nWhether surpass the constant threshold values of setting,, judge that absciss layer is about to take place, make corresponding early warning as surpassing the constant threshold values.
CN2008100143692A 2008-03-10 2008-03-10 Down-hole mining space top board separation layer prealarming method Expired - Fee Related CN101240718B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100143692A CN101240718B (en) 2008-03-10 2008-03-10 Down-hole mining space top board separation layer prealarming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100143692A CN101240718B (en) 2008-03-10 2008-03-10 Down-hole mining space top board separation layer prealarming method

Publications (2)

Publication Number Publication Date
CN101240718A CN101240718A (en) 2008-08-13
CN101240718B true CN101240718B (en) 2010-06-16

Family

ID=39932502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100143692A Expired - Fee Related CN101240718B (en) 2008-03-10 2008-03-10 Down-hole mining space top board separation layer prealarming method

Country Status (1)

Country Link
CN (1) CN101240718B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102913285B (en) * 2012-11-02 2015-06-17 中滦科技有限公司 Mine roof hazard warning method
CN103244185B (en) * 2013-05-10 2015-06-24 山东科技大学 Early warning method for instability of bolt-supported roadway roof separation
CN103603690B (en) * 2013-11-14 2015-11-18 中国矿业大学 A kind of method of geologic radar detection roof delamination and accident early warning
CN113685230B (en) * 2021-04-08 2023-08-22 中铁十六局集团有限公司 Safety early warning method and device for tunnel construction process, medium and electronic equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818235A (en) * 2006-03-27 2006-08-16 天地科技股份有限公司 Determination of top-plate structural variation and separating layer
CN1834405A (en) * 2006-04-13 2006-09-20 山东科技大学 Remote monitoring precasting method of empty zone hard top plate

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1818235A (en) * 2006-03-27 2006-08-16 天地科技股份有限公司 Determination of top-plate structural variation and separating layer
CN1834405A (en) * 2006-04-13 2006-09-20 山东科技大学 Remote monitoring precasting method of empty zone hard top plate

Also Published As

Publication number Publication date
CN101240718A (en) 2008-08-13

Similar Documents

Publication Publication Date Title
CN105257339B (en) The multi-parameter integrated monitoring and pre-alarming method of driving face
CN101519963B (en) Filling mining multi-information dynamic monitoring method
CN103233777B (en) A kind of roof safety ore pressure monitor method and device
CN201251564Y (en) Device for monitoring stability of roof strata or concrete structure of well in real-time
CN113360592B (en) N00 construction method coal seam roof water inrush danger early warning method based on microseismic monitoring
CN101240718B (en) Down-hole mining space top board separation layer prealarming method
CN110609335A (en) Multi-means-based residual mining area complex condition detection method
CN104240133A (en) Acceptance inspection method of mine goaf caving and blasting treatment effect in conversion from underground mining to opencast mining
CN100494636C (en) Remote monitoring predicting method of empty zone hard top plate
CN107764323B (en) A kind of multi-parameter enclosed area risk Monitoring and forecasting system in real-time method
CN113586160B (en) Comprehensive-caving face water condition monitoring system based on artificial intelligence
Joass Stability monitoring on the West Wall of the Muja open cut
Fenton et al. Glaciotectonic deformation and geotechnical stability in open pit coal mining
CN113375753A (en) Method for monitoring and analyzing influence of coal mine fully mechanized mining face mining on underground water
Nicoll et al. Managing risks on an active haul road adjacent to a propagating subsidence zone at Telfer gold mine
Osasan Open-cast mine slope deformation and failure mechanisms interpreted from slope radar monitoring
Stöckel et al. Mining-induced ground deformations in Kiruna and Malmberget
Poulter et al. Geotechnical monitoring of the Carrapateena cave
Boyum Subsidence case histories in Michigan mines
Seedsman Failure modes and support of coal roofs
Beingessner et al. Post-shearing data collection with enhanced network smart markers
Simser et al. The Value of Recording Small Mining Induced Microseismic Events with Examples from Glencore’s Nickel Rim South Mine
Yun et al. Geotechnical challenges and strategies at McArthur River operation
Clayton et al. Development of a monitoring network for surface subsidence at New Gold's New Afton block cave operation
Shoaei et al. Prediction of Time to Failure in Creep Type Large-Scale Landslide

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100616

Termination date: 20130310