CN101191407A - Well drilling method for shallow layer thick oil branching well - Google Patents

Well drilling method for shallow layer thick oil branching well Download PDF

Info

Publication number
CN101191407A
CN101191407A CNA2006101644162A CN200610164416A CN101191407A CN 101191407 A CN101191407 A CN 101191407A CN A2006101644162 A CNA2006101644162 A CN A2006101644162A CN 200610164416 A CN200610164416 A CN 200610164416A CN 101191407 A CN101191407 A CN 101191407A
Authority
CN
China
Prior art keywords
branch
well
hole
main
thick oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2006101644162A
Other languages
Chinese (zh)
Inventor
王新
林晶
刘灵
李燕
王凤屏
王芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Karamay Drilling Technology Institute of CNPC Western Drilling Engineering Co Ltd
Original Assignee
Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Drilling Technology Research Institute of Xinjiang Petroleum Administration filed Critical Drilling Technology Research Institute of Xinjiang Petroleum Administration
Priority to CNA2006101644162A priority Critical patent/CN101191407A/en
Publication of CN101191407A publication Critical patent/CN101191407A/en
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a drilling method for a superficial thick oil branch well. The technical proposal of the invention is that: construction is performed in turn according to position sequence of branch points of various branch wellbores on a main horizontal wellbore; when a section of main wellbore is drilled in every time and a drill bit reaches the branch points of the branch wellbores, the branch wellbores are drilled at first and the drill bit is lifted to the branch points of the branch wellbores, and then the next section of the main wellbore is drilled into until the drilling operation of all parts of the branch wellbores and the main wellbore is completed. The drilling method provided by the invention mainly aims to realize that the branch well technology is utilized to exploit superficial thick oil reservoirs.

Description

A kind of boring method of shallow layer thick oil branching well
Technical field
The present invention relates to the oilfield drilling operation, especially a kind of boring method of shallow layer thick oil branching well.
Background technology
The branch hole drilling completion technique is subjected to showing great attention to of domestic and international oil industry, and it is asserted at the beginning of 21 century first of the most potential drilling well new technology by the international petroleum brainstrust, has represented the direction of 21 century drilling well development.For the shallow layer thick oil oil reservoir of common employing heat extraction by steam injection, some exposed branch well holes if can distribute at the net horizontal section of shallow layer thick oil horizontal well, for increasing involving scope, improving thick oil recovery ratio and be highly profitable of steam injection, the main horizontal hole of this shallow layer thick oil oil pool branch well requires to adopt tubing string that slot pipe etc. can provide oil stream and steam channel hole as completion tubular column, the mode that the branch horizontal well eye then can adopt bore hole to finish.So, the key issue that the shallow layer thick oil branching well faces is exactly: after the finishing drilling, main horizontal hole must guarantee the ability of reentrying, to guarantee being lowered to smoothly of main horizontal hole completion tubular column, and for branch well hole, the not specific (special) requirements of reentry property aspect, direct bore hole is finished and is got final product after the finishing drilling.Because shallow layer thick oil oil reservoir buried depth is all more shallow, the complexity of conventional Multilateral Wells technology and invest high characteristics and make this technology in the exploitation of shallow layer thick oil oil reservoir, use to be subject to significant restrictions.At present, Shang Weiyou can take into account the shallow layer thick oil branching well drilling technology that cost is low, construction is simple, the high many-side of reliability requires.
Summary of the invention
The object of the present invention is to provide a kind of boring method of simple and easy to do shallow layer thick oil branching well,, reduce the drilling cost of shallow layer thick oil oil reservoir, improve the individual well recovery ratio to improve and supporting shallow layer thick oil branching well technology.
The boring method of shallow layer thick oil branching well provided by the invention, be meant from a main horizontal hole both sides sidetracking and go out a plurality of branch horizontal well eyes, main horizontal hole is lowered to screen casing, branch well hole adopts the boring method of barefoot completion, the following technology of main employing of creeping into of its horizontal hole is drilled to: construct successively in the priority sequence of positions of main horizontal hole according to each branch well hole branch point, creep into one section main borehole earlier at every turn, when drill bit arrives the bifurcation of branch well hole, subdrilling finishes branch well hole, the bifurcation of branch well hole will be mentioned then on the drill bit, then creep into next section of main borehole, up to the work of creeping into of finishing whole branch well holes and main borehole.
When main borehole is drilled into design branch point position, in the time of need be from the sorrowful brill branch well hole of main borehole, be strayed into branch well hole for preventing down brill, adjust the track control method that well track creeps into again behind the certain distance of can taking to climb earlier after each branch well hole branch.
In addition, excessive for preventing that unsettled sidetracked hole section direction of deflection from changing, track is out of control, when unsettled sidetracking was proceeded creeping into of main borehole after branch well hole was finished, can carry out according to following steps:
(1) at first, put on repeatedly slowly at the curved screw rod of same direction utilization and put directed reaming;
(2) secondly, produce step or new well in predetermined sidetracking location fixes;
(3) Controlling Borehole Trajectory is normally crept into then.
The major advantage of shallow layer thick oil branching well provided by the invention is: the present invention is by taking suitable processing step, by taking effectively to have guaranteed the reenterability of main borehole by the reasonable control of the well track of the overall working procedure behind the forward direction and branch point place branch well and main borehole, the entire job process need not to use special drillng operation instrument can realize the reentry of main borehole after the sidetracking at branch point place and the finishing drilling, has the advantages that technology is simple, operating risk is low.
The specific embodiment
Below in conjunction with instantiation the present invention is further detailed.
It is as follows to adopt branch hole drilling method provided by the invention to finish the concrete work progress of a bite shallow layer thick oil branching well:
(1) finishing creeping into of top well section, for the shallow layer thick oil branching well, generally all is to finish creeping into of top straight well section and angle buildup interval, bores the starting point that reaches horizontal segment, next:
(2) with protective casing down to the precalculated position, cementing well;
(3) adopt the drill bit of little one-level size to spud in once more, creeping into all of following main borehole and branch well hole can be adopted following drilling assembly: drill bit+list is bent screw rod+ball-type centralizer+no magnetic pressure-bearing drilling rod+MWD pipe nipple+no magnetic pressure-bearing drilling rod+heavy weight drill pipe+slope drilling rod+heavy weight drill pipe+slope drilling rod;
When (4) being drilled into the first branch point place, the well orientation according to first branch well hole utilizes the screw rod directional drilling, requires at first branch well hole to climb at the branch point place in this process and creeps into, with the vertical depth of the branch well hole 2~3m that rises.Mainly be consider branch well hole finish carry brill after, be drilled into main borehole down once more, prevent that drilling tool is strayed into this branch well hole;
(5) after climbing is crept into, creep into according to oil reservoir situation increasing hole angle or drop angle control Multilateral Wells well track again;
After (6) first branch well holes are finished, in pit shaft, replace, to safeguard the follow-up wellbore stability that creeps into this branch well hole in the operation into diesel oil;
(7) carry and be drilled into the branch point place, utilize screw rod towards the opposite azimuthal orientation reaming of branch well hole, and get out step, continue main borehole then and creep into;
Repeat above-mentioned steps when (8) being drilled into the branch point place of second branch well hole, finish second and the creeping into of follow-up all branch well holes and main borehole.

Claims (3)

1. the boring method of a shallow layer thick oil branching well, be meant that going out a plurality of branch horizontal well eyes, main horizontal hole from a main horizontal hole both sides sidetracking is lowered to the boring method that screen casing, branch well hole adopt barefoot completion, it is characterized in that horizontal hole adopts following method to be drilled to:
Construct successively in the priority sequence of positions of main horizontal hole according to each branch well hole branch point, creep into one section main borehole earlier at every turn, when drill bit arrives the bifurcation of branch well hole, subdrilling finishes branch well hole, the bifurcation of branch well hole will be mentioned then on the drill bit, then creep into next section of main borehole, up to the work of creeping into of finishing whole branch well holes and main borehole.
2. the boring method of shallow layer thick oil branching well according to claim 1, it is characterized in that: when main borehole is drilled into design branch point position from main borehole sidetracking branch well hole, be strayed into branch well hole for preventing from down to bore, adjust the hole trajectory control technology that well track creeps into again behind the certain distance of taking after each branch well hole branch to climb earlier.
3. according to the boring method of claim 1 or 2 described shallow layer thick oil branching wells, it is characterized in that, when unsettled sidetracking was proceeded creeping into of main borehole after branch well hole was finished, carry out according to following steps:
(1) at first, put on repeatedly slowly at the curved screw rod of same direction utilization and put directed reaming;
(2) secondly, produce step or new well in predetermined sidetracking location fixes;
(3) then, Controlling Borehole Trajectory is normally crept into.
CNA2006101644162A 2006-11-30 2006-11-30 Well drilling method for shallow layer thick oil branching well Pending CN101191407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2006101644162A CN101191407A (en) 2006-11-30 2006-11-30 Well drilling method for shallow layer thick oil branching well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2006101644162A CN101191407A (en) 2006-11-30 2006-11-30 Well drilling method for shallow layer thick oil branching well

Publications (1)

Publication Number Publication Date
CN101191407A true CN101191407A (en) 2008-06-04

Family

ID=39486593

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2006101644162A Pending CN101191407A (en) 2006-11-30 2006-11-30 Well drilling method for shallow layer thick oil branching well

Country Status (1)

Country Link
CN (1) CN101191407A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806207A (en) * 2010-04-26 2010-08-18 徐萍 Horizontal well three-dimensional intersection well pattern structure
CN101818620A (en) * 2010-04-26 2010-09-01 徐萍 Mining method for maximum reservoir contact well and maximum reservoir contact well structure
CN101975048A (en) * 2010-10-19 2011-02-16 陕西龙门天地煤层气技术工程有限公司 Construction process of multi-branch underground screen pipe
CN102182403A (en) * 2011-04-28 2011-09-14 王萍萍 Drilling type well completion technology for fishbone branch borehole
CN101672159B (en) * 2009-10-23 2012-09-05 大庆油田有限责任公司 Vertical well wall small-bore bare hole horizontal well drilling method for oil-water well
CN106609657A (en) * 2015-10-22 2017-05-03 中国石油化工股份有限公司 Drilling tool assembly and method for well drilling with same
CN106609656A (en) * 2015-10-22 2017-05-03 中国石油化工股份有限公司 An open hole side tracking construction method for ultra-deep hard formations
CN106761624A (en) * 2015-11-24 2017-05-31 中国石油化工股份有限公司 The method for improving heavy crude reservoir edge reserves exploitation rate
CN111197461A (en) * 2020-01-19 2020-05-26 北京中海沃邦能源投资有限公司 Horizontal well suspended sidetracking method and sidetracking tool

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672159B (en) * 2009-10-23 2012-09-05 大庆油田有限责任公司 Vertical well wall small-bore bare hole horizontal well drilling method for oil-water well
CN101806207A (en) * 2010-04-26 2010-08-18 徐萍 Horizontal well three-dimensional intersection well pattern structure
CN101818620A (en) * 2010-04-26 2010-09-01 徐萍 Mining method for maximum reservoir contact well and maximum reservoir contact well structure
CN101818620B (en) * 2010-04-26 2013-04-10 徐萍 Mining method for maximum reservoir contact well
CN101975048A (en) * 2010-10-19 2011-02-16 陕西龙门天地煤层气技术工程有限公司 Construction process of multi-branch underground screen pipe
CN101975048B (en) * 2010-10-19 2013-12-25 陕西龙门天地油气技术有限公司 Construction process of multi-branch underground screen pipe
CN102182403A (en) * 2011-04-28 2011-09-14 王萍萍 Drilling type well completion technology for fishbone branch borehole
CN102182403B (en) * 2011-04-28 2016-06-29 王萍萍 Drilling type well completion technology for fishbone branch borehole
CN106609657A (en) * 2015-10-22 2017-05-03 中国石油化工股份有限公司 Drilling tool assembly and method for well drilling with same
CN106609656A (en) * 2015-10-22 2017-05-03 中国石油化工股份有限公司 An open hole side tracking construction method for ultra-deep hard formations
CN106761624A (en) * 2015-11-24 2017-05-31 中国石油化工股份有限公司 The method for improving heavy crude reservoir edge reserves exploitation rate
CN111197461A (en) * 2020-01-19 2020-05-26 北京中海沃邦能源投资有限公司 Horizontal well suspended sidetracking method and sidetracking tool

Similar Documents

Publication Publication Date Title
CN101191407A (en) Well drilling method for shallow layer thick oil branching well
Bosworth et al. Key issues in multilateral technology
CN104790918B (en) Method for mining coal bed gas from cluster well and horizontal well combined ground under complex terrain condition
CA2762439C (en) Improving recovery from a hydrocarbon reservoir
CN111594130B (en) Method for integrated periodical production of encryption adjustment of pressure, injection and extraction
CN104912480B (en) Coal bed gas near-end docks the brill completion method of horizontal well
Blikra et al. [4] 2 Extended Reach, Horizontal and Complex Design Wells: Challenges, Achievements and Cost-Benefits
Stanley et al. Global application of coiled-tubing acid tunneling yields effective carbonate stimulation
CN105625944B (en) Drilling method for sidetracking horizontal well with same diameter as original well shaft
Longbottom et al. Development, Testing, and Field Case Histories of Multilateral Well Completion Systems
CA2395746A1 (en) Method and apparatus for a combined exit guide and sectional mill for sidetracking
Fipke et al. Economical Multilateral Well Technology for Canadian Heavy Oil
CN202596577U (en) Radial horizontal well orienting device
Bosio et al. [11] HORIZONTAL DRILLING–A NEW PRODUCTION METHOD
Konopczynski et al. A novel approach to initiating multi-lateral horizontal wells
CN115577648A (en) Pipe column friction resistance calculation method and system for constant-pressure radial hydraulic drilling
Lentsch et al. First Multilateral Deep Geothermal Well in the South German Molasse Basin
LIU et al. Geosteering technology and CBM horizontal well drilling without pilot hole [J]
Shen et al. The Advanced Technology of Drilling and Completion for CBM in China
CN112160714B (en) Safe drilling method for long well section coiled tubing
CN116025328B (en) Stacked horizontal well gas production system with inclined-vertical gas bearing layers and construction method
RU2813423C1 (en) Multilateral well construction method
Dayabu et al. New technologies in drilling
CN202659183U (en) Multifunctional downhole positioning device for oil drilling and production
Cooney et al. Case History of an Opposed-Bore, Dual Horizontal Well in the Austin Chalk Formation of South Texas

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20081219

Address after: Hongyan road Karamay City, No. 80 the Xinjiang Uygur Autonomous Region post encoding: 834000

Applicant after: Western Drilling Kelamayi Drilling Technology Institute

Address before: Hongyan road Karamay City, No. 80 the Xinjiang Uygur Autonomous Region post encoding: 834000

Applicant before: Research Inst of Drilling Technology, Xinjiang Petroleum Administration

ASS Succession or assignment of patent right

Owner name: WEST DRILLING KARAMAY DRILLING CRAFT RESEARCH INST

Free format text: FORMER OWNER: DRILLING WELL TECHNOLOGY INSTITUTE, PETROLEUM ADMINISTRATION BUREAU, XINJIANG

Effective date: 20081219

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080604