CN101230578A - Foundation structure of inland river wharf and construction method thereof - Google Patents
Foundation structure of inland river wharf and construction method thereof Download PDFInfo
- Publication number
- CN101230578A CN101230578A CNA2008100185252A CN200810018525A CN101230578A CN 101230578 A CN101230578 A CN 101230578A CN A2008100185252 A CNA2008100185252 A CN A2008100185252A CN 200810018525 A CN200810018525 A CN 200810018525A CN 101230578 A CN101230578 A CN 101230578A
- Authority
- CN
- China
- Prior art keywords
- deep
- foundation
- harbour
- pile
- mixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 11
- 238000011144 upstream manufacturing Methods 0.000 claims description 28
- 150000001875 compounds Chemical class 0.000 claims description 11
- 239000007921 spray Substances 0.000 claims description 6
- 239000011230 binding agent Substances 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000003756 stirring Methods 0.000 claims description 4
- 239000011398 Portland cement Substances 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- FGUUSXIOTUKUDN-IBGZPJMESA-N C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 Chemical compound C1(=CC=CC=C1)N1C2=C(NC([C@H](C1)NC=1OC(=NN=1)C1=CC=CC=C1)=O)C=CC=C2 FGUUSXIOTUKUDN-IBGZPJMESA-N 0.000 claims description 2
- 239000002689 soil Substances 0.000 abstract description 17
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 239000011150 reinforced concrete Substances 0.000 abstract description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 3
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000004567 concrete Substances 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 239000004568 cement Substances 0.000 description 4
- 238000013461 design Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 239000011440 grout Substances 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000004698 Polyethylene Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 235000019353 potassium silicate Nutrition 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 230000011218 segmentation Effects 0.000 description 1
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Foundations (AREA)
Abstract
The invention relates to a foundation structure of an inland river wharf and a construction method thereof, which mainly achieves the purposes of reinforcing a soft soil foundation and preventing water by arranging a plurality of deep mixing piles below a foundation pit and on the water-facing surface of the wharf and forming an underground continuous wall by the deep mixing piles, wherein reinforcing steel bars are inserted into the upper parts of the deep mixing piles, and part of the reinforcing steel bars are exposed out of pile heads of the deep mixing piles and are welded with reinforcing steel bars at the bottom of the foundation, thereby achieving the purpose of reinforcing the foundation. The invention can reduce the earthwork excavation, avoid the trouble caused by the excavation of the deep foundation pit and greatly facilitate the construction; the using amount of reinforced concrete can be reduced, the construction cost of the wharf is reduced, and the construction period is shortened.
Description
Technical field
The present invention relates to a kind of foundation structure and job practices thereof of inland terminal depot, belong to harbour Soft Ground field.
Background technology
Most of inland terminal depot all belongs to weak soil property, and this weak soil property has brought certain difficulty for the construction of navigation channel harbour.With the south of the lower reaches of the Yangtze River is example, and the stratum soil here mostly is miscellaneous fill, cohesive soil and mucky soil, and the degree of depth differs, and engineering geological conditions is relatively poor; Under such soil property situation, run into when building the inland terminal depot more than 500 tonnes that the problem of trouble is a treatment of soft ground, especially the processing of the silt soil strata of shape is moulded in convection current.
On navigation channels such as Grand Canal, Wujiang and Chang Hu Shen line, build harbour; Shi Changhui runs into bed thickness is moulded shape above 10 meters stream silt soil strata; reach the navigation requirement of 500 tonnes of boats and ships for the depth of water before the wall that guarantees harbour; the harbour basis must be arranged under water more than 3 meters, and the cutting depth of foundation ditch is at 4.5---5.0 rice.Construction subject matter is: it is very difficult one, to dig dell in stream is moulded the silt soil strata of shape; Two, in being in the deep foundation ditch with rheological formation, the rheological behavior of soil also can cause the distortion of foundation ditch, and the construction period maintenance cost after foundation ditch forms is very expensive.Therefore the excavation of deep foundation ditch and maintenance are suitable difficulties, must drop into finishing smoothly that bigger fund and energy just can guarantee to construct.
Summary of the invention
The purpose of this invention is to provide a kind of harbour foundation structure and job practices thereof that can reduce difficulty of construction and construction cost, can reduce the difficulty of excavation of foundation pit, simultaneously effective strengthening soft foundation.
For achieving the above object, the technical solution adopted in the present invention is: a kind of foundation structure of inland terminal depot, it comprises foundation ditch, branch many deep-mixed piles below described foundation ditch, the top of described deep-mixed pile is inserted with reinforcing bar, and described reinforcing bar has part to expose the pile crown of described deep-mixed pile and weld together with the reinforcing bar of foundation bottom, wherein the part deep-mixed pile is arranged on the upstream face of harbour, and many deep-mixed piles of described harbour upstream face overlap the formation diaphragm wall mutually.
The diaphragm wall of described harbour upstream face is double diaphragm wall.
The thickness of the diaphragm wall of described harbour upstream face is 100~120cm.
Another technical scheme of the present invention is: a kind of foundation construction method of inland terminal depot is characterized in that: it comprises
The location of a, deep-mixed pile: the position of below foundation ditch, determining deep-mixed pile with the upstream face of harbour;
The construction of b, deep-mixed pile: machine is in place, and stirring-head sinks down into set depth, and the ejection curing compound promotes stirring-head simultaneously, repeats to stir sinking, promotes, sprays curing compound, rises to the aperture until stirring-head;
C, stirring-head displacement make the above-mentioned deep-mixed pile that is positioned at the harbour upstream face form diaphragm wall;
D, on the top of described deep-mixed pile with inserting reinforcing bar;
E, foundation construction;
F, the pile crown of described deep-mixed pile is partly cut, and the part reinforcing bar that exposes in the described deep-mixed pile and the reinforcing bar of foundation bottom are welded together.
The diaphragm wall of described harbour upstream face is double diaphragm wall, and the thickness of the diaphragm wall of described harbour upstream face is 100~120cm.
The lap width of described diaphragm wall adjacent studs when construction is more than 10 centimetres.
In step f, described cutting highly is 40 to 75 centimetres.
Be inserted with many reinforcing bars in the described deep-mixed pile, and described reinforcing bar is root shape layout in described deep-mixed pile.
Described curing compound is a portland cement, and the water/binder ratio of described curing compound is 1: 1~1.5: 1.
The present invention's advantage compared with prior art: the present invention utilizes deep-mixed pile that double-deck protecting wall is set below foundation ditch, wherein the diaphragm wall of harbour upstream face is the double action that plays dash and load-bearing, the deep-mixed pile of back then is the effect of mainly playing load-bearing, plays effects such as certain antiskid is moving, dash simultaneously.The present invention is originally as the deep-mixed pile of the pit maintenance soil part as permanent body of wall, raise the height of foundation of reinforced concrete wall, therefore significantly reduced soil excavation (only for conventional design about 20%), the trouble of thoroughly having avoided deep pit digging to bring greatly facilitates construction; Significantly reduced the consumption (be about conventional design 1/3) of steel concrete, not only reduced the harbour cost about half, also shortened the construction period, made it shorten to 1.5 months from 3 months of routine.
Description of drawings
Accompanying drawing 1 is the schematic diagram of the inland terminal depot in the embodiments of the invention one;
Accompanying drawing 2 is the deep-mixed pile schematic diagram of arranging;
Accompanying drawing 4 is the schematic diagram of the inland terminal depot in the embodiments of the invention two;
Wherein: 1, horsestone steel bar concrete; 2, basis; 3, foundation ditch; 4, roadbed; 5, road surface; 6, gutter; 7, deep-mixed pile; 8, reinforcing bar; 9, old revetment;
The specific embodiment
Accompanying drawing 1 to accompanying drawing 3 is embodiments of the invention one, it discloses a kind of foundation structure of inland terminal depot, it comprises foundation ditch 3, be distributed in the many deep-mixed piles 7 of described foundation ditch 3 belows, be arranged on the many deep-mixed piles 7 of harbour upstream face, the top of described deep-mixed pile 7 is inserted with reinforcing bar 8, and described reinforcing bar 8 has part to expose the pile crown of described deep-mixed pile 7 and weld together with the reinforcing bar of basic 2 bottoms, wherein, the many deep-mixed piles 7 of described harbour upstream face overlap joint mutually form diaphragm wall, this diaphragm wall is when construction, the lap width of adjacent deep-mixed pile 7 is not less than 10 centimetres, for guarantee effectively to block water and resistance wall after soil pressure, the diaphragm wall of described harbour upstream face preferably adopts double diaphragm wall system, and all the other deep-mixed piles that are positioned at foundation ditch 3 belows then 7 can be designed to single pile formula or platoon formula according to actual carrying capacity.Wherein the diaphragm wall of harbour upstream face is the double action that plays dash and load-bearing, and the deep-mixed pile of back then is the effect of mainly playing load-bearing, plays effects such as certain antiskid is moving, dash simultaneously.
The thickness of the diaphragm wall of described harbour upstream face is 100~120cm.
Below structure of the present invention and job practices are at large described:
The construction machinery of deep-mixed pile 7 is selected diaxon machine or single shaft machine for use, and the stake footpath is 50 centimetres, and 70 centimetres of diameters are stirred in spray, and the wheelbase of diaxon machine is 50 centimetres.Construct according to following step:
The location of a, deep-mixed pile 7: below foundation ditch 3, determine the position of deep-mixed pile 7, can realize by linear location and elevation location with the harbour upstream face of foundation ditch 3 peripheries;
The construction of b, deep-mixed pile 7: machine is in place, and stirring-head sinks down into set depth, and the ejection curing compound promotes stirring-head simultaneously; Repeat to stir sinking, promote, spray curing compound, rise to the aperture until stirring-head;
C, stirring-head or mixer displacement make the above-mentioned deep-mixed pile 7 that is positioned at the harbour upstream face form diaphragm wall;
D, on the top of described deep-mixed pile 7 with inserting reinforcing bar 8;
E, basis 2 constructions;
F, the pile crown of described deep-mixed pile 7 is partly cut, and the part reinforcing bar 8 that exposes in the described deep-mixed pile 7 reinforcing bar with basic 2 bottoms is welded together.
The dock crash-proof part of the force still is designed to steel concrete, it is the horsestone steel bar concrete 1 in the accompanying drawing 1, basis 2 is a reinforced concrete wall, above-mentioned horsestone steel bar concrete 1 uses 12 millimeters of diameters, 30 * 30 reinforced mesh, above-mentioned basic 2 use 14 millimeters of diameters, 30 * 30 reinforced mesh, backfill railway ballast in the foundation ditch 3, the railway ballast upside wraps up with geotextiles, insert 6%~8% rendzinas and do roadbed 4, road surface pavement 5 on the roadbed 4, and road surface 5 is 12 millimeters of application diameters, 30 * 30 reinforced mesh too, from foundation ditch 3 to a PVC gutter 6 is set the harbour upstream face.
Wherein the essentials for Construction Control of deep-mixed pile 7 is as follows:
1, the curing compound of rotary churning pile slurries can be selected Portland cement for use 32.5, No. 42.5, and the water/binder ratio of this cement grout should elect 1: 1 as according to the needs of soil stabilization intensity~and 1.5: 1.Also can add chemical auxiliary material and admixtures such as water glass in the cement grout, and Admixtures such as rapid hardening, strong, suspension early because the harbour engineering is nearly water operation, so the water/binder ratio of these chemical auxiliary material generally get 0.8: 1~1: 1 proper.
2, rig is laid and should be guaranteed enough planeness and verticality, and the drilling rod gradient must not be greater than 1%, and the deviation of boring Kong Weiyu design attitude must not be greater than 50mm.
3, cement paste is mixed the system system and should be furnished with reliable metering device; The whitewashing system should be equipped with checkout gears such as flowmeter, pressure gauge; In the whitewashing process, control device and measure should be arranged to hoisting velocity.Reply slurry flow, spray pressure, nozzle hoisting velocity etc. are demarcated before the construction.
4, cement paste should stir in last hour of churning, and leakage amount should be controlled at 10~25% in the churning process.Adjacent two pile driving constructions should be not less than 48 hours blanking time; If the deep-mixed pile 7 of foundation ditch 3 belows and harbour upstream face all makes diaphragm wall, construction continuously when then constructing.
5, the rotation of drilling rod and lifting must not interrupted continuously in the formation of pile, and when dismounting drilling rod continued spray, the Grouting Pipe lap length must not be less than 10cm;
6, the construction of inserting reinforcing bar 8 must be closelyed follow rig, must finish in 1 hour behind the pile, and the degree of depth of insertion must meet design requirement, and generally is advisable with 1/3~2/3 of deep-mixed pile 7 height; For the basis 2 that makes deep-mixed pile 7 and upper strata can be better in conjunction with and resistance wall after the needs of soil body lateral pressure, can be in deep-mixed pile 7 close slotting reinforcing bar 8, direction of insertion distributes along the root shape that axially is of deep-mixed pile 7.
7, first of the harbour upstream face genuine down diaphragm wall, for can guarantee effectively to block water and resistance wall after soil pressure, should adopt double diaphragm wall system, thickness is 100~120cm; The diaphragm wall of foundation ditch 3 belows then can be designed to single pile formula or platoon formula according to actual carrying capacity.
8, deep-mixed pile 7 pile crowns partly cut 40 to 75 centimetres, cut 50 centimetres high usually; The reinforcing bar 8 that inserts deep-mixed pile 7 welds together with basic 2 reinforcing bars, can be convenient to like this combine better with harbour basis 2, strengthens the globality of harbour.
Accompanying drawing 4 is embodiments of the invention two, and it is to construct on the basis of old harbour revetment, can reduce construction cost.During construction, at first directly the body of wall of old revetment 9 is reinforced with deep-mixed pile 7, diaphragm wall can be provided with bilayer or individual layer, after forming certain intensity its body of wall with old revetment 9 (ordinary water level is following) is connected as a single entity, make it to become the combined wall of upstream face, mainly bear the dash effect, subsequent processing steps and embodiment one are basic identical.The old revetment segmentation of newly-built harbour basis, the intersegmental 2 centimeter of polyethylene settlement joint of establishing, turning point is established settlement joint equally.1.5 meters platform, 1.0 meters of platform heights are stayed in dredging before the wall.Embodiment two and routine are beaten the castinplace pile processing mode and are compared funds and saved 1/3rd, and advantage economically is fairly obvious, and the construction period also has only half of conventional method.
Claims (10)
1. the foundation structure of an inland terminal depot, it is characterized in that: it comprises foundation ditch, branch many deep-mixed piles below described foundation ditch, the top of described deep-mixed pile is inserted with reinforcing bar, and described reinforcing bar has part to expose the pile crown of described deep-mixed pile and weld together with the reinforcing bar of foundation bottom, wherein the part deep-mixed pile is arranged on the upstream face of harbour, and many deep-mixed piles of described harbour upstream face overlap the formation diaphragm wall mutually.
2. the foundation structure of inland terminal depot according to claim 1, it is characterized in that: the diaphragm wall of described harbour upstream face is double diaphragm wall.
3. the foundation structure of inland terminal depot according to claim 1, it is characterized in that: the thickness of the diaphragm wall of described harbour upstream face is 100~120cm.
4. the foundation construction method of an inland terminal depot, it is characterized in that: it comprises
The location of a, deep-mixed pile: the position of below foundation ditch, determining deep-mixed pile with the upstream face of harbour;
The construction of b, deep-mixed pile: machine is in place, and stirring-head sinks down into set depth, and the ejection curing compound promotes stirring-head simultaneously, repeats to stir sinking, promotes, sprays curing compound, rises to the aperture until stirring-head;
C, stirring-head displacement make the above-mentioned deep-mixed pile that is positioned at the harbour upstream face form diaphragm wall;
D, on the top of described deep-mixed pile with inserting reinforcing bar;
E, foundation construction;
F, the pile crown of described deep-mixed pile is partly cut, and the part reinforcing bar that exposes in the described deep-mixed pile and the reinforcing bar of foundation bottom are welded together.
5. the foundation construction method of inland terminal depot according to claim 4, its feature also is: the diaphragm wall of described harbour upstream face is double diaphragm wall.
6. the foundation construction method of inland terminal depot according to claim 4, its feature also is: the thickness of the diaphragm wall of described harbour upstream face is 100~120cm.
7. the foundation construction method of inland terminal depot according to claim 4, its feature also is: the lap width of described diaphragm wall adjacent studs when construction is more than 10 centimetres.
8. the foundation construction method of inland terminal depot according to claim 4, its feature also is: in step f, described cutting highly is 40 to 75 centimetres.
9. the foundation construction method of inland terminal depot according to claim 4, its feature also is: be inserted with many reinforcing bars in the described deep-mixed pile, and described reinforcing bar is the root shape and arranges in described deep-mixed pile.
10. the foundation construction method of inland terminal depot according to claim 4, its feature also is: described curing compound is a portland cement, and the water/binder ratio of described curing compound is 1: 1~1.5: 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100185252A CN101230578B (en) | 2008-02-20 | 2008-02-20 | Substructure of inland river dock and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100185252A CN101230578B (en) | 2008-02-20 | 2008-02-20 | Substructure of inland river dock and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101230578A true CN101230578A (en) | 2008-07-30 |
CN101230578B CN101230578B (en) | 2010-10-27 |
Family
ID=39897361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100185252A Expired - Fee Related CN101230578B (en) | 2008-02-20 | 2008-02-20 | Substructure of inland river dock and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101230578B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114875841A (en) * | 2022-04-18 | 2022-08-09 | 中铁上海设计院集团有限公司 | River course revetment reconstruction method adjacent to railway pier |
CN115478512A (en) * | 2022-10-21 | 2022-12-16 | 中交第三航务工程勘察设计院有限公司 | Gantry rigid frame wharf structure and construction method thereof |
-
2008
- 2008-02-20 CN CN2008100185252A patent/CN101230578B/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114875841A (en) * | 2022-04-18 | 2022-08-09 | 中铁上海设计院集团有限公司 | River course revetment reconstruction method adjacent to railway pier |
CN114875841B (en) * | 2022-04-18 | 2023-05-23 | 中铁上海设计院集团有限公司 | River revetment reconstruction method for adjacent railway bridge piers |
CN115478512A (en) * | 2022-10-21 | 2022-12-16 | 中交第三航务工程勘察设计院有限公司 | Gantry rigid frame wharf structure and construction method thereof |
CN115478512B (en) * | 2022-10-21 | 2024-02-06 | 中交第三航务工程勘察设计院有限公司 | Portal rigid frame wharf structure and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN101230578B (en) | 2010-10-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106545005B (en) | A kind of reinforcing body and reinforcement means of subway tunnel shield end | |
CN108797598A (en) | The construction technology of pre-loaded support struts in a kind of deep basal pit | |
CN104846810A (en) | Self-circulating posterior grouting bored pile construction method | |
CN102518135A (en) | Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles | |
CN106088127A (en) | Open caisson construction method | |
CN101457526A (en) | Circular deep foundation ditch concrete pile arranging support and major structure inversing construction method | |
CN102966110A (en) | Vertically-combined type impermeable waterproof curtain structure and construction method thereof | |
CN108193642A (en) | A kind of revetment reinforces facility and its construction method | |
CN106869151A (en) | A kind of bridge construction method of deep foundation ditch | |
CN101481911A (en) | Construction method for special underground continuous wall | |
CN101225664A (en) | Caisson dock structure and construction method therefor | |
CN106193082A (en) | Stake raft construction technology in a kind of Shallow-buried soft plastomer Karst Tunnel | |
CN102561371A (en) | Steel caisson enclosure structure at island-tunnel combination part | |
CN102235007B (en) | Method for supporting deep foundation with upper nail-lower pile combination | |
CN102383442B (en) | Water inlet pump chamber construction method | |
CN206971247U (en) | Concrete toe board foundation reinforcing structure arranged on unloading rock mass | |
CN205776282U (en) | A kind of immersed tube tunnel rebuilds cofferdam structure | |
CN101230578B (en) | Substructure of inland river dock and construction method thereof | |
CN105839653B (en) | A kind of immersed tube tunnel rebuilds the construction method of seepage prevention of cofferdam system | |
CN111254877A (en) | Channel deep ballast rapid construction method | |
CN102433887A (en) | Construction method of sand replacement mixing pile impervious wall | |
CN113685190B (en) | Reinforcing system for shield to penetrate shallow soft clay and construction method | |
CN211171922U (en) | Construction structure for improving stability of groove wall | |
CN106192880B (en) | The box harbour of L-type and its method of construction | |
CN106149624A (en) | A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101027 Termination date: 20130220 |